Planning Application Status

PL2020351




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020351
Lee's Summit High School Addition and Renovations - 2020
Commercial Final Development Plan
Commercial Final Development Plan
Approved
11/20/2020
LEES SUMMIT SCHOOL DIST R 7
Locations
Contacts
LEES SUMMIT SCHOOL DIST R 7, Address:600 MILLER  
GOULD EVANS, Address:4041 MILL STREET, Phone:(816) 701-5315  
KAW VALLEY ENGINEERING INC, Address:14700 W 114TH TERR, Phone:(913) 894-5150  
Reviews
Review Type Outcome Est. Completion Date Completed
Redesign Review No Comments 07/29/2022 07/28/2022
Gene Williams, P.E.
Building Codes Review No Comments 01/27/2021 01/20/2021
Mike Weisenborn
Traffic Review No Comments 01/27/2021 01/20/2021
Mike Weisenborn
Engineering Review Approved with Conditions 01/27/2021 01/20/2021
Mike Weisenborn
DE Engineers Estimate
Corrective Action Required
01/20/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $185,883.14
DE Contact Field Eng. Inspector
Corrective Action Required
01/20/2021

A complete set of drawings, with the latest revisions for the water meter vault detail, is required prior to approval of the Final Development Plan.
Planning Review No Comments 01/27/2021 01/20/2021
Mike Weisenborn
Fire Review Approved with Conditions 01/27/2021 01/20/2021
Mike Weisenborn
Code Statement
Corrective Action Required
01/20/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fire Lanes - Marking
Corrective Action Required
01/20/2021

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Action required: 1. Fire lanes shall be marked by a combination of RED curbs and signage. 2. Mark the area in front of the new FDC.
Fire Lanes
Corrective Action Required
01/20/2021

IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm) Action required: The accesses being paved to the farthest east bulding (Ref. C130 Site Plan-North) need to meet this requirement. 12/17/2020- The lanes to and in front of Building E, need to meet this requirement.
Imposed Loads
Corrective Action Required
01/20/2021

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Fire Review Corrections 01/07/2021 01/07/2021
Mike Weisenborn
Code Statement
Corrective Action Required
01/07/2021

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fire Lanes - Marking
Corrective Action Required
01/07/2021

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Action required: 1. Fire lanes shall be marked by a combination of RED curbs and signage. 2. Mark the area in front of the new FDC.
Fire Lanes
Corrective Action Required
12/30/2020

IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm) Action required: The accesses being paved to the farthest east bulding (Ref. C130 Site Plan-North) need to meet this requirement. 12/17/2020- The lanes to and in front of Building E, need to meet this requirement.
Imposed Loads
Corrective Action Required
01/07/2021

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Engineering Review Approved with Conditions 01/07/2021 01/07/2021
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
01/07/2021

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $185,883.14
Corrective Action Required
01/07/2021

A complete set of drawings, with the latest revisions for the water meter vault detail, is required prior to approval of the Final Development Plan.
DE Contact Field Eng. Inspector
Corrective Action Required
01/07/2021

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Future Repair Work
Corrective Action Required
01/07/2021

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Traffic Review No Comments 01/07/2021 01/06/2021
Michael Park
Planning Review No Comments 01/07/2021 01/04/2021
Hector Soto Jr.
Building Codes Review No Comments 01/07/2021 12/30/2020
Joe Frogge
Miscellaneous Correction
Resolved
12/30/2020

Site lighting not found. Action required: Provide complete design or request deferral to building permit submittal. 12/17/20 - Sheets referenced in response letter only show fixture locations. We also need circuitry information and pole base details.
Planning Review No Comments 12/23/2020 12/27/2020
Hector Soto Jr.
Engineering Review Corrections 12/23/2020 12/23/2020
Gene Williams, P.E.
Corrective Action Required
12/23/2020

Please refer to the previous applicant letter. The special meter vault for the 4 inch water meter appears to be showing "note 8" on the various views, but "note 8" is discussing requirements for a strainer rather than the features that are referenced on the various views of the meter vault. Please revise as appropriate.
Corrective Action Required
12/23/2020

Please ensure the valve shown on the bypass is clear in terms of notation, either by a legend or a note. As shown, it might be missed by the contractor.
Traffic Review No Comments 12/23/2020 12/22/2020
Michael Park
Fire Review Corrections 12/23/2020 12/17/2020
Jim Eden
Code Statement
Informational
12/17/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fire Lanes - Marking
Informational
12/17/2020

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Action required: 1. Fire lanes shall be marked by a combination of RED curbs and signage. 2. Mark the area in front of the new FDC.
Fire Lanes
Corrective Action Required
12/16/2020

IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm) Action required: The accesses being paved to the farthest east bulding (Ref. C130 Site Plan-North) need to meet this requirement. 12/17/2020- The lanes to and in front of Building E, need to meet this requirement.
Imposed Loads
Informational
12/17/2020

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Building Codes Review Corrections 12/23/2020 12/17/2020
Joe Frogge
Miscellaneous Correction
Corrective Action Required
12/16/2020

Site lighting not found. Action required: Provide complete design or request deferral to building permit submittal. 12/17/20 - Sheets referenced in response letter only show fixture locations. We also need circuitry information and pole base details.
Miscellaneous Correction
Resolved
12/17/2020

Clarify construction/relocation of water meter. Plans show existing meter to remain but also shows an additional new meter. Provide the following: - Resolve conflicting information. - Provide complete water meter vault construction details. (fyi - we do not have a standard detail for your use.)
Fire Review Corrections 12/08/2020 12/08/2020
Jim Eden
Code Statement
Corrective Action Required
12/02/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fire Lanes - Marking
Corrective Action Required
12/02/2020

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Action required: 1. Fire lanes shall be marked by a combination of RED curbs and signage. 2. Mark the area in front of the new FDC.
Fire Lanes
Corrective Action Required
12/02/2020

IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm) Action required: The accesses being paved to the farthest east bulding (Ref. C130 Site Plan-North) need to meet this requirement.
Imposed Loads
Corrective Action Required
12/02/2020

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Planning Review Corrections 12/08/2020 12/08/2020
Hector Soto Jr.
Corrective Action Required
12/08/2020

LAND USE TABLE -- PARKING. - List the number of existing and proposed resulting number of classrooms to confirm parking adequacy. Minimum parking requirements are based on the number classrooms, calculated at 6 parking spaces required for each classrom for a high school. - The number of proposed parking spaces listed on Sheets C100 and C1005 do not match, 1154 vs 1159, respectively.
Corrective Action Required
12/08/2020

BLUE PKWY REALIGNMENT. Call out that the Blue Pkwy realignment shown on the plan is not part of this plan but a future improvement by others.
Corrective Action Required
12/08/2020

EXTERIOR MATERIALS. Label the proposed exterior building material colors.
Engineering Review Corrections 12/08/2020 12/08/2020
Gene Williams, P.E.
Corrective Action Required
12/08/2020

The public sanitary sewer running from the Highway Patrol property to City manhole #39-155 should be designated as private to avoid conflicts with construction. This would require a new public sanitary sewer extension to the Highway Patrol property from the public sanitary sewer located in the northeast portion of the High School property. In addiition, a portion of the sanitary sewer 39-041 to 39-039 should also be dedicated as private.
Corrective Action Required
12/08/2020

The asphaltic pavement detail should be revised to show aggregate subgrade and chemically-stablized subgrade extending a minimum of 1 foot beyond the back of curb.
Corrective Action Required
12/08/2020

A site-specific design is required for the water meter vault since the City does not supply meter vaults for water meters above 2 inches. The meter vault should include bypass piping. The ring and cover should be a square aluminum hatch, 36” X 36”, centered over the meter and steps. The steps need to be MA Industries copolymer polypropylene plastic coated steel model PS2-PF.
Corrective Action Required
12/08/2020

Sheet C350: Where are the retaining walls in relation to the project? This sheet appears to lack context to the overall project.
Corrective Action Required
12/08/2020

Where and how will the backflow vaults drain? The typical detail for the backflow vault shows a sump, and the notes require that a method be shown how the vault will draiin. This can be via daylighting, connection to a private junction box or inlet, or construction of an infiltration gallery.
Corrective Action Required
12/08/2020

The City will not support waiving the Comprehensive Control Strategy for this project. There did not appear to be any justification for relaxing these requirements in the waiver request.
Corrective Action Required
12/08/2020

On the revised detention basin plans, please provide a prominent note that the basin must be constructed prior to any other improvments on the site, with the exception of erosion and sediment control features.
Corrective Action Required
12/08/2020

Portions of utility easements should be vacated for those portions of the sanitary sewer line to be dedicated as private. Please see comment number 1 for specific information concerning these vacates.
Corrective Action Required
12/08/2020

Please ensure that all private sanitary sewer lines are connected to public mains via a wye rather than a direct manhole connection. This applies for all sanitary sewer lines less than 8 inches in diameter.
Traffic Review No Comments 12/08/2020 12/03/2020
Michael Park
Building Codes Review Corrections 12/08/2020 11/24/2020
Joe Frogge
Miscellaneous Correction
Corrective Action Required
11/24/2020

Site lighting not found. Action required: Provide complete design or request deferral to building permit submittal.
Miscellaneous Correction
Corrective Action Required
11/24/2020

Clarify construction/relocation of water meter. Plans show existing meter to remain but also shows an additional new meter. Provide the following: - Resolve conflicting information. - Provide complete water meter vault construction details. (fyi - we do not have a standard detail for your use.)
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $1,000.00 $1,000.00 Paid 11/20/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
11/20/2020 Application Form 20201119 LSHS Final Development Plan Application
11/20/2020 Application Form LSHS Ownership Affidavit
11/20/2020 Receipt Receipt for transaction:2020-007689
11/20/2020 Application Form LSHS_FDP_Application_Revision_1_11-20-2020
11/20/2020 Plans LSHS_FDP_Boundary Description_Revision_1_11-20-2020
11/20/2020 Letter LSHS_FDP_DCM Construction Waiver Request LSHS Additions & Renvoations and Athletics_Revision_1_11-20-2020
11/20/2020 Engineers Estimate LSHS_FDP_EPEOPCC_Revision_1_11-20-2020
11/20/2020 Plans LSHS_FDP_Master Drainage Plan_Revision_1_11-20-2020
11/20/2020 Application Form LSHS_FDP_Ownership Affidavit_Revision_1_11-20-2020
11/20/2020 Application Form LSHS_FDP_Plan Checklist_Revision_1_11-20-2020
11/20/2020 Specifications LSHS_FDP_Mech_Air_Conditioning_Units_Cutsheets_Revision_1_11-20-2020
11/20/2020 Specifications LSHS_FDP_Mech_Fan_Cutsheets_Revision_1_11-20-2020
11/20/2020 Specifications LSHS_FDP_Mech_Roof_Hood_Cutsheets_Revision_1_11-20-2020
11/20/2020 Plans LSHS_FDP_Drawing_Set_Revision_1_11-20-2020_part2
11/20/2020 Plans LSHS_FDP_Drawing_Set_Revision_1_11-20-2020_part1
12/09/2020 Letter Applicant Letter - FDP (DFDP)
12/15/2020 Letter 20201215 LSHS FDP Response Letter
12/15/2020 Plans 20201215 LSHS-Exterior Elevations_r1_FDP_GE response
12/15/2020 Plans 20201214 LSHS Master Drainage Plan (Rev 2)
12/15/2020 Plans 20201215_LSHS Exterior Images_r1_FDP_GE response
12/15/2020 Plans 20201215 LSHS Final Development Plan
12/15/2020 Plans 20201215_LSHS FDP_Drawing_Set_Revision_1_11-20-2020_part2_relabeled_GE response
12/28/2020 Letter Applicant Letter - FDP (DFDP)
12/29/2020 Plans 2020 1229 - LSHS Site Lighting
12/29/2020 20201229_C130
12/29/2020 20201229_C540
12/29/2020 20201229_LSHS FDP Response Letter
01/07/2021 Fee Worksheet FDP Renovation Project
01/07/2021 Letter Applicant Letter - FDP (DFDP)
01/14/2021 Letter 20210112 LSHS FDP - Response Letter
01/14/2021 Engineer Report/Study 20210108 LSHS FDP - Part 3 - Master Drainage Plan (Rev 2)
01/14/2021 Approved Plans Approved LSHS Addition Part 1 - Civil
01/14/2021 Plans Approved LSHS FDP - Part 2 - Arch_MEP
01/14/2021 Specifications Approved LSHS FDP - Part 4 - Mech Cut Sheets
07/22/2022 Plans 20220720 LSHS Sheet C560 (RFI 552 & 565 Rev9)
07/22/2022 Plans RFI 0552 - Area A - Exterior Tie for Sanitary Fall(KVE Review 20220720)
07/22/2022 Plans RFI 0565 - Sanitary Sewer and Water Line Elevation Conflict (KVE Review 20220720)
07/28/2022 Approved Plans RFI 0552 - Area A - Exterior Tie for Sanitary Fall(KVE Review 20220720)
07/28/2022 Approved Plans RFI 0565 - Sanitary Sewer and Water Line Elevation Conflict (KVE Review 20220720)
07/28/2022 Approved Plans 20220720 LSHS Sheet C560 (RFI 552 & 565 Rev9)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home