Planning Application Status

PL2024021




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2024021
The Village at Discovery Park, Lot 4 - mixed use building
Commercial Final Development Plan
Commercial Final Development Plan
Approved
01/25/2024
Mixed use building with garage, commercial and residential
Locations
Contacts
AJ Dolph, Address:1526 Grand Boulevard, Phone:(816) 472-1448  
DAVID EICKMAN, Address:OLSSON ASSOCIATES, Phone:(816) 361-1177  
Nolan Dixon, Address:1000 W. Nifong Blvd., Phone:(573) 447-0292  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 09/11/2024 09/11/2024
Susan Nelson, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
09/11/2024

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
09/11/2024

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #11 Pavement Thickness
Corrective Action Required
09/11/2024

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
09/11/2024

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Future Repair Work
Corrective Action Required
09/11/2024

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE Engineers Estimate
Corrective Action Required
09/11/2024

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $97,832.43
Engineering Review Corrections 09/03/2024 09/03/2024
Susan Nelson, P.E.
Corrective Action Required
09/03/2024

Resubmit plans that are signed and dated by the Professional Engineer. Also, please make sure that subsequent submittals have unique revision names each time, as it seems that there are two Rev1 sets that appear to be different and reflective of further comments.
Planning Review Approved with Conditions 09/03/2024 09/03/2024
Hector Soto Jr.
Corrective Action Required
09/03/2024

MECHANICAL SCREENING. Building perspectives and elevations have been provided and appear to show that building parapet wall heights are sufficient to fully screen all RTUs from view on all sides. Confirmation of adequate screening shall be done at the time of occupancy inspection. Should it be found at that time that adequate screening via the parapet wall heights is not achieved, screening of any visible RTUs shall be required using a metal screen system. This comment is only informational and requires no further action at this time.
Corrective Action Required
09/03/2024

PARKING LOT BOUNDARY. Staff will work with the developer on the timing or need for the actual installation of the temporary asphalt curb shown along the south project boundary depending on the timing of the development of the project site to the south. This comment is only informational and requires no further action at this time.
Fire Review Approved with Conditions 08/02/2024 08/05/2024
Jim Eden
Code Statement
Partial Correction
08/05/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 Fire Code.
Imposed Loads
Resolved
08/05/2024

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. All fire accesslanes around the building shall be capable of supporting 75,000-pounds.
Hydrants
Resolved
08/05/2024

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Provide a hydrant plan to meet this requirement
Fire Lanes - Marking
Resolved
08/05/2024

IFC 503.3 - 503.3 Marking. Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Fire lanes may be marked in one or a combination of methods as approved by the fire code official. Curbs. All curbs and curb ends shall be painted red with four inch (4") white lettering stating "FIRE LANE—NO PARKING". Wording may not be spaced more than fifteen feet (15') apart. Where no curb exists or a rolled curb is installed, a 6-inch (6") wide painted red stripe applied to the concrete or asphalt with four inch (4") white lettering stating "FIRE LANE—NO PARKING. "Signs. In areas where fire lanes are required, but no continuous curb is available, one of the following methods shall be used to indicate the fire lane. Option 1 : A sign twelve inches (12") wide and eighteen inches (18") in height shall be mounted on a metal post set in concrete a minimum of depth of eighteen inches (18") set back one foot (1') in from the edge of the roadway with the bottom of the sign being seven feet (7') from finished grade. Signs shall face oncoming traffic. Spacing of signs shall not exceed fifty feet (50') between signs. Signs shall be reflective material with a white color background with symbols, letters and border in red color. "FIRE LANE—NO PARKING". Option 2 : A sign twelve inches (12") wide and eighteen inches (18") in height shall be mounted on the side of a structure or other permanent fixture approved by the Fire Code Official. The bottom of the sign being seven feet (7') from finished grade. Spacing of signs shall not exceed fifty feet (50') between signs. Signs shall be reflective material with a white color background with symbols, letters and border in red color. "FIRE LANE—NO PARKING". Show posted fire lanes.
Engineering Review Corrections 08/02/2024 08/02/2024
Susan Nelson, P.E.
Corrective Action Required
08/02/2024

Submit the proposed private waterline easement documents for review and approval. Please note that these easements must be in place prior to issuance of any permit. Label and document all easements on the plans.
Corrective Action Required
08/02/2024

Verify and correctly label the existing manholes with the City numbering system. It appears that the plans show MH 16-109 as the label on two separate existing manholes.
Planning Review Approved with Conditions 08/02/2024 07/31/2024
Hector Soto Jr.
Corrective Action Required
07/31/2024

MECHANICAL SCREENING. Building perspectives and elevations have been provided and appear to show that building parapet wall heights are sufficient to fully screen all RTUs from view on all sides. Confirmation of adequate screening shall be done at the time of occupancy inspection. Should it be found at that time that adequate screening via the parapet wall heights is not achieved, screening of any visible RTUs shall be required using a metal screen system. This comment is only informational and requires no further action at this time.
Corrective Action Required
07/31/2024

PARKING LOT BOUNDARY. Staff will work with the developer on the timing or need for the actual installation of the temporary asphalt curb shown along the south project boundary depending on the timing of the development of the project site to the south. This comment is only informational and requires no further action at this time.
Building Codes Review No Comments 08/02/2024 07/30/2024
Joe Frogge
Miscellaneous Correction
Resolved
07/30/2024

Amend detail 14/CE7.3 to show correct frost depth which is 36". Also the depth is measured to nearest surface, not just vertically.
Miscellaneous Correction
Resolved
07/30/2024

Provide water use calculations to justify size of 3" water meter. (fyi - multiple 2" meters is often a more economical choice)
Miscellaneous Correction
Resolved
07/30/2024

WAT-11 detail is only valid for up to 2" water meter. Provide custom engineered pit design if you end up with 3" or larger meter.
Engineering Review Corrections 06/28/2024 06/28/2024
Susan Nelson, P.E.
Corrective Action Required
06/28/2024

Submit the proposed private waterline easement documents for review and approval. Please note that these easements must be in place prior to issuance of any permit.
Corrective Action Required
06/28/2024

Show proposed private waterline easement and all the water main connection locations and type, including valves and restraints. The fire line (please call it fire line instead of sprinkler line) will be connected with a tee and a valve at the BFPD per LS 6901 I. Fire Lines). Grade the vault area to drain and provide a note indicating how the vault sump will drain.
Corrective Action Required
06/28/2024

Show size and location of water service lines and water meters per LS 6901 L. Water Meters). The building service line and the irrigation line will each have their own connection to the water main by corporation stop with separate meters. If utilizing a 3” meter, the connection will be by a tee and the vault provide by the applicant. Add WAT-13 standard detail to the plans. Please note that the City Development Services inspectors do not use the MEP plans to inspect, please add all installation information to the civil plans.
Corrective Action Required
06/28/2024

Soft type “K” copper service line (diameter in accordance with the City standard details) shall extend a minimum of 10 feet beyond the meter well (between the meter and the private customer) per LS 6901 K. Service Lines.
Corrective Action Required
06/28/2024

Label the existing manholes with the City numbering system. Proposed label of EX. MH 16-107 should be EX. MH 16-108 (verify). EX. MH A3 is EX. MH 16-109. EX. MH A4 is EX. MH 16-110. Label other existing manholes going south with EX. MH 16-111 and EX. MH 16-112 respectively.
Corrective Action Required
06/28/2024

Show the connection of the sanitary stub to the main as a wye. Label the lateral connection to the stub with a coupler or max adapter, not a wye.
Corrective Action Required
06/28/2024

Include the following note on any profile sheet applicable: “Compacted Fill shall be placed to a minimum 18” above the top of the pipe prior to installation.” Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity.
Corrective Action Required
06/28/2024

Please review drops across structures and verify that they all meet the City’s requirements shown in the Design and Construction Manual Section 5604.5.
Corrective Action Required
06/28/2024

Verify that the pavement jointing plan is in accordance to the City Standard Detail Gen-10.
Corrective Action Required
06/28/2024

Please verify and note that only ornamental trees and shrubs may be planted within any easements.
Corrective Action Required
06/28/2024

Submit the MDNR Land Disturbance Permit.
Corrective Action Required
06/28/2024

The submitted estimate will not satisfy the requirements of the Unified Development Ordinance (Section 3.415) for the required documentation to calculate the Engineering Plan Review and Inspection Fee. This must be an itemized list of unit prices and quantities that includes all materials, labor, equipment and incidental work necessary to complete the entire project. Please resubmit an appropriate signed and sealed estimate.
Traffic Review No Comments 06/28/2024 06/27/2024
Erin Ralovo
Fire Review Corrections 06/28/2024 06/26/2024
Jim Eden
Code Statement
Corrective Action Required
06/26/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 Fire Code.
Imposed Loads
Corrective Action Required
06/26/2024

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. All fire accesslanes around the building shall be capable of supporting 75,000-pounds.
Hydrants
Corrective Action Required
06/26/2024

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Provide a hydrant plan to meet this requirement
Fire Lanes - Marking
Corrective Action Required
06/26/2024

IFC 503.3 - 503.3 Marking. Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Fire lanes may be marked in one or a combination of methods as approved by the fire code official. Curbs. All curbs and curb ends shall be painted red with four inch (4") white lettering stating "FIRE LANE—NO PARKING". Wording may not be spaced more than fifteen feet (15') apart. Where no curb exists or a rolled curb is installed, a 6-inch (6") wide painted red stripe applied to the concrete or asphalt with four inch (4") white lettering stating "FIRE LANE—NO PARKING. "Signs. In areas where fire lanes are required, but no continuous curb is available, one of the following methods shall be used to indicate the fire lane. Option 1 : A sign twelve inches (12") wide and eighteen inches (18") in height shall be mounted on a metal post set in concrete a minimum of depth of eighteen inches (18") set back one foot (1') in from the edge of the roadway with the bottom of the sign being seven feet (7') from finished grade. Signs shall face oncoming traffic. Spacing of signs shall not exceed fifty feet (50') between signs. Signs shall be reflective material with a white color background with symbols, letters and border in red color. "FIRE LANE—NO PARKING". Option 2 : A sign twelve inches (12") wide and eighteen inches (18") in height shall be mounted on the side of a structure or other permanent fixture approved by the Fire Code Official. The bottom of the sign being seven feet (7') from finished grade. Spacing of signs shall not exceed fifty feet (50') between signs. Signs shall be reflective material with a white color background with symbols, letters and border in red color. "FIRE LANE—NO PARKING". Show posted fire lanes.
Building Codes Review Corrections 06/28/2024 06/25/2024
Joe Frogge
Miscellaneous Correction
Corrective Action Required
06/25/2024

Amend detail 14/CE7.3 to show correct frost depth which is 36". Also the depth is measured to nearest surface, not just vertically.
Miscellaneous Correction
Corrective Action Required
06/25/2024

Provide water use calculations to justify size of 3" water meter. (fyi - multiple 2" meters is often a more economical choice)
Miscellaneous Correction
Corrective Action Required
06/25/2024

WAT-11 detail is only valid for up to 2" water meter. Provide custom engineered pit design if you end up with 3" or larger meter.
Planning Review Corrections 06/28/2024 06/25/2024
Hector Soto Jr.
Corrective Action Required
06/24/2024

DRIVEWAY/DRIVE AISLE DIMENSIONS. 1) Revise the parking lot drive aisle dimensions labeled on the Site Plan (Sheet CE 6.1) to exclude the curb, meaning only dimension the drive aisles from face-of-curb to face-of-curb. 2) Dimension the parking lot entrance on the south side of the proposed building, as well as the drive aisle entrances to the east-west parking area south of the parking garage. Drive aisles serving two-way traffic shall have a minimum 24' width of drivable pavement (i.e. excluding curb).
Corrective Action Required
06/25/2024

PHOTOMETRIC PLAN. The photometric plan provides no information on the wall-mounted exterior light fixtures to be used on the site. The information provided is only for the pole-mounted parking lot lighting. Include the foot-candle levels for the wall-mounted fixtures on the plan and the wall-mounted fixture information in the Site Lighting Fixture Schedule. Fixtures shall comply with the requirements of UDO Sections 8.220, 8.260 and 8.270.
Corrective Action Required
06/25/2024

MECHANICAL SCREENING. To comply with City ordinance, the roof-mounted equipment shall be fully screened from view by raising the building parapet walls to a height at least equal to the units being screened. Please account for the added height from any curbs on which the RTUs will be placed when designing the parapet wall heights.
Corrective Action Required
06/25/2024

LANDSCAPE PLAN. No landscape plan was submitted with the application plan set. A landscape plan shall be provided for review. Landscaping shall comply with the requirements of UDO Sections 8.720, 8.750, 8.790 and 8.810.
Corrective Action Required
06/25/2024

TRASH ENCLOSURE. Trash enclosure areas shall be improved with a Portland cement concrete pad and a Portland cement concrete approach 30 feet in length, measured from the enclosure opening. The pad and approach shall be improved with a minimum six inches of full depth unreinforced Portland cement concrete constructed on a sub-grade of four inches of granular base course.
Corrective Action Required
06/25/2024

PARKING LOT BOUNDARY. A temporary asphalt curb shall be constructed along the south boundary of the proposed parking lot where it will be expanded in the future for development of the project site to the south. Staff will work with the developer on the timing or need for the actual installation of the temporary asphalt curb depending on the timing of the development of the project site to the south.
Corrective Action Required
06/25/2024

FAA FORM 7460. A Form 7460 shall be completed and submitted to the FAA, and comments received back prior to the issuance of any building permit for the subject site.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $725.00 $725.00 Paid 08/26/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
06/14/2024 Plans Full Plan Set_Rev0_PL2024021
06/14/2024 Engineer Report/Study SWPPP_PL2024021
06/14/2024 Engineers Estimate Engineers Cost Estimate_PL2024021
06/14/2024 Application Form Application_PL2024021
06/14/2024 Engineer Report/Study Storm Water Calcs_PL2024021
06/14/2024 Engineer Report/Study Storm Water Study_PL2021021
07/01/2024 Letter Applicant Letter - FDP (DFDP)
07/26/2024 Engineers Estimate Engineers Cost Estimate_PL2024021
07/26/2024 Engineer Report/Study Stormwater Calcs_PL2024021
07/26/2024 Letter FAA Determination_PL2024021
07/26/2024 Letter MDNR Letter_PL2024021
07/26/2024 Letter Response Letter_PL2024021
07/26/2024 Plans Full Plan Set_Rev1_PL2024021
08/05/2024 Letter Applicant Letter_PL2024021
08/06/2024 Plans Full Plan Set_Rev2_PL2024021
08/06/2024 Letter Response Letter_PL2024021
08/26/2024 Receipt Receipt_PL2024021
09/03/2024 Letter Applicant Letter_PL2024021
09/04/2024 Receipt Response Letter_PL2024021
09/05/2024 Plans Full Plan Set_Rev3_PL2024021
09/11/2024 Engineers Estimate Fee Worksheet_PL2024021
09/11/2024 Letter Applicant Letter - FDP (DFDP)
09/24/2024 Approved Plans Stamped Approved Plans_FDP_PL2024021
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home