Permit Application Status

PRSUBD20242356


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20242356
Public Infrastructure
Issued
DEVELOPMENT COMPLETE
Sanitary sewer extension of approximately 140 LF. to serve Lot 1 of Village at Discovery Park.
05/10/2024
01/10/2025
Locations
Contacts
Nolan Dixon, Address:Bldg. 1, Phone:(573) 447-0292  
Matthew Braden, Address:1000 W. Nifong Blvd., Phone:(573) 447-0292  
bpmaenner@intrinsicdevelopment.com  
bpmaenner@intrinsicdevelopment.com  
Intrinsic Development, L.L.C., Address:3622 Endeavor Ave., Ste. 101  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review - Sanitary No Comments 09/10/2024 09/11/2024
Susan Nelson, P.E.
Engineering Review - Sanitary Corrections 08/08/2024 08/07/2024
Susan Nelson, P.E.
Miscellaneous Correction
Corrective Action Required
08/07/2024

The submitted estimate will not satisfy the requirements of the Unified Development Ordinance (Section 3.415) for the required documentation to calculate the Engineering Plan Review and Inspection Fee. This must be an itemized list of unit prices and quantities that includes all materials, labor, equipment and incidental work necessary to complete the entire project. Please resubmit an appropriate signed and sealed estimate. The specific material types must be added to the estimate.
Miscellaneous Correction
Corrective Action Required
08/07/2024

Submit the proposed public sanitary easement documents for review and approval. Please note that this easement must be in place prior to issuance of any permit. The entire legal document that is necessary to record the easement through Jackson County must be submitted for review, not just the exhibits.
Engineering Review - Sanitary Corrections 07/15/2024 07/05/2024
Susan Nelson, P.E.
Miscellaneous Correction
Corrective Action Required
07/05/2024

The submitted estimate will not satisfy the requirements of the Unified Development Ordinance (Section 3.415) for the required documentation to calculate the Engineering Plan Review and Inspection Fee. This must be an itemized list of unit prices and quantities that includes all materials, labor, equipment and incidental work necessary to complete the entire project. Please resubmit an appropriate signed and sealed estimate.
Miscellaneous Correction
Corrective Action Required
07/05/2024

Submit the proposed public sanitary easement documents for review and approval. Please note that this easement must be in place prior to issuance of any permit.
Miscellaneous Correction
Corrective Action Required
07/05/2024

Show and document the new public sanitary sewer easement on the plans.
Engineering Review - Sanitary Corrections 05/24/2024 05/24/2024
Susan Nelson, P.E.
Miscellaneous Correction
Corrective Action Required
05/24/2024

Submit an Engineer’s Estimate of Probable Construction Costs.
Miscellaneous Correction
Corrective Action Required
05/24/2024

Submit the proposed public sanitary easement document for review and approval. Please note that the public sanitary sewer easement must be in place prior to issuance of any permit.
Miscellaneous Correction
Corrective Action Required
05/24/2024

Show and document all utility/access easements. Provide stationing to identify the location of the proposed public improvements. Cleary identify the individual lots.
Miscellaneous Correction
Corrective Action Required
05/24/2024

Please add a note to the plans stating: “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200.”
Miscellaneous Correction
Corrective Action Required
05/24/2024

Label Existing MH A2 as 16-108.
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $600.00 $600.00 Paid 10/29/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Grading/Excavation/Fill Inspection Pending
Sanitary - Material Verification Pending
Sanitary Sewer - Air Test Pending
Sanitary Sewer - Mandrel Pending
Sanitary Sewer - Vacuum Pending
Punch List Inspection Pending
Sanitary Sewer Construction Inspection Pending
Misc
Informational
04/18/2025
2-27-25 DP. Aaron's crew started the morning breaking rock, but their machine broke down. They are moving onto something else until next week. 3-6-25 DP. Aaron's crew has started back laying the sewer extension. They have rose above rock so will be moving quicker. 3-7-25 DP. Aaron's crew finished running A line today. They set A1 and have backfilled while compacting in lifts. Today starts the 30 day wait on the extension before testing can begin. 4-18-25 DP. Testing can begin any time on the sewer extension. The required 30 day wait has lapsed.
Erosion Control Inspection Pending 4/23/2025
Misc
Informational
02/24/2025
1-10-25 NS Site Visited and grass has stopped growing since it is winter 1-16-25 NS Site Visited and grass has stopped growing since it is winter 1-24-25 NS Site Visited and grass has stopped growing since it is winter 1-31-25 NS Site visited crews are not working because 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues
Erosion Control Inspection Partial 1/25/2025 01/25/2025
Misc
Informational
01/25/2025
1-10-25 NS Site Visited and grass has stopped growing since it is winter 1-16-25 NS Site Visited and grass has stopped growing since it is winter 1-24-25 NS Site Visited and grass has stopped growing since it is winter
Erosion Control Inspection Partial 2/24/2025 02/24/2025
Misc
Informational
01/25/2025
1-10-25 NS Site Visited and grass has stopped growing since it is winter 1-16-25 NS Site Visited and grass has stopped growing since it is winter 1-24-25 NS Site Visited and grass has stopped growing since it is winter 1-31-25 NS Site visited crews are not working because 2-3-25 NS Site Visited and still no erosion control issues 2-10-25 NS Site Visited and still no erosion control issues 2-17-25 NS Site Visited and still no erosion control issues 2-24-25 NS Site Visited and still no erosion control issues
Sanitary Sewer Construction Inspection Partial 2/26/2025 2/26/2025 02/27/2025
Misc
Informational
02/27/2025
2-26-25 DP. Aaron's crew with Advanced Excavation was onsite and began excavating for the sewer extension. They are in deep rock, so will be a slow process.
Sanitary Sewer Construction Inspection Partial 2/27/2025 2/27/2025 02/27/2025
Misc
Informational
02/27/2025
2-27-25 DP. Aaron's crew started the morning breaking rock, but their machine broke down. They are moving onto something else until next week.
Sanitary Sewer Construction Inspection Partial 3/6/2025 3/6/2025 03/06/2025
Misc
Informational
02/27/2025
2-27-25 DP. Aaron's crew started the morning breaking rock, but their machine broke down. They are moving onto something else until next week. 3-6-25 DP. Aaron's crew has started back laying the sewer extension. They have rose above rock so will be moving quicker.
Sanitary Sewer Construction Inspection Partial 3/7/2025 3/7/2025 03/07/2025
Misc
Informational
03/06/2025
2-27-25 DP. Aaron's crew started the morning breaking rock, but their machine broke down. They are moving onto something else until next week. 3-6-25 DP. Aaron's crew has started back laying the sewer extension. They have rose above rock so will be moving quicker. 3-7-25 DP. Aaron's crew finished running A line today. They set A1 and have backfilled while compacting in lifts. Today starts the 30 day wait on the extension before testing can begin.
Sanitary Sewer Construction Inspection Partial 4/18/2025 4/18/2025 04/18/2025
Misc
Informational
03/07/2025
2-27-25 DP. Aaron's crew started the morning breaking rock, but their machine broke down. They are moving onto something else until next week. 3-6-25 DP. Aaron's crew has started back laying the sewer extension. They have rose above rock so will be moving quicker. 3-7-25 DP. Aaron's crew finished running A line today. They set A1 and have backfilled while compacting in lifts. Today starts the 30 day wait on the extension before testing can begin. 4-18-25 DP. Testing can begin any time on the sewer extension. The required 30 day wait has lapsed.
Documents & Images
Date Uploaded File Type Document Name
05/10/2024 Plans 230286 Village at Discovery Park - Lot 1 Sewer Extension s
05/10/2024 Letter Sewer Extension submittal letter
06/27/2024 Plans Sewer Extension Plans_PRSUBD20242356
06/27/2024 Engineers Estimate Engineers Cost Estimate_PRSUBD20242356
06/27/2024 Letter Response letter_PRSUBD20242356
07/24/2024 Plans Sewer Extension Plans_PRSUBD20242356
07/24/2024 Engineers Estimate Engineers Cost Estimate_PRSUBD20242356
07/24/2024 Letter Response Letter_PRSUBD20242356
07/24/2024 Plans Public Sewer Esmt Exhibit_PRSUBD20242356
08/26/2024 Engineers Estimate Engineers Cost Estimate_PRSUBD20242356
08/26/2024 Recorded Document Signed Sanitary Sewer Easement_PRSUBD20242356
08/26/2024 Letter Response Letter_PRSUBD2024356
09/04/2024 Activity Document Fee Worksheet Revisions_PRSUBD20242356
09/16/2024 Letter MDNR SANITARY CONCURRENCE LETTER_PRSUBD20242356
09/16/2024 Letter SUBD Comment Letter_PRSUBD20242356
09/18/2024 Letter MDNR Concurrence Letter - PRSUBD20242356 Sanitary Village at Discovery - Lot 1
10/29/2024 Receipt Receipt_PRSUBD20242356
11/05/2024 Plans Stamped Approved Plans_PRSUBD20242356
01/25/2025 Letter INSPECTION SUMMARY
02/27/2025 Letter INSPECTION SUMMARY
02/27/2025 Letter INSPECTION SUMMARY
02/27/2025 Letter INSPECTION SUMMARY
02/27/2025 Letter INSPECTION SUMMARY
02/27/2025 Letter INSPECTION SUMMARY
02/27/2025 Letter INSPECTION SUMMARY
02/27/2025 Letter INSPECTION SUMMARY
02/27/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home