Summary
PL2024031
Longview Mansion - Parking Lot Addition
Commercial Final Development Plan
Commercial Final Development Plan
Approved
02/01/2024
NLV MANSION LLC
New Parking Lot - 79 Stalls
Locations
Contacts
NLV MANSION LLC, Address:1125 GRAND BLVD STE 202  
Sunflower Development Group, LLC, Address:Attn: Mark Moberly, Phone:(816) 581-3997  
Sunflower Development Group, LLC, Address:Attn: Mark McHugh  
Olsson Engineering, Address:1301 Burlington, Suite 100, Phone:(816) 361-1177  
NLV MANSION LLC, Address:1125 GRAND BLVD STE 202, Phone:(816) 581-3997  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 10/16/2024 10/16/2024
Gene Williams, P.E.
Engineering Review No Comments 06/25/2024 06/25/2024
Gene Williams, P.E.
Planning Review No Comments 06/20/2024 06/17/2024
Shannon McGuire
Building Codes Review No Comments 06/20/2024 06/13/2024
Joe Frogge
Engineering Review Corrections 06/14/2024 06/13/2024
Gene Williams, P.E.
Misc.
Corrective Action Required
06/07/2024

Sheet C03 is only partially-visible. Please correct with the entire sheet.
Misc.
Corrective Action Required
06/07/2024

Please specify "aluminized CMP" for the County Rd. crossing. If the county does not want aluminized CMP, we will need an email from them stating they do not desire aluminized CMP.
Planning Review No Comments 04/04/2024 04/05/2024
Shannon McGuire
Engineering Review Approved with Conditions 04/04/2024 04/04/2024
Gene Williams, P.E.
Corrective Action Required
04/04/2024

Final approval is contingent upon approval of the stormwater improvements across County Park Rd. This may be in the form of an email from the jurisdiction responsible for maintenance of County Park Rd.
DE Engineers Estimate
Corrective Action Required
04/04/2024

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost) have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $5,637.48
DE Contact Field Eng. Inspector
Corrective Action Required
04/04/2024

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a project coordination meeting with the assigned Field Engineering Inspector.
DE Commercial Detention Basin
Corrective Action Required
04/04/2024

The applicant shall submit and the City shall accept an “As-built / As-graded” detention basin plan for the infiltration trenches prior to issuance of a Certificate of Substantial Completion.
Building Codes Review No Comments 04/04/2024 03/28/2024
Scott Ready
Traffic Review No Comments 04/04/2024 03/28/2024
Scott Ready
Fire Review No Comments 04/04/2024 03/28/2024
Scott Ready
Fire Review No Comments 03/15/2024 03/18/2024
Jim Eden
Building Codes Review No Comments 03/15/2024 03/15/2024
Joe Frogge
Planning Review Corrections 03/15/2024 03/15/2024
Shannon McGuire
Corrective Action Required
03/15/2024

Please provide details how ADA users will be directed to the ADA lot.
Corrective Action Required
03/15/2024

Please provide a short narrative justifying how the consolidation of the ADA stalls will provide substantially equivalent or greater accessibility in terms of distance from an accessible entrance or entrances, and improved user convenience.
Engineering Review Corrections 03/15/2024 03/14/2024
Gene Williams, P.E.
Corrective Action Required
03/14/2024

Informational Comment: Waiver for stormwater detention is currently under review.
Corrective Action Required
03/14/2024

Grading plan shall be revised to account for the subgrade being extended a minimum of 1 foot beyond the back of curb. As shown, the subgrade for the pavement will extend into the infiltration trench, and what was 5.5 feet width for the infiltration trench will be only 4.5 feet width. Please revise, and ensure a maximum 3:1 slope is maintained.
Corrective Action Required
03/14/2024

KCMMB asphaltic concrete mix is now required on all projects as of Oct. 2023. Please provide notation on the typical section views of the pavement to provide KCMMB asphaltic concrete mix.
Corrective Action Required
03/14/2024

Standard duty asphaltic concrete is called-out. Will any trash trucks or emegency vehicles utilize the parking lot? If so, an additional 1 inch of base course asphaltic concrete is needed in accordance with the Unified Development Ordinance (UDO). Please revise if appropriate.
Corrective Action Required
03/14/2024

The infiltration trench is shown discharging near the USACE property line without any indication of off-site contours or grades. It appears there is a gentle swale that should be utilized. Please evaluate and relocate the discharge point where a swale already exists.
Corrective Action Required
03/14/2024

An Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate.
Traffic Review No Comments 03/15/2024 03/12/2024
Erin Ralovo
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
03/01/2024 Letter Longview Mansion Parking Addition_Design Modification Request_Detention_24_03_01
03/01/2024 Application Form Longview Mansion Parking Addition_FDP Application_24-03-01
03/01/2024 Plans The FDP
03/01/2024 Letter Longview Mansion Parking Addition_Legal Description_24-03-01
03/01/2024 Engineer Report/Study The Stormwater Report
03/13/2024 Waiver/Modification Document The Waiver Request
03/18/2024 Letter Applicant Letter - FDP (DFDP)
03/28/2024 Letter Longview Mansion Parking Addition_Comment Resopnse Letter_24_03_28
03/28/2024 Letter Longview Mansion Parking Addition_Design Modification Request_Detention_24_03_28
03/28/2024 Plans Longview Mansion Parking Addition_FDP
03/28/2024 Engineers Estimate Longview Mansion Parking Addition_OPC_24_03_28
03/29/2024 Letter WAIVERLONGIEWMANSION
04/03/2024 Letter SIGNED WAIVER CITY ENGINEER
04/04/2024 Activity Document FeeWorksheetLongviewMansionParkingLot
04/05/2024 Approved Plans Approved FDP_Longview Mansion Parking Lot Expanson_04052024
04/05/2024 Letter Applicant Letter - FDP (DFDP)
06/07/2024 Plans 24-06-07_Longview Mansion Parking Addition_FDP_CTAP
06/07/2024 Letter 24-06-07_Longview Mansion Parking Addition_FDP_CTAP_Memo
06/07/2024 Plans Plan Sheet C03
06/13/2024 Letter Applicant Letter - FDP (DFDP)
06/18/2024 Plans 24-06-18_Longview Mansion Parking Addition_FDP_CTAP_2nd Submittal
06/18/2024 Letter 24-06-18_Longview Mansion Parking Addition_FDP_CTAP_Comment Response Letter
06/25/2024 Letter Applicant Letter - FDP (DFDP)
06/26/2024 Plans 24-06-26_Longview Mansion Parking Addition_FDP_CTAP_3rd Submittal
06/26/2024 Approved Plans Approved FDP Rev_Longview Mansion Parking Lot Expansion_06262024
10/16/2024 Letter 24-10-16_Longview Mansion_FDP_Change to Approved Plans Letter
10/16/2024 Approved Plans 24-10-16_Longview Mansion Parking Addition_FDP_CTAP_5th Submittal
10/16/2024 Email JACKSON COUNTY EMAIL
10/16/2024 Approved Plans Approved Revised FDP Plan Set_PL2024031_10.16.2024_Admin
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home