Planning Application Status

PL2021074




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2021074
WOODLAND OAKS 1ST PLAT - PUBLIC LOW PRESSURE SANITARY SEWER SYSTEM
Engineering Plan Review
Engineering Plan Review
Approved
02/26/2021
WOODLAND OAKS LLC
Public Low Pressure Sanitary Sewer system - onsite and offsite
Locations
Address
1751 NE WOODLAND SHORES DR, LEES SUMMIT, MO 64086

Address
2624 NE WOODLAND OAK DR, LEES SUMMIT, MO 64086

Address
2620 NE WOODLAND OAK DR, LEES SUMMIT, MO 64086

Address
2616 NE WOODLAND OAK DR, LEES SUMMIT, MO 64086

Address
2612 NE WOODLAND OAK DR, LEES SUMMIT, MO 64086

Address
2608 NE WOODLAND OAK DR, LEES SUMMIT, MO 64086

Address
2604 NE WOODLAND OAK DR, LEES SUMMIT, MO 64086

Address
2536 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
2532 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
2528 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
2524 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
2520 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
2516 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
2512 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
2508 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
2504 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
2500 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
2505 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
2509 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
2513 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
2517 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
2531 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
2533 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
2535 NE WOODLAND OAK CIR, LEES SUMMIT, MO 64086

Address
1812 NE LASHBROOK CIR, LEES SUMMIT, MO 64086

Address
1816 NE LASHBROOK CIR, LEES SUMMIT, MO 64086

Address
1820 NE LASHBROOK CIR, LEES SUMMIT, MO 64086

Address
1817 NE LASHBROOK CIR, LEES SUMMIT, MO 64086

Address
1813 NE LASHBROOK CIR, LEES SUMMIT, MO 64086

Address
1809 NE LASHBROOK CIR, LEES SUMMIT, MO 64086

Address
2603 NE WOODLAND OAK DR, LEES SUMMIT, MO 64086

Address
2607 NE WOODLAND OAK DR, LEES SUMMIT, MO 64086

Address
2611 NE WOODLAND OAK DR, LEES SUMMIT, MO 64086

Address
2615 NE WOODLAND OAK DR, LEES SUMMIT, MO 64086

Address
1810 NE CHERRYBARK CT, LEES SUMMIT, MO 64086

Address
1812 NE CHERRYBARK CT, LEES SUMMIT, MO 64086

Address
1816 NE CHERRYBARK CT, LEES SUMMIT, MO 64086

Address
1820 NE CHERRYBARK CT, LEES SUMMIT, MO 64086

Address
1817 NE CHERRYBARK CT, LEES SUMMIT, MO 64086

Address
1813 NE CHERRYBARK CT, LEES SUMMIT, MO 64086

Address
1809 NE CHERRYBARK CT, LEES SUMMIT, MO 64086

Address
1805 NE CHERRYBARK CT, LEES SUMMIT, MO 64086

Address
1801 NE LASHBROOK DR, LEES SUMMIT, MO 64086

Address
2600 NE COLBERN RD, LEES SUMMIT, MO 64086

Address
1652 NE WOODLAND SHORES CIR, LEES SUMMIT, MO 64086

Address
1653 NE WOODLAND SHORES CIR, LEES SUMMIT, MO 64086

Property
53440222000000000

Property
53440221900000000

Property
53440221800000000

Property
53440221700000000

Property
53440221600000000

Property
53440221500000000

Property
53440221400000000

Property
53440221300000000

Property
53440253900000000

Property
53440254000000000

Property
53440254100000000

Property
53440254200000000

Property
53440254300000000

Property
53440254400000000

Property
53440254500000000

Property
53440255200000000

Property
53440254600000000

Property
53440255100000000

Property
53440254700000000

Property
53440255000000000

Property
53440254800000000

Property
53440254900000000

Property
53440256200000000

Property
53440256300000000

Property
53440255500000000

Property
53440255400000000

Property
53440255300000000

Property
53440256100000000

Property
53440255600000000

Property
53440256000000000

Property
53440255900000000

Property
53440255700000000

Property
53440255800000000

Property
53440257300000000

Property
53440256500000000

Property
53440257200000000

Property
53440256600000000

Property
53440256400000000

Property
53440257100000000

Property
53440256700000000

Property
53440256800000000

Property
53440257000000000

Property
53440256900000000

Property
53440257400000000

Property
53440080100000000

Property
53440083700000000

Property
53440083600000000

Address
2628 NE WOODLAND OAK DR, LEES SUMMIT, MO 64086

Contacts
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
WOODLAND OAKS LLC, Address:656 BAYBERRY LN STE 101  
WALKER CUSTOM HOMES LLC, Address:PO BOX 247  
WEGNER FAMILY TRUST AGREEMENT DATED SEPTEMBER 24, 2009, Address:5718 NE SAPPHIRE PL  
TRUMARK CUSTOM HOMES LLC, Address:2924 NW THOREAU DR  
JFE CONSTRUCTION INC, Address:1314 SW MARKET ST  
JFE HOMES LLC, Address:1314 SW MARKET ST  
STONE CHASE PROPERTIES LLC, Address:240 STONE CHASE  
BELLAH HOMES LLC, Address:PO BOX 346  
WOODLAND SHORES HOMES ASSOCIATION INC, Address:1800 NE BLUE HERON DR  
MASTERS PAXTON, Address:1653 NE WOODLAND SHORES CIR  
SADASIVAN THERESA DENISE & RAJ, Address:1652 NE WOODLAND SHORES CIR  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Corrections 06/24/2024 06/24/2024
Gene Williams, P.E.
Review of a different pump manufacturer to establish “equivalency or greater”.
Record Drawings Review No Comments 02/01/2024 01/31/2024
Gene Williams, P.E.
Engineering Review No Comments 11/28/2023 11/28/2023
Gene Williams, P.E.
Engineering Review Corrections 11/17/2023 11/17/2023
Gene Williams, P.E.
Engineering Review Corrections 05/26/2023 05/26/2023
Gene Williams, P.E.
Corrective Action Required
05/26/2023

Section 3: Please add a note at the beginning of this section stating that "Prior to commencement of work on the installation of grinder pumps or maintenance to the system, the homeowner or homebuilder shall obtain a permit from Development Services Department" or equivalent language.
Corrective Action Required
05/26/2023

Section 3: Please add a note similar to the following to the second paragraph: “Final connection shall not be made until system has been inspected and approved by the City.”
Corrective Action Required
05/26/2023

SS Lateral Kit and Typical Lateral Installation details: Please clarify the notes that read “by others” and “supplied by others” to make it clear what is to be supplied/installed by builder/homeowner and what was supplied/installed by developer.
Corrective Action Required
05/26/2023

Typical Lateral Installation Detail: Modify detail to indicate the 4” PVC service line.
Corrective Action Required
05/26/2023

Section 4: Insert the phrase “is subject to approval by the City and” after “…however the selected equipment…” in the second sentence.
Corrective Action Required
05/26/2023

Section 4: Section references E-One specifications. Other than duty point, none were found. Cut sheets were referenced, but none were found. Please provide cut sheets for the referenced items.
Engineering Review Corrections 09/02/2022 09/02/2022
Gene Williams, P.E.
Corrective Action Required
09/02/2022

The purpose of this manual is to serve as a short and concise guide for City staff to review building permits for private grinder pumps and the connection to the ball valve at the end of the public force main, and the building contractor for installation of private grinder pumps, and connection to the existing public main at the the public system. It would appear the manual does not meet the intent, and discusses the overal system, how it was designed, and provides a copy of the public force main plans for the public system as well as the private grinder pumps and private system. We would suggest the following: 1) a title sheet "Private Grinder Pump Installation and Connection Manual for Woodland Oaks" or equivalent language, 2) presentation in drawing format of the pumps, electrical devices, materials, depth of bury, and all other materials and devices necessary to make the connection to the existing system, and 3) an overall location drawing of the ball valves and where they are located on each lot to serve as a guide for planning purposes. Please revise as appropriate.
Corrective Action Required
09/02/2022

Please remove any extraneous details that are not necessary such as pump curves, odor control systems, flushing connections, connections to Woodland Shores, or any other items which are irrelevant to the installation of the private system. Please revise as appropriate. Please revise as appropriate.
Engineering Review No Comments 08/10/2022 08/10/2022
Gene Williams, P.E.
Engineering Review Corrections 07/22/2022 07/22/2022
Gene Williams, P.E.
Corrective Action Required
07/22/2022

Note 7 on the Cover Sheet names an epoxy supplier and series that does not meet the requirements of the most recent version of the standard specifications, Section 3500 – Sanitary Sewers, Paragraph 3501.P.10 nor is it included on the Water Utilities Department Approved Products List.
Corrective Action Required
07/22/2022

Cost estimate was missing the following items: 1) epoxy-lining of manholes, 2) connection to existing line, 3) boring costs (assuming this is separate since the linear foot cost for pipe seemed low).
Engineering Review Corrections 06/29/2022 06/30/2022
Gene Williams, P.E.
Corrective Action Required
06/30/2022

Can the applicant provide cut sheets and additional information on the odor/control system they used as the basis of their design? Specifically, we would like to see cut sheets of the chemical storage tank and the control panel.
Corrective Action Required
06/30/2022

The Sewer Study states that the chemical feed pump is configurable and has the ability to change dose based on timing. Can the applicant provide clarification on this statement? For example, will the system be set up to provide a fixed flow rate based upon a timer or will the system be set up to have a variable flow rate that can be adjusted around peak and non-peak portion of the day.
Corrective Action Required
06/30/2022

Delete the last sentence under Paragraph 6 of the Odor/Corrosion Control System Specification. Replace with “Acceptance of the system is contingent upon successful start-up, providing the required training, and providing complete Operation and Maintenance Manuals to the City in both hard copy and PDF form.”
Corrective Action Required
06/30/2022

Provide two chemical feed pumps, one firm and one standby.
Corrective Action Required
06/30/2022

Delete from the warranty the following “or eighteen (18) months from shipment, whichever occurs first.”
Corrective Action Required
06/30/2022

The bend at Woodland Oak Dr. and Blackwell appears to be a non-standard fitting size. If it is the intent to make the angle through bending of the pipe, please provide calculations showing that this does not exceed the manufacturer’s recommended bending radius. Same for the bend at Woodland Shores Dr. and Blackwell.
Corrective Action Required
06/30/2022

The applicant stated that additional notes were provided concerning the epoxy lining of the manholes. I did not see where this was addressed.
Corrective Action Required
06/30/2022

Additional comments will be provided as an attachment and in a form of a "marked-up" pdf of the plans, and a "marked-up" pdf of the "response to comments.
Corrective Action Required
06/30/2022

Please be aware the "Low Pressure Sanitary Sewer Installation Manual" (or equivalent title language) shall be required prior to issuance of a Certificate of Substantial Completion for the project, and hence, no building permits shall be allowed until this document has been submitted and accepted by the City.
Engineering Review Corrections 05/17/2022 05/17/2022
Gene Williams, P.E.
Corrective Action Required
05/17/2022

Additional information is required on the odor control system to be included in the report. Information such as sizing, application/dosing details, onsite storage, electrical/controls. Other than making a mention that it will be included, there was no additional detail.
Corrective Action Required
05/17/2022

Tracer wire should be provided on the forcemain and on the sewer stubs. Please show by sufficient notation or other means on the plans.
Corrective Action Required
05/17/2022

A high point appears to exist on Line 3 near station 14+00. An air release valve appears warranted.
Corrective Action Required
05/17/2022

Construction and Design Notes, Notes 1 and 2 under Sanitary Sewers reference PVC, SDR-26. This should be updated to be SDR 11 HDPE.
Corrective Action Required
05/17/2022

Note 2 seems to be for gravity mains/laterals, not LPS. All notes should probably be checked for conflicts.
Corrective Action Required
05/17/2022

Sheet C.401 and Sheet C.405: Odor control is only mentioned, but no specific information is presented. On-site storage requirements are required, electrical and control systems are required, as well as any other information required to build the odor control system.
Corrective Action Required
05/17/2022

Sheet C.406: Please submit calculations supporting the valve sizing. These calculations can be either from the manufacturer, or your firm.
Corrective Action Required
05/17/2022

Sheet C.406: Flomatic is not on the approved products list. Please provide justification for inclusion of this non-approved part, or specify what is already shown on the approved products list.
Corrective Action Required
05/17/2022

Sheet C.406: Provide a 5 feet diameter manhole detail for use with the air release valve assembly.
Corrective Action Required
05/17/2022

Sheet C.406: Provide a tee instead of the tapping saddle for the air release valve assembly.
Corrective Action Required
05/17/2022

Sheet C.406: Provide an isolation valve in the yard upstream of the ARV. This way if there’s a break, we can isolate the system to fix it.
Corrective Action Required
05/17/2022

Sheet C.406: There is concern about the location for the ARV near the entrance to Woodland Shores subdivision. This is right inside the main entrance and close to property owners. What is the proposal to manage potential odor issues? Carbon cannister appears warranted.
Corrective Action Required
05/17/2022

Sheet C.406: Provide additional detail on the valves proposed for the ARV assembly They are shown in the detail but not called out.
Corrective Action Required
05/17/2022

Updated "Low Pressure Sanitary Sewer System" installation manual was not included in the resubmittal. This manual is required, as it will be consulted when homeowners and homebuilders are installing pumps and performing maintenance. An updated manual shall be required prior to formal approval of the plans.
Corrective Action Required
05/17/2022

Forcemain is located at the foot of three (3) retaining walls. Two (2) are located along Blackwell, and one (1) is located along Woodland Shores Dr. near the entrance. The Design and Construction Manual requires a minimum of 15 feet of distance between any structures and the outside of the pipe, and this has not been achieved.
Corrective Action Required
05/17/2022

Forcemain is located at the foot of three (3) floodlights. See above comment concerning this issue.
Corrective Action Required
05/17/2022

The 90 degree bend at the south corner of Woodland Oak Dr. and Blackwell is not desired. Please eliminate the 90 degree bend and replace with two (2) 45 degree bends at a minimum.
Corrective Action Required
05/17/2022

The 90 degree bend at the south corner of Woodland Shores Dr. and Blackwell is not desired by the City. Please use two (2) 45 degree bends at a minimum.
Corrective Action Required
05/17/2022

Will the forcemain be bored? At a minimum, it shall be bored at all street crossings. Please add sufficient notation showing where the forcemain will be bored. Steel casing shall not be required.
Corrective Action Required
05/17/2022

Epoxy coating of three (3) manholes is shown on Sheet C.404 with no corresponding information, details, or specifications on what is required to epoxy-coat these three (3) manholes. Please provide all necessary information on what is required to epoxy-coat these manholes.
Corrective Action Required
05/17/2022

Profile view along line 3 appears to be missing the location of the three (3) water lines. This would include near station 12+00, and station 12+50.
Engineering Review Corrections 03/18/2022 03/16/2022
Gene Williams, P.E.
Engineering Review No Comments 06/18/2021 06/18/2021
Gene Williams, P.E.
Engineering Review Corrections 05/25/2021 05/25/2021
Gene Williams, P.E.
Corrective Action Required
05/25/2021

Sheet C.404: A special drop manhole is being requested by Water Utilities, and will be attached separately. This is being requested due to the high spot being created at the point before the manhole.
Corrective Action Required
05/25/2021

Sheet C.405: The details for the lateral intallation and the terminal flushing connection call-out for valve installation (ball and check), but no details are provided for material, make or model.
Corrective Action Required
05/25/2021

I have also attached the "Prairie Lee Low Pressure Guide" as a reference. When individual homebuilders and plumbers pull building permits, and individual homeowners are needing to replace equipment, a similar guide is warranted. We would recommend a short document be prepared which specifies the approved grinder pumps, ball and backflow valves, line type, etc.
Engineering Review Corrections 03/26/2021 03/26/2021
Gene Williams, P.E.
Corrective Action Required
03/02/2021

A sanitary sewer report is required for the low pressure sanitary sewer. The report should analyze and discuss the low pressure sanitary sewer system in terms of total users connected to the lines, residence time within the forcemain, required individual pump systems, and how it relates to sizing of the line. The intent is to minimize residence time within the line to minimize odor issues, and to ensure sewage cannot be allowed to become septic.
Corrective Action Required
03/05/2021

HDPE line must be used for the force main.
Corrective Action Required
03/05/2021

Force main is shown entering the manhole too high.
Corrective Action Required
03/05/2021

Please label the existing manhole with the City manhole number #26-274.
Corrective Action Required
03/05/2021

We continue to see errors in the flowline directions at inverts. Please perform a thorough QA/QC review of flowline in and out elevations in relation to directions shown.
Corrective Action Required
03/05/2021

The first two manholes receiving waste from a force main must be epoxy lined.
Corrective Action Required
03/05/2021

Sheet C.403: Provide end flushing assembly.
Corrective Action Required
03/05/2021

A ball/check valve with valve box and cover shall be installed on the stub line just upstream of the connection to the low pressure sewer main connection point. This denotes the end of the public system. The private system includes everything from the ball valve to points upstream, including the pumps and the ball/check valve.
Corrective Action Required
03/05/2021

Please see new requirements concerning minimum slope for an 8 inch line. It is now based on upstream lots. It would appear the minimum slope for these lines would be 1.00%.
Corrective Action Required
03/05/2021

Storm sewer crossings at Sta. 1+73.79 and 0+24.03 seems to be less than 18” from top of forcemain and bottom of storm pipe.
Corrective Action Required
03/26/2021

Provide notes stating the end of the public low-pressure sanitary sewer system, versus the private low-pressure sanitary sewer system. The private portion includes the ball/check valve.
Corrective Action Required
03/26/2021

Sheet C.404: Why is the force main being placed beneath the storm line? Please re-design the storm system, or perhaps adjust the grading in that area so the force main can be placed above the storm line. The proposed location will be a high-maintenance issue.
Corrective Action Required
03/26/2021

Sheet C.404: It would appear the plans are incomplete at the end of the line (i.e., Lot 40). It would appear this line needs to be extended further beyond the Lot 40 connection stub.
Corrective Action Required
03/26/2021

Sheet C.403: Why was the force main shown beneath the storm line? The storm line should be revised, and/or grading should be adjusted.
Corrective Action Required
03/26/2021

Sheet C.403: Plan and profile view appear incomplete concerning the end of the line near Lot 20. Shouldnt the line extend beyond Lot 20, just beyond the private stub?
Corrective Action Required
03/26/2021

Private sanitary sewer stub typical detail was missing for the low-pressure sewer. Since the City does not have such a detail, this will need to be supplied by the engineer.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
02/26/2021 2.26.21 SANITARY - Woodland Oaks 1st Plat
03/26/2021 FW Woodland Oaks Sanitary Sewer - Centerline Requirement
03/26/2021 Letter DE-Comment Letter (Engineering Plans)
05/11/2021 5.11.21 COST ESTIMATE SANITARY
05/11/2021 5.11.21 City Response Letter Sanitary
05/11/2021 5.11.21 SANITARY PLANS REVISIONS
05/11/2021 5.11.21 LOW PRESSURE SANITARY SEWER STUDY
05/25/2021 Prairie Lee Lake Low Pressure System Handout
05/25/2021 RE Woodland Oaks On-Site Sanitary Sewer - Including Low-Pressure Sanitary Sewer and Gravity System
06/04/2021 Letter City Response Letter Sanitary 210601
06/04/2021 Plans SANITARY 210604
06/07/2021 Plans Woodland Oaks LPSS Overview and Equipment
06/14/2021 Letter DE-Comment Letter (Engineering Plans)
06/18/2021 STKY NOTE APPROVAL
03/16/2022 LPS SYSTEM
04/27/2022 220406 LOW PRESSURE SANITARY SEWER STUDY
04/27/2022 SANITARY PLANS
04/27/2022 220427 COST ESTIMATE SANITARY SEALED
05/17/2022 Letter DE-Comment Letter (Engineering Plans)
06/15/2022 220614 LOW PRESSURE SANITARY SEWER STUDY
06/15/2022 Letter City Response Letter Sanitary 220614
06/15/2022 Plans SANITARY PLANS 220614
06/30/2022 Letter DE-Comment Letter (Engineering Plans)
06/30/2022 City Response Letter Sanitary 220614-ABB Comments
06/30/2022 Pages from SANITARY PLANS 220614
06/30/2022 EMAIL COMMENTS JUN2022
07/08/2022 Letter City Response Letter Sanitary 220705
07/08/2022 Engineers Estimate Signed Cost Estimate
07/08/2022 Plans LPS Sanitary Set
07/08/2022 Engineer Report/Study STUDY LOW PRESSURE SANITARY SEWER STUDY
07/22/2022 Letter DE-Comment Letter (Engineering Plans)
08/03/2022 Plans 220803 LPS Sanitary Set
08/03/2022 Engineers Estimate 220803 Signed Cost Estimate
08/03/2022 Letter City Response Letter Sanitary 220803
08/19/2022 Plans LPS Manual for Individual Sewer Connection
08/30/2022 MDNR CONC AUG 2022 SAN
09/02/2022 Letter DE-Comment Letter (Engineering Plans)
09/27/2022 MDNR CONSTR PERMIT SAN
09/27/2022 FeeWorksheetWoodlandOaksLPSewerFees
10/03/2022 Approved Plans Woodland Oaks LPS Sanitary Set Approved 10.3.22
10/04/2022 Letter DE-Engineering Plans Approval Letter
05/12/2023 230512 Private Grinder Pump Installation and Connection Manual
05/12/2023 City Response Letter LPS Manual 230512
05/26/2023 Letter DE-Comment Letter (Engineering Plans)
11/02/2023 Engineer Report/Study 230512 Private Grinder Pump Installation and Connection Manual
11/02/2023 Letter City Response Letter LPS Manual 231102
11/02/2023 Engineer Report/Study 231102 Private Grinder Pump Installation and Connection Manual
11/17/2023 Email EMAIL COMMENTS NOV2023
11/17/2023 Letter City Response Letter LPS Manual 231117
11/28/2023 Engineer Report/Study APPROVED GRINDER PUMP MANUAL
01/24/2024 Plans Sanitary record drawing
01/31/2024 Accepted Record Drawings ACCEPTED RECORD DWG LOW PRESSURE SAN SEWER
06/10/2024 Specifications Franklin IGPH-A Series Model 515713
06/24/2024 Email EMAIL REJECTION CHANGES TO MANUAL
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home