Summary
PRRES20242717
Building Permit - Residential
Issued
STEWART BUILDERS LLC
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. WALKOUT BASEMENT. COVERED DECK. ENGINEERED FLOOR SYSTEM - DEFERRED. STOP WORK ORDER generated on 06/25/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 06/25/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER generated on 06/28/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 07/09/2024 12:00 AM by username 'Mitchell Schwarz'.
05/29/2024
06/21/2024
12/04/2024
Locations
Contacts
STEWART BUILDERS LLC, Address:12 SEQUOYAH PT, Phone:(816) 510-7850  
STEWART BUILDERS LLC, Address:12 SEQUOYAH PT  
Randy Stewart, Address:12 SEQUOYAH POINTE  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
Arrow Circle Electric, Address:7801 Blue Ridge Blvd , Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
RANDY@STEWARTBUILDERSKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 06/21/2024
8350015-Water Meter Fee $680.46 $680.46 Paid 06/21/2024
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 06/21/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 06/21/2024
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 06/21/2024
9110078-Valuation Fee New Single Family $1,738.12 $1,738.12 Paid 06/21/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Pending
Misc
Informational
10/08/2024
Erosion control in compliance at time of inspection
Occupancy Inspection - Codes Residential Pending
Footing Inspection - Residential Passed 6/25/2024 06/25/2024
Water Service Inspection - R Partial 7/12/2024 06/25/2024
Misc
Informational
06/25/2024
Erosion Control Inspection Residential Failed 6/25/2024 06/25/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/25/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 6/28/2024 6/28/2024 06/28/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/25/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 06/28/24- erosion control still not in place and street not clean. STOP WORK ISSUED
Erosion Control Inspection Residential Partial 7/9/2024 07/09/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
07/09/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 06/28/24- erosion control still not in place and street not clean. STOP WORK ISSUED
Sewer Service Inspection - R Passed 7/9/2024 07/09/2024
Water Service Inspection - R Partial 7/9/2024 07/09/2024
Misc
Informational
07/09/2024
Pex ran from foundation
Water Service Inspection - R Passed 7/12/2024 07/12/2024
Misc
Resolved
07/12/2024
Pex ran from foundation
Erosion Control Inspection Residential Failed 8/1/2024 8/1/2024 08/01/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/01/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Maintain overgrown vegetation
Underslab Plumbing Inspection - Residential Passed 8/1/2024 8/1/2024 08/01/2024
Piers/Caissons Inspection - Residential Passed 8/15/2024 08/15/2024
Erosion Control Inspection Residential Partial 8/19/2024 08/19/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
08/19/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Maintain overgrown vegetation
Misc
Corrective Action Required
08/19/2024
Clean debris from storm inlet and street
All Rough Inspection - Residential Failed 10/2/2024 10/02/2024
Misc
Corrective Action Required
10/02/2024
Nail pattern not to PFH design. Also missing top plate under header per design.
All Rough Inspection - Residential Partial 10/4/2024 10/04/2024
Misc
Resolved
10/04/2024
Nail pattern not to PFH design. Also missing top plate under header per design.
Misc
Corrective Action Required
10/04/2024
Garage portal frame inspected only and okay to cover
Erosion Control Inspection Residential Failed 10/4/2024 10/4/2024 10/04/2024
Misc
Corrective Action Required
08/19/2024
-Clean debris from storm inlet and street
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/04/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/04/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Partial 10/8/2024 10/08/2024
Misc
Resolved
10/08/2024
-Clean debris from storm inlet and street
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
10/08/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
10/08/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Misc
Informational
10/08/2024
Erosion control in compliance at time of inspection
All Rough Inspection - Residential Failed 12/17/2024 12/17/2024 12/17/2024
Misc
Resolved
12/17/2024
Garage portal frame inspected only and okay to cover
Misc
Corrective Action Required
12/17/2024
Front entry nailing cover without inspection Rear deck roofing covered without inspection -provide stud packs under truss beam in garage per plans -fireblock top of furr out wall in garage -seal penetration in return air stud space entry 1/2 bath -missing stud pack under beam at entry -add king stud each side of great room window -add king stud each side of master bedroom windows -sister all over notched studs in basement, over notched for anchor bolts -missing anchor bolts bed 4 -fire block bed 3 wall space to ceiling space at closet -seal penetrations in return air joist space above bed 3 -address damaged I-joists above beam used for return air
All Rough Inspection - Residential Failed 12/31/2024 12/31/2024 12/31/2024
Misc
Corrective Action Required
12/17/2024
-Front entry nailing cover without inspection -okay to insulate
All Rough Inspection - Residential Passed 12/31/2024 12/31/2024 12/31/2024
Misc
Resolved
12/31/2024
-Front entry nailing cover without inspection -okay to insulate
Electrical Service Inspection Passed 1/6/2025 1/7/2025 01/07/2025
Gas Service Inspection - Residential Passed 1/6/2025 1/7/2025 01/07/2025
Driveway Inspection Partial 3/31/2025 3/31/2025 03/31/2025
Misc
Informational
03/31/2025
3-31-25 DP. DW is formed, aggregate compacted, approved to pour.
Sidewalk Inspection Partial 3/31/2025 3/31/2025 03/31/2025
Misc
Informational
03/31/2025
3-31-25 DP. SW on east side of Dw is formed, aggregate compacted, cross slopes in compliance. Approved to pour.
Sidewalk Inspection Partial 4/1/2025 4/1/2025 04/01/2025
Misc
Informational
04/01/2025
4-1-25 DP. SW is formed, aggregate compacted, cross slopes are in compliance but conditions can change. Approved to pour.
Driveway Inspection Passed 4/8/2025 4/8/2025 04/08/2025
Misc
Informational
03/31/2025
3-31-25 DP. DW is formed, aggregate compacted, approved to pour. 4-8-25 Dustin A, dw has been poured to city specs and slopes are in compliance . Pass
Sidewalk Inspection Passed 4/8/2025 4/8/2025 04/08/2025
Misc
Informational
04/08/2025
4-8-25 Dustin A, sw has been poured to city specs and slopes are in compliance . Pass
Plot Plan Inspection Failed 5/13/2025 05/13/2025
Misc
Corrective Action Required
05/13/2025
Finish grading lot and remove excess material
Plot Plan Inspection Passed 5/16/2025 05/16/2025
Misc
Resolved
05/16/2025
Documents & Images
Date Uploaded File Type Document Name
05/29/2024 LOT 81 SVF Residental Permit Application
06/04/2024 Permit Codes Residential Plan Review
06/07/2024 Permit Codes Residential Plan Review
06/07/2024 Plot Plan APPROVED PLOT PLAN
06/11/2024 Permit Codes Residential Plan Review
06/21/2024 Permit DS Building Permit
06/21/2024 Receipt Receipt for transaction:2024-005013
06/24/2024 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
06/25/2024 Approved Plans APPROVED PLANS
06/25/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter Stop Work Order
06/25/2024 Letter Stop Work Order
06/25/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
06/28/2024 Letter Stop Work Order
07/09/2024 Letter INSPECTION SUMMARY
07/09/2024 Letter INSPECTION SUMMARY
07/09/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/15/2024 Letter INSPECTION SUMMARY
08/19/2024 Letter INSPECTION SUMMARY
10/02/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/08/2024 Letter INSPECTION SUMMARY
12/03/2024 Approved Plans APPROVED JOIST DRAWING
12/03/2024 Approved Plans APPROVED TRUSS PACKAGE
12/03/2024 APPROVED TRUSS LAYOUT
12/17/2024 Letter INSPECTION SUMMARY
12/30/2024 L81 Smt Vw Frms_ 2315 SW Serena Pl_ Lee's Summit_ MO
12/31/2024 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
04/01/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
05/12/2025 Plot Plan APPROVED AS BUILT PLOT PLAN
05/13/2025 Letter INSPECTION SUMMARY
05/16/2025 Letter INSPECTION SUMMARY
06/13/2025 Lot 81 SVF lawn sprinkler doc
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home