Review Type |
Outcome |
Est. Completion Date |
Completed |
Record Drawings Review
|
Approved with Conditions
|
11/30/2022
|
12/12/2022
|
|
Mike Weisenborn
|
|
|
Record Drawings Review
|
No Comments
|
10/06/2022
|
10/04/2022
|
|
Sue Pyles, P.E.
|
|
|
Engineering Review
|
Approved with Conditions
|
03/25/2022
|
03/18/2022
|
|
Loic Nguinguiri, E.I.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
|
|
|
Redesign Review
|
No Comments
|
03/18/2022
|
03/18/2022
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
Show and label the required aggregate course (crushed stone layer) in the concrete pavement cross section view, shown on sheet C11.
|
|
Corrective Action Required
Please revise the detail note shown on sheet C11 to state that “Aggregate base and compacted subgrade must extend 1’ beyond back of curb” under the concrete pavement detail. And that “Aggregate base and chemically stabilized subgrade must extend 1’ beyond back of curb” under the asphalt pavement detail.
|
|
|
Building Codes Review
|
No Comments
|
03/25/2022
|
03/18/2022
|
|
Scott Ready
|
|
|
Traffic Review
|
No Comments
|
03/25/2022
|
03/18/2022
|
|
Scott Ready
|
|
|
Fire Review
|
Approved with Conditions
|
03/25/2022
|
03/18/2022
|
|
Scott Ready
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018International Fire Code.
|
|
|
Planning Review
|
No Comments
|
03/25/2022
|
03/18/2022
|
|
Scott Ready
|
|
|
Redesign Review
|
Corrections
|
02/02/2022
|
02/03/2022
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
On sheet C7, the proposed 6” curb should not cross over the opening of the proposed concrete flume, to the east.
|
|
Corrective Action Required
On sheet C7, does keyed note AQ refer to a 6’ or 6” concrete curb ?
|
|
Corrective Action Required
On sheets C8 and C8A, keyed note A appears to be pointing at the wrong location. Please revise.
|
|
Corrective Action Required
On sheet C8A, revise the G998.55 proposed elevation at the low point of the swale, since it is higher than both the preceding G998.24 and the succeeding G998.0 middle elevations.
|
|
Corrective Action Required
Revise the accuracy of the data for post-2 and post-3 drainage areas shown in the post-development stormwater runoff calculations table, on sheet C9.
|
|
Corrective Action Required
In the concrete slab detail shown on sheet C11, revise detail note 5 to mention that “base must extend 1’ beyond back of curb”.
|
|
Corrective Action Required
Update the landscape and irrigation sheets to reflect the changes (i.e. the new proposed flumes, to the northwest and northeast corners). A proposed ornamental tree might need to be relocated, as a result.
|
|
Corrective Action Required
Revise the typical trenching detail shown on sheet IR-3.1 to show bedding aggregate to be placed from a level 6 inches (minimum) below the bottom of the pipe to a level 12 inches (minimum) above the top of the pipe.
|
|
|
Engineering Review
|
Approved with Conditions
|
08/05/2021
|
07/30/2021
|
|
Loic Nguinguiri, E.I.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $7,624.66
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
|
|
|
Building Codes Review
|
No Comments
|
08/05/2021
|
07/29/2021
|
|
Mike Weisenborn
|
|
|
Planning Review
|
No Comments
|
08/05/2021
|
07/29/2021
|
|
Mike Weisenborn
|
|
|
Traffic Review
|
No Comments
|
08/05/2021
|
07/29/2021
|
|
Mike Weisenborn
|
|
|
Fire Review
|
Approved with Conditions
|
08/05/2021
|
07/29/2021
|
|
Mike Weisenborn
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018International Fire Code.
|
|
|
Engineering Review
|
Corrections
|
07/28/2021
|
07/27/2021
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
Respectively on sheet C3 and C4, add the meaning of WP and PS (show on plan view) in the legend.
|
|
Corrective Action Required
Proposed midway elevation (G 998.60’), at the discharging point along proposed swale, appears to be higher than its edges (G 998.24’ and ME G 998.00’). Remove the leader or revise as necessary.
|
|
Corrective Action Required
Add the missing bend, shown on plan view, within structure type 3 in the sanitary structure table.
|
|
Corrective Action Required
Revise the trench section detail on sheet C25 to show the 12”-thick minimum layer of granular bedding (aggregate fill) required above the edge of utility pipe.
|
|
Corrective Action Required
Sequence of construction, shown on sheet C3, still lists installation of storm sewers under phase 2, activity 2. Revise, as shown on sheet C4.
|
|
Corrective Action Required
Please provide an Engineer’s Opinion of Probable Construction Cost (EOOPCC) sheet, for the civil site work expected to occur on-site.
|
|
|
Traffic Review
|
No Comments
|
07/28/2021
|
07/22/2021
|
|
Mike Weisenborn
|
|
|
Planning Review
|
No Comments
|
07/28/2021
|
07/22/2021
|
|
Mike Weisenborn
|
|
|
Fire Review
|
Approved with Conditions
|
07/28/2021
|
07/22/2021
|
|
Mike Weisenborn
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018International Fire Code.
|
|
|
Building Codes Review
|
No Comments
|
07/28/2021
|
07/22/2021
|
|
Mike Weisenborn
|
|
|
Engineering Review
|
Corrections
|
07/12/2021
|
07/12/2021
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
Revise the City’s Engineering Inspection phone number to (816) 969-1200.
|
|
Corrective Action Required
Bottom elevation at discharging point along proposed swale must be below elevation 998.24 feet. Revise, as necessary.
|
|
Corrective Action Required
Clearly label/show the path of the existing 8” water main running east and west, where aready shown throughout the plans. (e.g. utility and landscape sheet)
|
|
Corrective Action Required
Add information for or label the (dimensions of) bends intended to be used along the water service line.
|
|
Corrective Action Required
The sanitary structure stable is missing one cleanout location (an additional structure name) and a second bend shown in pan view along the sanitary lateral. Revise, as necessary. Also, cut-in wye needs to be included in keyed note G, as well.
|
|
Corrective Action Required
Within the asphalt paving detail added on sheet C11, revise “compacted’’ to “stabilized” subgrade, both in the table and in the cross-sectional view.
|
|
Corrective Action Required
Base of proposed concrete slab must extend 1’ beyond back of curb, as well. Add note on the concrete slab detail shown on sheet C11.
|
|
Corrective Action Required
The City requires a 12”-thick minimum layer of granular bedding (aggregate fill) above the edge of utility pipe. Revise the trenching and backfill construction detail accordingly.
|
|
Corrective Action Required
Except the construction of swale (grading work) and flume (pavement work), It does not appear that there are any storm (sewer) infrastructure intended to be built. Clarify as necessary or revise phase 2, activity 2 of the sequence of construction accordingly.
|
|
Corrective Action Required
Please provide an Engineer’s Opinion of Probable Construction Cost (EOOPCC) sheet, for the civil site work expected to occur on-site.
|
|
|
Traffic Review
|
No Comments
|
07/12/2021
|
07/12/2021
|
|
Brad Cooley, P.E., RSPI
|
|
|
Fire Review
|
Approved with Conditions
|
07/12/2021
|
07/12/2021
|
|
Mike Weisenborn
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018International Fire Code.
|
|
|
Building Codes Review
|
No Comments
|
07/12/2021
|
07/07/2021
|
|
Joe Frogge
|
|
|
Planning Review
|
No Comments
|
07/12/2021
|
07/06/2021
|
|
Victoria Nelson
|
|
Miscellaneous Correction
Corrective Action Required
Sidewalk. Please label the width of the sidewalk
|
|
Miscellaneous Correction
Corrective Action Required
Trash enclosure pavement. Trash enclosure areas shall be improved with a Portland cement concrete pad and a Portland cement concrete approach 30 feet in length, measured from the enclosure opening. It appears the length you are proposing is short of the 30’ requirement.
|
|
Miscellaneous Correction
Corrective Action Required
ATM Lighting. The foot candle lighting around the ATM is higher then what the UDO allows. The max is 16.0. You are showing 16.9 and 17.9 FC. Please revise. UDO lighting requirements can be found under article 8.200.
|
|
|
Traffic Review
|
Corrections
|
05/20/2021
|
05/20/2021
|
|
Michael Park
|
|
Corrective Action Required
The Langsford Road median design shall be four (4) feet wide and six (6) inches tall with a mountable nose; consistent with the designed and constrcted median along Langsford Road east of M291. Engineering drawing/plans for the built median in reference east of M291 are available upon request.
|
|
Corrective Action Required
The Langsford Road median shall be extended approximately 30 to 40 feet west to discourage any left-turn movements and u-turn circumvention, but not so far as to impede exiting traffic at the adjacent driveway (e.g. to a point near perpendicular with the east edge of the adjacent driveway or its exit trajectory).
|
|
Corrective Action Required
Langsford Road median signing shall consist of a Keep Right Symbolic Sign with an Object Marker mounted below it accourding to MUTCD and City standards/specifications for each end of the median just beyond the mountable nose. The divided highway signs should not be used. A No U-Turn symbolic sign shall also be mounted on the back of the Keep Right sign for westbound traffic at the West sign location. The One-Way sign proposed is okay to remain in the plans. See City Standard Details and Specifications for installation and material requirements.
|
|
Corrective Action Required
Pavement Marking approaching and alongside the Langsford Road median shall conform to City Standards/Specifications (See City Standard Details). Markings shall be high build paint material.
|
|
|
Engineering Review
|
Corrections
|
05/20/2021
|
05/19/2021
|
|
Loic Nguinguiri, E.I.
|
|
Corrective Action Required
Please revise the title to mention “Final” instead of “Preliminary”, since this is a commercial FDP set of plans.
|
|
Corrective Action Required
Please revise the Stormwater governing agency to “Stormwater (Lee’s Summit Public Works Department)” with “220 SE GREEN STREET, LEE’S SUMMIT MO 64063, (816) 969-1800” as the address + contact information.
|
|
Corrective Action Required
Dena Mezger is an out of date contact for Public Works. Please delete the contact name. Names aren’t needed for the City’s contact info.
|
|
Corrective Action Required
Please revise title block information, throughout the set of plans, to match the sheet index (i.e. sheets C15, C16, C17 and C19). It looks like sheet C13 is duplicated and C15 is also missing.
|
|
Corrective Action Required
Please include a note stating that “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with an inspector prior to any land disturbance work at (816) 969-1200”.
|
|
Corrective Action Required
Please revise “governing agency” to “City of Lee’s Summit” where applicable, on sheet C2.
|
|
Corrective Action Required
General utility notes 22 & 23 are incorrect. The design engineer reviews/approves shop drawings. Approved shop drawings are then provided to the City’s inspector. Please revise.
|
|
Corrective Action Required
Please revise the sequence of construction to match the proposed scope of work. Since no SWPPP is required to be provided for this project, please also revise the maintenance and general erosion notes accordingly.
|
|
Corrective Action Required
A couple of ESC symbols, shown on plan view, appear to be missing from the legend. Please include/list them all. Also, inlet protection can be removed since non applicable.
|
|
Corrective Action Required
Please include standard details for all applicable ESC BMPs. Construction standard details are accessible through the Design & Construction manual tab located on the City’s website. Make sure to also remove the “silt fence without wire support” detail since it does not match with our silt fence requirements.
|
|
Corrective Action Required
Several page references, throughout the set of plans, appear to be inaccurate/misleading. Please revise.
|
|
Corrective Action Required
Monument sign has to be at least 10’ away from water main. Please revise the proposed location accordingly.
|
|
Corrective Action Required
Although 2% cross-slope and 8.33% running slope are allowed, it is recommended that the private ADA route(s) be designed to include construction tolerances. Design slopes of 1.5% and 7.5% are typical. It is relevant to note that during the inspection process, private ADA route(s) that exceeds the maximum allowable slopes will be rejected. There is no allowance given during construction. Staff therefore recommends revising all applicable drawings and construction details to design slope values.
|
|
Corrective Action Required
ADA ramps are required at commercial entrances that pass through a sidewalk. Please include a drawing showing that the proposed sidewalk ramps across commercial entrance are ADA compliant.
|
|
Corrective Action Required
In order to clearly show proposed contour line elevations on the site grading plan, please assign a different page for the spot elevations. Make sure to also match the grading and revise drainage elevations along swale. Staff recommends a 2% minimum drainage slope.
|
|
Corrective Action Required
The sanitary sewer connection needs to require a cut-in wye, not just a wye.
|
|
Corrective Action Required
Please include the building sewer stub & riser [SAN-1] standard detail and show a trenching & backfill construction detail.
|
|
Corrective Action Required
Subgrade, shown in asphalt pavement detail, has to be “chemically stabilized” instead of just compacted. Make sure to also label or indicate what type of stabilization chemical will be used during the process. We require 6” granular base course with geogrid OR 6” granular base course with chemically stabilized subgrade.
|
|
Corrective Action Required
Please show base extending 1’ beyond back of curb.
|
|
Corrective Action Required
Please label or indicate, on the pavement detail, the type(s) of asphalt mix to be used in the construction of surface and base courses.
|
|
Corrective Action Required
While ornamental tree varieties are allowed within public easements and anywhere else on-site, please maintain a 5 -7 feet minimum horizontal separation between the edge of overstory tree and the edge of any utility line in order to prevent tree roots from growing into the utility pipe.
|
|
Corrective Action Required
Please provide an Engineer’s Opinion of Probable Construction Cost (EOOPCC) sheet, for the civil site work expected to occur on-site.
|
|
Corrective Action Required
Please provide a storm water memorandum, discussing the decrease in impervious pavement area and the exception that waives the storm water report requirement, in accordance with Section 5600 of the City’s Design and Construction Manual.
|
|
|
Fire Review
|
Approved with Conditions
|
05/20/2021
|
05/18/2021
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018International Fire Code.
|
|
|
Building Codes Review
|
Corrections
|
05/20/2021
|
05/18/2021
|
|
Joe Frogge
|
|
Corrective Action Required
Clarify conflicts at water service meters. According to water department there is only one meter serving this site. The second well on site is a backflow device which would need to be brought up to current standards (including new vault) if it were to remain. Staff recommends eliminating pit mounted backflow device and provide new inside building.
|
|
|
Planning Review
|
Corrections
|
05/20/2021
|
05/10/2021
|
|
Victoria Nelson
|
|
Miscellaneous Correction
Corrective Action Required
Sidewalk. Please label the width of the sidewalk
|
|
Miscellaneous Correction
Corrective Action Required
Trash enclosure pavement. Trash enclosure areas shall be improved with a Portland cement concrete pad and a Portland cement concrete approach 30 feet in length, measured from the enclosure opening. It appears the length you are proposing is short of the 30’ requirement.
|
|
Miscellaneous Correction
Corrective Action Required
ATM Lighting. The foot candle lighting around the ATM is higher then what the UDO allows. The max is 16.0. You are showing 16.9 and 17.9 FC. Please revise. UDO lighting requirements can be found under article 8.200.
|
|
|