Permit Application Status

PRCOM20192646


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20192646
Building Permit - Commercial
Issued
HAPPY VALLEY PROPERTIES LLC
NEW SHELL BUILDING
NEW 2 STORY SHELL FOR MIXED USE - A2, M, & B STOP WORK ORDER generated on 11/13/2024 12:00 AM by username 'Mark Harding'. STOP WORK ORDER removed on 12/23/2024 12:00 AM by username 'Mark Harding'.
09/16/2019
12/08/2022
02/26/2023
Locations
Contacts
FOGEL-ANDERSON CONSTRUCTION CO, Address:1212 E 8TH ST, Phone:(816) 842-6914  
TEMP-CON LLC, Address:15670 S KEELER ST, Phone:(913) 768-4888  
WESTHUES ELECTRIC INC, Address:PO BOX 18220, Phone:(816) 356-5223  
SHE DIGS IT LLC, Address:600 SE CENTRAL DR, Phone:(816) 295-1100  
BSE STRUCTURAL ENGINEERS LLC, Address:11320 WEST 79TH ST, Phone:(913) 492-7400  
Casey Williams, Address:cwilliams@fogel-anderson.com, Phone:(816) 935-4239  
FINKLE & WILLIAMS ARCHITECTURE, Address:7007 COLLEGE BLVD STE 415, Phone:(913) 498-1550  
HAPPY VALLEY PROPERTIES LLC, Address:801 NW COMMERCE DR  
PARAGON STAR LLC, Address:801 NW COMMERCE DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 09/30/2019 12/12/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
12/12/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Plans received November 15, 2023.
Installation acceptance testing
Corrective Action Required
12/12/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule testing with the flow test of the sprinkler system.
Sprinkler Plan Review Released for Construction 05/22/2022 05/31/2023
Jim Eden
Installation acceptance testing
Corrective Action Required
05/31/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule hydrostatic and waterflow tests.
Miscellaneous Correction
Corrective Action Required
05/31/2023

NFPA 13 8.17.4.2.2 The trip test connection or manifold shall be located on the end of the most distant sprinkler pipe in the upper story and shall be equipped with an accessible shutoff valve and a plug not less than 1 in. (25 mm), of which at least one shall be brass. Provide a remote test. Verified at inspection.
Construction documents - Fire protection systems
Corrective Action Required
05/31/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. pLANS RECEIVED 5/22/2023.
Building Plan Review Approved with Conditions 04/12/2023 04/06/2023
Joe Frogge
License Tax Application
Corrective Action Required
11/15/2022

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter.
Elevator Equipment Permit
Corrective Action Required
11/15/2022

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
11/15/2022

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
11/15/2022

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter.
Bldg - Premises identification/address 501.2
Corrective Action Required
11/15/2022

2012 IBC 501.2 – Premises identification. New and existing buildings shall have approved numbers or letters. Each character shall not be less than 3 inches high with a minimum stroke width of 0.5 inch. They should be installed on a contrasting background and be plainly legible and visible from the street or road fronting the property. When required by the fire code official, address numbers shall be provided in additional approved locations to facilitate emergency response. Address numbers and letters shall be Arabic numbers or alphabetical letters. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address numbers shall be maintained. In multi-tenant commercial buildings where tenants have multiple entrances located on different sides of the building, each door shall be addressed. Address characters shall be capable of being illuminated by an internal or external lighting source. Action required: Comment is for informational purposes. An address for this building has not yet been assigned. 11/6/19 - Acknowledged in letter.
Fire Plan Review Approved with Conditions 04/12/2023 04/05/2023
Jim Eden
Licensed Contractors Approved 06/15/2022 12/08/2022
Joe Frogge
LC - MEP Subs
Resolved
12/08/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/6/19 - Acknowledged in letter.
Final Development Plan Review Approved 11/15/2022
Mike Weisenborn
Building Plan Review Approved with Conditions 06/22/2022 06/17/2022
Joe Frogge
License Tax Application
Resolved
12/08/2022

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter. 12/8/22 - not applicable as they have already paid the fee
Elevator Equipment Permit
Corrective Action Required
06/15/2022

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
06/15/2022

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
06/15/2022

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter.
Bldg - Premises identification/address 501.2
Resolved
12/08/2022

2012 IBC 501.2 – Premises identification. New and existing buildings shall have approved numbers or letters. Each character shall not be less than 3 inches high with a minimum stroke width of 0.5 inch. They should be installed on a contrasting background and be plainly legible and visible from the street or road fronting the property. When required by the fire code official, address numbers shall be provided in additional approved locations to facilitate emergency response. Address numbers and letters shall be Arabic numbers or alphabetical letters. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address numbers shall be maintained. In multi-tenant commercial buildings where tenants have multiple entrances located on different sides of the building, each door shall be addressed. Address characters shall be capable of being illuminated by an internal or external lighting source. Action required: Comment is for informational purposes. An address for this building has not yet been assigned. 11/6/19 - Acknowledged in letter.
NEC Article 110.26 (C)(2) Large equipment
Resolved
07/22/2022

2017 NEC Article 110.26 (C) (3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: Provide panic hardware at doors 107.A, 112.A, & 203.A. field verified at inspections
IBC 1015.2 Where required - guard
Resolved
06/17/2022

2018 IBC 1015.2 Where required. (As amended by the City of Lee’s Summit) Guards shall be located along open-sided walking surfaces, including mezzanines, equipment platforms, aisles, stairs, ramps and landings that are located more than 30 inches measured vertically to the floor or grade below at any point within 36 inches horizontally to the edge of the open side. Guards shall be adequate in strength and attachment in accordance with Section 1607.8. Guards are required at retaining walls over 30” above grade when walking surfaces are within ten (10) feet of the high side of the retaining wall. (See code section for possible exceptions.) Action required: Stair guards are to protect entire flights when over 30" high. Modify 1/A6.02 & 1/A6.03 to comply.
Fire Plan Review Approved with Conditions 06/22/2022 06/15/2022
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
06/15/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Corrective Action Required
06/15/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide shop drawings for review and approval.
Installation acceptance testing
Corrective Action Required
06/15/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Action required- Call (816) 969-1300 to schedule testing. All life safety systems shall be tested and operable before calling for an ocupancy inspection.
Fire Plan Review Approved with Conditions 05/17/2022 05/22/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
05/22/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Corrective Action Required
05/22/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide shop drawings for review and approval.
Installation acceptance testing
Corrective Action Required
05/22/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Action required- Call (816) 969-1300 to schedule testing. All life safety systems shall be tested and operable before calling for an ocupancy inspection.
Building Plan Review Rejected 05/17/2022 05/12/2022
Joe Frogge
License Tax Application
Corrective Action Required
05/10/2022

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter.
Elevator Equipment Permit
Corrective Action Required
05/10/2022

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
05/10/2022

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
05/10/2022

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter.
Bldg - Premises identification/address 501.2
Corrective Action Required
05/10/2022

2012 IBC 501.2 – Premises identification. New and existing buildings shall have approved numbers or letters. Each character shall not be less than 3 inches high with a minimum stroke width of 0.5 inch. They should be installed on a contrasting background and be plainly legible and visible from the street or road fronting the property. When required by the fire code official, address numbers shall be provided in additional approved locations to facilitate emergency response. Address numbers and letters shall be Arabic numbers or alphabetical letters. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address numbers shall be maintained. In multi-tenant commercial buildings where tenants have multiple entrances located on different sides of the building, each door shall be addressed. Address characters shall be capable of being illuminated by an internal or external lighting source. Action required: Comment is for informational purposes. An address for this building has not yet been assigned. 11/6/19 - Acknowledged in letter.
NEC Article 110.26 (C)(2) Large equipment
Corrective Action Required
05/12/2022

2017 NEC Article 110.26 (C) (3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: Provide panic hardware at doors 107.A, 112.A, & 203.A
IBC 1015.2 Where required - guard
Corrective Action Required
05/12/2022

2018 IBC 1015.2 Where required. (As amended by the City of Lee’s Summit) Guards shall be located along open-sided walking surfaces, including mezzanines, equipment platforms, aisles, stairs, ramps and landings that are located more than 30 inches measured vertically to the floor or grade below at any point within 36 inches horizontally to the edge of the open side. Guards shall be adequate in strength and attachment in accordance with Section 1607.8. Guards are required at retaining walls over 30” above grade when walking surfaces are within ten (10) feet of the high side of the retaining wall. (See code section for possible exceptions.) Action required: Stair guards are to protect entire flights when over 30" high. Modify 1/A6.02 & 1/A6.03 to comply.
Licensed Contractors Rejected 05/17/2022 05/12/2022
Joe Frogge
LC - MEP Subs
Corrective Action Required
05/10/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/6/19 - Acknowledged in letter.
Special Inspections Review Approved 11/06/2019
Joe Frogge
Building Plan Review Rejected 11/12/2019 11/06/2019
Joe Frogge
Final Development Plan
Resolved
05/19/2021

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter.
License Tax Application
Corrective Action Required
11/05/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter.
Elevator Equipment Permit
Corrective Action Required
11/05/2019

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
11/05/2019

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
11/05/2019

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 11/6/19 - Acknowledged in letter.
Misc
Resolved
11/06/2019

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 11/6/19 - Acknowledged in letter.
Bldg - Premises identification/address 501.2
Corrective Action Required
11/05/2019

2012 IBC 501.2 – Premises identification. New and existing buildings shall have approved numbers or letters. Each character shall not be less than 3 inches high with a minimum stroke width of 0.5 inch. They should be installed on a contrasting background and be plainly legible and visible from the street or road fronting the property. When required by the fire code official, address numbers shall be provided in additional approved locations to facilitate emergency response. Address numbers and letters shall be Arabic numbers or alphabetical letters. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address numbers shall be maintained. In multi-tenant commercial buildings where tenants have multiple entrances located on different sides of the building, each door shall be addressed. Address characters shall be capable of being illuminated by an internal or external lighting source. Action required: Comment is for informational purposes. An address for this building has not yet been assigned. 11/6/19 - Acknowledged in letter.
Miscellaneous Correction
Resolved
11/06/2019

2018 IBC 713.4 Fire-Resistance rating. Shaft enclosures shall have a fire-resistance rating of not less than 2 hours where connecting four stories or more, and not less than 1 hour where connecting less than four stories. The number of stories connected by the shaft enclosure shall include any basements but not any mezzanines. Shaft enclosures shall be a fire-resistance rating not less than the floor assembly penetrated, but need not exceed 2 hours. Shaft enclosures shall meet the requirements of Section 703.2.1. Action required: Shaft walls must be 1 hour rated.
Bldg - Types I and II construction allowable materials 602.2
Resolved
11/06/2019

2018 IBC 602.2 Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Wood is not allowed in roof and/or parapet assemblies unless it is fire retardant treated. Modify relevant notes and details.
Accessibility - Vertical clearance 307.4
Resolved
11/06/2019

ICC A117.1-2017 Section 307.4 Vertical Clearance. Vertical clearance shall be 80 inches minimum. Rails or other barriers shall be provided where the vertical clearance is less than 80 inches. The leading edge of such rails or barrier shall be located 27 inches maximum above the floor. (see code for exception) Action required: Provide barriers beneath stairs.
Miscellaneous Correction
Resolved
11/06/2019

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide roof hatch details to verify compliance.
Miscellaneous Correction
Resolved
11/06/2019

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to verify compliance.
Screening - Rooftop equipment
Resolved
11/06/2019

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: All mechanical equipment (including condensing units) must be behind screening.
Miscellaneous Correction
Resolved
11/06/2019

2017 NEC Article 230.2 (E) Identification. Where a building or structure is supplied by more than one service, or any combination of branch circuits, feeders, and services, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. See 225.37. Action required: Specify electric service signage to verify compliance.
Licensed Contractors Rejected 11/12/2019 11/06/2019
Joe Frogge
LC - General Contractor
Resolved
11/06/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
11/05/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/6/19 - Acknowledged in letter.
Fire Plan Review Approved with Conditions 11/12/2019 11/05/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
11/05/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the fire alarm system.
Tenant identification
Corrective Action Required
11/05/2019

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Informational Purposes)
Address numbers required
Corrective Action Required
11/05/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
11/05/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Verified At Inspection) Provide a Knox Box on the exterior of the building by the FDC. It can be ordered on Knoxbox.com
Construction documents - Fire protection systems
Corrective Action Required
11/05/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system. Class 1 standpipes required. 4 inch storz connection for the FDC.
Installation acceptance testing
Corrective Action Required
11/05/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. Testing must be complete before a final can be scheduled.
Misc
Resolved
11/05/2019

(Action Required) Provide a fire hydrant within 100 feet of the FDC.
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
11/05/2019

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. (Verified At Inspection) Provide a elevator Knox Box. Knox box to be mounted by the elevators on the first floor. Order at Knoxbox.com
Duct smoke detectors
Corrective Action Required
11/05/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Verified At Inspection) Duct detection required with CFM over 2000.
Door operations
Corrective Action Required
11/05/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Fire Plan Review Approved with Conditions 11/12/2019 11/05/2019
Michael Weissenbach
Fire Plan Review Rejected 09/30/2019 09/23/2019
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
09/23/2019

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the fire alarm system.
Tenant identification
Corrective Action Required
09/23/2019

2018 IFC 403.11.1.5 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. (Informational Purposes)
Address numbers required
Corrective Action Required
09/23/2019

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Knox box required
Corrective Action Required
09/23/2019

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) Provide a Knox Box on the exterior of the building by the FDC. It can be ordered on Knoxbox.com
Construction documents - Fire protection systems
Corrective Action Required
09/23/2019

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system. Class 1 standpipes required. 4 inch storz connection for the FDC.
Installation acceptance testing
Corrective Action Required
09/23/2019

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing. Testing must be complete before a final can be scheduled.
Misc
Corrective Action Required
09/23/2019

(Action Required) Provide a fire hydrant within 100 feet of the FDC.
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
09/23/2019

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. (Action Required) Provide a elevator Knox Box. Knox box to be mounted by the elevators on the first floor. Order at Knoxbox.com
Duct smoke detectors
Corrective Action Required
09/23/2019

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action required) Duct detection required with CFM over 2000.
Door operations
Corrective Action Required
09/23/2019

2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (Verified At Inspection)
Building Plan Review Rejected 09/30/2019 09/23/2019
Joe Frogge
Final Development Plan
Corrective Action Required
09/23/2019

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
License Tax Application
Corrective Action Required
09/23/2019

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Elevator Equipment Permit
Corrective Action Required
09/23/2019

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
09/23/2019

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
09/23/2019

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
09/23/2019

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Bldg - Premises identification/address 501.2
Corrective Action Required
09/23/2019

2012 IBC 501.2 – Premises identification. New and existing buildings shall have approved numbers or letters. Each character shall not be less than 3 inches high with a minimum stroke width of 0.5 inch. They should be installed on a contrasting background and be plainly legible and visible from the street or road fronting the property. When required by the fire code official, address numbers shall be provided in additional approved locations to facilitate emergency response. Address numbers and letters shall be Arabic numbers or alphabetical letters. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address numbers shall be maintained. In multi-tenant commercial buildings where tenants have multiple entrances located on different sides of the building, each door shall be addressed. Address characters shall be capable of being illuminated by an internal or external lighting source. Action required: Comment is for informational purposes. An address for this building has not yet been assigned.
Miscellaneous Correction
Corrective Action Required
09/23/2019

2018 IBC 713.4 Fire-Resistance rating. Shaft enclosures shall have a fire-resistance rating of not less than 2 hours where connecting four stories or more, and not less than 1 hour where connecting less than four stories. The number of stories connected by the shaft enclosure shall include any basements but not any mezzanines. Shaft enclosures shall be a fire-resistance rating not less than the floor assembly penetrated, but need not exceed 2 hours. Shaft enclosures shall meet the requirements of Section 703.2.1. Action required: Shaft walls must be 1 hour rated.
Bldg - Types I and II construction allowable materials 602.2
Corrective Action Required
09/23/2019

2018 IBC 602.2 Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: Wood is not allowed in roof and/or parapet assemblies unless it is fire retardant treated. Modify relevant notes and details.
Accessibility - Vertical clearance 307.4
Corrective Action Required
09/23/2019

ICC A117.1-2017 Section 307.4 Vertical Clearance. Vertical clearance shall be 80 inches minimum. Rails or other barriers shall be provided where the vertical clearance is less than 80 inches. The leading edge of such rails or barrier shall be located 27 inches maximum above the floor. (see code for exception) Action required: Provide barriers beneath stairs.
Miscellaneous Correction
Corrective Action Required
09/23/2019

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide roof hatch details to verify compliance.
Miscellaneous Correction
Corrective Action Required
09/23/2019

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to verify compliance.
Screening - Rooftop equipment
Corrective Action Required
09/23/2019

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: All mechanical equipment (including condensing units) must be behind screening.
Miscellaneous Correction
Corrective Action Required
09/23/2019

2017 NEC Article 230.2 (E) Identification. Where a building or structure is supplied by more than one service, or any combination of branch circuits, feeders, and services, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. See 225.37. Action required: Specify electric service signage to verify compliance.
Licensed Contractors Rejected 09/30/2019 09/23/2019
Joe Frogge
LC - General Contractor
Corrective Action Required
09/23/2019

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
09/23/2019

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Shell Building $52,400.00 $52,400.00 Paid 12/05/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Miscellaneous Inspection Pending
Misc
Corrective Action Required
11/13/2024
This permit is expired and Folgel Anderson is no longer the GC, Westhues Elect is not the contractor installing the primary and secondary to the panels in the building Arrowhead Elect. we have asked to obtain a new permit with GC and new MEP's. No further work will be complete under this GC and PERMIT> MARK HARDING 11/13/2024 3:09 PM
Piers/Caissons Inspection - Commercial Partial 1/19/2023 (10:30) 1/19/2023 01/19/2023
Misc
Informational
01/19/2023
Drilled piles for foundation-
Piers/Caissons Inspection - Commercial Partial 1/27/2023 1/27/2023 01/27/2023
Miscellaneous Correction
Informational
01/23/2023
Drilled piers for foundation -Depth, bearing and placement to be verified by Olsson
Foundation Inspection - Commercial Partial 2/13/2023 (2:00) 2/13/2023 02/13/2023
Misc
Corrective Action Required
02/13/2023
The following areas approved- Perimeter footing and pads: Line 2 from U-N **UFER LOCATED AT 2/Q
Footing Inspection - Commercial Partial 2/15/2023 (1:00) 2/15/2023 02/15/2023
Misc
Informational
02/15/2023
The following areas approved Perimeter footing and pads: Line 2 from S-4' EAST OF LINE L **UFER LOCATED AT 2/Q
Foundation Inspection - Commercial Partial 2/21/2023 (1:30) 2/21/2023 02/21/2023
Misc
Corrective Action Required
02/13/2023
The following areas approved- WEST BUILDING: Perimeter footing and pads: Line 2 from S to J Line J from 2 to 4 Line 4 from J to N **UFER LOCATED AT 2/Q
Footing Inspection - Commercial Partial 2/24/2023 (1:30) 2/24/2023 02/24/2023
Misc
Informational
02/15/2023
The following areas approved- WEST BUILDING: Perimeter footing and pads completed **UFER LOCATED AT 2/Q
Footing Inspection - Commercial Partial 2/28/2023 (2:00) 2/28/2023 02/28/2023
Misc
Informational
02/24/2023
The following areas approved- WEST BUILDING: -Perimeter footing and pads completed -Interior column pads complete -Exterior column pads at line 1/m and 1/R **UFER LOCATED AT 2/Q
Footing Inspection - Commercial Partial 3/2/2023 3/2/2023 03/02/2023
Misc
Informational
02/28/2023
The following areas approved- WEST BUILDING: -Perimeter footing and pads completed -Interior column pads complete -Exterior column pads at line 1/m and 1/R -Footing for elevator pit **UFER LOCATED AT 2/Q
Foundation Inspection - Commercial Partial 3/2/2023 (2:00) 3/2/2023 03/02/2023
Misc
Corrective Action Required
02/21/2023
The following areas approved- WEST BUILDING: -Perimeter footing and pads completed -Interior column pads complete -Exterior column pads at line 1/m and 1/R -Footing for elevator pit **UFER LOCATED AT 2/Q
Foundation Inspection - Commercial Partial 3/6/2023 (2:00) 3/6/2023 03/06/2023
Misc
Corrective Action Required
03/02/2023
The following areas approved- WEST BUILDING: -Perimeter footing and pads completed -Interior column pads complete -Exterior column pads at line 1/m and 1/R -Footing and walls for elevator pit **UFER LOCATED AT 2/Q
Footing Inspection - Commercial Partial 03/06/2023
Misc
Informational
03/02/2023
The following areas approved- WEST BUILDING: -Perimeter footing and pads completed -Interior column pads complete -Exterior column pads at line 1/m and 1/R -Footing and walls for elevator pit **UFER LOCATED AT 2/Q
Foundation Inspection - Commercial Partial 3/24/2023 (2:00) 3/24/2023 03/24/2023
Misc
Corrective Action Required
03/06/2023
The following areas approved- WEST BUILDING: -Perimeter footing and pads completed -Interior column pads complete -Exterior column pads at line 1/m and 1/R -Footing and walls for elevator pit **UFER LOCATED AT 2/Q - Stem wall on West side only , N to T, framed and rebar complete. OK to pour.
Footing Inspection - Commercial Partial 3/30/2023 03/30/2023
Misc
Informational
03/06/2023
The following areas approved- WEST BUILDING: -Perimeter footing and pads completed -Interior column pads complete -Exterior column pads at line 1/m and 1/R -Footing and walls for elevator pit **UFER LOCATED AT 2/Q EAST BUILDING 2: - footing and column pads South side A to H and 20" around corners 3/30
Foundation Inspection - Commercial Partial 4/4/2023 (2:00) 4/4/2023 04/04/2023
Misc
Corrective Action Required
03/24/2023
The following areas approved- WEST BUILDING: -Perimeter footing and pads completed -Interior column pads complete -Exterior column pads at line 1/m and 1/R -Footing and walls for elevator pit **UFER LOCATED AT 2/Q - Stem wall on West side only , N to T, framed and rebar complete. OK to pour. EAST BUILDING 2: - Perimeter footing and pads: Line 1 and 2 from A to H, Line A from 1 to 3.5, Line 4 and 5 from A to D, Line H from 1 to 3.5
Foundation Inspection - Commercial Partial 4/6/2023 (2:00) 4/6/2023 04/06/2023
Misc
Corrective Action Required
04/04/2023
The following areas approved- WEST BUILDING: -Perimeter footing and pads completed -Interior column pads complete -Exterior column pads at line 1/m and 1/R -Footing and walls for elevator pit **UFER LOCATED AT 2/Q - Stem wall on West side only , N to T, framed and rebar complete. OK to pour. EAST BUILDING 2: - Perimeter footing and pads completed
Foundation Inspection - Commercial Partial 4/7/2023 (2:00) 4/7/2023 04/07/2023
Misc
Corrective Action Required
04/06/2023
The following areas approved- WEST BUILDING: -Perimeter footing and pads completed -Interior column pads complete -Exterior column pads at line 1/m and 1/R -Footing and walls for elevator pit **UFER LOCATED AT 2/Q - Stem wall on West side only , N to T, framed and rebar complete. OK to pour. EAST BUILDING 2: - Perimeter footing and pads completed -Interior pads at line 3 completed
Foundation Inspection - Commercial Partial 4/11/2023 (2:00) 4/11/2023 04/11/2023
Misc
Corrective Action Required
04/07/2023
The following areas approved- WEST BUILDING: -Perimeter footing and pads completed -Interior column pads complete -Exterior column pads at line 1/m and 1/R -Footing and walls for elevator pit **UFER LOCATED AT 2/Q EAST BUILDING 2: - Perimeter footing and pads completed -Interior pads at line 3 complete -Exterior column pads complete
Footing Inspection - Commercial Partial 04/11/2023
Misc
Informational
03/30/2023
The following areas approved- WEST BUILDING: -Perimeter footing and pads completed -Interior column pads complete -Exterior column pads at line 1/m and 1/R -Footing and walls for elevator pit **UFER LOCATED AT 2/Q EAST BUILDING 2: - Perimeter footing and pads completed -Interior pads at line 3 complete -Exterior column pads complete
Underslab Plumbing Inspection - Commercial Passed 4/19/2023 4/19/2023 04/19/2023
Underslab Plumbing Inspection - Commercial Partial 04/19/2023
Misc
Informational
04/19/2023
West building complete
Suspended Slab Inspection Failed 4/28/2023 (10:00) 4/28/2023 04/28/2023
Misc
Corrective Action Required
04/28/2023
Provide clearance to bar and mats per detail from deck
Suspended Slab Inspection Partial 5/2/2023 5/2/2023 05/02/2023
Misc
Informational
05/02/2023
-West Building suspended composite deck approved
Footing Inspection - Commercial Partial 5/17/2023 (8:00) 5/17/2023 05/17/2023
Misc
Informational
04/11/2023
The following areas approved- WEST BUILDING: -Perimeter footing and pads completed -Interior column pads complete -Exterior column pads at line 1/m and 1/R -Footing and walls for elevator pit **UFER LOCATED AT 2/Q -Thickened slab at stairwell EAST BUILDING 2: - Perimeter footing and pads completed -Interior pads at line 3 complete -Exterior column pads complete
Underslab Electrical Inspection - Commercial Partial 05/17/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/17/2023
-Stub ups at west building north side chase location
Underslab Electrical Inspection - Commercial Partial 5/24/2023 5/24/2023 05/24/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/17/2023
-Stub ups at west building north side chase location -Conduit at 1st floor west electrical room
Underslab Electrical Inspection - Commercial Partial 5/25/2023 5/25/2023 05/25/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/24/2023
**West building complete
Underslab Plumbing Inspection - Commercial Passed 5/26/2023 5/26/2023 05/26/2023
Misc
Informational
04/19/2023
West building complete East building complete
In-wall Inspection Partial 5/26/2023 5/26/2023 05/26/2023
Misc
Corrective Action Required
05/26/2023
West building -Exterior wall framing at second floor and parapet from line K to T ok to cover exterior
Suspended Slab Inspection Passed 5/30/2023 05/30/2023
Misc
Informational
05/02/2023
-West Building suspended composite deck approved -East Building suspended composite deck approved **Pending engineer's approval
Fire Line - Hydrostatic Test Passed 6/6/2023 6/6/2023 06/06/2023
Misc
Informational
06/06/2023
06/06/23 JMJ ( SDI - SHE DIG IT - Foreman Shawn ) Contactor test approximately 25' of 8" DIP water pipe including riser inside building frame. Contractor wanted to ensure this portion passed before floor slab was poured.
Water Line - Hydrostatic Test Passed 6/6/2023 6/6/2023 06/06/2023
Misc
Informational
06/06/2023
06/06/25 Tuesday JMJ ( SDI- Shawn ) Contractor tested approximately 25' of 4" DIP domestic water line including riser that is in the frame of building. Contractor wanted to test this portion to verify it passed before concrete slab was poured.
Rough Framing Inspection - Commercial Partial 06/12/2023
MISC
Corrective Action Required
06/12/2023
Exterior sheathing at 2nd floor and parapet from K to T ok *Parapet plywood sheathing from K to T: -Add missing screws, fasten seams to framing
Underslab Electrical Inspection - Commercial Partial 06/16/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/25/2023
**West building complete **East building -Secodary lines from transformer to electrical room
Rough Framing Inspection - Commercial Partial 6/20/2023 6/20/2023 06/20/2023
MISC
Corrective Action Required
06/12/2023
Exterior sheathing at 2nd floor and parapet from K to T ok *Parapet plywood sheathing from K to T: -fasten seams to framing East building incomplete
In-wall Inspection Partial 6/12/2023 06/20/2023
Misc
Corrective Action Required
05/26/2023
-Exterior wall framing at second floor and parapet ok to cover
Underslab Electrical Inspection - Commercial Partial 06/20/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/16/2023
**West building complete **East building -Secodary lines from transformer to electrical room -From electrical room to stair pad
Underslab Electrical Inspection - Commercial Partial 06/27/2023
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
06/20/2023
**West building complete **East building -Secodary lines from transformer to electrical room -From electrical room to stair pad -Electrical room
Footing Inspection - Commercial Partial 6/28/2023 (8:00) 6/28/2023 06/28/2023
Misc
Informational
05/17/2023
The following areas approved- WEST BUILDING: -Perimeter footing and pads completed -Interior column pads complete -Exterior column pads at line 1/m and 1/R -Footing and walls for elevator pit **UFER LOCATED AT 2/Q -Thickened slab at stairwell -Meter enclosure room EAST BUILDING 2: - Perimeter footing and pads completed -Interior pads at line 3 complete -Exterior column pads complete
Rough Framing Inspection - Commercial Partial 07/05/2023
MISC
Corrective Action Required
06/20/2023
Exterior sheathing at 2nd floor and parapet from K to T ok Sheathing at rooftop parapet screw pattern ok
In-wall Inspection Partial 7/13/2023 7/13/2023 07/13/2023
Misc
Corrective Action Required
06/20/2023
-Exterior wall framing at second floor and parapet ok to cover -Complete electrical for inwall inspection at column bump outs
In-wall Inspection Failed 8/8/2023 8/8/2023 08/08/2023
Misc
Corrective Action Required
07/13/2023
-Exterior wall framing at second floor and parapet ok to cover -Complete electrical for inwall inspection at column bump outs **8/8/23-REMOVE ROCK AT FACE OF COLUMNS FOR INSPECTION, SECURE ALL RIGID PVC PER NEC 252.30, COMPLETE ELECTRICAL AND SPRINKLER AT SOFFITS -ALL FURTHER INSPECTIONS WILL BE PERFORMED UNDER IN-WALL INSPECTION
In-wall Inspection Failed 11/27/2023 11/27/2023 08/08/2023
Misc
Corrective Action Required
08/08/2023
-Exterior wall framing at second floor and parapet ok to cover -Complete electrical for inwall inspection at column bump outs **8/8/23-REMOVE ROCK AT FACE OF COLUMNS FOR INSPECTION, SECURE ALL RIGID PVC PER NEC 252.30, COMPLETE ELECTRICAL AND SPRINKLER AT SOFFITS
Rough Framing Inspection - Commercial Failed 8/8/2023 8/8/2023 08/08/2023
MISC
Corrective Action Required
07/05/2023
Exterior sheathing at 2nd floor and parapet ok Sheathing at rooftop parapet screw pattern ok 7/13/23 -Complete electrical for inwall inspection at column bump outs **8/8/23-REMOVE ROCK AT FACE OF COLUMNS FOR INSPECTION, SECURE ALL RIGID PVC PER NEC 252.30, COMPLETE ELECTRICAL AND SPRINKLER AT SOFFITS -ALL FURTHER INSPECTIONS WILL BE DONE UNDER IN=WALL INSPECTION
In-wall Inspection Partial 8/11/2023 8/11/2023 08/11/2023
MISC
Corrective Action Required
08/08/2023
Exterior sheathing at 2nd floor and parapet ok Sheathing at rooftop parapet screw pattern ok 7/13/23 -Complete electrical for inwall inspection at column bump outs **8/8/23-REMOVE ROCK AT FACE OF COLUMNS FOR INSPECTION, SECURE ALL RIGID PVC PER NEC 252.30, COMPLETE ELECTRICAL AND SPRINKLER AT SOFFITS -ALL FURTHER INSPECTIONS WILL BE DONE UNDER IN=WALL INSPECTION
Miscellaneous Correction
Corrective Action Required
08/11/2023
- Rigid PVC in knock out columns have been secured. - soffit electrical and sprinkler system have not been completed This is a partial pass for the columns only 08/11/2023. KBEARD
Underground Electrical Inspection - Commercial Partial 6/27/2023 8/21/2023 08/21/2023
Misc
Corrective Action Required
08/21/2023
-Conduit from building for (6) columns at NW corner
Underground Electrical Inspection - Commercial Partial 8/22/2023 08/22/2023
Misc
Corrective Action Required
08/21/2023
-Conduit from building for (6) columns at NE corner, (6) columns at SE corner
Underground Electrical Inspection - Commercial Partial 8/23/2023 8/23/2023 08/23/2023
Misc
Corrective Action Required
08/22/2023
-Conduit from building for (6) columns at NE corner, (6) columns at SE corner, (6) at SW corner
Rough Framing Inspection - Commercial Passed 8/28/2023 8/28/2023 08/28/2023
MISC
Informational
08/28/2023
Exterior framing ok to cover
Above Ceiling Inspection Partial 08/28/2023
Misc
Corrective Action Required
08/28/2023
-Exterior soffif framing ok **Leave back open to inspect electrical once installed
Underground Electrical Inspection - Commercial Partial 8/28/2023 8/28/2023 08/28/2023
Misc
Corrective Action Required
08/23/2023
-Conduit from building for (6) columns at NE corner, (6) columns at SE corner, (6) at SW corner and (6) at NW corner
In-wall Inspection Partial 09/05/2023
Misc
Corrective Action Required
08/08/2023
**Exterior wall framing, columns and parapet ok to cover -In wall plumbing only ok at building 2 second floor restrooms 9/5/23 -COMPLETE ELECTRICAL AND SPRINKLER AT SOFFITS
Rated Assembly Inspection Failed 9/27/2023 9/27/2023 09/27/2023
Misc
Corrective Action Required
09/27/2023
-Seal all gaps and penetrations through shaft layer with approved means -Correct rock short of top channel at middle future mechanical shaft
In-wall Inspection Partial 10/12/2023 10/12/2023 10/12/2023
MISC
Corrective Action Required
09/05/2023
Complete all MEPs *OK to 1 side
Miscellaneous Correction
Resolved
10/12/2023
Above Ceiling Inspection Partial 10/12/2023
Misc
Corrective Action Required
08/28/2023
-Exterior soffif framing ok **Leave back open to inspect electrical once installed Breezway hard lid ok to cover
Rated Assembly Inspection Partial 10/12/2023 10/12/2023 10/12/2023
Misc
Corrective Action Required
09/27/2023
-Seal all gaps and penetrations through shaft layer with approved means at elevator shaft (2) locations at steel and at gap in East building future hvac shaft at bar joist -(3) future shafts approvded to cover
Rated Assembly Inspection Partial 10/16/2023 10/16/2023
Misc
Informational
10/16/2023
Shaft wall assemblies for elevator and (4) future mechanical shafts approved
In-wall Inspection Partial 10/24/2023 10/24/2023 10/24/2023
MISC
Corrective Action Required
10/12/2023
Complete all MEPs *OK to 1 side
Misc
Informational
10/24/2023
In-wall OK to cover: -Ceiling soffit wall west of the restroom
In-wall Inspection Partial 10/27/2023 10/27/2023 10/26/2023
MISC
Corrective Action Required
10/24/2023
Complete all MEPs *OK to 1 side
Misc
Informational
10/24/2023
In-wall OK to cover: -Ceiling soffit wall west of the restroom -Soffit at East building
Rough Framing Inspection - Commercial Passed 10/26/2023 10/26/2023 10/26/2023
In-wall Inspection Partial 10/27/2023 10/27/2023 10/27/2023
MISC
Corrective Action Required
10/26/2023
-Secure MC within 12" of boxes at both stairwells -Land MC at west 2nd floor doorway -Complete plumbing and electrical outside of restrooms at alcove -Provide bocca plates, secure dwv at riser room
Misc
Informational
10/26/2023
In-wall OK to cover: -Ceiling soffit wall west of the restroom -Soffit at East building -Restrooms 206/207 except at drinking fountain alcove ok
In-wall Inspection Partial 11/2/2023 11/2/2023 11/02/2023
MISC
Corrective Action Required
10/27/2023
-Provide bocca plates, secure dwv at riser room -Seal through floor penetrations at restroom walls
Misc
Informational
10/27/2023
In-wall OK to cover: -Ceiling soffit wall west of the restroom -Soffit at East building -Stairwell walls -Restrooms 206/207 except at drinking fountain alcove and north wall
In-wall Inspection Partial 11/8/2023 11/8/2023 11/08/2023
MISC
Corrective Action Required
11/02/2023
-Provide bocca plates, secure dwv at riser room -Seal through floor penetrations at restroom walls
Misc
Informational
11/02/2023
In-wall OK to cover: -Ceiling soffit wall west of the restroom -Soffit at East building -Stairwell walls -Restrooms 206/207 except at drinking fountain alcove and north wall -Column at breezeway
In-wall Inspection Passed 11/28/2023 11/28/2023 11/28/2023
MISC
Resolved
11/28/2023
-Provide bocca plates, secure dwv at riser room -Seal through floor penetrations at restroom walls
Misc
Resolved
11/28/2023
In-wall OK to cover: -Ceiling soffit wall west of the restroom -Soffit at East building -Stairwell walls -Restrooms 206/207 except at drinking fountain alcove and north wall -Column at breezeway
Rated Assembly Inspection Partial 12/6/2023 12/6/2023 12/06/2023
Misc
Informational
10/16/2023
Shaft wall assemblies for elevator and (4) future mechanical shafts approved -Screw pattern at top inside of elevator shaft ok
Rated Assembly Inspection Passed 12/11/2023 12/11/2023 12/11/2023
Misc
Resolved
12/11/2023
Shaft wall assemblies for elevator and (4) future mechanical shafts approved -Screw pattern at top inside of elevator shaft ok
Above Ceiling Inspection Partial 12/14/2023 12/14/2023 12/14/2023
Misc
Corrective Action Required
10/12/2023
-Exterior soffif framing ok **Leave back open to inspect electrical once installed -Breezway hard lid ok to cover -Hard lids at first floor lobby west building
Above Ceiling Inspection Failed 12/20/2023 12/20/2023
Misc
Corrective Action Required
12/14/2023
-Exterior soffif framing ok **Leave back open to inspect electrical once installed -Breezway hard lid ok to cover -Hard lids at first floor lobby west building 12/20/23 -complete hvac at second floor hard lids
Above Ceiling Inspection Partial 12/27/2023 12/27/2023 12/27/2023
Misc
Corrective Action Required
12/20/2023
-Exterior soffif framing ok **Leave back open to inspect electrical once installed -Breezway hard lid ok to cover -Hard lids at first floor lobby west building -Hard lids at second floor restroom vestibule
Underground Plumbing Inspection - Commercial Failed 5/31/2024 5/31/2024 05/31/2024
Misc
Corrective Action Required
05/31/2024
5/31/24 Inspection for grease interceptor: -No grease interceptor detail or specifications on building or civil plans. Submit updated plan revisions for approval
Miscellaneous Inspection Failed - Stop Work 11/13/2024 11/13/2024
Misc
Corrective Action Required
11/13/2024
This permit is expired and Folgel Anderson is no longer the GC, Westhues Elect is not the contractor installing the primary and secondary to the panels in the building Arrowhead Elect. we have asked to obtain a new permit with GC and new MEP's. No further work will be complete under this GC and PERMIT> MARK HARDING 11/13/2024 3:09 PM
Electrical Service Inspection Passed 12/27/2024 12/30/2024 12/30/2024
Misc
Informational
12/30/2024
Services for MSBE and MSBW approved
Electrical Service Inspection Failed 12/31/2024
Misc
Corrective Action Required
12/31/2024
PROVIDE PERMANENT PLAQUE OR DIRECTORY AT SERVICE DISCONNECTS INDICATING NAME AND LOCATION OF EACH ELECTRICAL SERVICE SERVING BUILDING TO MEET REQUIREMENTS OF NEC 225.37
Electrical Service Inspection Passed 01/08/2025
Misc
Resolved
01/08/2025
PROVIDE PERMANENT PLAQUE OR DIRECTORY AT SERVICE DISCONNECTS INDICATING NAME AND LOCATION OF EACH ELECTRICAL SERVICE SERVING BUILDING TO MEET REQUIREMENTS OF NEC 225.37
Documents & Images
Date Uploaded File Type Document Name
09/23/2019 Letter Fire Building Plan Review
09/26/2019 Letter DS P/R Corrections Document
11/05/2019 Letter Fire Building Plan Review
11/06/2019 3RD Party Insp Report Statement of Special Inspection - Sealed
05/21/2021 Application Form application
05/21/2021 Letter plan review responses
05/21/2021 Engineer Report/Study geotech report
06/01/2021 Plans 2019-1025_Paragon Bldg 2_CONSTRUCTION SET_ARCH-STRUC
06/01/2021 Plans 2019-1025_Paragon Bldg 2_CONSTRUCTION SET_MEPF
06/01/2021 Approved Plans approved - 2019-1025_Paragon Bldg 2_CONSTRUCTION SET_ARCH-STRUC
06/01/2021 Approved Plans approved - 2019-1025_Paragon Bldg 2_CONSTRUCTION SET_MEPF
06/15/2021 Plans Addressing Plan
05/10/2022 Application Form 2022-0509 ParagonStar Bldg2Lot9 Revised LS Commercial Permit Application
05/10/2022 Letter 2022-0509_Paragon Bldg2Lot9 - Change Narrative
05/10/2022 Plans 2022-0509_ParagonStar Bldg2 PERMIT SET_ARCH+STRUCT
05/10/2022 Plans 2022-0509_ParagonStar Bldg2 PERMIT SET_MEPFP
05/23/2022 Letter DS P/R Corrections Document
06/01/2022 Letter Fire Building Plan Review
06/14/2022 Application Form 2022-0602_Paragon Bldg2Lot9 - Revised Permit Application
06/14/2022 Letter 2022-0602_Paragon Bldg2Lot9 - Change Narrative
06/14/2022 Code Mod Request 2022-0614_Code Modification Request for Paragon Bldg2 Shell PRCOM20192646
06/14/2022 Plans arch -2022-0602_ParagonStar Bldg2 PERMIT RESUBMITTAL_ARCH+STRUCT
06/14/2022 Plans mep -2022-0602_ParagonStar Bldg2 PERMIT RESUBMITTAL_MEPF
06/16/2022 Code Mod Request CMR/clarification for stair guards
06/16/2022 Approved Plans approved - 2022-0602_ParagonStar Bldg2 PERMIT RESUBMITTAL_MEPF
06/16/2022 Approved Plans approved - 2022-0602_ParagonStar Bldg2 PERMIT RESUBMITTAL_ARCH+STRUCT
07/28/2022 Email FDP email
08/30/2022 Letter DS P/R Corrections Document
12/05/2022 Receipt Receipt for transaction: 2022-009267
12/08/2022 Letter DS Building Permit
01/19/2023 Letter INSPECTION SUMMARY
01/27/2023 Letter INSPECTION SUMMARY
02/13/2023 Letter INSPECTION SUMMARY
02/15/2023 Letter INSPECTION SUMMARY
02/21/2023 Letter INSPECTION SUMMARY
02/24/2023 Letter INSPECTION SUMMARY
02/28/2023 Letter INSPECTION SUMMARY
03/02/2023 Letter INSPECTION SUMMARY
03/02/2023 Letter INSPECTION SUMMARY
03/06/2023 Letter INSPECTION SUMMARY
03/06/2023 Letter INSPECTION SUMMARY
03/24/2023 Letter INSPECTION SUMMARY
03/30/2023 Letter INSPECTION SUMMARY
04/04/2023 Plans 2023-0202_ParagonStarASI-02 ARCH SET
04/04/2023 Plans 2023-0404_ParagonStar Fully Compiled Latest CONSULTANT SETS
04/04/2023 Letter 23-0404_ParagonStar-Bldg2Lot9 latest change narrative
04/04/2023 Letter INSPECTION SUMMARY
04/06/2023 Approved Plans approved bldg 2 - arch
04/06/2023 Approved Plans approved bldg 2 - str-mep
04/06/2023 Letter INSPECTION SUMMARY
04/07/2023 Letter INSPECTION SUMMARY
04/11/2023 Letter INSPECTION SUMMARY
04/11/2023 Letter INSPECTION SUMMARY
04/19/2023 Letter INSPECTION SUMMARY
04/19/2023 Letter INSPECTION SUMMARY
04/28/2023 Letter INSPECTION SUMMARY
05/02/2023 Letter INSPECTION SUMMARY
05/17/2023 Letter INSPECTION SUMMARY
05/17/2023 Letter INSPECTION SUMMARY
05/24/2023 Letter INSPECTION SUMMARY
05/25/2023 Letter INSPECTION SUMMARY
05/26/2023 Letter INSPECTION SUMMARY
05/26/2023 Plans Paragon Star 2 - Submittal
05/26/2023 Letter INSPECTION SUMMARY
05/30/2023 Letter INSPECTION SUMMARY
05/31/2023 Letter Fire (Sprinkler) Plan Review
06/06/2023 Letter INSPECTION SUMMARY
06/06/2023 Letter INSPECTION SUMMARY
06/06/2023 Letter INSPECTION SUMMARY
06/12/2023 Letter INSPECTION SUMMARY
06/16/2023 Letter INSPECTION SUMMARY
06/20/2023 Letter INSPECTION SUMMARY
06/20/2023 Letter INSPECTION SUMMARY
06/20/2023 Letter INSPECTION SUMMARY
06/27/2023 Letter INSPECTION SUMMARY
06/28/2023 Letter INSPECTION SUMMARY
07/05/2023 Letter INSPECTION SUMMARY
07/13/2023 Letter INSPECTION SUMMARY
08/08/2023 Letter INSPECTION SUMMARY
08/08/2023 Letter INSPECTION SUMMARY
08/08/2023 Letter INSPECTION SUMMARY
08/11/2023 Letter INSPECTION SUMMARY
08/21/2023 Letter INSPECTION SUMMARY
08/22/2023 Letter INSPECTION SUMMARY
08/23/2023 Letter INSPECTION SUMMARY
08/28/2023 Letter INSPECTION SUMMARY
08/28/2023 Letter INSPECTION SUMMARY
08/28/2023 Letter INSPECTION SUMMARY
09/05/2023 Letter INSPECTION SUMMARY
09/27/2023 Letter INSPECTION SUMMARY
10/12/2023 Letter INSPECTION SUMMARY
10/12/2023 Letter INSPECTION SUMMARY
10/12/2023 Letter INSPECTION SUMMARY
10/16/2023 Letter INSPECTION SUMMARY
10/24/2023 Letter INSPECTION SUMMARY
10/26/2023 Letter INSPECTION SUMMARY
10/26/2023 Letter INSPECTION SUMMARY
10/27/2023 Letter INSPECTION SUMMARY
11/02/2023 Letter INSPECTION SUMMARY
11/08/2023 Letter INSPECTION SUMMARY
11/15/2023 Paragon Calcs PE Stamp
11/15/2023 Paragon FA 10 10 23 PE Stamp
11/28/2023 Letter INSPECTION SUMMARY
12/06/2023 Letter INSPECTION SUMMARY
12/11/2023 Letter INSPECTION SUMMARY
12/12/2023 Letter Fire (Alarm) Plan Review Notice
12/14/2023 Letter INSPECTION SUMMARY
12/20/2023 Letter INSPECTION SUMMARY
12/27/2023 Letter INSPECTION SUMMARY
05/31/2024 Letter INSPECTION SUMMARY
12/08/2022 Approved Plans Approved Village Private Street and Utilities
11/13/2024 Letter Stop Work Order
12/30/2024 Letter INSPECTION SUMMARY
12/31/2024 Letter INSPECTION SUMMARY
01/08/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home