Permit Application Status

PRCOM20220598


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20220598
Building Permit - Commercial
Withdrawn
NEW COMMERCIAL
NEW MULTI-USE APARTMENT BUILDING INCLUDING RETAIL AREAS, PARKING GARAGE, AND SITE DEVELOPMENT - Garage - IIA, Retail/Lobby - IA, Apartments - VA WITHDRAWN BY APPLICANT Mike Weisenborn 08/29/2023 7:57 AM
02/16/2022
08/29/2023
Locations
Contacts
BRINKMANN CONSTRUCTORS, Address:16650 CHESTERFIELD GROVE RD, Phone:(636) 537-9700  
sgrause@brinkmannconstructors.com, Address:sgrause@brinkmannconstructors.com, Phone:(636) 537-9700  
ALDEN PLUMBING & MECHANICAL LLC, Address:5600 W 95TH ST STE307, Phone:(816) 666-8662  
M & S ELECTRIC, Address:PO BOX 1147, Phone:(816) 427-5913  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
Finkle + Williams Architecture, Address:8787 Renner Blvd. Suite 100, Phone:(913) 498-1550  
  
WELKER HEATING & COOLING, Address:2221 N 147TH STREET, Phone:(913) 669-7555  
KASA ELECTRIC LLC, Address:1206 NW VALLEY RIDGE DR, Phone:(816) 228-4886  
MJC ELECTRIC CO LLC, Address:4301 NW GATEWAY AVE, Phone:(816) 741-2111  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved with Conditions 11/02/2022 11/02/2022
Ben Hicks
Miscellaneous Correction
Resolved
11/02/2022

A] 104.7.2 Technical assistance. To determine the acceptability of technologies, processes, products, facilities,materials and uses attending the design, operation or use of a building or premises subject to inspection by the fire code official, the fire code official is authorized to require the owner or owner’s authorized agent to provide,without charge to the jurisdiction, a technical opinion and report. The opinion and report shall be prepared by a qualified engineer, specialist, laboratory or fire safety specialty organization acceptable to the fire code official and shall analyze the fire safety properties of the design, operation or use of the building or premises and the facilities and appurtenances situated thereon, to recommend necessary changes. The fire code official is authorized to require design submittals to be prepared by, and bear the stamp of, a registered design professional. Action required-Have a third-party code consultant evaluate the overall code compliance of the parking garage, apartments, and commercial portions of the project as it relates to egress. Contact our office for approval of evaluating group.
Construction documents for fire alarm systems
Corrective Action Required
11/02/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Construction documents - Fire protection systems
Corrective Action Required
11/02/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Installation acceptance testing
Corrective Action Required
11/02/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Building Plan Review Rejected 11/02/2022 10/27/2022
Joe Frogge
Final Development Plan
Corrective Action Required
10/26/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 6/15/22 - acknowledged in letter
IBC 1704.2 Special Inspections
Corrective Action Required
10/26/2022

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 6/15/22 - acknowledged in letter
Elevator Equipment Permit
Corrective Action Required
10/26/2022

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 10/27/22 -acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
10/26/2022

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 10/27/22 -acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
10/26/2022

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 10/27/22 -acknowledged in letter.
Elevator Pit Ladder
Corrective Action Required
10/26/2022

ASME A17.1-2017 2.2.4.2 There shall be installed in the pit of each elevator, where the pit extends more than 900 mm (35 in.) below the sill of the pit access door, a fixed vertical ladder of noncombustible material, located within reach of the access door. The ladder shall extend not less than 1 200 mm (48 in.) above the sill of the access door. The rungs, cleats, or steps shall be a minimum of 400 mm (16 in.) wide. When unavoidable obstructions are encountered, the width shall be permitted to be decreased to less than 400 mm (16 in.). The reduced width shall be as wide as the available space permits, Action required: Comment is informational. 10/27/22 -acknowledged in letter.
IBC 706.1 Fire and Smoke Protection - General
Resolved
10/27/2022

2018 IBC 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Clarifications needed: - Door schedule notes that "R" indicates fire rating, but no rating shown for "30-R". Investigate and rectify other inconsistencies. - Provide UL #'s for all rated assemblies. - Provide complete construction details for all rated assemblies.
Engineered truss package
Corrective Action Required
10/26/2022

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Trusses deferred per noted request. 10/27/22 -acknowledged in letter.
Suite address
Corrective Action Required
10/26/2022

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Comment is informational. Addressing to follow Fire Department's direction. To be established at a later date. 10/27/22 -acknowledged in letter.
IBC 1209.2 Finish materials
Resolved
10/27/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finishes at clubhouse toilets. If paint is used it must be epoxy based. (see sheet A2.02)
ICC A117.1 305.3 Clear Floor Space
Resolved
10/27/2022

ICC A117.1-2009 Section 1004.10 Laundry Equipment. Washing machines and clothes dryers shall comply with Sections 1004.10. ICC A117.1-2009 Section 1004.10.1 Clear Floor Space. A clear floor space complying with Section 305.3, shall be provided. A parallel approach shall be provided for a top loading machine, A forward or parallel approach shall be provided for a front loading machine. Action required: Modify unit design at PH-6 (on sheet A2.50) to comply.
IPC 604.9 Water hammer
Resolved
10/27/2022

2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Air chambers not allowed. Modify General Notes on P-series drawings to comply.
Misc
Resolved
10/27/2022

Utility service entries do not comply with building design. Action required: Coordinate FDP with building plans.
IBC 706.6 Fire and Smoke Protection - Vertical Continuity
Resolved
10/27/2022

2018 706.6 Vertical continuity. Fire walls shall extend from the foundation to a termination point not less than 30 inches above both adjacent roofs. Exceptions: (see code for complete list) 4. In buildings of Types III, IV and V construction, walls shall be permitted to terminate at the underside of combustible roof sheathing or decks provide that all of the following are met: (see code for complete list) 4.1. Roof openings are not less than 4 feet from the fire wall. Action required: Relocate plumbing vent penetrations, and any other penetrations, to comply. Not allowed within 4' of fire walls.
IPC 502.1 Water heater manufacturers installation instructions
Resolved
11/02/2022

2018 IPC 502.1 General. Water heaters shall be installed in accordance with the manufacturer’s installation instructions. Oil-fired water heaters shall conform to the requirements of this code and the International Mechanical Code. Electric water heaters shall conform to the requirements of this code and provisions of NFPA 70. Gas-fired water heaters shall conform to the requirements of the International Fuel Gas Code. Action required: Provide expansion tank at water heater or provide verification that water heater installed will not require expansion tank in the manufacturer's written instructions. 10/27/22 - water heater detail 3/MP2.01 does not show or note the required tank.
IPC 916.3 Island vent installation below flood level rim
Resolved
10/27/2022

2018 IPC 916.3 Vent installation below the fixture flood level rim. The vent located below the flood level rim of the fixture being vented shall be installed as required for drainage piping in accordance with Chapter 7, except for sizing. The vent shall be sized in accordance with Section 906.2. The lowest point of the island fixture vent shall connect full size to the drainage system. The connection shall be to a vertical drain pipe or to the top half of a horizontal drain pipe. Cleanouts shall be provided in the island fixture vent to permit rodding of all vent piping located below the flood level rim of the fixtures. Rodding in both directions shall be permitted through a cleanout. Action required: Modify island fixture vent venting detail. Cleanout on vent side to either be above flood rim level or be bi-directional. (see M/12MP2.01)
NEC Article 230.2 (E) Identification of multiple services
Resolved
10/27/2022

2017 NEC Article 230.2 (E) Identification. Where a building or structure is supplied by more than one service, or any combination of branch circuits, feeders, and services, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. See 225.37. Action required: Modify designs to show wording and location of plaques that identify building as having multiple services.
Licensed Contractors Approved 11/02/2022 10/27/2022
Joe Frogge
LC - MEP Subs
Corrective Action Required
10/26/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 08/04/2022 08/30/2022
Joe Frogge
Miscellaneous Correction
Corrective Action Required
08/29/2022

A] 104.7.2 Technical assistance. To determine the acceptability of technologies, processes, products, facilities,materials and uses attending the design, operation or use of a building or premises subject to inspection by the fire code official, the fire code official is authorized to require the owner or owner’s authorized agent to provide,without charge to the jurisdiction, a technical opinion and report. The opinion and report shall be prepared by a qualified engineer, specialist, laboratory or fire safety specialty organization acceptable to the fire code official and shall analyze the fire safety properties of the design, operation or use of the building or premises and the facilities and appurtenances situated thereon, to recommend necessary changes. The fire code official is authorized to require design submittals to be prepared by, and bear the stamp of, a registered design professional. Action required-Have a third-party code consultant evaluate the overall code compliance of the parking garage, apartments, and commercial portions of the project as it relates to egress. Contact our office for approval of evaluating group.
Building Plan Review Rejected 08/04/2022 08/30/2022
Joe Frogge
Final Development Plan
Corrective Action Required
08/29/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 6/15/22 - acknowledged in letter
IBC 1704.2 Special Inspections
Corrective Action Required
08/29/2022

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 6/15/22 - acknowledged in letter
Elevator Equipment Permit
Corrective Action Required
08/29/2022

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational.
Elevator Equipment Inspection
Corrective Action Required
08/29/2022

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational.
Elevator Certificate of Inspection
Corrective Action Required
08/29/2022

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational.
Elevator Pit Ladder
Corrective Action Required
08/29/2022

ASME A17.1-2017 2.2.4.2 There shall be installed in the pit of each elevator, where the pit extends more than 900 mm (35 in.) below the sill of the pit access door, a fixed vertical ladder of noncombustible material, located within reach of the access door. The ladder shall extend not less than 1 200 mm (48 in.) above the sill of the access door. The rungs, cleats, or steps shall be a minimum of 400 mm (16 in.) wide. When unavoidable obstructions are encountered, the width shall be permitted to be decreased to less than 400 mm (16 in.). The reduced width shall be as wide as the available space permits, Action required: Comment is informational.
IBC 706.1 Fire and Smoke Protection - General
Corrective Action Required
08/29/2022

2018 IBC 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Clarifications needed: - Door schedule notes that "R" indicates fire rating, but no rating shown for "30-R". Investigate and rectify other inconsistencies. - Provide UL #'s for all rated assemblies. - Provide complete construction details for all rated assemblies.
Engineered truss package
Corrective Action Required
08/29/2022

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Trusses deferred per noted request.
Suite address
Corrective Action Required
08/29/2022

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Comment is informational. Addressing to follow Fire Department's direction. To be established at a later date.
IBC 1209.2 Finish materials
Corrective Action Required
08/29/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finishes at clubhouse toilets. If paint is used it must be epoxy based. (see sheet A2.02)
ICC A117.1 305.3 Clear Floor Space
Corrective Action Required
08/29/2022

ICC A117.1-2009 Section 1004.10 Laundry Equipment. Washing machines and clothes dryers shall comply with Sections 1004.10. ICC A117.1-2009 Section 1004.10.1 Clear Floor Space. A clear floor space complying with Section 305.3, shall be provided. A parallel approach shall be provided for a top loading machine, A forward or parallel approach shall be provided for a front loading machine. Action required: Modify unit design at PH-6 (on sheet A2.50) to comply.
IPC 604.9 Water hammer
Corrective Action Required
08/29/2022

2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Air chambers not allowed. Modify General Notes on P-series drawings to comply.
Misc
Corrective Action Required
08/29/2022

Utility service entries do not comply with building design. Action required: Coordinate FDP with building plans.
IBC 706.6 Fire and Smoke Protection - Vertical Continuity
Corrective Action Required
08/29/2022

2018 706.6 Vertical continuity. Fire walls shall extend from the foundation to a termination point not less than 30 inches above both adjacent roofs. Exceptions: (see code for complete list) 4. In buildings of Types III, IV and V construction, walls shall be permitted to terminate at the underside of combustible roof sheathing or decks provide that all of the following are met: (see code for complete list) 4.1. Roof openings are not less than 4 feet from the fire wall. Action required: Relocate plumbing vent penetrations, and any other penetrations, to comply. Not allowed within 4' of fire walls.
IPC 502.1 Water heater manufacturers installation instructions
Corrective Action Required
08/29/2022

2018 IPC 502.1 General. Water heaters shall be installed in accordance with the manufacturer’s installation instructions. Oil-fired water heaters shall conform to the requirements of this code and the International Mechanical Code. Electric water heaters shall conform to the requirements of this code and provisions of NFPA 70. Gas-fired water heaters shall conform to the requirements of the International Fuel Gas Code. Action required: Provide expansion tank at water heater or provide verification that water heater installed will not require expansion tank in the manufacturer's written instructions.
IPC 916.3 Island vent installation below flood level rim
Corrective Action Required
08/29/2022

2018 IPC 916.3 Vent installation below the fixture flood level rim. The vent located below the flood level rim of the fixture being vented shall be installed as required for drainage piping in accordance with Chapter 7, except for sizing. The vent shall be sized in accordance with Section 906.2. The lowest point of the island fixture vent shall connect full size to the drainage system. The connection shall be to a vertical drain pipe or to the top half of a horizontal drain pipe. Cleanouts shall be provided in the island fixture vent to permit rodding of all vent piping located below the flood level rim of the fixtures. Rodding in both directions shall be permitted through a cleanout. Action required: Modify island fixture vent venting detail. Cleanout on vent side to either be above flood rim level or be bi-directional. (see M/12MP2.01)
NEC Article 230.2 (E) Identification of multiple services
Corrective Action Required
08/29/2022

2017 NEC Article 230.2 (E) Identification. Where a building or structure is supplied by more than one service, or any combination of branch circuits, feeders, and services, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. See 225.37. Action required: Modify designs to show wording and location of plaques that identify building as having multiple services.
Fire Plan Review Rejected 08/11/2022 08/12/2022
Jim Eden
Miscellaneous Correction
Corrective Action Required
08/12/2022

A] 104.7.2 Technical assistance. To determine the acceptability of technologies, processes, products, facilities,materials and uses attending the design, operation or use of a building or premises subject to inspection by the fire code official, the fire code official is authorized to require the owner or owner’s authorized agent to provide,without charge to the jurisdiction, a technical opinion and report. The opinion and report shall be prepared by a qualified engineer, specialist, laboratory or fire safety specialty organization acceptable to the fire code official and shall analyze the fire safety properties of the design, operation or use of the building or premises and the facilities and appurtenances situated thereon, to recommend necessary changes. The fire code official is authorized to require design submittals to be prepared by, and bear the stamp of, a registered design professional. Action required-Have a third-party code consultant evaluate the overall code compliance of the parking garage, apartments, and commercial portions of the project as it relates to egress. Contact our office for approval of evaluating group.
Fire Plan Review Rejected 06/17/2022 08/11/2022
Jim Eden
Miscellaneous Correction
Corrective Action Required
06/15/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Miscellaneous Correction
Corrective Action Required
06/15/2022

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
Misc
Corrective Action Required
06/15/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Miscellaneous Correction
Corrective Action Required
06/15/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Miscellaneous Correction
Corrective Action Required
08/11/2022

A] 104.7.2 Technical assistance. To determine the acceptability of technologies, processes, products, facilities,materials and uses attending the design, operation or use of a building or premises subject to inspection by the fire code official, the fire code official is authorized to require the owner or owner’s authorized agent to provide,without charge to the jurisdiction, a technical opinion and report. The opinion and report shall be prepared by a qualified engineer, specialist, laboratory or fire safety specialty organization acceptable to the fire code official and shall analyze the fire safety properties of the design, operation or use of the building or premises and the facilities and appurtenances situated thereon, to recommend necessary changes. The fire code official is authorized to require design submittals to be prepared by, and bear the stamp of, a registered design professional. Action required-Have a third-party code consultant evaluate the overall code compliance of the parking garage, apartments, and commercial portions of the project as it relates to egress. Contact our office for approval of evaluating group.
Building Plan Review Rejected 08/11/2022 08/11/2022
Joe Frogge
Final Development Plan
Corrective Action Required
07/28/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 6/15/22 - acknowledged in letter
IBC 1704.2 Special Inspections
Corrective Action Required
07/28/2022

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 6/15/22 - acknowledged in letter
IBC 1010.1.2 Door swing - direction of swing egress travel
Resolved
08/10/2022

2018 IBC 1010.1.2 Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for exceptions.) 2018 IBC 1010.1.2.1 Direction of swing. Pivot or side-hinged swinging doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Action required: Egress doors must swing outwards in direction of egress travel. Modify design.
Elevator Equipment Permit
Corrective Action Required
08/11/2022

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational.
Elevator Equipment Inspection
Corrective Action Required
08/11/2022

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational.
Elevator Certificate of Inspection
Corrective Action Required
08/11/2022

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational.
Elevator Pit Ladder
Corrective Action Required
08/11/2022

ASME A17.1-2017 2.2.4.2 There shall be installed in the pit of each elevator, where the pit extends more than 900 mm (35 in.) below the sill of the pit access door, a fixed vertical ladder of noncombustible material, located within reach of the access door. The ladder shall extend not less than 1 200 mm (48 in.) above the sill of the access door. The rungs, cleats, or steps shall be a minimum of 400 mm (16 in.) wide. When unavoidable obstructions are encountered, the width shall be permitted to be decreased to less than 400 mm (16 in.). The reduced width shall be as wide as the available space permits, Action required: Comment is informational.
IBC 706.1 Fire and Smoke Protection - General
Corrective Action Required
08/11/2022

2018 IBC 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Clarifications needed: - Door schedule notes that "R" indicates fire rating, but no rating shown for "30-R". Investigate and rectify other inconsistencies. - Provide UL #'s for all rated assemblies. - Provide complete construction details for all rated assemblies.
Engineered truss package
Corrective Action Required
08/11/2022

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Trusses deferred per noted request.
Suite address
Corrective Action Required
08/11/2022

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Comment is informational. Addressing to follow Fire Department's direction. To be established at a later date.
IBC 1209.2 Finish materials
Corrective Action Required
08/11/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finishes at clubhouse toilets. If paint is used it must be epoxy based. (see sheet A2.02)
ICC A117.1 305.3 Clear Floor Space
Corrective Action Required
08/11/2022

ICC A117.1-2009 Section 1004.10 Laundry Equipment. Washing machines and clothes dryers shall comply with Sections 1004.10. ICC A117.1-2009 Section 1004.10.1 Clear Floor Space. A clear floor space complying with Section 305.3, shall be provided. A parallel approach shall be provided for a top loading machine, A forward or parallel approach shall be provided for a front loading machine. Action required: Modify unit design at PH-6 (on sheet A2.50) to comply.
IPC 604.9 Water hammer
Corrective Action Required
08/11/2022

2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Air chambers not allowed. Modify General Notes on P-series drawings to comply.
Misc
Corrective Action Required
08/11/2022

Utility service entries do not comply with building design. Action required: Coordinate FDP with building plans.
IBC 706.6 Fire and Smoke Protection - Vertical Continuity
Corrective Action Required
08/11/2022

2018 706.6 Vertical continuity. Fire walls shall extend from the foundation to a termination point not less than 30 inches above both adjacent roofs. Exceptions: (see code for complete list) 4. In buildings of Types III, IV and V construction, walls shall be permitted to terminate at the underside of combustible roof sheathing or decks provide that all of the following are met: (see code for complete list) 4.1. Roof openings are not less than 4 feet from the fire wall. Action required: Relocate plumbing vent penetrations, and any other penetrations, to comply. Not allowed within 4' of fire walls.
IPC 502.1 Water heater manufacturers installation instructions
Corrective Action Required
08/11/2022

2018 IPC 502.1 General. Water heaters shall be installed in accordance with the manufacturer’s installation instructions. Oil-fired water heaters shall conform to the requirements of this code and the International Mechanical Code. Electric water heaters shall conform to the requirements of this code and provisions of NFPA 70. Gas-fired water heaters shall conform to the requirements of the International Fuel Gas Code. Action required: Provide expansion tank at water heater or provide verification that water heater installed will not require expansion tank in the manufacturer's written instructions.
IPC 916.3 Island vent installation below flood level rim
Corrective Action Required
08/11/2022

2018 IPC 916.3 Vent installation below the fixture flood level rim. The vent located below the flood level rim of the fixture being vented shall be installed as required for drainage piping in accordance with Chapter 7, except for sizing. The vent shall be sized in accordance with Section 906.2. The lowest point of the island fixture vent shall connect full size to the drainage system. The connection shall be to a vertical drain pipe or to the top half of a horizontal drain pipe. Cleanouts shall be provided in the island fixture vent to permit rodding of all vent piping located below the flood level rim of the fixtures. Rodding in both directions shall be permitted through a cleanout. Action required: Modify island fixture vent venting detail. Cleanout on vent side to either be above flood rim level or be bi-directional. (see M/12MP2.01)
NEC Article 230.2 (E) Identification of multiple services
Corrective Action Required
08/11/2022

2017 NEC Article 230.2 (E) Identification. Where a building or structure is supplied by more than one service, or any combination of branch circuits, feeders, and services, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. See 225.37. Action required: Modify designs to show wording and location of plaques that identify building as having multiple services.
Licensed Contractors Rejected 08/11/2022 08/09/2022
Joe Frogge
LC - MEP Subs
Corrective Action Required
07/28/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Rejected 06/17/2022 06/15/2022
Joe Frogge
Final Development Plan
Corrective Action Required
06/15/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 6/15/22 - acknowledged in letter
IBC 1704.2 Special Inspections
Corrective Action Required
06/15/2022

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 6/15/22 - acknowledged in letter
IBC 1010.1.2 Door swing - direction of swing egress travel
Corrective Action Required
06/23/2022

2018 IBC 1010.1.2 Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for exceptions.) 2018 IBC 1010.1.2.1 Direction of swing. Pivot or side-hinged swinging doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Action required: Egress doors must swing outwards in direction of egress travel. Modify design.
Licensed Contractors Rejected 06/17/2022 06/15/2022
Joe Frogge
LC - MEP Subs
Corrective Action Required
06/15/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Rejected 03/03/2022 03/04/2022
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
03/03/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Knox box required
Informational
06/20/2022

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
Construction documents - Fire protection systems
Corrective Action Required
03/03/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Installation acceptance testing
Corrective Action Required
03/03/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Portable fire extinguishers - general
Corrective Action Required
03/03/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Miscellaneous Correction
Resolved
06/20/2022

[BE] 1023.3 Termination. Interior exit stairways and ramps shall terminate at an exit discharge or a public way. Exception: A combination of interior exit stairways, interior exit ramps and exit passageways, constructed in accordance with Sections 1023.2, 1023.3.1 and 1024, respectively, and forming a continuous protected enclosure, shall be permitted to extend an interior exit stairway or ramp to the exit discharge or a public way. [BE] 1023.3.1 Extension. Where interior exit stairways and ramps are extended to an exit discharge or a public way by an exit passageway, the interior exit stairway and ramp shall be separated from the exit passageway by a fire barrier con structed in accordance with Section 707 of the International Building Code or a horizontal assembly constructed in accordance with Section 711 of the International Building Code, or both. The fire-resistance rating shall be not less than that required for the interior exit stairway and ramp. A fire door assembly complying with Section 716 of the International Building Code shall be installed in the fire barrier to provide a means of egress from the interior exit stairway and ramp to the exit passageway. Openings in the fire barrier other than the fire door assembly are prohibited. Penetrations of the fire barrier are prohibited. Exceptions: 1. Penetrations of the fire barrier in accordance with Section 1023.5 shall be permitted. 2. Separation between an interior exit stairway or ramp and the exit passageway extension shall not be required where there are no openings into the exit passageway extension. 3. Separation between an interior exit stairway or ramp and the exit passageway extension shall not be required where the interior exit stairway and the exit passageway extension are pressurized in accordance with Section 909.20.5 of the International Building Code. Action required- Once an occupant enters a protected stairwell in the parking garage they shall remain in the protected enclosure until reaching a public way. This is not being done in the garage. Make corrections.
Miscellaneous Correction
Resolved
06/20/2022

What is the egress strategy for the garage? Some doors swng in, some swing out. Its unlikely that there would be access to the general public from the garage to the apartments. Additional stairs are needed in the garage.
Miscellaneous Correction
Corrective Action Required
06/20/2022

Miscellaneous Correction
Corrective Action Required
06/20/2022

Standpipes (hose valves) shall be located at each egress point between the garage and apartments and proximate to the door.
Miscellaneous Correction
Corrective Action Required
06/20/2022

Building Plan Review Rejected 03/03/2022 02/25/2022
Joe Frogge
IBC 1704.2 Special Inspections
Corrective Action Required
02/25/2022

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
IBC 1010.1.2 Door swing - direction of swing egress travel
Corrective Action Required
02/25/2022

2018 IBC 1010.1.2.1 Direction of swing. Pivot or side-hinged swinging doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Action required: Egress doors must swing outwards in direction of egress travel. Modify design.
Final Development Plan
Corrective Action Required
03/04/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
R
Licensed Contractors Rejected 03/03/2022 02/25/2022
Joe Frogge
LC - MEP Subs
Corrective Action Required
02/25/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
LC - General Contractor
Corrective Action Required
02/25/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address for the on-site contact which is where inspection reports will be sent.
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
02/16/2022 Application Form Commercial Permit Application PS North Village Garage
02/16/2022 Plans MEP - Paragon Star Garage Permit (2-4-22)
02/16/2022 Engineer Report/Study 220204 -Garage ST Calc Binder
02/16/2022 Plans Arch/Struct - 22-0204 Paragon Star_Garage Permit Set
03/04/2022 Letter DS P/R Corrections Document
06/10/2022 Letter 22-0609 Paragon Star North Village Garage Plan Review Response
06/10/2022 Plans 22-0608 Paragon_Garage Resubmittal
07/27/2022 Application Form Commercial Permit Application PS North Village Apartment Retail
07/27/2022 Engineer Report/Study 220722 -ST Calc Binder
07/27/2022 Plans 22-0721 Paragon Star_Civil
07/27/2022 Plans 22-0721 Paragon Star_Arch 1
07/27/2022 Plans 22-0721 Paragon Star_Arch 2
07/27/2022 Plans 22-0721 Paragon Star_Struct
07/27/2022 Plans 22-0721 Paragon Star_MEP
07/27/2022 Specifications 07-11-22_Paragon Star_MEP SPEC
08/12/2022 Letter DS P/R Corrections Document
10/25/2022 Letter 22-1025 Paragon Star North Village Building Plan Review Response
10/25/2022 Engineer Report/Study 2022_10_18 Gaar - Plan Reviw Approval
10/25/2022 Plans ASI 1_ARCH
10/25/2022 Plans ASI 1_CIVIL
10/25/2022 Plans ASI 1_MEP
10/25/2022 Plans ASI 1_STRUCTURAL
10/25/2022 Letter 22-1003 Paragon Star North Village FP&C Plan Review Response
11/02/2022 Letter 22-1102 Paragon Star North Village Building Plan Review Response
11/02/2022 Drawing Paragon Star MEP ASI 2
11/02/2022 Letter Fire Building Plan Review
08/29/2023 Email Re_ Paragon Star North Village - Multifamily
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home