Summary


PRSUBD20214758
Public Infrastructure
Final Acceptance
SCHOOL DISTRICT 7 REORGANIZED
DEVELOPMENT COMPLETE
Public road improvements. Includes the extension of Cape Dr., intersection improvements at Bailey Rd and Hamblen Rd. and turn lanes to the school. Engineering application PL2021129
09/10/2021
01/10/2022
01/30/2024
Locations
Contacts
SCHOOL DISTRICT 7 REORGANIZED, Address:301 NE TUDOR RD  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
SEXTON PROPERTIES LLC, Address:398 NW 1851ST RD  
CHAPEL OAKS DEVELOPMENT CO, Address:3606 NE INDEPENDENCE AVE  
OLSSON ASSOCIATES, Address:1301 BURLINGTON, SUITE 100, Phone:(816) 361-1171  
MCCOWN GORDON CONSTRUCTION LLC, Address:850 MAIN ST, Phone:(816) 960-1111  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
JARRETT SIERKS, Address:TEAGUE ELECTRIC, Phone:(913) 238-6022  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 09/10/2021 09/17/2021
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 10/04/2021
91100C9-Water Insp Fee $933.90 $933.90 Paid 10/04/2021
9110068-Storm Fee $2,440.31 $2,440.31 Paid 10/04/2021
9110081-Street Inspections $39,634.90 $39,634.90 Paid 10/04/2021
9110071-Site Grading Fee $4,670.98 $4,670.98 Paid 10/04/2021
9110072-Water Test Fee $200.00 $200.00 Paid 10/04/2021
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Site Visit Partial 02/11/2022
Misc
Informational
02/09/2022
On Wednesday 2-09-2022. Teague Electric mobilized and drilled signal bases at the intersection of Bailey and Hamblen.
Misc
Informational
02/11/2022
On Friday 2-11-2022. Teague Electric set steel and bolts for concrete placement for the NE SE & NW corners . The Traffic electrical box footing is also poured. The goggle fiber group is on site relocating the fiber lines on the SE corner due to a location adjustment.
Misc
Informational
02/11/2022
On Friday, 2-11-2022. Teague Electric hit rock before getting to the design depth of 13 FT. Contractor got to 11 FT. Will have a sub contractor finish the designed depth some time next week.CFS Testing lab tested concrete and will send test results to me when they come in.
Erosion Control Inspection Passed 03/02/2022
Misc
Informational
03/02/2022
On Wednesday, 3-02-2022. Erosion Specialist installed silt fencing for the south side of the street.
Grading/Excavation/Fill Inspection Partial 04/11/2022
Misc
Informational
03/17/2022
Pt Sunny 73 degrees On Tuesday, 3-15-2022 through Thursday 3-17-2022. Amino Brothers completed dirt removal for lane widening between Hamblen and SE Norwood on Bailey. Contractor began placement of Geo-grid and rock for approx 300 LF of lane. Contractor cannot complete the total lane fill dirt removal due to a utility pending relocation. Cloudy, rain off and on high 43 On Friday 3-18-2022. Amino Brothers resumed type 5 rock installation and compacted on Bailey between Broadway and Norwood.
Misc
Informational
03/21/2022
Cloudy 60 degrees Monday, 3-21-2022. Amino Brothers moved to the west end of the school entrance and began dirt removal for the lane widening. Also survey staking for the curbing was staked for the intersection at Bailey and Hamblen moving east to Broadway and Norwood. All staking on the south side of the street.
Misc
Informational
04/04/2022
On Monday 4-04-2022, Amino Brothers resumed dirt Excavating for the line addition at the east entrance. On Thursday 4-07-2022, A proof roll was performed and failed testing. Contractor was told no rock could be placed until contractor retested sub-grade and passed it.
Misc
Informational
04/11/2022
On Monday, 4-11-2022. A proof roll was conducted and the far west section of the roadway passed for the contractor to place 6” shot rock with geo-grid. Then cover with Type 5 and geo-grid. Third party testing was completed by Cook,flat and Smobel .
Misc
Informational
04/20/2022
On Tuesday 4-19-2022, Amino Brothers began demolition of curb and driveway at 15th & Dalton Dr. Contractor preparing for drive and curb installation for 1501 SE Dalton Dr. On Wednesday, 4-20-2022. The contractor resumes demolition of existing roadway for installation of new driveway for 1501 SE Dalton Dr. Contractor placing rock base for property owner to park vehicle.
Misc
Informational
04/25/2022
On Monday 4-25-2022 Amino Brothers Backfilled between the east of the east entrance towards the first CI for the street lane widening. On Wednesday, 4-27-2022, the contractor is digging unsuitable fill east of the east entrance down to the CI’s and is installing geo-grid and shut rock. The contractor is also placing shot rock west of the east entrance where the fill was not completed prior. Approx 150LF. On Thursday. 4-28-2022 Amino brothers resume rock installation for the lane widening at the east side of the east entrance. Rain has come in and is expected off and on for the day. On Friday, 4-29-2022 Amino Brothers resume rock sub-base installation at the east entrance.
Misc
Informational
05/13/2022
On Friday, 5-13-2022 the Amino Brothers worked the sub-grade at the east entrance.
Misc
Informational
06/13/2022
On Monday, 6-13-2022. Amino Brothers placed 3” shot rock and compacted for sub-grade stabilization at the Cape Street entrance. Contractor also placed geo-grid and 10” type 5 rock and compacted. Amino Brothers completed backfill for driveway on Dalton Street intersection.
Misc
Informational
06/22/2022
On Monday and Tuesday 6-20 &6-21-2022. Amino Brothers cut grade and hauled dirt fill for the sidewalk at the school entrances and at the west end of the project at Hamblen and Bailey. On Wednesday, 6-22-2022. Amino Brothers formed CG-1 curb and poured radius and throats for east entrance of school.
Misc
Informational
06/30/2022
On Thursday, 6-30-2022. Amino Brothers are grading the 10’ wide sidewalk for the schools entrances. Also Throne Asphalt has graded remaining subgrade for first lift of base asphalt at the north side of the school. McCown Gordon is cleaning larger parking lot in prep for surface asphalt installation. On Friday, 7-01-2022. Amino Brothers begin removals of curbing and fill dirt where fiber cables were located at the SE corner of Bailey and Hamblen. AT&T have completed the fiber phone line relocation.
Misc
Informational
07/15/2022
On Friday, 7-15-2022. Contractor completing soil removal for sidewalk installation at the intersection of Hamblen and Bailey at the south side of roadway east side of intersection.
Misc
Informational
08/01/2022
On Saturday, 7-30-2022. The contractor worked back filling curbing at Century and Bailey.
Misc
Informational
08/05/2022
On Friday, 8-05-2022. Amino Brothers completing dirt fill removal and grading at the east end of the project at the end of the lane taper. Contractor also placing surface asphalt at Ranson Road & Bailey.
Storm Sewer Construction Inspection Partial 05/02/2022
Misc
Informational
04/05/2022
On Tuesday, 4-05-2022, The Amino Brothers Construction Co. installed CI box E-1 at the east end of the entrance. It was found the honch that was designed to go around the sides of the box came without them. The contractor was notified and I will ask for the solution from an engineer. The contractor also completed demo of the curbs along the front of school. On Wednesday, 4-06-2022. Amino Brothers installed the 12’x4’ CI and approx 40 ft 15” of RCP. The 2 - 36” RCP pipes that tie into the existing CI box are squid to the right and will not meet flush into the existing CMP pipe. On Thursday, 4-07-2022. The contractor installed CI E-3 and approx 15 ft of RCP. On Friday, 4-08-2022 it was discovered, The easterly 36” RCP pipe will drain towards the center wall of the new box and the front wall of the new box has been removed due the askew of the pipe. The contractor has poured the invert and front wall back before I could I could notify the engineers of the findings. Ryan Fleming of Olson has been notified of the findings.
Misc
Informational
04/11/2022
On Monday, 4-11-2022. Amino Brothers placed approx 200 LF of 15” RCP and back fill east of the east school entrance.
Misc
Informational
04/25/2022
On Monday 4-25-2022. Amino Brothers Contracting resumed 15” RCP Storm Sewer installation located at the east entrance. The contractor relocated the 6” Waterline that was in conflict on Friday. And back filled. Contractor also installed (1) CI west of the east entrance of the school completing roadway storm sewer. Contractor will pour invert for CI
Misc
Informational
05/02/2022
On Monday, 5-02-2022. The Amino Brothers began installation of the haunches on the east and west sides of the prior installed CI’s located east of the east entrance of the school. It was also determined. The existing CI that is supposed to be made a 10x4 junction box is actual (2) 5x4 CI’s. After talking with the designer Ryan Fleming of Olson Engineering. It was determined we are going to change purposed CI junction box to a inclosed storm sewer system by modifying the existing boxes and filling them in with concrete. This will allow us to eliminate the lid and cover the structure with asphalt.
Pavement-Stabilized Subgrade Failed 05/11/2022
Misc
Informational
04/18/2022
On Friday, 4-15-2022. It was determined the sub-grade for the lane additions in front of the middle school were to wet to stabilize. The 3rd party testing firm suggested the contractor Amino Brothers place multiple layers of 3” shot rock with geo-grid for a total of 10” west of the west entrance and 14” of rock in 6” layers with geo-grid east of the west entrance. Then a proof roll will be performed. The contractor completed the west roadway widening.
Misc
Informational
04/18/2022
On Monday, 4-18-2022. Amino Brothers resumed stabilization on the east side of the east entrance. Shot rock is compacted and a proof roll will be preformed.
Misc
Informational
05/11/2022
Did a proofroll on the 2 stub streets on the dirt with a 20 ton load. Proofroll failed, very wet.
Pavement-Stabilized Subgrade Partial 05/11/2022
Misc
Informational
05/11/2022
Amino Bros worked on installing the rock in the turn lane on the east side of the entrance on Bailey Rd.
Pavement-Aggregate Base Partial 05/17/2022
Misc
Informational
05/17/2022
Amino Bros think that water is coming out Of the subgrade. They are submitting to the design engineer as what to do with the wet area between the 2 entrances off of Bailey Rd.
Pavement-Proof Roll Passed 06/15/2022
Misc
Informational
06/15/2022
On Thursday, 6-09-2022. A proof roll was conducted and passed in front of middle school for placement of asphalt pavement.
Pavement-Curb Construction Partial 06/22/2022
Misc
Informational
05/23/2022
On Monday 5-23-2022, Amino brothers formed and poured approx 280 LF of CG-1 curb at the intersection of Hamblen & Bailey. Contractor also poured concrete full depth for roads pavement.
Misc
Informational
06/15/2022
On Wednesday, 6-15-2022. Amino Brothers formed curb radius’s on Cape st for the intersection for the far south entrance. On Thursday, 6-16-2022. Amino Brothers Formed and installed CG-1 curbing at both the Cape Drive entrances. One at the far sW edge of the project and the other at the NW edge at the roadway tie-ins.
Misc
Informational
06/20/2022
On Friday, 6-17-2022. Amino Brothers completed approx 1,200 LF of CG-1 curb for the front entrance of the school.
Misc
Informational
06/22/2022
On Wednesday, 6-22-2022 Amino Brothers formed and poured CG-1 curb and (3) throats at the east end of the lane widening.
Misc
Informational
06/27/2022
On Monday, 6-27-2022. Amino Brother formed and placed CG-1 curbing on bailey and on Broadway on and also the entrance for the west entrance of the school.
Misc
Informational
07/07/2022
On Thursday, 7-07-2022. Amino Brothers poured CG-1 curbing formed day prior. Contractor poured approx 500 LF of curb in front of the animal hospital and then at the south side of the street between Broadway and Hamblen. And then at the SW corner of Hamblen and Bailey. Curb was cured.
Misc
Informational
07/11/2022
On Monday, 7-11-2022. Amino Brothers poured CG-1 curb radius at the SE corner of Bailey and Century.
Misc
Informational
07/21/2022
On Wednesday, 7-20-2022. Amino Brothers formed and then removed curb formed at the nw corner of the intersection at Bailey and Century. Not sure way they did that? On Thursday, 7-21-2022. Contractor re-installed the curb forms at the intersection of Bailey and Century. Also formed the NW corner of the intersection. Got a complaint of cracked curb at the staging entrance at Broadway and Bailey. Did find curb had crack caused by contractor. Will have curb repaired.
Grading/Excavation/Fill Inspection Partial 07/13/2022
Misc
Informational
03/17/2022
Pt Sunny 73 degrees On Tuesday, 3-15-2022 through Thursday 3-17-2022. Amino Brothers completed dirt removal for lane widening between Hamblen and SE Norwood on Bailey. Contractor began placement of Geo-grid and rock for approx 300 LF of lane. Contractor cannot complete the total lane fill dirt removal due to a utility pending relocation.
Misc
Informational
07/13/2022
7-13-22 RH. Sidewalk grading and vegetation removal continues around the SE corner Bailey and Broadway.
Site Visit Partial 07/13/2022
Misc
Informational
02/14/2022
On Wednesday 2-09-2022. Teague Electric mobilized and drilled signal bases at the intersection of Bailey and Hamblen.
Misc
Informational
02/14/2022
On Friday 2-11-2022. Teague Electric set steel and bolts for concrete placement for the NE SE & NW corners . The Traffic electrical box footing is also poured. The goggle fiber group is on site relocating the fiber lines on the SE corner due to a location adjustment. On Monday, 2-14-2022. The contractor resumed signal base installation on the SE corner of the intersection. Contractor drilled base, set steel cage and poured base. Contractor also did some conduit boring for the traffic box.
Misc
Informational
07/13/2022
7-13-22 RH. While visiting site at Bailey and Ranson Rd a cable line was hit and knocked down from power line before arriving. Contractor had informed us that a truck driver had hit line with the bed of truck. Contractor had already contacted cable company.
Pavement-Surface Passed 08/02/2022
Misc
Informational
06/15/2022
On Wednesday, 6-14-2022. Amino Brothers layed asphalt base from Idecker asphalt in Grandview Mo. on the lane widening in front of the middle school and (1) lift of base asphalt was placed east of the Hamblen and Bailey Rd intersection. Asphalt was also placed in front of the animal Hospital.
Misc
Informational
07/07/2022
On Thursday, 7-07-2022. Amino Brothers Asphalt placed 2nd base lift of asphalt in front of school entrances.
Misc
Informational
07/29/2022
On Friday, 7-29-2022. Amino Brothers placed Base Lift of asphalt on the turn lane from Bailey to Broadway to Norwood Dr.
Misc
Informational
08/01/2022
On Saturday, 7-30-2022. Contractor placed base asphalt at the SE entrance of Cape Dr.
Misc
Informational
08/01/2022
On Monday, 8-01-2022. Amino Brothers are placing surface asphalt at entrances for the school turn lanes. Contract also placing surface asphalt for the intersection of Bailey and Century. All surface is placed on lane widening on Bailey Rd. On Tuesday, 8-02-2022. Asphalt contractor finished asphalt surface for the lane widening and various entrances around the Middle school. this completes all asphalt for Lee’s summit area. States Ranson Rd has not been completed as of today.
Site Visit Partial 08/03/2022
Misc
Informational
02/11/2022
On Wednesday 2-09-2022. Teague Electric mobilized and drilled signal bases at the intersection of Bailey and Hamblen.
Misc
Informational
02/11/2022
On Friday 2-11-2022. Teague Electric set steel and bolts for concrete placement for the NE SE & NW corners . The Traffic electrical box footing is also poured. The goggle fiber group is on site relocating the fiber lines on the SE corner due to a location adjustment. On Monday, 2-14-2022. The contractor resumed signal base installation on the SE corner of the intersection. Contractor drilled base, set steel cage and poured base. Contractor also did some conduit boring for the traffic box. On Tuesday, 2-15-2022. Teague electric bored under roadway for push button signals bases. Contractor also worked boring at Bailey and ransom Rd. On Wednesday, 2-16-2022. Teague Electric bored conduit for push button signal bases.
Misc
Informational
02/21/2022
On Monday, 2-21-2022. Teague Electric installed conduit and pull box on the SE corner on Bailey and Hamblen. Contractor also installed conduit on the NE corner for the signal base. On Tuesday, 2-22-2022. Contractor resumed conduit installation for traffic signal work at the intersection of Hamblen and Bailey. On Wednesday, 2-23-2022. McCown Gorden held a reconstruction meeting with Sub Contractor Amino Brothers Construction, MoDot Inspector (Nathan Juliana) and myself. Ground rules were set and a start date of March 1st was given. A schedule of the locations will be forwarded to all parties. On Thursday, 2-24-2022. The contractor Teague Electric prepared signal pole bases for East bound (SE) corner and the (NW) corners. Contractor will pour tomorrow.
Misc
Informational
03/01/2022
On Monday, 2-28-2022. Teague Electric resumed boring at the Intersection of Bailey and Hamblen. Contractor also bored at Ranson rd and Bailey. On Tuesday contractor resumed drilling for signal bases at the intersection of Bailey and Ransom Rd. Contractor also bored for Hamblen, Bailey intersection. On Wednesday 3-02-2022. Amino Brothers construction Inc. had the saw cutting company Fine cut out sawing the street preparing for street demo. On Wednesday 3-02-2022. Traffic Control barricades were placed on the south side of the street from the intersection of Bailey and Hamblen to the east end of the lane widening. On Friday, 3-04-2022 Amino Brothers began demo removal of sidewalk on Bailey Rd from sta. 54+50 to 57+00 south side of street.
Misc
Informational
03/08/2022
On Tuesday, 3-08-2022. Amino Brothers began ADA and sidewalk demo at the SE corner of SE Norwood Dr. Contractor also removed dirt fill for proposed 10’ sidewalk and new curbing. On Wednesday, 3-09-2022. Contractor resumed demo of curb and hauled at SW corner of Bailey and Hamblen and at the Animal hospital between Broadway Norwood Dr. Contractor not working due to winter storm.
Misc
Informational
03/14/2022
Monday, 3-14-2022, No work preformed. However contractor had utilities located for conflicts. Sunny 63 On Tuesday 3-15-2022. Amino Brothers resume removing fill dirt for line widening and hauled between Hamblen & Broadway St. on Bailey Rd.
Misc
Informational
03/29/2022
PT Cloudy 53 degrees On Monday, 3-28-2022, Amino Brothers resumed soil removal for new lane installation in front of the school at the west entrance. Contractor also moved to the east entrance and begin grading down to the existing CI. PT Sunny 72 degrees On Tuesday, 3-29-2022. The contractor resumed fill removal in front of the school entrances between both drive entrances . Cloudy cold and windy High 40 Wednesday 3-30-2022. Rain over night. Too wet, no work today!
Misc
Informational
04/25/2022
On Monday, 4-25-2022. Teague Electric assembled and installed signal poles and lights at the intersection of Hamblen and Bailey.
Misc
Informational
05/20/2022
On Friday, 5-20-2022. Amino Brothers formed and poured driveway on for roadway closure for 15th St and Dalton.
Misc
Informational
05/23/2022
On Monday, 5-23-2022. Amino Brothers formed and poured CS-curb at 15th &Dalton St. The contractor also worked at the intersection of Helen and Bailey preparing sub grade for concrete placement. Contractor forming for CG-1 Curb placement.
Misc
Informational
06/15/2022
On Wednesday and Thursday, June 14th & 15th. The contractor Amino Brothers removed dirt fill for sidewalk placement on the south west side of street at Hamblen and Bailey.
Misc
Informational
06/20/2022
On Monday, 6-20-2022. McCown Gordon, Amino Brothers, AT&T and my self Rep for the City of Lee’s Summit. The meeting was for the remove or relocation of the fiber line at the intersection of Hamblen and Bailey. AT&T Will try to acquire some 800 pair wire by this week to make the necessary repairs to complete the intersection. On Friday, 6-24-2022. Amino Brothers set some forms for CG-1 curbs at the west entrance of the school and also the transition curb for the lane merge at the west end of the school before the rain came.
Misc
Informational
07/08/2022
On Friday, 7-08-2022 the Amino Brothers Construction company completed demo for the (2) CI located on the east side of street on Century, south of Hamblen St. On Saturday, 7-09-2022. Contractor Amino Brothers formed up 10’ wide sidewalk in front of school adjacent the lane widening. Contractor also sat CI’s on Century south of Hamblen St. Took pictures of phone line. Phone line is located directly under CI on north CI installed. Looks to have approx 6” of cover.
Misc
Informational
07/11/2022
On Monday 7-11-2022. Amino Brothers began pouring the 10’ wide sidewalk in the front of the school on Bailey Rd. Found a curb elevation bust at the west entrance on the east side of the drive entrance. Approx 20’ of curb and gutter will have to be removed and replaced to meet ADA spec’s. Amino Brothers set all (3) CI’s on Century and Bailey and poured inverts. The contractor in countered a AT&T phone line with the far north box at the Day care. The contractor dug around the phone line an got slack, set 6” of rock for CI to sit on top of the phone line . I took pictures and will discuss with others.
Misc
Informational
07/18/2022
On Monday 7-18-2022. Amino Brothers formed and poured approx 200 LF of 10’ wide sidewalk along the far west end of the west entrance at the school and at the ADA ramps at the east entrance, west and east ramps. Contractor formed and poured approx 100’ of 10’ wide city sidewalk at the Far East end of the line tapper at the east end of the project. On Tuesday, 7-19-2022. Amino Brothers remove curbing poured pervious at the east side of the west entrance and re-formed to meet the designed profile for that side of the ramp for that entrance. Contractor poured ramps on both sides of the west entrance. Also contractor poured east ramp for east entrance and also poured approx 80’ of 10’ wide sidewalk at the CI’s and the end of the lane merge On Thursday, 7-21-2022. Contractor formed curb formed removed day prior at the NE corner of Bailey and Century. On Friday 7-22-2022. Amino Brothers poured ADA ramps at the SE and SW corners of the intersection of Bailey and Hamblen. Contractor also poured CG-1 curb at the NE corner of the intersection, pouring to the Child Prodigy school.
Misc
Informational
07/27/2022
On Wednesday,7-27-2022. The contractor Amino Brothers worked forming the west and East entrance ADA ramps for the middle school. The contractor poured both ramps. Contractor also poured CG-1 curbing at Bailey and Ranson Rd. On Thursday, 7-28-2022. Amino Brothers are digging out sub grade for ADA ramp at the NW corner of Century and Bailey in the rain. Teague Elec. is forming pads around bases as well. Contractor milled edge of asphalt for street in front of school for surface placement on Monday. On Friday, 7-29-2022. Teague Elec. formed pole bases at the intersection of Bailey and Century. Approved forms for concrete placement around pull boxes and pole bases.
Misc
Informational
08/01/2022
On Monday, 8-01-2022. Jeff with McCown Gordon called me and requested a proof roll at Bailey and Ranson Rd. Contractor knows this is the states property and not Lee’s Summits jurisdiction. I witnessed a proof roll for the turn lane on Ranson west side of street heading south bound. Found (3) small areas that contractor will place 18” of 3” shot rock and cap with geo-grid and type 5. Pictures will be taken showing rock placement. Contractor was made aware I will not pass or fail sub-grade. I am observering sub-grades condition. On Monday and Tuesday 8-02-2022. Teague Electric is pouring all concrete caps for pull boxes and bases. On Wednesday, 8-03-2022. Amino Brothers Formed and poured (2) ADA Corners. One at 15th & Dalton, with approx 50 LF of 4’ wide sidewalk. At 15th & Cape the contractor poured 5’ ramp but should have poured a 6’ one Contractor will replace ramp to designed size. Approx 25 LF of 5’ sidewalk was poured at that location as well. The Amino Brothers formed 10’ wide sidewalk at the lane widening between Broadway and Hamblen on Bailey and poured approx 90’. Teague Electric installed ped poles at the intersection of Bailey & Hamblen/Century
Site Visit Partial 08/10/2022
Misc
Informational
07/13/2022
On Wednesday 2-09-2022. Teague Electric mobilized and drilled signal bases at the intersection of Bailey and Hamblen.
Misc
Informational
07/13/2022
On Friday 2-11-2022. Teague Electric set steel and bolts for concrete placement for the NE SE & NW corners . The Traffic electrical box footing is also poured. The goggle fiber group is on site relocating the fiber lines on the SE corner due to a location adjustment. On Monday, 2-14-2022. The contractor resumed signal base installation on the SE corner of the intersection. Contractor drilled base, set steel cage and poured base. Contractor also did some conduit boring for the traffic box.
Misc
Informational
07/13/2022
7-13-22 RH. While visiting site at Bailey and Ranson Rd a cable line was hit and knocked down from power line before arriving. Contractor had informed us that a truck driver had hit line with the bed of truck. Contractor had already contacted cable company.
Misc
Informational
08/10/2022
On Wednesday, 8-10-2022 Amino Brothers cleaned sidewalk and punch list items given yesterday. Teague Elec. turned on signal lights at Bailey and Century however lights were placed back at blinking red by traffic due to incomplete work at the intersection.
Site Visit Partial 08/11/2022
Misc
Informational
08/10/2022
On Wednesday 2-09-2022. Teague Electric mobilized and drilled signal bases at the intersection of Bailey and Hamblen.
Misc
Informational
08/10/2022
On Friday 2-11-2022. Teague Electric set steel and bolts for concrete placement for the NE SE & NW corners . The Traffic electrical box footing is also poured. The goggle fiber group is on site relocating the fiber lines on the SE corner due to a location adjustment. On Monday, 2-14-2022. The contractor resumed signal base installation on the SE corner of the intersection. Contractor drilled base, set steel cage and poured base. Contractor also did some conduit boring for the traffic box.
Misc
Informational
08/10/2022
7-13-22 RH. While visiting site at Bailey and Ranson Rd a cable line was hit and knocked down from power line before arriving. Contractor had informed us that a truck driver had hit line with the bed of truck. Contractor had already contacted cable company.
Misc
Informational
08/10/2022
On Wednesday, 8-10-2022 Amino Brothers cleaned sidewalk and punch list items given yesterday. Teague Elec. turned on signal lights at Bailey and Century however lights were placed back at blinking red by traffic due to incomplete work at the intersection. The paint striper are on project to lay out for the pavement markings
Site Visit Partial 08/16/2022
Misc
Informational
08/11/2022
On Wednesday 2-09-2022. Teague Electric mobilized and drilled signal bases at the intersection of Bailey and Hamblen.
Misc
Informational
08/11/2022
On Friday 2-11-2022. Teague Electric set steel and bolts for concrete placement for the NE SE & NW corners . The Traffic electrical box footing is also poured. The goggle fiber group is on site relocating the fiber lines on the SE corner due to a location adjustment. On Monday, 2-14-2022. The contractor resumed signal base installation on the SE corner of the intersection. Contractor drilled base, set steel cage and poured base. Contractor also did some conduit boring for the traffic box.
Misc
Informational
08/11/2022
7-13-22 RH. While visiting site at Bailey and Ranson Rd a cable line was hit and knocked down from power line before arriving. Contractor had informed us that a truck driver had hit line with the bed of truck. Contractor had already contacted cable company.
Misc
Informational
08/11/2022
On Wednesday, 8-10-2022 Amino Brothers cleaned sidewalk and punch list items given yesterday. Teague Elec. turned on signal lights at Bailey and Century however lights were placed back at blinking red by traffic due to incomplete work at the intersection. The paint striper are on project to lay out for the pavement markings
Misc
Informational
08/16/2022
On Tuesday, 8-16-2022. Amino Brothers formed sidewalk at the south side of street from 60 ft east of Hamblen and Bailey to the full length of the block at the animal shelter. Contractor ran out of forms to continue. Contractor was told that sub grade for a lot of the sidewalk formed would not meet compliance to place concrete. Rock removal and re-grading would be needed to pour concrete tomorrow.
Site Visit Complete 08/18/2022
Misc
Informational
08/16/2022
On Wednesday 2-09-2022. Teague Electric mobilized and drilled signal bases at the intersection of Bailey and Hamblen.
Misc
Informational
08/16/2022
On Friday 2-11-2022. Teague Electric set steel and bolts for concrete placement for the NE SE & NW corners . The Traffic electrical box footing is also poured. The goggle fiber group is on site relocating the fiber lines on the SE corner due to a location adjustment. On Monday, 2-14-2022. The contractor resumed signal base installation on the SE corner of the intersection. Contractor drilled base, set steel cage and poured base. Contractor also did some conduit boring for the traffic box.
Misc
Informational
08/16/2022
7-13-22 RH. While visiting site at Bailey and Ranson Rd a cable line was hit and knocked down from power line before arriving. Contractor had informed us that a truck driver had hit line with the bed of truck. Contractor had already contacted cable company.
Misc
Informational
08/16/2022
On Wednesday, 8-10-2022 Amino Brothers cleaned sidewalk and punch list items given yesterday. Teague Elec. turned on signal lights at Bailey and Century however lights were placed back at blinking red by traffic due to incomplete work at the intersection. The paint striper are on project to lay out for the pavement markings
Misc
Informational
08/16/2022
On Tuesday, 8-16-2022. Amino Brothers formed sidewalk at the south side of street from 60 ft east of Hamblen and Bailey to the full length of the block at the animal shelter. Contractor ran out of forms to continue. Contractor was told that sub grade for a lot of the sidewalk formed would not meet compliance to place concrete. Rock removal and re-grading would be needed to pour concrete tomorrow. On Wednesday, 8-17-2022. Amino Brothers formed and poured back sidewalk at various locations on Bailey from Hamblen to Norwood. They also poured both commercial drives at the day care and across the street for KC Dumpsters. Finally the contractor placed asphalt for the SE corner of Bailey and Hamblen and at the drive entrance of KC Dumpster. On Thursday, 8-18-2022, Contractor formed and poured ADA Ramps at the intersection of Century and Bailey, at the west corner of Norwood and Bailey and finally the ramp at the east corner of Broadway and Bailey.
Grading/Excavation/Fill Inspection Partial 08/22/2022
Misc
Informational
07/13/2022
Pt Sunny 73 degrees On Tuesday, 3-15-2022 through Thursday 3-17-2022. Amino Brothers completed dirt removal for lane widening between Hamblen and SE Norwood on Bailey. Contractor began placement of Geo-grid and rock for approx 300 LF of lane. Contractor cannot complete the total lane fill dirt removal due to a utility pending relocation.
Misc
Informational
07/13/2022
7-13-22 RH. Sidewalk grading and vegetation removal continues around the SE corner Bailey and Broadway.
Misc
Informational
08/22/2022
On Monday, 8-22-2022. Amino Brothers resume back fill at various locations throughout the project. Mainly towards the intersection of Bailey and Hamblen.
Install Street and Stop Signs Passed 08/22/2022
Misc
Informational
08/22/2022
On Monday, 8-22-2022 All signage has been completed. The last stop signs for the school entrances have been installed completing sign installations.
ESC - (Vegetation/Ground Cover) Partial 09/12/2022
Misc
Informational
09/12/2022
On Monday 9-12-2022. Contractor finish grading for placement of sodding throughout project. Sod delivered to Hamblen to Broadway.
ESC - (Vegetation/Ground Cover) Partial 09/13/2022
Misc
Informational
09/12/2022
On Monday 9-12-2022. Contractor finish grading for placement of sodding throughout project. Sod delivered to Hamblen to Broadway. On Tuesday 9-13-2022. Contractor ran out of sodding and did not place sodding at the animal hospital. Contractor grading for sod at the middle school and began hydro seeding.
ESC - (Vegetation/Ground Cover) Passed 09/19/2022
Misc
Informational
09/13/2022
On Monday 9-12-2022. Contractor finish grading for placement of sodding throughout project. Sod delivered to Hamblen to Broadway. On Tuesday 9-13-2022. Contractor ran out of sodding and did not place sodding at the animal hospital. Contractor grading for sod at the middle school and began hydro seeding.
Misc
Informational
09/19/2022
On Monday, 9-19-2022 all seeding and sodding completed on project.
Documents & Images
Date Uploaded File Type Document Name
10/04/2021 Receipt Receipt for transaction: 2021-007752
12/09/2021 Letter DE-Permit
12/15/2021 Approved Plans East Trails Middle School Off-site Traffic, Signal and Greenway Approved 12.15.21
02/11/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
02/14/2022 Letter INSPECTION SUMMARY
02/15/2022 Letter INSPECTION SUMMARY
02/24/2022 Letter INSPECTION SUMMARY
03/01/2022 Letter INSPECTION SUMMARY
03/02/2022 Letter INSPECTION SUMMARY
03/18/2022 Letter INSPECTION SUMMARY
03/18/2022 Letter INSPECTION SUMMARY
04/05/2022 Letter INSPECTION SUMMARY
03/31/2022 Approved Plans APPROVED REVISION TO SIDEWALK CROSSWALK
04/07/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/20/2022 Letter INSPECTION SUMMARY
04/25/2022 Letter INSPECTION SUMMARY
04/25/2022 Letter INSPECTION SUMMARY
04/25/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
05/02/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter INSPECTION SUMMARY
05/17/2022 Letter INSPECTION SUMMARY
05/23/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/16/2022 Letter INSPECTION SUMMARY
06/22/2022 Letter INSPECTION SUMMARY
06/24/2022 Letter INSPECTION SUMMARY
07/07/2022 Letter INSPECTION SUMMARY
07/08/2022 Letter INSPECTION SUMMARY
07/13/2022 Letter INSPECTION SUMMARY
07/13/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
08/03/2022 Letter INSPECTION SUMMARY
08/10/2022 Letter INSPECTION SUMMARY
08/18/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/29/2022 Letter DE-Certificate of Substantial Completion Single Lot
08/31/2022 Letter DE-Certificate of Substantial Completion Single Lot
08/31/2022 Activity Document East Trails Middle School -Off-Site Road Improvements Substantial Completion
09/01/2022 Activity Document East Trails Middle School -Off-Site Road Improvements Punch List
09/12/2022 Letter INSPECTION SUMMARY
09/13/2022 Letter INSPECTION SUMMARY
09/19/2022 Letter INSPECTION SUMMARY
11/09/2022 Letter INSPECTION SUMMARY
11/09/2022 Letter INSPECTION SUMMARY
11/17/2022 Letter INSPECTION SUMMARY
06/15/2023 Plans Lee's Summit Plan Set - 11_04_2022 - SEALED
10/26/2023 Security Document Teague Affidavit
10/26/2023 Security Document Amino Affidavit
10/26/2023 Security Document Traffic Signal - MGC Maintenance Bond.pdf - Shortcut
10/26/2023 Security Document Public Roadway Improvements - MGC Maintenance Bond
01/30/2024 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home