Summary
PRRES20221806
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. WALKOUT BASEMENT. FINISHED/UNFINISHED BASEMENT. COVERED DECK. ENGINEERED FLOOR SYSTEM - DEFERRED.
05/02/2022
05/09/2022
10/31/2022
03/25/2024
Locations
Contacts
STEWART BUILDERS LLC, Address:12 SEQUOYAH PT, Phone:(816) 510-7850  
Randy Stewart, Address:12 SEQUOYAH POINTE  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
RANDY@STEWARTBUILDERSKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $420.00 $420.00 Paid 05/09/2022
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 05/09/2022
8350015-Water Meter Fee $479.24 $479.24 Paid 05/09/2022
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 05/09/2022
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 05/09/2022
9110078-Valuation Fee New Single Family $1,201.95 $1,201.95 Paid 05/09/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 6/8/2022 06/08/2022
Misc
Informational
06/08/2022
Third party inspection performed.
Underslab Plumbing Inspection - Residential Passed 6/8/2022 6/8/2022 06/08/2022
Sewer Service Inspection - R Passed 6/28/2022 06/28/2022
Water Service Inspection - R Partial 6/28/2022 06/28/2022
Misc
Informational
06/28/2022
pex ran from foundation
Water Service Inspection - R Passed 6/29/2022 (11:00) 6/29/2022 06/29/2022
Misc
Informational
06/28/2022
pex ran from foundation
Piers/Caissons Inspection - Residential Passed 7/18/2022 (8:00) 7/18/2022 07/18/2022
Misc
Informational
07/18/2022
inspected 2 24" piers
Miscellaneous Inspection Passed 12/15/2022 12/15/2022
Misc
Informational
12/15/2022
REQUEST FOR EXTENTION HAS BEEN ASKED FOR BY EMAIL. APPROVED
Gas Service Inspection - Residential Passed 1/20/2023 1/20/2023 01/20/2023
Electrical Service Inspection Passed 1/20/2023 1/20/2023 01/20/2023
All Rough Inspection - Residential Failed 1/20/2023 1/20/2023 01/20/2023
Misc
Corrective Action Required
01/20/2023
-5 studs each end per plans in garage un gt truss -anchor bolts to be in the middle 1/3 of sill plate in garage -fire block dead spaces to ceiling space at garage entry. (When using Unfaced insulation must be packed tightly and securely) -completely furr out for laundry wall and fire block if necessary -fire block fireplace wall to ceiling space -use correct hangers for 2x8’s above great room -frame great room windows wall to plans -missing studs under lvl above entry at stairs -entry framing does not match plans -missing steel column A at stairs
All Rough Inspection - Residential Failed 3/7/2023 3/7/2023 03/07/2023
Misc
Resolved
03/07/2023
-5 studs each end per plans in garage un gt truss -anchor bolts to be in the middle 1/3 of sill plate in garage -fire block dead spaces to ceiling space at garage entry. (When using Unfaced insulation must be packed tightly and securely) -completely furr out for laundry wall and fire block if necessary -fire block fireplace wall to ceiling space -use correct hangers for 2x8’s above great room -frame great room windows wall to plans -missing studs under lvl above entry at stairs -entry framing does not match plans -missing steel column A at stairs
Misc
Corrective Action Required
03/07/2023
Address w18x36 stl beam replaced with (2) 2x8 in garage
All Rough Inspection - Residential Passed 3/8/2023 03/08/2023
Misc
Resolved
03/08/2023
Driveway Inspection Partial 4/12/2023 4/12/2023 04/12/2023
Misc
Informational
04/12/2023
4-12-23 RH. Approach is formed up and aggregate is placed and compacted. Approach was measured to be 40' which is 4' more than Lee's Summit allows along the curb. Contractor was contacted and will call a back once fixed. Contractor fixed driveway and is approved to pour.
Sidewalk Inspection Partial 4/14/2023 4/14/2023 04/14/2023
Misc
Informational
04/14/2023
4-14-23. Sidewalk is formed up and aggregate is placed and compacted. Approved to pour.
Driveway Inspection Passed 4/19/2023 4/19/2023 04/19/2023
Misc
Corrective Action Required
04/12/2023
4-12-23 RH. Approach is formed up and aggregate is placed and compacted. Approach was measured to be 40' which is 4' more than Lee's Summit allows along the curb. Contractor was contacted and will call a back once fixed. 4-19-23 RH. Approach meets LS and ADA specification.
Sidewalk Inspection Passed 4/21/2023 4/21/2023 04/19/2023
Misc
Informational
04/14/2023
4-14-23. Sidewalk is formed up and aggregate is placed and compacted. Approved to pour. 4-19-23 RH. Sidewalk meets LS and ADA specification.
Plot Plan Inspection Failed 6/8/2023 06/08/2023
Misc
Corrective Action Required
06/08/2023
Uncover covered manhole
Plot Plan Inspection Passed 6/21/2023 06/21/2023
Misc
Resolved
06/21/2023
Uncover covered manhole
Erosion Control Inspection Residential Passed 8/29/2023 08/29/2023
Occupancy Inspection - Codes Residential Failed 8/29/2023 8/29/2023 08/29/2023
Misc
Corrective Action Required
08/29/2023
-garage door to be self closing and latching from a 45° angle -window fall protection for windows in master bedroom -2 1/2” through bolts at each deck post to beam connection. Where over notched post use approved connectors -uncover sewer tracer wire -splash blocks missing on the north side of home -obtain issued lawn irrigation permit
Occupancy Inspection - Codes Residential Failed 2/16/2024 2/16/2024 02/16/2024
Misc
Corrective Action Required
08/29/2023
-2 1/2” through bolts at each deck post to beam connection. Where over notched post use approved connectors
Occupancy Inspection - Codes Residential Failed 3/22/2024 3/22/2024 03/22/2024
Misc
Corrective Action Required
02/16/2024
-2 1/2” through bolts at each deck post to beam connection. Where over notched post use approved connectors Only north most connection fixed to engineer specifications
Occupancy Inspection - Codes Residential Full C of O 3/25/2024 03/25/2024
Misc
Resolved
03/25/2024
-2 1/2” through bolts at each deck post to beam connection. Where over notched post use approved connectors Only north most connection fixed to engineer specifications
Documents & Images
Date Uploaded File Type Document Name
05/03/2022 LOT 119 LICENSE TAX APPLICATION
05/03/2022 LOT 119 PERMIT APPLICATION
05/04/2022 Permit Codes Residential Plan Review
05/05/2022 Plot Plan APPROVED PLOT PLAN
05/05/2022 Approved Plans APPROVED PLANS
05/05/2022 Permit Codes Residential Plan Review
05/09/2022 Permit DS Building Permit
05/09/2022 Receipt Receipt for transaction:2022-003104
06/03/2022 M L Crose 3208 SW Saddlebred Ter LSMO Stewart Bldrs Permit 2021-0387 3rd Party Footing Inspection Report 5-11-22
06/08/2022 Letter INSPECTION SUMMARY
06/08/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/29/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
12/05/2022 Letter Codes 140 Day Letter
12/15/2022 Waiver/Modification Document Capture
01/08/2023 DW I JOISTS Allenstone Lot 119 SVF 3208 SW Saddlebred Terr
01/10/2023 Approved Plans APPROVED PLANS
01/10/2023 Approved Plans APPROVED TRUSS LAYOUT
01/11/2023 Approved Plans APPROVED TRUSS PACKAGE
01/18/2023 Approved Plans APPROVED JOIST DRAWINGS
01/18/2023 portal framing 1
01/18/2023 portal framing 2
01/18/2023 portal framing 3
01/18/2023 portal framing 4
01/18/2023 portal framing 5
01/18/2023 portal framing 6
01/18/2023 portal framing 7
01/18/2023 portal framing 8
01/18/2023 portal framing 9
01/18/2023 portal framing 10
01/18/2023 portal framing 11
01/20/2023 Letter INSPECTION SUMMARY
01/20/2023 Letter INSPECTION SUMMARY
01/20/2023 Letter INSPECTION SUMMARY
01/20/2023 Letter INSPECTION SUMMARY
02/21/2023 DW FRAMING REPORT Allenstone Lot 119 SVF 3208 SW Saddlebred Terr 2-16-23
03/04/2023 DW FRAMING INSPECTION RESPONSE 2[1]
03/07/2023 Letter INSPECTION SUMMARY
03/08/2023 Letter INSPECTION SUMMARY
04/12/2023 Letter INSPECTION SUMMARY
04/12/2023 Letter INSPECTION SUMMARY
04/14/2023 Letter INSPECTION SUMMARY
04/19/2023 Letter INSPECTION SUMMARY
04/19/2023 Letter INSPECTION SUMMARY
06/05/2023 Plot Plan APPROVED AS BUILT PLOT PLAN
06/08/2023 Letter INSPECTION SUMMARY
06/21/2023 Letter INSPECTION SUMMARY
08/29/2023 Letter INSPECTION SUMMARY
08/29/2023 Letter INSPECTION SUMMARY
02/16/2024 Letter INSPECTION SUMMARY
02/16/2024 Letter INSPECTION SUMMARY
03/21/2024 3RD Party Insp Report DECK POST BLOCKING FRAMING INSPECTION DECK CORNER POST ATTACHMENT
03/21/2024 3RD Party Insp Report DECK POST CONNECTION FRAMING INSPECTION DECK POST ATTACHMENT
03/22/2024 Letter INSPECTION SUMMARY
03/25/2024 Letter Codes Final Certificate of Occupancy
03/25/2024 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home