Planning Application Status

PL2024194




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2024194
Academy Bank - Drive thru ATM
Commercial Final Development Plan
Commercial Final Development Plan
Approved
07/30/2024
GENEVA D MCKEEVER TRUST DATED 6/5/89
Drive thru ATM at the northeast corner of McKeever's parking lot - Streets of West Pryor. Will be operated by Academy Bank.
Locations
Contacts
GENEVA D MCKEEVER TRUST DATED 6/5/89, Address:4216 S HOCKER BLDG 9 STE 100  
Generator Studio, Address:1615 Baltimore Ave, Phone:(816) 333-6527  
Scott McCleary, Address:1218 Energy Drive  
UHL ENGINEERING INC, Address:7211 W 98th Terrace, Suite 110, Phone:(913) 385-2670  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 09/11/2024 09/04/2024
Susan Nelson, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
09/04/2024

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
09/04/2024

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #11 Pavement Thickness
Corrective Action Required
09/04/2024

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
09/04/2024

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Future Repair Work
Corrective Action Required
09/04/2024

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE Engineers Estimate
Corrective Action Required
09/04/2024

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $888.30
Engineering Review Corrections 09/03/2024 09/03/2024
Susan Nelson, P.E.
Corrective Action Required
09/03/2024

Please show in GEN-4 the extension of the compacted stable subgrade extending beyond back of curb connected to the compacted stable subgrade below the curb without a gap. The curb and gutter detail or pavement detail must show that the aggregate base and compaction of native subgrade extends a minimum of one (1) foot beyond back of curb.
Corrective Action Required
09/03/2024

Revise the Engineer's Estimate of Probable Construction Costs to include the proposed asphalt material quantity and extended cost.
Planning Review No Comments 09/03/2024 08/26/2024
Claire Byers
Engineering Review Corrections 08/23/2024 08/21/2024
Susan Nelson, P.E.
Corrective Action Required
08/21/2024

Please submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
08/21/2024

Add to the plans the City standard detail for curbs (GEN-4).
Corrective Action Required
08/21/2024

Show in the pavement section and add the following notes to the plans regarding paving per Section 2200 of the City Design and Construction Manual. - All asphalt materials shall conform to the KCMMB ASPHALT MATERIAL SPECIFICATION, current edition. - All concrete materials for paving curb and gutter, sidewalks, paths, commercial driveways and other pavements shall conform to the KCMMB specifications.
Corrective Action Required
08/21/2024

Please provide a graphic and notes showing the aggregate base to be extended a minimum of 12 inches beyond the back of curb. The City standard detail does not show this, so provide either a standalone curb detail or add the curb detail to the typical pavement section.
Building Codes Review No Comments 08/23/2024 08/20/2024
Joe Frogge
Traffic Review No Comments 08/23/2024 08/20/2024
Erin Ralovo
Planning Review Corrections 08/23/2024 08/14/2024
Claire Byers
Corrective Action Required
08/14/2024

diagonal hatch pavement markings not enough; curbing required
Corrective Action Required
08/14/2024

Please add one more tree to landscape plan to replace tree removed due to new curb
Fire Review No Comments 08/23/2024 08/12/2024
Jim Eden
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $725.00 $725.00 Paid 07/31/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
07/31/2024 Receipt Receipt_PL2024194
07/31/2024 Plans Plan set_Rev 0_PL2024194
07/31/2024 Engineer Report/Study Structural Calcs_PL2024194
08/08/2024 Application Form FDP Application form_PL2024194
08/09/2024 Plans Plan set additional sheets_Rev 0_PL2024194
08/23/2024 Letter Applicant Letter - FDP (DFDP)
08/26/2024 Plans Plan set_Rev 1_PL2024194
08/26/2024 Engineers Estimate Engineers cost Estimate_PL2024194
09/03/2024 Letter Applicant Letter - FDP (DFDP)
09/04/2024 Engineers Estimate Engineers cost Estimate_Rev 1_PL2024194
09/04/2024 Plans Updated sheets_Plan set_Rev 2_PL2024194
09/04/2024 Engineers Estimate Fee Worksheet FY24_PL2024194
09/04/2024 Approved Plans Approved plan set_Academy Bank Drive-thru ATM_PL2024194_9.4.2024
09/10/2024 Letter Applicant Letter - FDP (DFDP)
09/24/2024 ACADEMY LS Cost Estimate (2) (1)
09/24/2024 ACADEMY LS ITM (4) (1)
02/04/2025 m107799499-1_MAP
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home