Permit Application Status

PRSITE20192650


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSITE20192650
Development - Site
Final Acceptance
FSD WOODS CHAPEL LLC
DEVELOPMENT COMPLETE
Full site development for Taco Bell and Scooters Coffee.
09/17/2019
10/10/2019
07/02/2020
Locations
Contacts
FSD WOODS CHAPEL LLC, Address:456 1ST ST W FL 2  
BEAR CONSTRUCTION SERVICES, Address:9218 METCALF #311, Phone:(913) 674-8004  
LELAND HICKS, Address:8017 HIGH DRIVE, Phone:(913) 238-0081  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 09/17/2019 09/17/2019
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Insp Fees $410.70 $410.70 Paid 09/24/2019
Water Insp Fee $326.10 $326.10 Paid 09/24/2019
Storm Sewer Inspection Fee $1,064.25 $1,064.25 Paid 09/24/2019
Paved Surface Inspection Fee $5,744.91 $5,744.91 Paid 09/24/2019
Site Grading Fee $3,938.70 $3,938.70 Paid 09/24/2019
Water Tap Fee $36,408.00 $36,408.00 Paid 09/24/2019
Water Meter Fee $2,624.68 $2,624.68 Paid 09/24/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Water Line - Construction Inspection Partial 10/24/2019
Misc
Informational
10/24/2019
Contractor ( Bair Excavating ) installed 3/11 deg bends, 3/22 deg bends & 2/45 deg bends on replacement waterline. Backing thrust blocks will be poured tomorrow. Contractor installed approximately 80’ of 8” pipe with fittings.
Water Line - Construction Inspection Partial 10/25/2019
Misc
Informational
10/24/2019
Contractor ( Bair Excavating ) installed 3/11 deg bends, 3/22 deg bends & 2/45 deg bends on replacement waterline. Backing thrust blocks will be poured tomorrow. Contractor installed approximately 80’ of 8” pipe with fittings.
Misc
Informational
10/25/2019
Contractor complete construction of replacement 8” PVC line with DIP bends just short of the two Tie-in location. Contractor passed Hydrostatic Test on replacement water line 2hours at 150psi.
Water Line - Construction Inspection Partial 10/29/2019
Misc
Informational
10/25/2019
Contractor ( Bair Excavating ) installed 3/11 deg bends, 3/22 deg bends & 2/45 deg bends on replacement waterline. Backing thrust blocks will be poured tomorrow. Contractor installed approximately 80’ of 8” pipe with fittings.
Misc
Informational
10/25/2019
Contractor complete construction of replacement 8” PVC line with DIP bends just short of the two Tie-in location.
Misc
Informational
10/26/2019
Approximately 5 thrust blocks were poured behind water main bends. Contractor will complete thrust blocks on another date.
Misc
Informational
10/29/2019
Contractor chlorinated water line .
Misc
Informational
10/30/2019
water line was DeChlorinated line @ 10:30 am 10/30/19. First Bacterial sample will be pulled 10/31/19.
Storm - Pipe Partial 10/29/2019
Misc
Informational
10/29/2019
Contractor ( Bair Excavation) installed approximately 70’ of 18” HDPE storm pipe. 0+00 to 70+00. Gravel was layed to ensure storm pipe meets grade with a 0.75% slope.
Misc
Informational
10/30/2019
Contractor poured flowable fill over storm pipe as per construction plans. Concrete schedule for 10/31/19.
Misc
Informational
11/06/2019
Contractor Installed 120’ of 18” HDPE backfilled with gravel dirt.
Misc
Informational
11/07/2019
Contractor installed 60’ of 18 “ HDPE to Junction Box Sta 2+46. Gravel then Flowable Fill throughout storm line excavation. 11/7/19
Misc
Informational
11/08/2019
Contractor poured 8” of concrete over 18” HDPE storm pipe. 11/8/19
Misc
Informational
11/11/2019
Misc
Informational
11/11/2019
Contractor installed approximately 75’ of 18” HDPE storm pipe 11/1019. 4 steel plates to allow traffic to continue in driving lanes. Followable Fill will be poured at later due to weather.
Sanitary Sewer Construction Inspection Partial 10/31/2019
Misc
Informational
10/31/2019
Contractor (Bair Exavating) installed approximately 108’ of 8” of PVC. Contractor began installing Manhole A1.
Misc
Informational
11/01/2019
Contractor continued. To run 6” PVC sanitary line up to the stub line for the proposed restaurant Scooter’s. Approximately 80’ was installed with a 45 deg bend at ss(11) as per plans pg C5.0 . Contractor ran approximately 10’ of 6” SDR-26 for sanitary service line and began 6” SDR-26 for grease trap.
Misc
Informational
11/08/2019
Storm - Outlet Structure Partial 11/07/2019
Misc
Informational
10/28/2019
Contractor ( Bair Const.) started working on the storm line. The existing Storm box was reconstructed to install line. 10/28/19
Misc
Informational
10/29/2019
Contractor ( Bair Const.) started working on the storm line. The existing Storm box was reconstructed to install line. 10/28/19
Misc
Informational
10/29/2019
Contractor (Bair Excavation) installed lowers portion of 3’x4’ junction box at Sta. 0+69.25.
Misc
Informational
11/07/2019
Contractor installed lower portion of 3’X4’ junction box at Sta. 2+46.80 on storm line. 11/7/19
Misc
Informational
11/11/2019
Storm Box was installed 3+19.47 NON SETBACK CURB INLET 11/10/19.
Storm - Pipe Partial 11/14/2019
Misc
Informational
10/29/2019
Contractor ( Bair Excavation) installed approximately 70’ of 18” HDPE storm pipe. 0+00 to 70+00. Gravel was layed to ensure storm pipe meets grade with a 0.75% slope. 11/7/19
Storm - Outlet Structure Partial 11/14/2019
Misc
Informational
11/07/2019
Contractor ( Bair Const.) started working on the storm line. The existing Storm box was reconstructed to install line. 10/28/19
Misc
Informational
11/07/2019
Contractor ( Bair Const.) started working on the storm line. The existing Storm box was reconstructed to install line. 10/28/19
Misc
Informational
11/07/2019
Contractor (Bair Excavation) installed lowers portion of 3’x4’ junction box at Sta. 0+69.25.
Misc
Informational
11/07/2019
Contractor installed lower portion of 3’X4’ junction box at Sta. 2+46.80 on storm line. 11/7/19
Storm - Pipe Partial 11/14/2019
Misc
Informational
11/14/2019
Contractor ( Bair Excavation) installed approximately 70’ of 18” HDPE storm pipe. 0+00 to 70+00. Gravel was layed to ensure storm pipe meets grade with a 0.75% slope.
Storm - Pipe Partial 11/7/2019 11/14/2019
Misc
Informational
11/14/2019
Contractor ( Bair Excavation) installed approximately 70’ of 18” HDPE storm pipe. 0+00 to 70+00. Gravel was layed to ensure storm pipe meets grade with a 0.75% slope.
Storm - Pipe Partial 11/13/2019 11/14/2019
Informational
11/14/2019
Contractor poured poured flowable fill over all storm pipe that was layed in parking lot stalls and driveing areas as per plan. Cotractor proposed plan to mix black color to 8" of concrete til it met existing parking lot grade ( this plan was approved). At this time the contractor has decided to return to the original Asphaltic Concrete Street Repair See C 11.0. 11/13/19
Water Line - Construction Inspection Partial 11/12/2019 11/14/2019
Misc
Informational
10/29/2019
Contractor ( Bair Excavating ) installed 3/11 deg bends, 3/22 deg bends & 2/45 deg bends on replacement waterline. Backing thrust blocks will be poured tomorrow. Contractor installed approximately 80’ of 8” pipe with fittings.
Misc
Informational
10/29/2019
Contractor complete construction of replacement 8” PVC line with DIP bends just short of the two Tie-in location.
Misc
Informational
10/29/2019
Approximately 5 thrust blocks were poured behind water main bends. Contractor will complete thrust blocks on another date.
Misc
Informational
10/29/2019
Contractor chlorinated water line .
Misc
Informational
11/11/2019
2 Tie-in for the new 8” water main. Tie-in happen Saturday night @ 10pm 11/9/19. Notifications were sent to inform all essential parties.
Misc
Informational
11/14/2019
Contractor installed install water meters for future Coffee Shop and Taco Bell. Taps were done performed by LS Water Department.
Misc
Informational
11/14/2019
Contractor started removing existing 6” DIP water line as per construction plans.
Roof Drain Partial 11/14/2019
Misc
Informational
11/14/2019
Contractor installed the roof drain system as per plan see C 5.0 ST/03, 04, 05, 06, & 07. Contractor installation stopped at the stub coming out of the drain that will connect to 4” drains running from the roof.
Commercial Curb Inspection Partial 12/04/2019
Corrective Action Required
12/04/2019
Contractor (Bear Const.) began installation 12/4/19 of curbs Drive-Thru on Taco Bell. No proof roll was done before curbs were installed contractor did know contact contact me. The contractor was told that Proof rolls were neeed for curbs and parking lot. Contractor is aware that proof must be perform on the remaining 85% of curbs and all of the parking lot.
Curb - Proof Roll Partial 12/04/2019
Pavement-Curb Construction Partial 12/07/2019
Misc
Corrective Action Required
12/07/2019
CONTRACTOR- is working to seal honeycomb that were in the curb that were poured from 12/3/19 to 12/6/19. Before any curb or proof roll will be performed. Steel reinforced subgrade was installed for Dumpster Land Pad.
Site Visit Partial 12/07/2019
Misc
Informational
12/07/2019
Visit site to ensure contractor followed the design construction manual on concrete installation. A time was set to meet for a proof roll for additional curbs to be installed. Contractor was notified that the current curbs would need to be corrected before curb installation continued.
Curb - Proof Roll Partial 12/10/2019
Corrective Action Required
12/04/2019
No proof roll was done for Taco Bell Drive-Thru. Contractor was informed of the oversight. Inspector will continue to monitor site to ensure visaul curb quality.
Misc
Informational
12/10/2019
Proof of subgrade passed for curbs and dumpster landing pad.
Misc
Informational
12/11/2019
Proof Rolled of parking lot passed 12/11/19 5:00pm.
Pavement-Curb Construction Partial 12/10/2019
Misc
Corrective Action Required
12/07/2019
CONTRACTOR- is working to seal honeycomb that were in the curb that were poured from 12/3/19 to 12/6/19. Before any curb or proof roll will be performed. Steel reinforced subgrade was installed for Dumpster Land Pad.
Misc
Informational
12/10/2019
Contractor continued to fill honey combs in poured curbs. Contractor continued to pour curbs and Dumpster Landing Pad.
Pavement-Curb Construction Partial 12/11/2019
Misc
Corrective Action Required
12/10/2019
CONTRACTOR- is working to seal honeycomb that were in the curb that were poured from 12/3/19 to 12/6/19. Before any curb or proof roll will be performed. Steel reinforced subgrade was installed for Dumpster Land Pad.
Misc
Informational
12/10/2019
Contractor continued to fill honey combs in poured curbs. Contractor continued to pour curbs and Dumpster Landing Pad.
Misc
Informational
12/11/2019
Contractor continue to install curb as per plans. Blankets are onsite.
Driveway Inspection Partial 12/11/2019
Misc
Informational
12/11/2019
Driveway approach forms and materials were approved. The driveway approach was poured and concrete ticket was collected.
Street - Surface Course Passed 12/13/2019
Misc
Informational
12/13/2019
Phillips Paving Co., Inc. has completed surface pavement ( TYPE 3-01RC ) for Taco Bell & Scoote Coffee.
Pavement-Surface Passed 12/13/2019
Misc
Informational
12/13/2019
Phillips Paving Co., Inc began paving of onsite drive and parking lot for Taco Bell and Scoots Coffee. I will collect asphalt tickets at the end of the day.
Site Visit Complete 12/19/2019 12/19/2019
Misc
Informational
12/19/2019
Discuss with contractor about changing plans for Lot Developement. There will be a Phase 1 that includes approximately 85% of the Lot which Taco Bell sit on & Phase 2 inwhich the proposed Scooters Coffee is soon to be fully developed.
Sanitary Sewer - Mandrel Partial 12/30/2019
Driveway Inspection Passed 03/12/2020
Misc
Informational
12/11/2019
Driveway approach forms and materials were approved. The driveway approach was poured and concrete ticket was collected.
Misc
Informational
03/12/2020
Driveway entrance & drive-thru for Scooter’s was started 3/6/20 and completed today 3/12/20. Contractor Tommy Concrete poured Drive-thru.
Sanitary Sewer Construction Inspection Passed 04/01/2020
Erosion Control Inspection Passed 04/01/2020
ESC - (Vegetation/Ground Cover) Partial 4/24/2020 at 12:00 PM 04/24/2020
Misc
Informational
04/24/2020
Steve Robbins 04/24/2020 12:28 PMVegetation is not completed.
ESC - (Vegetation/Ground Cover) Partial 4/24/2020 04/24/2020
Misc
Informational
04/24/2020
Still no grass.Steve Robbins 04/24/2020 12:32 PM
Pavement-Curb Construction Partial 4/24/2020 at 10:00 AM 04/24/2020
Misc
Corrective Action Required
12/11/2019
CONTRACTOR- is working to seal honeycomb that were in the curb that were poured from 12/3/19 to 12/6/19. Before any curb or proof roll will be performed. Steel reinforced subgrade was installed for Dumpster Land Pad.
Misc
Informational
12/11/2019
Contractor continued to fill honey combs in poured curbs. Contractor continued to pour curbs and Dumpster Landing Pad.
Misc
Informational
12/11/2019
Contractor continue to install curb as per plans. Blankets are onsite.
Misc
Informational
04/24/2020
Curbs have been installed. Steve Robbins 04/24/2020 12:35 PM
Pavement-Surface Passed 04/24/2020
Misc
Informational
12/13/2019
Phillips Paving Co., Inc began paving of onsite drive and parking lot for Taco Bell and Scoots Coffee. I will collect asphalt tickets at the end of the day.
Curb - Proof Roll Partial 04/24/2020
Commercial Curb Inspection Passed 04/24/2020
Roof Drain Passed 04/24/2020
Misc
Informational
11/14/2019
Contractor installed the roof drain system as per plan see C 5.0 ST/03, 04, 05, 06, & 07. Contractor installation stopped at the stub coming out of the drain that will connect to 4” drains running from the roof.
Water Line - Construction Inspection Partial 04/24/2020
Misc
Informational
11/14/2019
Contractor ( Bair Excavating ) installed 3/11 deg bends, 3/22 deg bends & 2/45 deg bends on replacement waterline. Backing thrust blocks will be poured tomorrow. Contractor installed approximately 80’ of 8” pipe with fittings.
Misc
Informational
11/14/2019
Contractor complete construction of replacement 8” PVC line with DIP bends just short of the two Tie-in location.
Misc
Informational
11/14/2019
Approximately 5 thrust blocks were poured behind water main bends. Contractor will complete thrust blocks on another date.
Misc
Informational
11/14/2019
Contractor chlorinated water line .
Misc
Informational
11/14/2019
2 Tie-in for the new 8” water main. Tie-in happen Saturday night @ 10pm 11/9/19. Notifications were sent to inform all essential parties.
Misc
Informational
11/14/2019
Contractor installed install water meters for future Coffee Shop and Taco Bell. Taps were done performed by LS Water Department.
Misc
Informational
11/14/2019
Contractor started removing existing 6” DIP water line as per construction plans.
Storm - Pipe Partial 04/24/2020
Sanitary Sewer Construction Inspection Partial 4/24/2020 at 9:00 AM 04/24/2020
Misc
Informational
04/24/2020
Contractor (Bair Exavating) installed approximately 108’ of 8” of PVC. Contractor began installing Manhole A1.
Misc
Informational
04/24/2020
Contractor continued. To run 6” PVC sanitary line up to the stub line for the proposed restaurant Scooter’s. Approximately 80’ was installed with a 45 deg bend at ss(11) as per plans pg C5.0 . Contractor ran approximately 10’ of 6” SDR-26 for sanitary service line and began 6” SDR-26 for grease trap.
Misc
Informational
04/24/2020
Steve Robbins 04/24/2020 12:41 PMSanitary is not completed.
Record Drawing Review Partial 4/24/2020 at 9:15 AM 04/24/2020
Misc
Informational
04/24/2020
Steve Robbins 04/24/2020 12:44 PMNo as-build has been turned in.
Sanitary Sewer - Invert Passed 04/24/2020
Pavement-Proof Roll Passed 04/24/2020
Storm - Inlets Clean Passed 04/24/2020
Misc
Informational
11/11/2019
Storm - Rip Rap Passed 04/24/2020
Storm - Swales Passed 04/24/2020
Roof Drain Partial 4/24/2020 04/24/2020
Miscellaneous Correction
Corrective Action Required
04/24/2020
Forgot a sectioSteve Robbins 04/24/2020 12:49 PMn of roof drain.
Roof Drain Failed 4/24/2020 04/24/2020
Miscellaneous Correction
Corrective Action Required
04/24/2020
Forgot a sectioSteve Robbins 04/24/2020 12:49 PMn of roof drain.
Misc
Corrective Action Required
04/24/2020
Roof drains are wrong.
Storm - Material Verification Passed 3/4/2020 04/29/2020
Misc
Informational
04/29/2020
Material Verification was approved during the project activity timeline.
ESC - (Vegetation/Ground Cover) Passed 4/28/2020 06/05/2020
Misc
Informational
04/24/2020
Steve Robbins 04/24/2020 12:28 PMVegetation is not completed.
Misc
Informational
06/05/2020
Vegetation and ground covering is complete. John M. Jackson 06/05/20 8:00 AM
Record Drawing Review Passed 6/3/2020 06/15/2020
Misc
Informational
04/24/2020
Steve Robbins 04/24/2020 12:44 PMNo as-build has been turned in.
Grading/Excavation/Fill Inspection Passed 07/01/2020
Sanitary - Material Verification Partial 07/01/2020
Sanitary Sewer Construction Inspection Passed 07/01/2020
Storm - Material Verification Passed 07/01/2020
Sidewalk Inspection Passed 07/01/2020
Sewer Service Inspection Passed 07/01/2020
Pavement-Curb Construction Partial 4/28/2020 07/01/2020
Misc
Corrective Action Required
04/24/2020
CONTRACTOR- is working to seal honeycomb that were in the curb that were poured from 12/3/19 to 12/6/19. Before any curb or proof roll will be performed. Steel reinforced subgrade was installed for Dumpster Land Pad.
Misc
Informational
04/24/2020
Contractor continued to fill honey combs in poured curbs. Contractor continued to pour curbs and Dumpster Landing Pad.
Misc
Informational
04/24/2020
Contractor continue to install curb as per plans. Blankets are onsite.
Misc
Informational
04/24/2020
Curbs have been installed. Steve Robbins 04/24/2020 12:35 PM
Curb - Proof Roll Passed 07/01/2020
Water Line - Construction Inspection Passed 07/01/2020
Misc
Informational
04/24/2020
Contractor ( Bair Excavating ) installed 3/11 deg bends, 3/22 deg bends & 2/45 deg bends on replacement waterline. Backing thrust blocks will be poured tomorrow. Contractor installed approximately 80’ of 8” pipe with fittings.
Misc
Informational
04/24/2020
Contractor complete construction of replacement 8” PVC line with DIP bends just short of the two Tie-in location.
Misc
Informational
04/24/2020
Approximately 5 thrust blocks were poured behind water main bends. Contractor will complete thrust blocks on another date.
Misc
Informational
04/24/2020
Contractor chlorinated water line .
Misc
Informational
04/24/2020
2 Tie-in for the new 8” water main. Tie-in happen Saturday night @ 10pm 11/9/19. Notifications were sent to inform all essential parties.
Misc
Informational
04/24/2020
Contractor installed install water meters for future Coffee Shop and Taco Bell. Taps were done performed by LS Water Department.
Misc
Informational
04/24/2020
Contractor started removing existing 6” DIP water line as per construction plans.
Storm - Pipe Passed 07/01/2020
Roof Drain Passed 4/28/2020 07/01/2020
Miscellaneous Correction
Corrective Action Required
04/24/2020
Forgot a sectioSteve Robbins 04/24/2020 12:49 PMn of roof drain.
Misc
Corrective Action Required
04/24/2020
Roof drains are wrong.
Documents & Images
Date Uploaded File Type Document Name
09/24/2019 Receipt Receipt for transaction: 2019-006409
09/26/2019 Letter DE-Permit
09/26/2019 Signed Permit
10/24/2019 24 2
10/24/2019 24 1
10/29/2019 image
10/29/2019 image 0
10/29/2019 image
10/29/2019 image0
10/29/2019 image1
11/11/2019 image2
11/11/2019 image3
11/11/2019 Water Tie-in 1
11/11/2019 Water Tie-in 2
11/14/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
11/14/2019 Letter INSPECTION SUMMARY
12/04/2019 Letter INSPECTION SUMMARY
12/07/2019 Letter INSPECTION SUMMARY
12/07/2019 Letter INSPECTION SUMMARY
12/10/2019 Letter INSPECTION SUMMARY
12/10/2019 Letter INSPECTION SUMMARY
12/11/2019 Letter INSPECTION SUMMARY
12/11/2019 Letter INSPECTION SUMMARY
12/11/2019 Letter INSPECTION SUMMARY
12/11/2019 Letter INSPECTION SUMMARY
12/13/2019 Letter INSPECTION SUMMARY
12/13/2019 Letter INSPECTION SUMMARY
12/13/2019 Letter INSPECTION SUMMARY
12/19/2019 Letter INSPECTION SUMMARY
12/31/2019 Letter DE-Certificate of Substantial Completion Multiple Lot
12/31/2019 Letter DE-Punch List
12/31/2019 Taco Bell and Scooters Coffee Certificate of Partial Substantial Completion and Punch List
01/02/2020 Taco Bell and Scooters Coffee Signed Partial Substantial Completion
03/12/2020 Scooter’s Drive-Thru
03/12/2020 Scooter’s Drive-Thru #1
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter DE-Punch List
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/12/2020 Letter INSPECTION SUMMARY
03/13/2020 Taco Bell and Scooters Substatntial Completion and Punch List
03/13/2020 Taco Bell And Scooters Substantial Completion and Punch List
04/24/2020 Letter DE-Daily Inspection Summary
04/24/2020 Letter DE-Daily Inspection Summary
04/24/2020 Letter DE-Daily Inspection Summary
04/24/2020 Letter DE-Daily Inspection Summary
04/24/2020 Letter DE-Daily Inspection Summary
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter DE-Daily Inspection Summary
06/05/2020 Letter INSPECTION SUMMARY
06/05/2020 Letter INSPECTION SUMMARY
06/05/2020 Letter INSPECTION SUMMARY
06/05/2020 Letter INSPECTION SUMMARY
06/05/2020 Letter INSPECTION SUMMARY
06/05/2020 Letter INSPECTION SUMMARY
06/05/2020 Plans STORM AS BUILT 2020-04-10
06/05/2020 Plans UTILITY AS BUILT 2020-04-10
06/04/2020 Taco Bell Substantial and Punch List
07/01/2020 Letter DE-Certificate of Final Acceptance (Commercial)
07/01/2020 Taco Bell and Scooter Coffee woods chapel Final Acceptance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home