Permit Application Status

PRCOM20161756


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20161756
Building Permit - Commercial
Certificate of Occupancy
TOWNSEND SUMMIT LLC
NEW MULTI-FAMILY
NEW 4 STORY APARTMENT BUILDING REF: PRCOM20162362 FOR FOUNDATION PERMIT
07/19/2016
02/08/2017
12/13/2017
Locations
Contacts
NEIGHBORS CONSTRUCTION COMPANY INC, Address:1708 E 123RD ST, Phone:(913) 422-5555  
AIR DOCTOR SOLUTIONS LLC, Address:P O BOX 842400, Phone:(435) 688-3060  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
Reviews
Review Type Outcome Est. Completion Date Completed
Special Inspections Review Approved 12/14/2017
Mike Weisenborn
Licensed Contractors Approved 07/19/2016 02/08/2017
Mike Weisenborn
Alarm Plan Review Released for Construction 12/31/2016
Joe Dir
Sprinkler Plan Review Released for Construction 12/31/2016
Joe Dir
Building Plan Review Approved 10/13/2016
Joe Frogge
Final Development Plan Review Approved 10/13/2016
Joe Frogge
Fire Plan Review Approved with Conditions 09/21/2016
Joe Dir
09/21/2016

09/21/2016

09/21/2016

09/21/2016

Construction documents for fire alarm systems
Corrective Action Required
09/21/2016

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. HAVE CONTRACTOR PROVIDE SHOP DRAWINGS OF THE FIRE ALARM SYSTEM TO BE INSTALLED.
Tenant identification
Corrective Action Required
09/21/2016

2012 IFC 408.11.2 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. POST THE ADDRESS OF EACH APARTMENT IN THE CORRIDORS. LABEL ALL ELECTRICAL ROOM DOORS, MECHANICAL ROOM DOORS, IT ROOM DOORS, FIRE SPRINKLER ROOM DOORS, ELEVATOR MECHANICAL ROOM DOORS. (VERIFIED AT INSPECTION)
Address numbers required
Corrective Action Required
09/21/2016

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE NUMERIC ADDRESS OF 795 ON ALL FOUR SIDES OF THE BUILDING IN A CONTRASTING COLOR TO THE BACKGROUND READABLE FROM THE ROADWAY/DRIVEWAY. (VERIFIED AT INSPECTION)
Knox box required
Corrective Action Required
09/21/2016

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. MOUNT THE KNOX BOX ON THE BUILDING ABOVE THE FIRE DEPARTMENT CONNECTION WITH THE TOP OF THE BOX APPRO. 6" OFF FINAL GRADE. 506.1.2 Key boxes for nonstandardized fire service elevator keys. Key boxes provided for nonstandardized fire service elevator keys shall comply with Section 506.1 and all of the following: 1. The key box shall be compatible with an existing rapid entry key box system in use in the jurisdiction and approved by the fire code official. 2. The front cover shall be permanently labeled with the words “Fire Department Use Only—Elevator Keys.” 3. The key box shall be mounted at each elevator bank at the lobby nearest to the lowest level of fire department access. 4. The key box shall be mounted 5 feet 6 inches (1676 mm) above the finished floor to the right side of the elevator bank. 5. Contents of the key box are limited to fire service elevator keys. Additional elevator access tools, keys and information pertinent to emergency planning or elevator access shall be permitted when authorized by the fire code official. 6. In buildings with two or more elevator banks, a single key box shall be permitted to be used when such elevator banks are separated by not more than 30 feet (9144 mm). Additional key boxes shall be provided for each individual elevator or elevator bank separated by more than 30 feet (9144 mm). MOUNT THE ELEVATOR BOX ON THE WALL BESIDE THE ELEVATOR WITH THE TOP OF THE BOX APPROX. 6' OFF FINISH FLOOR KNOX BOXES CAN BE OBTAIN ONLINE AT knoxbox.com
Construction documents - Fire protection systems
Corrective Action Required
09/21/2016

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. HAVE CONTRACTOR PROVIDE SHOP DRAWINGS OF THE FIRE SPRINKLER SYSTEM TO BE INSTALLED.
Installation acceptance testing
Corrective Action Required
09/21/2016

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. FIELD AND ACCEPTANCE TESTING OF THE FIRE SPRINKLER AND ALARM SYSTEMS WILL BE REQUIRED PRIOR TO THE FINAL OCCUPANCY INSPECTION. TO SCHEDULE TESTING CONTACT THE FIRE DEPARTMENT AT 816-969-1300
Portable fire extinguishers - general
Corrective Action Required
09/21/2016

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. PROVIDE 2A-10BC FIRE EXTINGUISHERS FOR EACH APARTMENT AND CORRIDORS ON EACH FLOOR LEVEL. (VERIFIED AT INSPECTION)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
09/21/2016

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. MOUNT THE FIRE EXTINGUISHERS IN THE CORRIDORS BY EACH STAIRWAY DOOR ON EACH FLOOR LEVEL. (VERIFIED AT INSPECTION) MOUNT THE FIRE EXTINGUISHERS IN THE APARTMENTS IN A EASY ACCESSABLE LOCATION. (VERIFIED AT INSPECTION)
Misc
Corrective Action Required
09/21/2016

503.1.2 Additional access. The fire code official is authorized to require more than one fire apparatus access road based on the potential for impairment of a single road by vehicle congestion, condition of terrain, climatic conditions or other factors that could limit access. 503.2 Specifications. Fire apparatus access roads shall be installed and arranged in accordance with Sections 503.2.1 through 503.2.8. PROVIDE TWO MEANS OF ACCESS TO THE CONSTRUCTION AREAS AND FIRE HYDRANTS PRIOR TO STARTING ANY VERTICAL CONTSRUCTION OF BUILDINGS.
Misc
Corrective Action Required
09/21/2016

[B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. [B] 1008.1.9.1 Hardware. Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. [B] 1008.1.9.8  Access-controlled egress doors. The entrance doors in a means of egress in buildings with an occupancy in Groups A, B, E, I-2, M, R-1 or R-2, and entrance doors to tenant spaces in occupancies in Groups A, B, E, I-2, M, R-1 or R-2, are permitted to be equipped with an approved entrance and egress access control system, listed in accordance with UL 294, which shall be installed in accordance with all of the following criteria: 1. A sensor shall be provided on the egress side arranged to detect an occupant approaching the doors. The doors shall be arranged to unlock by a signal from or loss of power to the sensor. 2. Loss of power to that part of the access control system which locks the doors shall automatically unlock the doors. 3. The doors shall be arranged to unlock from a manual unlocking device located 40 inches to 48 inches (1016 mm to 1219 mm) vertically above the floor and within 5 feet (1524 mm) of the secured doors. Ready access shall be provided to the manual unlocking device and the device shall be clearly identified by a sign that reads “PUSH TO EXIT.” When operated, the manual unlocking device shall result in direct interruption of power to the lock—independent of the access control system electronics—and the doors shall remain unlocked for a minimum of 30 seconds. 4. Activation of the building fire alarm system, if provided, shall automatically unlock the doors, and the doors shall remain unlocked until the fire alarm system has been reset. 5. Activation of the building automatic sprinkler or fire detection system, if provided, shall automatically unlock the doors. The doors shall remain unlocked until the fire alarm system has been reset. 6. Entrance doors in buildings with an occupancy in Group A, B, E or M shall not be secured from the egress side during periods that the building is open to the general public.
Misc
Corrective Action Required
09/21/2016

LABEL THE STAIRWAYS AT EACH LANDING DOOR TO INDICATE EACH FLOOR LEVEL. (VERIFIED AT INSPECTION)
Misc
Corrective Action Required
09/21/2016

[B] 1008.1.9.11 Stairway doors. Interior stairway means of egress doors shall be openable from both sides without the use of a key or special knowledge or effort. Exceptions: 1. Stairway discharge doors shall be openable from the egress side and shall only be locked from the opposite side. 2. This section shall not apply to doors arranged in accordance with Section 403.5.3 of the International Building Code. 3. In stairways serving not more than four stories, doors are permitted to be locked from the side opposite the egress side, provided they are openable from the egress side and capable of being unlocked simultaneously without unlatching upon a signal from the fire command center, if present, or a signal by emergency personnel from a single location inside the main entrance to the building. 4. Stairway exit doors shall be openable from the egress side and shall only be locked from the opposite side in Group B, F, M and S occupancies where the only interior access to the tenant space is from a single exit stair where permitted in Section 1021.2. 5. Stairway exit doors shall be openable from the egress side and shall only be locked from the opposite side in Group R-2 occupancies where the only interior access to the dwelling unit is from a single exit stair where permitted in Section 1021.2. [B] 1008.1.6 Landings at doors. Landings shall have a width not less than the width of the stairway or the door, whichever is greater. Doors in the fully open position shall not reduce a required dimension by more than 7 inches (178 mm). When a landing serves an occupant load of 50 or more, doors in any position shall not reduce the landing to less than one-half its required width. Landings shall have a length measured in the direction of travel of not less than 44 inches (1118 mm). Exception: Landing length in the direction of travel in Groups R-3 and U and within individual units of Group R-2 need not exceed 36 inches (914 mm).
Fire Plan Review Rejected 08/01/2016 07/26/2016
Joe Dir
07/26/2016

Misc
Corrective Action Required
07/26/2016

HAVE ALL FINAL DEVELOPMENT PLANS APPROVED BEFORE MOVING FORWARD WITH THE PROJECT.
Construction documents for fire alarm systems
Corrective Action Required
07/26/2016

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. HAVE CONTRACTOR PROVIDE SHOP DRAWINGS OF THE FIRE ALARM SYSTEM TO BE INSTALLED.
Tenant identification
Corrective Action Required
07/26/2016

2012 IFC 408.11.2 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. POST THE ADDRESS OF EACH APARTMENT IN THE CORRIDORS. LABEL ALL ELECTRICAL ROOM DOORS, MECHANICAL ROOM DOORS, IT ROOM DOORS, FIRE SPRINKLER ROOM DOORS, ELEVATOR MECHANICAL ROOM DOORS. (VERIFIED AT INSPECTION)
Address numbers required
Corrective Action Required
07/26/2016

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE NUMERIC ADDRESS OF 795 ON ALL FOUR SIDES OF THE BUILDING IN A CONTRASTING COLOR TO THE BACKGROUND READABLE FROM THE ROADWAY/DRIVEWAY. (VERIFIED AT INSPECTION)
Knox box required
Corrective Action Required
07/26/2016

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. MOUNT THE KNOX BOX ON THE BUILDING ABOVE THE FIRE DEPARTMENT CONNECTION WITH THE TOP OF THE BOX APPRO. 6" OFF FINAL GRADE. 506.1.2 Key boxes for nonstandardized fire service elevator keys. Key boxes provided for nonstandardized fire service elevator keys shall comply with Section 506.1 and all of the following: 1. The key box shall be compatible with an existing rapid entry key box system in use in the jurisdiction and approved by the fire code official. 2. The front cover shall be permanently labeled with the words “Fire Department Use Only—Elevator Keys.” 3. The key box shall be mounted at each elevator bank at the lobby nearest to the lowest level of fire department access. 4. The key box shall be mounted 5 feet 6 inches (1676 mm) above the finished floor to the right side of the elevator bank. 5. Contents of the key box are limited to fire service elevator keys. Additional elevator access tools, keys and information pertinent to emergency planning or elevator access shall be permitted when authorized by the fire code official. 6. In buildings with two or more elevator banks, a single key box shall be permitted to be used when such elevator banks are separated by not more than 30 feet (9144 mm). Additional key boxes shall be provided for each individual elevator or elevator bank separated by more than 30 feet (9144 mm). MOUNT THE ELEVATOR BOX ON THE WALL BESIDE THE ELEVATOR WITH THE TOP OF THE BOX APPROX. 6' OFF FINISH FLOOR KNOX BOXES CAN BE OBTAIN ONLINE AT knoxbox.com
Construction documents - Fire protection systems
Corrective Action Required
07/26/2016

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. HAVE CONTRACTOR PROVIDE SHOP DRAWINGS OF THE FIRE SPRINKLER SYSTEM TO BE INSTALLED.
Installation acceptance testing
Corrective Action Required
07/26/2016

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. FIELD AND ACCEPTANCE TESTING OF THE FIRE SPRINKLER AND ALARM SYSTEMS WILL BE REQUIRED PRIOR TO THE FINAL OCCUPANCY INSPECTION. TO SCHEDULE TESTING CONTACT THE FIRE DEPARTMENT AT 816-969-1300
Portable fire extinguishers - general
Corrective Action Required
07/26/2016

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. PROVIDE 2A-10BC FIRE EXTINGUISHERS FOR EACH APARTMENT AND CORRIDORS ON EACH FLOOR LEVEL.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
07/26/2016

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. MOUNT THE FIRE EXTINGUISHERS IN THE CORRIDORS BY EACH STAIRWAY DOOR ON EACH FLOOR LEVEL. (VERIFIED AT INSPECTION) MOUNT THE FIRE EXTINGUISHERS IN THE APARTMENTS IN A EASY ACCESSABLE LOCATION. (VERIFIED AT INSPECTION)
Misc
Corrective Action Required
07/26/2016

PROVIDE CIVIL PLANS SHOWING THE LOCATIONS OF THE FIRE HYDRANTS
Misc
Corrective Action Required
07/26/2016

903.3.7 FIRE DEPARTMENT CONNECTIONS. THE LOCATION OF THE FIRE DEPARTMENT CONNECTION SHALL BE APPROVED BY THE FIRE CODE OFFICIAL. CONNECTIONS SHALL BE A 4 INCH STORTZ FITTING (INCLUDE A 30 DRGREE ELBOW) AND LOCATED WITHIN 100 FEET OF A FIRE HYDRANT, OR AS APPROVED BY THE OFFICIAL.
Misc
Corrective Action Required
07/26/2016

503.1.2 Additional access. The fire code official is authorized to require more than one fire apparatus access road based on the potential for impairment of a single road by vehicle congestion, condition of terrain, climatic conditions or other factors that could limit access. 503.2 Specifications. Fire apparatus access roads shall be installed and arranged in accordance with Sections 503.2.1 through 503.2.8. PROVIDE TWO MEANS OF ACCESS TO THE CONSTRUCTION AREAS AND FIRE HYDRANTS PRIOR TO STARTING ANY VERTICAL CONTSRUCTION OF BUILDINGS.
Misc
Corrective Action Required
07/26/2016

[B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. [B] 1008.1.9.1 Hardware. Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. [B] 1008.1.9.8  Access-controlled egress doors. The entrance doors in a means of egress in buildings with an occupancy in Groups A, B, E, I-2, M, R-1 or R-2, and entrance doors to tenant spaces in occupancies in Groups A, B, E, I-2, M, R-1 or R-2, are permitted to be equipped with an approved entrance and egress access control system, listed in accordance with UL 294, which shall be installed in accordance with all of the following criteria: 1. A sensor shall be provided on the egress side arranged to detect an occupant approaching the doors. The doors shall be arranged to unlock by a signal from or loss of power to the sensor. 2. Loss of power to that part of the access control system which locks the doors shall automatically unlock the doors. 3. The doors shall be arranged to unlock from a manual unlocking device located 40 inches to 48 inches (1016 mm to 1219 mm) vertically above the floor and within 5 feet (1524 mm) of the secured doors. Ready access shall be provided to the manual unlocking device and the device shall be clearly identified by a sign that reads “PUSH TO EXIT.” When operated, the manual unlocking device shall result in direct interruption of power to the lock—independent of the access control system electronics—and the doors shall remain unlocked for a minimum of 30 seconds. 4. Activation of the building fire alarm system, if provided, shall automatically unlock the doors, and the doors shall remain unlocked until the fire alarm system has been reset. 5. Activation of the building automatic sprinkler or fire detection system, if provided, shall automatically unlock the doors. The doors shall remain unlocked until the fire alarm system has been reset. 6. Entrance doors in buildings with an occupancy in Group A, B, E or M shall not be secured from the egress side during periods that the building is open to the general public.
Misc
Corrective Action Required
07/26/2016

LABEL THE STAIRWAYS AT EACH LANDING DOOR TO INDICATE EACH FLOOR LEVEL. (VERIFIED AT INSPECTION)
Misc
Corrective Action Required
07/26/2016

[B] 1008.1.9.11 Stairway doors. Interior stairway means of egress doors shall be openable from both sides without the use of a key or special knowledge or effort. Exceptions: 1. Stairway discharge doors shall be openable from the egress side and shall only be locked from the opposite side. 2. This section shall not apply to doors arranged in accordance with Section 403.5.3 of the International Building Code. 3. In stairways serving not more than four stories, doors are permitted to be locked from the side opposite the egress side, provided they are openable from the egress side and capable of being unlocked simultaneously without unlatching upon a signal from the fire command center, if present, or a signal by emergency personnel from a single location inside the main entrance to the building. 4. Stairway exit doors shall be openable from the egress side and shall only be locked from the opposite side in Group B, F, M and S occupancies where the only interior access to the tenant space is from a single exit stair where permitted in Section 1021.2. 5. Stairway exit doors shall be openable from the egress side and shall only be locked from the opposite side in Group R-2 occupancies where the only interior access to the dwelling unit is from a single exit stair where permitted in Section 1021.2. [B] 1008.1.6 Landings at doors. Landings shall have a width not less than the width of the stairway or the door, whichever is greater. Doors in the fully open position shall not reduce a required dimension by more than 7 inches (178 mm). When a landing serves an occupant load of 50 or more, doors in any position shall not reduce the landing to less than one-half its required width. Landings shall have a length measured in the direction of travel of not less than 44 inches (1118 mm). Exception: Landing length in the direction of travel in Groups R-3 and U and within individual units of Group R-2 need not exceed 36 inches (914 mm).
Misc
Corrective Action Required
07/26/2016

PROVIDE ADDITIONAL EXTERIOR ACCESS TO THE FIRE SPRINKLER ROOMS.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $15,676.12 $15,676.12 Paid 02/08/2017
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 02/08/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underground Electrical Inspection - Commercial Partial 3/16/2017 3/16/2017 03/16/2017
Misc
Partial Correction
03/16/2017
NO MATERIAL OR WORKMANSHIP ISSUES FOUND ON SECONDARY ELECTRICAL SERVICE CONDUITS TRENCHED AND LAID FROM TRANSFORMER LOCATIONS TO BUILDING ENTRIES AT NORTH & SOUTH ENDS OF BLDG.
Rough Framing Inspection - Commercial Partial 2/21/2017 (9:00) 5/11/2017 05/11/2017
Misc
Partial Correction
05/11/2017
COMPONENTS OF PORTAL FRAMING: INTERIOR PORTAL STRAPS IN PLACE AND FULLY NAILED;
Rough Framing Inspection - Commercial Partial 5/12/2017 5/12/2017 05/12/2017
Misc
Partial Correction
05/11/2017
COMPONENTS OF PORTAL FRAMING: INTERIOR PORTAL STRAPS IN PLACE AND FULLY NAILED;
Misc
Corrective Action Required
05/12/2017
1ST FLOOR: CHECK ENTIRE PERIMETER SILL PLATE AND ENSURE ALL ANCHOR BOLTS ARE INSTALLED PER IBC: MIN TWO PER PIECE; ONE WITHIN 12" OF EACH END OF EACH PIECE; MAX 4' O/C.
Misc
Corrective Action Required
05/12/2017
1ST FLOOR: NUMBER OF JACK STUDS SUPPORTING HEADERS IS NOT IBC COMPLIANT.
Rough Framing Inspection - Commercial Partial 5/15/2017 5/15/2017 05/15/2017
Misc
Partial Correction
05/12/2017
COMPONENTS OF PORTAL FRAMING: INTERIOR PORTAL STRAPS IN PLACE AND FULLY NAILED;
Misc
Corrective Action Required
05/12/2017
1ST FLOOR: CHECK ENTIRE PERIMETER SILL PLATE AND ENSURE ALL ANCHOR BOLTS ARE INSTALLED PER IBC: MIN TWO PER PIECE; ONE WITHIN 12" OF EACH END OF EACH PIECE; MAX 4' O/C.
Misc
Corrective Action Required
05/12/2017
1ST FLOOR: NUMBER OF JACK STUDS SUPPORTING HEADERS IS NOT IBC COMPLIANT.
Misc
Partial Correction
05/15/2017
INTERIOR SHEAR WALLS AT STAIRWELLS OK TO COVER WITH 1ST LAYER GWB WHEN READY
Rated Assembly Inspection Partial 5/16/2017 5/16/2017 05/16/2017
Misc
Partial Correction
05/16/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER AT NORTH STAIRWELL WALLS: 1ST LAYER 5/8" GWB AT WELL FACE + PRE-ROCK AT BACKSIDE; OK TO COVER AT SOUTH STAIRWELL WALLS: 1ST LAYER 5/8" GWB AT WELL FACE;
Rated Assembly Inspection Partial 5/19/2017 5/19/2017 05/19/2017
Misc
Partial Correction
05/16/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE;
Misc
Partial Correction
05/19/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST LAYER PERIMETER PRE-ROCK AT JOIST SPACE;
Rated Assembly Inspection Partial 5/23/2017 5/23/2017 05/23/2017
Misc
Partial Correction
05/19/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE;
Misc
Partial Correction
05/19/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST LAYER PERIMETER PRE-ROCK AT JOIST SPACE;
Rated Assembly Inspection Partial 5/25/2017 5/25/2017 05/25/2017
Misc
Partial Correction
05/23/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE;
Misc
Partial Correction
05/23/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST LAYER PERIMETER PRE-ROCK AT JOIST SPACE;
Rated Assembly Inspection Partial 6/1/2017 6/1/2017 06/01/2017
Misc
Partial Correction
05/25/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD LEVELS; OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE;
Misc
Partial Correction
05/25/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS;
Misc
Partial Correction
06/01/2017
OK TO COVER AT RATED CORRIDOR WALLS: 1ST FLOOR: 1ST LAYER 5/8" TYPE X GWB;
Misc
Corrective Action Required
06/01/2017
VERTICAL FIRE-BLOCKING AT 10' HORIZ INTERVALS: CLOSE GAPS AT MID-HEIGHT AND TOP OF ALL
All Rough Inspection - Commercial Not Ready 6/2/2017 6/7/2017 06/07/2017
Electrical Service Inspection Partial 6/9/2017 06/09/2017
Misc
Partial Correction
06/09/2017
RELEASE PEDESTAL-MOUNTED TEMPORARY ELECTRICAL SERVICE
All Rough Inspection - Commercial Partial 6/9/2017 6/9/2017 06/09/2017
Misc
Partial Correction
06/09/2017
PRELIMINARY FRAMING INSPECTION PERFORMED IN ADVANCE OF START OF PLUMBING AND HVAC SYSTEMS INSTALLATION
Rough Framing Inspection - Commercial Partial 5/25/2017 6/26/2017 06/26/2017
Misc
Resolved
06/26/2017
COMPONENTS OF PORTAL FRAMING: INTERIOR PORTAL STRAPS IN PLACE AND FULLY NAILED;
Misc
Corrective Action Required
05/15/2017
1ST FLOOR: CHECK ENTIRE PERIMETER SILL PLATE AND ENSURE ALL ANCHOR BOLTS ARE INSTALLED PER IBC: MIN TWO PER PIECE; ONE WITHIN 12" OF EACH END OF EACH PIECE; MAX 4' O/C.
Misc
Resolved
06/26/2017
1ST FLOOR: NUMBER OF JACK STUDS SUPPORTING HEADERS IS NOT IBC COMPLIANT.
Misc
Partial Correction
05/15/2017
INTERIOR SHEAR WALLS AT STAIRWELLS OK TO COVER WITH 1ST LAYER GWB WHEN READY
Misc
Partial Correction
06/26/2017
NAILING OF ROOF SHEATHING APPROVED. OK TO COVER WHEN READY.
Rough Framing Inspection - Commercial Partial 6/27/2017 6/27/2017 06/27/2017
Misc
Corrective Action Required
06/26/2017
1ST FLOOR: CHECK ENTIRE PERIMETER SILL PLATE AND ENSURE ALL ANCHOR BOLTS ARE INSTALLED PER IBC: MIN TWO PER PIECE; ONE WITHIN 12" OF EACH END OF EACH PIECE; MAX 4' O/C.
Misc
Partial Correction
06/26/2017
INTERIOR SHEAR WALLS AT STAIRWELLS OK TO COVER WITH 1ST LAYER GWB WHEN READY
Misc
Partial Correction
06/26/2017
NAILING OF ROOF SHEATHING APPROVED. OK TO COVER WHEN READY.
Misc
Partial Correction
06/27/2017
EXTERIOR WALL SHEATHING: OK AT S & N ENDS OF BLDG FOR ELECT METER BANK;
Rough Framing Inspection - Commercial Partial 7/3/2017 6/30/2017 06/30/2017
Misc
Resolved
06/30/2017
1ST FLOOR: CHECK ENTIRE PERIMETER SILL PLATE AND ENSURE ALL ANCHOR BOLTS ARE INSTALLED PER IBC: MIN TWO PER PIECE; ONE WITHIN 12" OF EACH END OF EACH PIECE; MAX 4' O/C.
Misc
Partial Correction
06/27/2017
INTERIOR SHEAR WALLS AT STAIRWELLS OK TO COVER WITH 1ST LAYER GWB WHEN READY
Misc
Partial Correction
06/27/2017
NAILING OF ROOF SHEATHING APPROVED. OK TO COVER WHEN READY.
Misc
Partial Correction
06/27/2017
OK TO COVER EXTERIOR WALL SHEATHING AT: S & N ENDS OF BLDG FOR ELECT METER BANK; STAIRWELLS ABOVE ROOF;
Rough Framing Inspection - Commercial Not Ready 7/3/2017 07/03/2017
Misc
Partial Correction
06/30/2017
INTERIOR SHEAR WALLS AT STAIRWELLS OK TO COVER WITH 1ST LAYER GWB WHEN READY
Misc
Partial Correction
06/30/2017
NAILING OF ROOF SHEATHING APPROVED. OK TO COVER WHEN READY.
Misc
Corrective Action Required
07/03/2017
OK TO COVER EXTERIOR WALL SHEATHING AT: S & N ENDS OF BLDG FOR ELECT METER BANK; STAIRWELLS ABOVE ROOF; BEFORE REQUESTING INSPECTION OF EXTERIOR WALL SHEATHING RE-CHECK AND RE-NAIL FLUSH
Rough Framing Inspection - Commercial Partial 7/7/2017 7/7/2017 07/07/2017
Misc
Partial Correction
07/03/2017
INTERIOR SHEAR WALLS AT STAIRWELLS OK TO COVER WITH 1ST LAYER GWB WHEN READY
Misc
Partial Correction
07/03/2017
NAILING OF ROOF SHEATHING APPROVED. OK TO COVER WHEN READY.
Misc
Partial Correction
07/07/2017
OK TO COVER ALL EXTERIOR WALL SHEATHING.
Misc
Partial Correction
07/07/2017
NO ISSUES FOUND WITH FRAMING OF STAIR TOWERS AND ELEVATOR SHAFT; WHERE NO M/E/P TO BE INSTALLED OK TO COVER WHEN READY.
Rough Framing Inspection - Commercial Partial 7/13/2017 7/13/2017 07/13/2017
Misc
Partial Correction
07/07/2017
INTERIOR SHEAR WALLS AT STAIRWELLS OK TO COVER WITH 1ST LAYER GWB WHEN READY
Misc
Partial Correction
07/07/2017
NAILING OF ROOF SHEATHING APPROVED. OK TO COVER WHEN READY.
Misc
Partial Correction
07/07/2017
OK TO COVER ALL EXTERIOR WALL SHEATHING.
Misc
Partial Correction
07/07/2017
NO ISSUES FOUND WITH FRAMING OF STAIR TOWERS AND ELEVATOR SHAFT; WHERE NO M/E/P TO BE INSTALLED OK TO COVER WHEN READY.
Misc
Partial Correction
07/13/2017
NO ISSUES FOUND WITH FRAMING OF BALCONIES.
Rated Assembly Inspection Partial 7/14/2017 7/14/2017 07/14/2017
Misc
Partial Correction
06/01/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR;
Misc
Partial Correction
06/01/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS;
Misc
Partial Correction
06/01/2017
OK TO COVER AT RATED CORRIDOR WALLS: 1ST FLOOR: 1ST LAYER 5/8" TYPE X GWB;
Misc
Corrective Action Required
06/01/2017
VERTICAL FIRE-BLOCKING AT 10' HORIZ INTERVALS: CLOSE GAPS AT MID-HEIGHT AND TOP OF ALL
All Rough Inspection - Commercial Partial 7/17/2017 7/17/2017 07/17/2017
Misc
Resolved
07/17/2017
PRELIMINARY FRAMING INSPECTION PERFORMED IN ADVANCE OF START OF PLUMBING AND HVAC SYSTEMS INSTALLATION
Misc
Partial Correction
07/17/2017
OK TO PRE-ROCK WHEN READY AT SHOWERS AT: 4TH FLOOR; 3RD FLOOR;
Rated Assembly Inspection Partial 7/17/2017 7/17/2017 07/17/2017
Misc
Partial Correction
07/14/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR;
Misc
Partial Correction
07/14/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 1ST LAYER AT 4TH, 3RD, 2ND
Misc
Partial Correction
07/14/2017
OK TO COVER AT RATED CORRIDOR WALLS: 1ST FLOOR: 1ST LAYER 5/8" TYPE X GWB;
Misc
Corrective Action Required
07/14/2017
VERTICAL FIRE-BLOCKING AT 10' HORIZ INTERVALS: CLOSE GAPS AT MID-HEIGHT AND TOP OF ALL
All Rough Inspection - Commercial Partial 7/19/2017 7/19/2017 07/19/2017
Misc
Partial Correction
07/17/2017
OK TO PRE-ROCK WHEN READY AT SHOWERS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLR AFTER LID AT SW UNIT IS FIRE-BLOCKED; 1ST FLR;
Rated Assembly Inspection Partial 7/19/2017 07/19/2017
Misc
Partial Correction
07/17/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; [2ND LAYER AT 3RD & 4TH FLOORS; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; [2ND LAYER AT 3RD & 4TH FLOORS;
Misc
Partial Correction
07/17/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: [2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS
Misc
Partial Correction
07/17/2017
OK TO COVER AT RATED CORRIDOR WALLS: 1ST FLOOR: 1ST LAYER 5/8" TYPE X GWB;
Misc
Corrective Action Required
07/17/2017
VERTICAL FIRE-BLOCKING AT 10' HORIZ INTERVALS: CLOSE GAPS AT MID-HEIGHT AND TOP OF ALL
All Rough Inspection - Commercial Partial 7/20/2017 07/20/2017
Misc
Partial Correction
07/19/2017
OK TO PRE-ROCK WHEN READY AT SHOWERS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLR; 1ST FLR; [4TH FLR; 3RD FLR;
Rough Framing Inspection - Commercial Partial 7/19/2017 7/21/2017 07/21/2017
Misc
Partial Correction
07/13/2017
INTERIOR SHEAR WALLS AT STAIRWELLS OK TO COVER WITH 1ST LAYER GWB WHEN READY SHEAR WALL BEHIND SHOWERS: 1ST FLOOR;
Misc
Partial Correction
07/13/2017
NAILING OF ROOF SHEATHING APPROVED. OK TO COVER WHEN READY.
Misc
Partial Correction
07/13/2017
OK TO COVER ALL EXTERIOR WALL SHEATHING.
Misc
Partial Correction
07/13/2017
NO ISSUES FOUND WITH FRAMING OF STAIR TOWERS AND ELEVATOR SHAFT; WHERE NO M/E/P TO BE INSTALLED OK TO COVER WHEN READY.
Misc
Partial Correction
07/13/2017
NO ISSUES FOUND WITH FRAMING OF BALCONIES.
Rated Assembly Inspection Partial 7/20/2017 7/21/2017 07/21/2017
Misc
Partial Correction
07/19/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; [2ND LAYER AT 3RD & 4TH FLOORS; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; [2ND LAYER AT 3RD & 4TH FLOORS;
Misc
Partial Correction
07/19/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER;
Misc
Partial Correction
07/19/2017
OK TO COVER AT RATED CORRIDOR WALLS: 1ST FLOOR: 1ST LAYER 5/8" TYPE X GWB;
Misc
Partial Correction
07/21/2017
VERTICAL FIRE-BLOCKING AT 10' HORIZ INTERVALS: CLOSE GAPS AT MID-HEIGHT AND TOP OF ALL
Misc
Partial Correction
07/21/2017
5/8" TYPE X GWB BEHIND SHOWERS/TUBS: 2ND FLOOR: 1ST LAYER; 3RD FLOOR: 1ST & 2ND LAYERS; 4TH FLOOR: 1ST & 2ND LAYERS;
Rated Assembly Inspection Partial 7/24/2017 7/24/2017 07/24/2017
Misc
Partial Correction
07/21/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS;
Misc
Partial Correction
07/21/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER; [4TH LAYER;
Misc
Partial Correction
07/21/2017
OK TO COVER AT RATED CORRIDOR WALLS: 1ST FLOOR: 1ST LAYER 5/8" TYPE X GWB;
Misc
Partial Correction
07/24/2017
5/8" TYPE X GWB AT SHOWERS/TUBS @ STAIRWELLS, SHEAR WALLS: 2ND FLOOR: 1ST LAYER; 2ND LAYER; 1ST FLOOR: 1ST LAYER;
Rough Framing Inspection - Commercial Not Ready 7/24/2017 07/24/2017
Misc
Partial Correction
07/21/2017
INTERIOR SHEAR WALLS AT STAIRWELLS OK TO COVER WITH 1ST LAYER GWB WHEN READY SHEAR WALL BEHIND SHOWERS: 1ST FLOOR;
Misc
Partial Correction
07/21/2017
NAILING OF ROOF SHEATHING APPROVED. OK TO COVER WHEN READY.
Misc
Partial Correction
07/21/2017
OK TO COVER ALL EXTERIOR WALL SHEATHING.
Misc
Partial Correction
07/21/2017
NO ISSUES FOUND WITH FRAMING OF STAIR TOWERS AND ELEVATOR SHAFT; WHERE NO M/E/P TO BE INSTALLED OK TO COVER WHEN READY.
Misc
Partial Correction
07/21/2017
NO ISSUES FOUND WITH FRAMING OF BALCONIES.
Misc
Corrective Action Required
07/24/2017
FRAMING PRELIMINARY INSPECTION: CONTINUED TO SUSEQUENT DAY AFTER ALL CORNERS STUDS, WALL INTERSECTIONS, TRUSS JOIST ROTATION BLOCKING, AND DRAFT-STOPPING ARE CHECK AND COMPLETED
Rated Assembly Inspection Partial 7/25/2017 7/25/2017 07/25/2017
Misc
Partial Correction
07/21/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; [2ND LAYER AT 3RD & 4TH FLOORS; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS;
Misc
Partial Correction
07/21/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER;
Misc
Partial Correction
07/21/2017
OK TO COVER AT RATED CORRIDOR WALLS: 1ST FLOOR: 1ST LAYER 5/8" TYPE X GWB;
Misc
Partial Correction
07/21/2017
VERTICAL FIRE-BLOCKING AT 10' HORIZ INTERVALS: CLOSE GAPS AT MID-HEIGHT AND TOP OF ALL
Misc
Partial Correction
07/21/2017
5/8" TYPE X GWB AT SHEAR WALLS & BEHIND SHOWERS/TUBS: 2ND FLOOR: 1ST LAYER; [2ND LAYER; 3RD FLOOR: 1ST & 2ND LAYERS; 4TH FLOOR: 1ST & 2ND LAYERS;
Rough Framing Inspection - Commercial Partial 7/25/2017 7/25/2017 07/25/2017
Misc
Partial Correction
07/24/2017
INTERIOR SHEAR WALLS AT STAIRWELLS OK TO COVER WITH 1ST LAYER GWB WHEN READY SHEAR WALL BEHIND SHOWERS: 1ST FLOOR;
Misc
Partial Correction
07/24/2017
NAILING OF ROOF SHEATHING APPROVED. OK TO COVER WHEN READY.
Misc
Partial Correction
07/24/2017
OK TO COVER ALL EXTERIOR WALL SHEATHING.
Misc
Partial Correction
07/24/2017
NO ISSUES FOUND WITH FRAMING OF STAIR TOWERS AND ELEVATOR SHAFT; WHERE NO M/E/P TO BE INSTALLED OK TO COVER WHEN READY.
Misc
Partial Correction
07/24/2017
NO ISSUES FOUND WITH FRAMING OF BALCONIES.
Misc
Partial Correction
07/25/2017
FRAMING PRELIMINARY INSPECTION: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR CHECKED IN ADVANCE OF M/E/P WORK. LOCATIONS WITH ISSUES MARKED FOR CORRECTION. POSTS AT SOME GARAGES HAVE SHIMS SMALLER THAN TOP AREA OF POST.
All Rough Inspection - Commercial Not Ready 7/27/2017 7/27/2017 07/27/2017
Misc
Partial Correction
07/20/2017
OK TO PRE-ROCK WHEN READY AT SHOWERS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLR; 1ST FLR;
Misc
Corrective Action Required
07/27/2017
AT 4TH FLOOR PENTHOUSE EXTERIOR WALLS NO INSTALLATION CLEARANCE EXISTS BETWEEN BOTTOM OF WINDOWS AND TRIPLE BOTTOM PLATES. PLATES MAY NOT BE SEVERED FOR INSTALLATION OF BOXES AND CABLE. IF A/E SO DIRECTS LISTED FLOOR BOXES AND RECEPTACLES WILL BE APPROVABLE.
Sprinkler - Hydrostatic Test Passed 7/28/2017 07/28/2017
All Rough Inspection - Commercial Failed 8/1/2017 8/1/2017 08/01/2017
Misc
Partial Correction
07/27/2017
OK TO PRE-ROCK WHEN READY AT SHOWERS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLR; 1ST FLR;
Misc
Resolved
08/01/2017
AT 4TH FLOOR PENTHOUSE EXTERIOR WALLS NO INSTALLATION CLEARANCE EXISTS BETWEEN BOTTOM OF WINDOWS AND TRIPLE BOTTOM PLATES. PLATES MAY NOT BE SEVERED FOR INSTALLATION OF BOXES AND CABLE. IF A/E SO DIRECTS LISTED FLOOR BOXES AND RECEPTACLES WILL BE APPROVABLE.
Misc
Corrective Action Required
08/01/2017
4TH FLOOR: - CLOSE HOLES / GAPS IN DRAFT STOPS - FIRE-BLOCK TOPS OF CHASES & DEAD SPACES - FIRE-BLOCK HOLES IN R.A. WALL PLENUMS - PUTTY PAD ELECTRICAL BOXES PER IBC 712.3.2 INCLUDING BOXES HIGH ON WALLS - FIRE-CAULK PEX PENETRATIONS OF RATED WALLS IN BATHROOMS
All Rough Inspection - Commercial Partial 8/2/2017 08/02/2017
Misc
Resolved
08/02/2017
OK TO PRE-ROCK WHEN READY AT SHOWERS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLR; 1ST FLR;
Misc
Corrective Action Required
08/01/2017
4TH FLOOR: - CLOSE HOLES / GAPS IN DRAFT STOPS - FIRE-BLOCK TOPS OF CHASES & DEAD SPACES - FIRE-BLOCK HOLES IN R.A. WALL PLENUMS - PUTTY PAD ELECTRICAL BOXES PER IBC 712.3.2 INCLUDING BOXES HIGH ON WALLS - FIRE-CAULK PEX PENETRATIONS OF RATED WALLS IN BATHROOMS
Misc
Partial Correction
08/02/2017
OK TO COVER AT STAIR TOWERS: CEILING AT 4TH FLOOR (TOP) OF SOUTH AND NORTH TOWERS;
All Rough Inspection - Commercial Partial 8/3/2017 8/3/2017 08/03/2017
Misc
Resolved
08/03/2017
4TH FLOOR: - CLOSE HOLES / GAPS IN DRAFT STOPS - FIRE-BLOCK TOPS OF CHASES & DEAD SPACES - FIRE-BLOCK HOLES IN R.A. WALL PLENUMS - PUTTY PAD ELECTRICAL BOXES PER IBC 712.3.2 INCLUDING BOXES HIGH ON WALLS - FIRE-CAULK PEX PENETRATIONS OF RATED WALLS IN BATHROOMS
Misc
Partial Correction
08/02/2017
OK TO COVER WALL AND CEILING FRAMING + SYSTEMS FOR BE CONCEALED AT: BOTH STAIR TOWERS AT & ABOVE 4TH FLOOR; ALL SPACES AT 4TH FLOOR;
Rated Assembly Inspection Partial 8/3/2017 8/3/2017 08/03/2017
Misc
Partial Correction
07/25/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR;
Misc
Partial Correction
07/25/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER;
Misc
Partial Correction
07/25/2017
OK TO COVER AT RATED CORRIDOR WALLS: 1ST FLOOR: 1ST LAYER 5/8" TYPE X GWB;
Misc
Partial Correction
07/25/2017
VERTICAL FIRE-BLOCKING AT 10' HORIZ INTERVALS: CLOSE GAPS AT MID-HEIGHT AND TOP OF ALL
Misc
Partial Correction
07/25/2017
5/8" TYPE X GWB AT SHEAR WALLS & BEHIND SHOWERS/TUBS: 2ND FLOOR: 1ST LAYER; [2ND LAYER; 3RD FLOOR: 1ST & 2ND LAYERS; 4TH FLOOR: 1ST & 2ND LAYERS;
Rated Assembly Inspection Partial 8/7/2017 08/07/2017
Misc
Partial Correction
08/03/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR;
Misc
Partial Correction
08/03/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER;
Misc
Partial Correction
08/03/2017
OK TO COVER AT RATED CORRIDOR WALLS: 1ST FLOOR: 1ST LAYER 5/8" TYPE X GWB;
Misc
Partial Correction
08/03/2017
VERTICAL FIRE-BLOCKING AT 10' HORIZ INTERVALS: CLOSE GAPS AT MID-HEIGHT AND TOP OF ALL
Misc
Partial Correction
08/03/2017
5/8" TYPE X GWB AT SHEAR WALLS & BEHIND SHOWERS/TUBS: 2ND FLOOR: 1ST LAYER; [2ND LAYER; 3RD FLOOR: 1ST & 2ND LAYERS; 4TH FLOOR: 1ST & 2ND LAYERS;
Rated Assembly Inspection Partial 8/8/2017 08/08/2017
Misc
Partial Correction
08/07/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; [3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; [3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR;
Misc
Partial Correction
08/07/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER;
Misc
Partial Correction
08/07/2017
OK TO COVER AT RATED CORRIDOR WALLS: 1ST FLOOR: 1ST LAYER 5/8" TYPE X GWB;
Misc
Partial Correction
08/07/2017
VERTICAL FIRE-BLOCKING AT 10' HORIZ INTERVALS: CLOSE GAPS AT MID-HEIGHT AND TOP OF ALL
Misc
Partial Correction
08/07/2017
5/8" TYPE X GWB AT SHEAR WALLS & BEHIND SHOWERS/TUBS: 2ND FLOOR: 1ST LAYER; [2ND LAYER; 3RD FLOOR: 1ST & 2ND LAYERS; 4TH FLOOR: 1ST & 2ND LAYERS;
Rated Assembly Inspection Partial 8/14/2017 8/14/2017 08/14/2017
Misc
Partial Correction
08/08/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; [4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; [4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR;
Misc
Partial Correction
08/08/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER;
Misc
Partial Correction
08/08/2017
OK TO COVER AT RATED CORRIDOR WALLS: 1ST FLOOR: 1ST LAYER 5/8" TYPE X GWB;
Misc
Partial Correction
08/08/2017
VERTICAL FIRE-BLOCKING AT 10' HORIZ INTERVALS: CLOSE GAPS AT MID-HEIGHT AND TOP OF ALL
Misc
Partial Correction
08/08/2017
5/8" TYPE X GWB AT SHEAR WALLS & BEHIND SHOWERS/TUBS: 2ND FLOOR: 1ST LAYER; [2ND LAYER; 3RD FLOOR: 1ST & 2ND LAYERS; 4TH FLOOR: 1ST & 2ND LAYERS;
All Rough Inspection - Commercial Partial 8/15/2017 8/15/2017 at 1:40 PM 08/15/2017
Misc
Partial Correction
08/03/2017
OK TO COVER WALL AND CEILING FRAMING + SYSTEMS FOR BE CONCEALED AT: BOTH STAIR TOWERS AT & ABOVE 4TH FLOOR; ALL SPACES AT 4TH FLOOR; ALL SPACES AT 3RD FLOOR INCLUDING STAIRWELLS, BALCONIES*, AND CORRIDOR; *MEP PENETRATIONS OF EXT WALL TO BE AIR-SEALED
Rated Assembly Inspection Partial 8/15/2017 08/15/2017
Misc
Partial Correction
08/14/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; [4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; [4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR;
Misc
Partial Correction
08/14/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER;
Misc
Partial Correction
08/14/2017
OK TO COVER AT RATED CORRIDOR WALLS: 1ST FLOOR: 1ST LAYER 5/8" TYPE X GWB;
Misc
Resolved
08/15/2017
VERTICAL FIRE-BLOCKING AT 10' HORIZ INTERVALS: CLOSE GAPS AT MID-HEIGHT AND TOP OF ALL
Misc
Resolved
08/15/2017
5/8" TYPE X GWB AT SHEAR WALLS & BEHIND SHOWERS/TUBS: 2ND FLOOR: 1ST LAYER; [2ND LAYER; 3RD FLOOR: 1ST & 2ND LAYERS; 4TH FLOOR: 1ST & 2ND LAYERS;
Misc
Partial Correction
08/15/2017
OK TO TAPE, MUD, AND FIRE-STOP GWB WALLS AT CLOSET AND MECH CLOSET AT TOP OF BOTH STAIRWELLS AT 4TH FLOOR
All Rough Inspection - Commercial Partial 8/16/2017 8/16/2017 at 1:10 PM 08/16/2017
Misc
Partial Correction
08/15/2017
OK TO COVER WALL AND CEILING FRAMING + SYSTEMS FOR BE CONCEALED AT: BOTH STAIR TOWERS AT & ABOVE 4TH FLOOR; ALL SPACES AT 4TH FLOOR; ALL SPACES AT 3RD FLOOR INCLUDING STAIRWELLS, BALCONIES*, AND CORRIDOR; ACOUSTICAL FURRING CHANNELS FOUND TO BE INSTALLED AT 4TH FLOOR CORRIDOR. 2ND FLOOR SPACES TO BE RE-INSPECTED AFTER ISSUES NOTED BY LEO AT LOCATIONS ON WALL FRAMING ARE CORRECTED. *MEP PENETRATIONS OF EXT WALL TO BE AIR-SEALED
All Rough Inspection - Commercial Partial 8/17/2017 at 1:15 PM 08/17/2017
Misc
Partial Correction
08/16/2017
OK TO COVER WALL AND CEILING FRAMING + SYSTEMS FOR BE CONCEALED AT: BOTH STAIR TOWERS AT & ABOVE 4TH FLOOR; ALL SPACES AT 4TH FLOOR; ALL SPACES AT 3RD FLOOR INCLUDING STAIRWELLS, BALCONIES, AND CORRIDOR; ALL SPACES AT 2ND FLOOR; ACOUSTICAL FURRING CHANNELS FOUND TO BE INSTALLED AT 4TH FLOOR CORRIDOR.
Misc
Partial Correction
08/17/2017
ABOVE-CEILING SPACE OK TO COVER WITH GWB AT SOUTH & NORTH GARAGES TO ALLOW FUR-DOWN TO BE BUILT TO ENCLOSE ELECTRICAL SERVICE FEEDER CABLES
Rated Assembly Inspection Partial 8/17/2017 8/17/2017 at 2:25 PM 08/17/2017
Misc
Partial Correction
08/15/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; [4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; [4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR;
Misc
Partial Correction
08/15/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER;
Misc
Partial Correction
08/15/2017
OK TO COVER AT RATED CORRIDOR WALLS: 1ST FLOOR: 1ST LAYER 5/8" TYPE X GWB;
Misc
Partial Correction
08/15/2017
OK TO TAPE, MUD, AND FIRE-STOP GWB WALLS AT CLOSET AND MECH CLOSET AT TOP OF BOTH STAIRWELLS AT 4TH FLOOR
Misc
Partial Correction
08/17/2017
OK TO COVER WHEN READY 1ST LAYER 5/8" TYPE X GWB AT 4TH FLOOR CEILINGS AND BACKSIDE OF STAIRWELLS AND ELEVATOR SHAFT;
All Rough Inspection - Commercial Partial 8/18/2017 8/18/2017 at 1:15 PM 08/18/2017
Misc
Partial Correction
08/17/2017
OK TO COVER WALL AND CEILING FRAMING + SYSTEMS FOR BE CONCEALED AT: BOTH STAIR TOWERS AT & ABOVE 4TH FLOOR; ALL SPACES AT 4TH FLOOR; ALL SPACES AT 3RD FLOOR INCLUDING STAIRWELLS, BALCONIES, AND CORRIDOR; ALL SPACES AT 2ND FLOOR; 1ST FLOOR CORRIDOR + STAIRWELLS + UNITS & STORAGE #1 THRU #9;
Misc
Partial Correction
08/17/2017
ABOVE-CEILING SPACE OK TO COVER WITH GWB AT SOUTH & NORTH GARAGES TO ALLOW FURR-DOWN TO BE BUILT TO ENCLOSE ELECTRICAL SERVICE FEEDER CABLES
Misc
Partial Correction
08/18/2017
RC FURRING CHANNELS FOUND TO BE INSTALLED AT UNIT & ROOM CEILINGS + CEILINGS AND WALLS AT: 4TH FLOOR; 3RD FLOOR;
Rated Assembly Inspection Partial 8/21/2017 8/21/2017 at 12:35 PM 08/21/2017
Misc
Partial Correction
08/17/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; [4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; [4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR;
Misc
Partial Correction
08/17/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER;
Misc
Partial Correction
08/17/2017
OK TO COVER AT 5/8" TYPE X GWB RATED CEILINGS & WALLS: ALL CEILINGS & WALLS AT 4TH FLOOR 1ST FLOOR: 1ST LAYER ;
Misc
Resolved
08/21/2017
OK TO TAPE, MUD, AND FIRE-STOP GWB WALLS AT CLOSET AND MECH CLOSET AT TOP OF BOTH STAIRWELLS AT 4TH FLOOR
Misc
Partial Correction
08/17/2017
OK TO COVER WHEN READY 1ST LAYER 5/8" TYPE X GWB AT BACKSIDE FACE OF STAIRWELLS AND ELEVATOR SHAFT AT: 4TH FLOOR; [3RD FLOOR;
Rated Assembly Inspection Partial 8/24/2017 8/24/2017 at 8:15 AM 08/24/2017
Misc
Partial Correction
08/21/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; [4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; [4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR;
Misc
Partial Correction
08/21/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER;
Misc
Partial Correction
08/21/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB RATED CEILINGS & WALLS AT: 4TH FLOOR; 3RD FLOOR INCLUDING BOTH STAIRWELLS; 1ST FLOOR: 1ST LAYER ;
Misc
Partial Correction
08/21/2017
OK TO COVER WHEN READY 1ST LAYER 5/8" TYPE X GWB AT BACKSIDE FACE OF STAIRWELLS AND ELEVATOR SHAFT AT: 4TH FLOOR; 3RD FLOOR;
All Rough Inspection - Commercial Partial 8/21/2017 8/24/2017 at 9:15 AM 08/24/2017
Misc
Partial Correction
08/18/2017
OK TO COVER WALL AND CEILING FRAMING + SYSTEMS FOR BE CONCEALED AT: BOTH STAIR TOWERS AT & ABOVE 4TH FLOOR; ALL SPACES AT 4TH FLOOR; ALL SPACES AT 3RD FLOOR INCLUDING STAIRWELLS, BALCONIES, AND CORRIDOR; ALL SPACES AT 2ND FLOOR; 1ST FLOOR CORRIDOR + STAIRWELLS + UNITS & STORAGE #1 THRU #9;
Misc
Partial Correction
08/18/2017
ABOVE-CEILING SPACE OK TO COVER WITH GWB AT SOUTH & NORTH GARAGES TO ALLOW FURR-DOWN TO BE BUILT TO ENCLOSE ELECTRICAL SERVICE FEEDER CABLES
Misc
Partial Correction
08/18/2017
RC FURRING CHANNELS FOUND TO BE INSTALLED AT UNIT & ROOM CEILINGS + CEILINGS AND WALLS AT: 4TH FLOOR; 3RD FLOOR; [2ND FLOOR;
Rated Assembly Inspection Partial 8/25/2017 8/25/2017 at 10:25 AM 08/25/2017
Misc
Partial Correction
08/24/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; 4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; 4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR;
Misc
Partial Correction
08/24/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER;
Misc
Partial Correction
08/24/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB RATED CEILINGS & WALLS AT: 4TH FLOOR; 3RD FLOOR INCLUDING BOTH STAIRWELLS; 1ST FLOOR: 1ST LAYER ;
Misc
Partial Correction
08/24/2017
OK TO COVER WHEN READY 1ST LAYER 5/8" TYPE X GWB AT BACKSIDE FACE OF STAIRWELLS, ELEVATOR SHAFT AND SHEAR WALLS BOTH FACES AT: 4TH FLOOR; 3RD FLOOR; [2ND FLOOR;
Misc
Partial Correction
08/25/2017
PENETRATIONS ABOVE GWB CEILING AT FOUR LAUNDRY ROOMS AT 4TH FLOOR OK TO COVER
All Rough Inspection - Commercial Partial 8/25/2017 at 11:10 AM 08/25/2017
Misc
Partial Correction
08/24/2017
OK TO COVER WALL AND CEILING FRAMING + SYSTEMS FOR BE CONCEALED AT: BOTH STAIR TOWERS AT & ABOVE 4TH FLOOR; ALL SPACES AT 4TH FLOOR; ALL SPACES AT 3RD FLOOR INCLUDING STAIRWELLS, BALCONIES, AND CORRIDOR; ALL SPACES AT 2ND FLOOR; 1ST FLOOR CORRIDOR + STAIRWELLS + UNITS & STORAGE #1 THRU #9;
Misc
Partial Correction
08/24/2017
ABOVE-CEILING SPACE OK TO COVER WITH GWB AT SOUTH & NORTH GARAGES TO ALLOW FURR-DOWN TO BE BUILT TO ENCLOSE ELECTRICAL SERVICE FEEDER CABLES
Misc
Partial Correction
08/24/2017
RC FURRING CHANNELS FOUND TO BE INSTALLED AT UNIT & ROOM CEILINGS + CEILINGS AND WALLS AT: 4TH FLOOR; 3RD FLOOR; [2ND FLOOR;
Misc
Partial Correction
08/25/2017
CEILING AND WALLS AT ATTACHED GARAGES OK TO COVER WHEN READY
Rated Assembly Inspection Partial 8/28/2017 8/28/2017 at 3:05 PM 08/28/2017
Misc
Partial Correction
08/25/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; 4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; 4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR;
Misc
Partial Correction
08/25/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER;
Misc
Partial Correction
08/25/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB RATED CEILINGS & WALLS AT: 4TH FLOOR; 3RD FLOOR INCLUDING BOTH STAIRWELLS; [2ND FLOOR; 1ST FLOOR: 1ST LAYER ;
Misc
Partial Correction
08/25/2017
OK TO COVER WHEN READY 1ST LAYER 5/8" TYPE X GWB AT BACKSIDE FACE OF STAIRWELLS, ELEVATOR SHAFT AND SHEAR WALLS BOTH FACES AT: 4TH FLOOR; 3RD FLOOR; [2ND FLOOR;
Misc
Partial Correction
08/25/2017
PENETRATIONS ABOVE GWB CEILING AT FOUR LAUNDRY ROOMS AT 4TH FLOOR OK TO COVER
Rated Assembly Inspection Partial 8/29/2017 at 2:20 PM 08/29/2017
Misc
Partial Correction
08/28/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; 4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; 4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR;
Misc
Partial Correction
08/28/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER;
Misc
Partial Correction
08/28/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB RATED CEILINGS & WALLS AT: 4TH FLOOR; 3RD FLOOR INCLUDING BOTH STAIRWELLS; 2ND FLOOR; 1ST FLOOR: 1ST LAYER ;
Misc
Partial Correction
08/28/2017
OK TO COVER WHEN READY 1ST LAYER 5/8" TYPE X GWB AT BACKSIDE FACE OF STAIRWELLS, ELEVATOR SHAFT AND SHEAR WALLS BOTH FACES AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR;
Misc
Partial Correction
08/28/2017
OK TO COVER WHEN READY FIRE-STOPPED PENETRATIONS ABOVE GWB CEILING AT FOUR LAUNDRY ROOMS AT: 3RD FLOOR; [2ND FLOOR;
All Rough Inspection - Commercial Partial 8/29/2017 at 2:35 PM 08/29/2017
Misc
Partial Correction
08/25/2017
OK TO COVER WALL AND CEILING FRAMING + SYSTEMS FOR BE CONCEALED AT: BOTH STAIR TOWERS AT & ABOVE 4TH FLOOR; ALL SPACES AT 4TH FLOOR; ALL SPACES AT 3RD FLOOR INCLUDING STAIRWELLS, BALCONIES, AND CORRIDOR; ALL SPACES AT 2ND FLOOR; 1ST FLOOR CORRIDOR + STAIRWELLS + UNITS & STORAGE #1 THRU #9;
Misc
Partial Correction
08/25/2017
ABOVE-CEILING SPACE OK TO COVER WITH GWB AT SOUTH & NORTH GARAGES TO ALLOW FURR-DOWN TO BE BUILT TO ENCLOSE ELECTRICAL SERVICE FEEDER CABLES
Misc
Partial Correction
08/25/2017
RC FURRING CHANNELS FOUND TO BE INSTALLED AT UNIT & ROOM CEILINGS + CEILINGS AND WALLS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; [1ST FLOOR;
Misc
Partial Correction
08/25/2017
CEILING AND WALLS AT ATTACHED GARAGES OK TO COVER WHEN READY
All Rough Inspection - Commercial Partial 8/30/2017 8/30/2017 at 1:00 PM 08/30/2017
Misc
Resolved
08/30/2017
OK TO COVER WALL AND CEILING FRAMING + SYSTEMS FOR BE CONCEALED AT: BOTH STAIR TOWERS AT & ABOVE 4TH FLOOR; ALL SPACES AT 4TH FLOOR; ALL SPACES AT 3RD FLOOR INCLUDING STAIRWELLS, BALCONIES, AND CORRIDOR; ALL SPACES AT 2ND FLOOR; 1ST FLOOR CORRIDOR + STAIRWELLS + UNITS & STORAGE #1 THRU #9;
Misc
Resolved
08/30/2017
ABOVE-CEILING SPACE OK TO COVER WITH GWB AT SOUTH & NORTH GARAGES TO ALLOW FURR-DOWN TO BE BUILT TO ENCLOSE ELECTRICAL SERVICE FEEDER CABLES
Misc
Resolved
08/30/2017
RC FURRING CHANNELS FOUND TO BE INSTALLED AT UNIT & ROOM CEILINGS + CEILINGS AND WALLS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR;
Misc
Resolved
08/30/2017
CEILING AND WALLS AT ATTACHED GARAGES OK TO COVER WHEN READY
Misc
Partial Correction
08/30/2017
OK TO COVER WHEN READY FRAMING & ENCLOSED SYSTEMS AT FUR-DOWNS, SMALL CEILINGS AND SOFFITS AT 4TH FLOOR
Rough Framing Inspection - Commercial Partial 8/8/2017 8/30/2017 at 1:45 PM 08/30/2017
Misc
Partial Correction
07/25/2017
INTERIOR SHEAR WALLS AT STAIRWELLS OK TO COVER WITH 1ST LAYER GWB WHEN READY [SHEAR WALLS COMPLETE AT 1ST FLOOR
Misc
Partial Correction
07/25/2017
NAILING OF ROOF SHEATHING APPROVED. OK TO COVER WHEN READY.
Misc
Partial Correction
07/25/2017
OK TO COVER ALL EXTERIOR WALL SHEATHING.
Misc
Partial Correction
07/25/2017
NO ISSUES FOUND WITH FRAMING OF STAIR TOWERS AND ELEVATOR SHAFT; WHERE NO M/E/P TO BE INSTALLED OK TO COVER WHEN READY.
Misc
Partial Correction
07/25/2017
NO ISSUES FOUND WITH FRAMING OF BALCONIES.
Misc
Partial Correction
07/25/2017
FRAMING PRELIMINARY INSPECTION: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR CHECKED IN ADVANCE OF M/E/P WORK. LOCATIONS WITH ISSUES MARKED FOR CORRECTION. POSTS AT SOME GARAGES HAVE SHIMS SMALLER THAN TOP AREA OF POST.
Rated Assembly Inspection Partial 8/31/2017 8/31/2017 at 1:20 PM 08/31/2017
Misc
Partial Correction
08/29/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; 4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; [1ST FLOOR 1ST LAYER; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; 4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; [1ST FLOOR 1ST LAYER;
Misc
Partial Correction
08/29/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER; [1ST FLOOR: 1ST LAYER AT BACKSIDE;
Misc
Partial Correction
08/29/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB RATED CEILINGS & WALLS AT: 4TH FLOOR; 3RD FLOOR INCLUDING BOTH STAIRWELLS; 2ND FLOOR; 1ST FLOOR: 1ST LAYER ;
Misc
Partial Correction
08/29/2017
OK TO COVER WHEN READY 1ST LAYER 5/8" TYPE X GWB AT BACKSIDE FACE OF STAIRWELLS, ELEVATOR SHAFT AND SHEAR WALLS BOTH FACES AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR;
Misc
Partial Correction
08/29/2017
OK TO COVER WHEN READY FIRE-STOPPED PENETRATIONS ABOVE GWB CEILING AT FOUR LAUNDRY ROOMS AT: 3RD FLOOR; [2ND FLOOR;
Misc
Partial Correction
08/31/2017
OK TO COVER WHEN READY ONE LAYER 5/8" TYPE X GWB AT SHEAR WALLS AT: [1ST FLOOR
Misc
Partial Correction
08/31/2017
AT ELEVATOR EQUIPMENT ROOM AT 1ST FLOOR 3 LAYERS 5/8" TYPE X GWB + HAT CHANNEL + ONE LAYER INSTALLED
All Rough Inspection - Commercial Partial 8/31/2017 at 2:15 PM 08/31/2017
Misc
Partial Correction
08/30/2017
OK TO COVER WHEN READY FRAMING & ENCLOSED SYSTEMS AT FUR-DOWNS, SMALL CEILINGS AND SOFFITS AT 4TH FLOOR
Misc
Partial Correction
08/31/2017
OK TO COVER WHEN READY RC CHANNEL AT CEILING OF ATTACHED GARAGES
Rated Assembly Inspection Partial 9/6/2017 at 12:50 PM 09/06/2017
Misc
Partial Correction
08/31/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; 4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; 1ST FLOOR 1ST LAYER; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; 4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; 1ST FLOOR 1ST LAYER;
Misc
Partial Correction
08/31/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER; [1ST FLOOR: 1ST LAYER AT BACKSIDE;
Misc
Partial Correction
08/31/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB RATED CEILINGS & WALLS AT: 4TH FLOOR 3RD FLOOR INCLUDING BOTH STAIRWELLS 2ND FLOOR 1ST FLOOR INCLUDING STAIRWELLS
Misc
Partial Correction
08/31/2017
OK TO COVER WHEN READY 1ST LAYER 5/8" TYPE X GWB AT BACKSIDE FACE OF STAIRWELLS, ELEVATOR SHAFT AND SHEAR WALLS BOTH FACES AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR;
Misc
Partial Correction
08/31/2017
OK TO COVER WHEN READY FIRE-STOPPED PENETRATIONS ABOVE GWB CEILING AT FOUR LAUNDRY ROOMS AT: 3RD FLOOR; [2ND FLOOR;
Misc
Partial Correction
08/31/2017
OK TO COVER WHEN READY ONE LAYER 5/8" TYPE X GWB AT SHEAR WALLS AT: [1ST FLOOR
Misc
Partial Correction
08/31/2017
AT ELEVATOR EQUIPMENT ROOM AT 1ST FLOOR 3 LAYERS 5/8" TYPE X GWB + HAT CHANNEL + ONE LAYER INSTALLED
All Rough Inspection - Commercial Partial 9/14/2017 9/14/2017 at 1:45 PM 09/14/2017
Misc
Partial Correction
08/31/2017
OK TO COVER WHEN READY FRAMING & ENCLOSED SYSTEMS AT: FUR-DOWNS, SMALL CEILINGS AND SOFFITS AT 4TH FLOOR; WALL & CEILING AT SOUTH GARAGE WHERE ELECTRICAL FEEDER CABLES ENTER AND PROCEED UP THROUGH STRUCTURE;
Misc
Partial Correction
08/31/2017
OK TO COVER WHEN READY RC CHANNEL AT CEILING OF ATTACHED GARAGES
Electrical Service Inspection Partial 9/26/2017 9/26/2017 at 4:00 PM 09/26/2017
Misc
Partial Correction
06/09/2017
RELEASE PEDESTAL-MOUNTED TEMPORARY ELECTRICAL SERVICE
Misc
Partial Correction
09/26/2017
RELEASE ELECTRICAL SERVICE AT SOUTH END OF BUILDING ONLY.
Electrical Service Inspection Passed 10/10/2017 10/10/2017 at 3:20 PM 10/10/2017
Misc
Resolved
10/10/2017
RELEASE PEDESTAL-MOUNTED TEMPORARY ELECTRICAL SERVICE
Misc
Resolved
10/10/2017
RELEASE ELECTRICAL SERVICE AT SOUTH END OF BUILDING ONLY.
All Rough Inspection - Commercial Passed 9/14/2017 11/08/2017
Misc
Resolved
11/08/2017
OK TO COVER WHEN READY FRAMING & ENCLOSED SYSTEMS AT: FUR-DOWNS, SMALL CEILINGS AND SOFFITS AT 4TH FLOOR; WALL & CEILING AT SOUTH GARAGE WHERE ELECTRICAL FEEDER CABLES ENTER AND PROCEED UP THROUGH STRUCTURE;
Misc
Resolved
11/08/2017
OK TO COVER WHEN READY RC CHANNEL AT CEILING OF ATTACHED GARAGES
Underground Electrical Inspection - Commercial Passed 5/25/2017 3/16/2017 11/08/2017
Misc
Resolved
11/08/2017
NO MATERIAL OR WORKMANSHIP ISSUES FOUND ON SECONDARY ELECTRICAL SERVICE CONDUITS TRENCHED AND LAID FROM TRANSFORMER LOCATIONS TO BUILDING ENTRIES AT NORTH & SOUTH ENDS OF BLDG.
Rated Assembly Inspection Passed 9/6/2017 11/08/2017
Misc
Resolved
11/08/2017
RATED ASSEMBLY AT STAIRWELLS: OK TO COVER 5/8" TYPE X MOLD TOUGH GWB AT NORTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE; PRE-ROCK AT JOIST SPACE AT BACKSIDE AT 1ST, 2ND & 3RD FLOORS; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; 4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; 1ST FLOOR 1ST LAYER; SOUTH STAIRWELL WALLS: 2ND LAYER AT 1ST LEVEL WELL FACE + 1ST LAYER PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 2ND LEVEL WELL FACE; 2ND LAYER AT 2ND LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 3RD LEVEL WELL FACE + PRE-ROCK AT JOIST SPACE AT BACKSIDE; 1ST LAYER AT 4TH FLOOR; 2ND LAYER AT 3RD & 4TH FLOORS; 1ST LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 2ND LAYER AT WALLS & CEILING ABOVE 4TH FLOOR; 3RD LAYER + RC CHANNEL AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; 4TH LAYER AT LOW AND HIGH CEILINGS ABOVE 4TH FLOOR; 1ST FLOOR 1ST LAYER;
Misc
Resolved
11/08/2017
OK TO COVER WHEN READY RATED ASSEMBLY AT ELEVATOR SHAFT: 1ST & 2ND LAYERS PERIMETER PRE-ROCK AT JOIST SPACE AT 1ST, 2ND, AND 3RD FLOORS; 5/8" TYPE X GWB AT WELL FACE: 2ND LAYER AT 4TH, 3RD, 2ND, 1ST FLOORS SHAFT LID: 1ST LAYER; 2ND LAYER; 3RD LAYER; [1ST FLOOR: 1ST LAYER AT BACKSIDE;
Misc
Resolved
11/08/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB RATED CEILINGS & WALLS AT: 4TH FLOOR 3RD FLOOR INCLUDING BOTH STAIRWELLS 2ND FLOOR 1ST FLOOR INCLUDING STAIRWELLS
Misc
Resolved
11/08/2017
OK TO COVER WHEN READY 1ST LAYER 5/8" TYPE X GWB AT BACKSIDE FACE OF STAIRWELLS, ELEVATOR SHAFT AND SHEAR WALLS BOTH FACES AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR;
Misc
Resolved
11/08/2017
OK TO COVER WHEN READY FIRE-STOPPED PENETRATIONS ABOVE GWB CEILING AT FOUR LAUNDRY ROOMS AT: 3RD FLOOR; [2ND FLOOR;
Misc
Resolved
11/08/2017
OK TO COVER WHEN READY ONE LAYER 5/8" TYPE X GWB AT SHEAR WALLS AT: [1ST FLOOR
Misc
Resolved
11/08/2017
AT ELEVATOR EQUIPMENT ROOM AT 1ST FLOOR 3 LAYERS 5/8" TYPE X GWB + HAT CHANNEL + ONE LAYER INSTALLED
Rough Framing Inspection - Commercial Passed 8/30/2017 11/08/2017
Misc
Resolved
11/08/2017
INTERIOR SHEAR WALLS AT STAIRWELLS OK TO COVER WITH 1ST LAYER GWB WHEN READY [SHEAR WALLS COMPLETE AT 1ST FLOOR
Misc
Resolved
11/08/2017
NAILING OF ROOF SHEATHING APPROVED. OK TO COVER WHEN READY.
Misc
Resolved
11/08/2017
OK TO COVER ALL EXTERIOR WALL SHEATHING.
Misc
Resolved
11/08/2017
NO ISSUES FOUND WITH FRAMING OF STAIR TOWERS AND ELEVATOR SHAFT; WHERE NO M/E/P TO BE INSTALLED OK TO COVER WHEN READY.
Misc
Resolved
11/08/2017
NO ISSUES FOUND WITH FRAMING OF BALCONIES.
Misc
Resolved
11/08/2017
FRAMING PRELIMINARY INSPECTION: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR CHECKED IN ADVANCE OF M/E/P WORK. LOCATIONS WITH ISSUES MARKED FOR CORRECTION. POSTS AT SOME GARAGES HAVE SHIMS SMALLER THAN TOP AREA OF POST.
Miscellaneous Inspection Partial 11/8/2017 at 4:00 PM 11/08/2017
Miscellaneous Inspection Partial 11/20/2017 at 4:25 PM 11/20/2017
Miscellaneous Inspection Partial 11/22/2017 at 11:35 AM 11/22/2017
Miscellaneous Inspection Partial 11/27/2017 at 7:30 AM 11/27/2017
Miscellaneous Inspection Not Ready 11/29/2017 at 1:55 PM 11/29/2017
Miscellaneous Inspection Partial 12/4/2017 at 3:05 PM 12/04/2017
Miscellaneous Inspection Partial 12/6/2017 at 7:00 AM 12/06/2017
Miscellaneous Inspection Partial 12/7/2017 at 7:00 AM 12/07/2017
Alarm Test Failed 12/7/2017 12/07/2017
Sprinkler - Flow Test Passed 12/7/2017 12/07/2017
Miscellaneous Inspection Partial 12/7/2017 at 9:50 AM 12/07/2017
Partial Correction
12/07/2017
MODEL UNITS 2107 & 2111 OK TO PLACE FURNITURE. PERMIT NO STAFF USE AND ADMIT NO PUBLIC PRIOR TO APPROVAL.
Miscellaneous Inspection Partial 12/8/2017 at 7:10 AM 12/08/2017
Misc
Partial Correction
12/07/2017
MODEL UNITS 2107 & 2111 OK TO PLACE FURNITURE. PERMIT NO STAFF USE AND ADMIT NO PUBLIC PRIOR TO APPROVAL.
Alarm Test Passed 12/11/2017 12/11/2017
Occupancy Inspection - Fire Failed 12/12/2017 12/12/2017
Miscellaneous Inspection Partial 12/12/2017 at 9:15 AM 12/12/2017
Misc
Partial Correction
12/08/2017
MODEL UNITS 2107 & 2111 OK TO PLACE FURNITURE. PERMIT NO STAFF USE AND ADMIT NO PUBLIC PRIOR TO APPROVAL.
Miscellaneous Inspection Partial 12/12/2017 at 12:25 PM 12/12/2017
Misc
Partial Correction
12/12/2017
MODEL UNITS 2107 & 2111 OK TO PLACE FURNITURE. PERMIT NO STAFF USE AND ADMIT NO PUBLIC PRIOR TO APPROVAL.
Miscellaneous Inspection Passed 12/12/2017 at 2:00 PM 12/12/2017
Misc
Partial Correction
12/12/2017
MODEL UNITS 2107 & 2111 OK TO PLACE FURNITURE. PERMIT NO STAFF USE AND ADMIT NO PUBLIC PRIOR TO APPROVAL.
Occupancy Inspection - Codes Commercial Failed 12/12/2017 12/12/2017 at 3:30 PM 12/12/2017
Misc
Corrective Action Required
12/12/2017
ELEVATOR APPROVAL REQUIRED
Occupancy Inspection - Codes Commercial Full C of O 12/13/2017 at 9:35 AM 12/13/2017
Misc
Resolved
12/13/2017
ELEVATOR APPROVAL REQUIRED
Occupancy Inspection - Fire Passed 12/13/2017 12/13/2017
Occupancy Inspection - Water Utilities Passed 12/13/2017
Occupancy Inspection - Engineering Passed 12/14/2017
Occupancy Inspection - Planning Passed 12/14/2017
Documents & Images
Date Uploaded File Type Document Name
07/26/2016 Letter Fire Building Plan Review
08/08/2016 Site Map
09/21/2016 Letter Fire Building Plan Review
02/08/2017 Receipt Receipt for transaction: 2017-000389
02/08/2017 Letter Codes Building Permit
02/08/2017 Letter Codes Plan Review Conditions
03/16/2017 Letter Inspection Summary
05/11/2017 Letter Inspection Summary
05/12/2017 Letter Inspection Summary
05/15/2017 Letter Inspection Summary
05/16/2017 Letter Inspection Summary
05/19/2017 Letter Inspection Summary
05/23/2017 Letter Inspection Summary
05/25/2017 Letter Inspection Summary
06/01/2017 Letter Inspection Summary
06/09/2017 Letter Inspection Summary
06/26/2017 Letter Inspection Summary
06/27/2017 Letter Inspection Summary
06/30/2017 Letter Inspection Summary
07/03/2017 Letter Inspection Summary
07/07/2017 Letter Inspection Summary
07/13/2017 Letter Inspection Summary
07/14/2017 Letter Inspection Summary
07/17/2017 Letter Inspection Summary
07/19/2017 Letter Inspection Summary
07/20/2017 Letter Inspection Summary
07/21/2017 Letter Inspection Summary
07/24/2017 Letter Inspection Summary
07/25/2017 Letter Inspection Summary
07/27/2017 Letter Inspection Summary
08/01/2017 Letter Inspection Summary
08/02/2017 Letter Inspection Summary
08/03/2017 Letter Inspection Summary
08/07/2017 Letter Inspection Summary
08/08/2017 Letter Inspection Summary
08/14/2017 Letter Inspection Summary
08/15/2017 Letter Inspection Summary
08/16/2017 Letter Inspection Summary
08/17/2017 Letter Inspection Summary
08/18/2017 Letter Inspection Summary
08/21/2017 Letter Inspection Summary
08/24/2017 Letter Inspection Summary
08/25/2017 Letter Inspection Summary
08/25/2017 Letter Inspection Summary
08/28/2017 Letter Inspection Summary
08/29/2017 Letter Inspection Summary
08/30/2017 Letter Inspection Summary
08/31/2017 Letter Inspection Summary
09/06/2017 Letter Inspection Summary
09/14/2017 Letter Inspection Summary
10/10/2017 Letter Inspection Summary
12/07/2017 Letter Inspection Summary
12/13/2017 Letter Field Certificate of Occupancy
12/15/2017 Letter Codes Final Certificate of Occupancy
01/29/2018 Letter DOC012918-010
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home