Planning Application Status

PL2022217




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2022217
COLTONS CROSSING
Residential Rezoning with Preliminary Development Plan
Residential Rezoning with Preliminary Development Plan
Approved
05/26/2022
HAMBLEN ROAD PROJECT LLC
Locations
Contacts
HAMBLEN ROAD PROJECT LLC, Address:PO BOX 217  
HAMBLEN ROAD PROJECT LLC, Address:PO BOX 217  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 02/06/2023 02/06/2023
Dawn Bell
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
02/21/2023

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
02/21/2023

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
02/21/2023

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
DE C&O #02 Master Drainage Plan
Corrective Action Required
02/21/2023

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #05 As-Graded MDP
Corrective Action Required
02/21/2023

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
02/21/2023

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
02/21/2023

All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to approval of any final plans.
Corrective Action Required
02/21/2023

Downstream improvements to the sanitary sewer shall be required. The applicant shall work with the City in terms of paying for these downstream improvements or constructing these improvements, as directed by Water Utilities.
Fire Review Approved with Conditions 02/06/2023 01/30/2023
Dawn Bell
Code Statement
Informational
01/30/2023

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Water Supply
Corrective Action Required
01/30/2023

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required- There shall be adequate fire flow for the structures being built. Work with Water Utilities to confirm adequate fire flow.
Miscellaneous Correction
Corrective Action Required
01/30/2023

The north/south portion of Colton Drive should have a different suffix from the east/west portion of Coltons Drive, with a name break at Karens Drive.
Traffic Review No Comments 02/06/2023 01/30/2023
Brad Cooley, P.E., RSPI
Planning Review No Comments 02/06/2023 01/30/2023
Dawn Bell
Traffic Review Corrections 01/17/2023 01/17/2023
Brad Cooley, P.E., RSPI
Corrective Action Required
01/17/2023

Please review the study for completion and format as defined in the City's Access Management Code.
Corrective Action Required
01/17/2023

No turn lane assessment was completed. Hook will be a major arterial. Left turn lanes will be required at every intersection. Location and length should be studied and recommended within the study.
Corrective Action Required
01/17/2023

A Unimproved Road Policy section should be included and separate from the future traffic considerations. Additionally, Thompson Drive should be constructed with two 12-foot wide lanes and 6-foot wide paved shoulders, meeting the interim road standard. Discussion in this section should explain why this cross-section is acceptable (e.g. projected volume and when the road will be required to be built to a full urban standard - 80%, 11,000 vpd,etc.).
Corrective Action Required
01/17/2023

The section looking at the City's TFMP does not include any evaluation of Hook Road.
Fire Review Approved with Conditions 01/17/2023 01/11/2023
Dawn Bell
Code Statement
Informational
01/11/2023

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Water Supply
Corrective Action Required
01/11/2023

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required- There shall be adequate fire flow for the structures being built. Work with Water Utilities to confirm adequate fire flow.
Miscellaneous Correction
Corrective Action Required
01/11/2023

The north/south portion of Colton Drive should have a different suffix from the east/west portion of Coltons Drive, with a name break at Karens Drive.
Engineering Review Corrections 01/17/2023 01/11/2023
Dawn Bell
Planning Review No Comments 01/17/2023 01/11/2023
Dawn Bell
Traffic Review Corrections 01/03/2023 01/03/2023
Brad Cooley, P.E., RSPI
Corrective Action Required
01/03/2023

TIS: Please include a section within the report analyzing Access Management Compliance. Including assessment of; access spacing, throat length, and turn lanes. (LOS calcs should be updated with the inclusion of any additional turn lanes.)
Corrective Action Required
01/03/2023

TIS: Please include an assessment of compliance with the City’s Thoroughfare and Greenway Master Plans. Per the TFMP, Doc Henry is planned to extend and connect to Hook at the subject property. The current plan does not accommodate this plan. A acceptable alternative should be discussed within this section. Additionally, a 10’ shared-use path should be planned along Hook to comply with the GWMP (confirm 100’ of R/W is adequate for 4 lanes, appropriate sidewalk/shared-use paths and any medians, if required).
Engineering Review Corrections 01/03/2023 01/03/2023
Gene Williams, P.E.
Corrective Action Required
01/03/2023

Please see comment #1 in the previous applicant letter. A waiver for the peripheral drainage area at P-3 was missing from the submittal package. Instead, the waiver appeared to be a Comprehensive Plan Amendment, not a waiver. Please submit the waiver request.
Corrective Action Required
01/03/2023

Please be aware this is not a final review of the design. Other aspects of the design, such as rear-yard field inlets and underground routing of stormwater will be examined during the final design stage of the project.
Planning Review No Comments 01/03/2023 01/03/2023
Hector Soto Jr.
Fire Review Approved with Conditions 01/03/2023 12/30/2022
Jim Eden
Code Statement
Informational
12/22/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Water Supply
Corrective Action Required
12/22/2022

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required- There shall be adequate fire flow for the structures being built. Work with Water Utilities to confirm adequate fire flow.
Miscellaneous Correction
Corrective Action Required
12/22/2022

The north/south portion of Colton Drive should have a different suffix from the east/west portion of Coltons Drive, with a name break at Karens Drive.
Engineering Review Corrections 11/30/2022 12/01/2022
Gene Williams, P.E.
Corrective Action Required
12/01/2022

A waiver for the peripheral drainage area at P-3 appeared to be missing from the submittal package. Please contact me for the template, and it will be forwarded to you. Ensure the template form is properly completed, along with a signed and sealed summary of the proposed waiver request (i.e., not the complete stormwater report, although the summary may reference the stormwater report), along with an exhibit(s) showing the requested waiver.
Corrective Action Required
12/01/2022

The Phasing Plan shown on Sheet 1 of 5 of the Preliminary Plat should include a list of traffic improvements to be completed along with each phase. It should also include a list of water line improvements to be made during the 1st phase. In terms of downstream sanitary sewer improvements, the phasing plan on this sheet should include these improvements as being required during the 1st phase of the project, with final determination to be made at a later date.
Corrective Action Required
12/01/2022

Dowstream sanitary sewer improvements shall follow the recommendations by Water Utilities. Alternatives were presented to you in the form of an email dated Jul. 11, 2022 from Jeff Thorn, Deputy Director of Water Utilities. The timing for these downstream improvements shall be determined at a later date, but it should be assumed the first phase of the project will trigger the downstream improvements.
Corrective Action Required
12/01/2022

Water line connection points shall follow the guidelines established by the email dated Jul. 11, 2022 from Jeff Thorn, Deputy Director of Water Utilities. This letter included a pdf markup of the Rezoning Map dated May 26, 2022, with an alternative to loop back to an "emergency interconnect" with District 12 water located near the southeast portion of the project. If this "emergency interconnect" cannot be made, or if conditions do not allow for this connection to be made, the water line shall be looped along the Hook Rd. extension to the west with a 12 inch line shall be required. This extension, if required, shall be made along the entire length of the Hook Rd. extension and shall be extended to the major distribution main along the east side of M-291.
Corrective Action Required
12/01/2022

The timing of the water line loop construction discussed in the above comment shall be at project initiation (i.e., the first phase of the project).
Corrective Action Required
12/01/2022

Please be aware this is not a final review of the engineering drawings included with the submittal package.
Traffic Review Corrections 11/30/2022 11/30/2022
Brad Cooley, P.E., RSPI
Corrective Action Required
11/30/2022

The Traffic Study/Memo submitted is incomplete. A study should be prepared in accordance with the City’s Access Management Code for the proposed development. Some additional analysis should be included (trip distribution, intersection analysis/LOS, section on compliance with the City’s Unimproved Road Policy, recently installed signals north, etc.). While improvements are included in the conclusion/recommendation section, justification for these should be included with the report.
Planning Review Corrections 11/30/2022 11/30/2022
Hector Soto Jr.
Corrective Action Required
11/30/2022

PROJECT SUMMARY TABLE (Sheets 1 and 5). - Under the "Minimum Lot Size and Width" line item on Sheet 1, list the minimum lot size for the duplex lots as 8,000 sq. ft. The RP-3 zoning district requires a minimum 4,000 sq. ft. lot size per dwelling unit, so a duplex (composed of two dwellings in said structure) requires a minimum 8,000 sq. ft. lot size. It appears that the lot size for each duplex lot well exceeds 8,000 sq. ft., but please confirm that this is the case. - On the "Minimum Lot Size" line item on Sheet 5, similarly break out the minimum lot size standard of 4,000 sq. ft. for single-family and the 8,000 sq. ft. minimum lot size for the duplex lots.
Corrective Action Required
11/30/2022

LOT SIZE SUMMARY TABLE (Sheet 1). For the "Minimum Lot Size" line item, break out and identify the minimum proposed lot size for the single-family lots and the minimum proposed lot size for the duplex lots.
Corrective Action Required
11/30/2022

BUILDING AREA/LIVABLE AREA (Sheets 1 and 5). Please clarify the difference between the "Minimum Livable Floor Area" line item on Sheet 1 (under Project Summary) that lists 1,100 sq. ft. and the "Proposed Buildings" information provided on Sheet 5 listing 2,010 sq. ft. for single-family and 2,925 sq. ft. for duplexes. Is the former figure on Sheet 1 only referring to finished sq. ft., whereas the figures on Sheet 5 refer to gross square footage (both finished and unfinished)?
Corrective Action Required
11/30/2022

SWIMMING POOL/CLUBHOUSE AREA. - Please note that in addition to the minimum street tree, street shrub, parking lot landscape screening and open yard tree and shrub requirements, UDO Section 6.510 requires a medium-impact landscape buffer along any property line shared with a residence. So a medium-impact landscape buffer shall be required along Lots 99-102, 122, 123 and 164. -
Corrective Action Required
11/30/2022

BUILDING ELEVATIONS. - Label the exterior materials and proposed colors for the pool clubhouse. - Label the exterior materials and proposed colors for the single-family residences. - Label the proposed exterior colors for the duplexes.
Corrective Action Required
11/30/2022

GENERAL NOTES. - Add a note to the plans stating that pavement design for the clubhouse/pool parking lot shall meet the standards of UDO Section 8.620. - Add a note to the plans stating that clubhouse and swimming pool area shall meet the lighting requirements UDO Article 8, and that the pool area shall meet the lighting requirements of UDO Section 6.510.
Corrective Action Required
11/30/2022

STREET NAME CHANGE. If the proposed development is approved, a street name change application shall be required to change the street name suffix from Road to Court for the future cul-de-sac. This comment is for informational purposes and requires no action at this time.
Corrective Action Required
11/30/2022

STREET NAMES. - For addressing purposes, the suffix for the north-south segment of the proposed Bennet Lane shall be changed to differentiate it from the east-west segment of Bennet Lane. - For addressing purposes, the proposed Coltons Drive has a natural break between the north-south and east-west segments at the intersection with Karens Drive. Coltons Drive shall only be use for one of the segments. A different name shall be provided for the remaining segment.
Fire Review Corrections 11/30/2022 11/30/2022
Jim Eden
Code Statement
Informational
11/16/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Water Supply
Resolved
12/30/2022

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required- There shall be adequate fire flow for the structures being built. Work with Water Utilities to confirm adequate fire flow.
Miscellaneous Correction
Resolved
12/30/2022

The north/south portion of Colton Drive should have a different suffix from the east/west portion of Coltons Drive, with a name break at Karens Drive.
Engineering Review Corrections 06/17/2022 06/17/2022
Gene Williams, P.E.
Corrective Action Required
06/09/2022

The report entitled "Preliminary Stormwater Management Study" dated May 27, 2022 (hereinafter referred to as "the stormwater report") contains issues discussed below.
Corrective Action Required
06/09/2022

The stormwater report states on page 3 the site lies within Zone X with minimal flood hazard. We do not agree, as there is a FEMA floodplain shown to the north and the southwest of the site.
Corrective Action Required
06/09/2022

Floodplain delineation shall be shown on the Preliminary Development Plan on at least one (1) of the sheets, and shall be discussed within the stormwater report. This was missing on the Preliminary Development Plan and the report. Please evaluate and update.
Corrective Action Required
06/09/2022

Stream buffer was missing along the FEMA floodplains to the north and south. Please see Design and Construction Manual for the distance from the ordinary high water mark to be set aside as a stream buffer, and show on the plan view. The stream buffer is based on drainage area. It appears at least two (2) stream buffers will affect the north part of the development, and one (1) stream buffer may affect a portion of the south side of the development. Please evaluate and show on the plan.
Corrective Action Required
06/09/2022

The stormwater report proposes a curve number of 82 for the post-developed condition. It would appear 83 might be a better value for the conditions shown, based on quarter acre lot sizes. It should be noted some lots are less than a quarter acre, so the tendency to use a higher number might be justified. Please evaluate and revise as necessary.
Corrective Action Required
06/09/2022

A concept plan shall be provided showing the off-site water main plan to the west and the north.
Corrective Action Required
06/09/2022

A concept plan shall be provided with a topographic survey for the Hook Rd. extension to the west.
Corrective Action Required
06/09/2022

A downstream sanitary analysis is being performed by Water Utilities. Please be aware downstream improvements may be required based on the results of the analysis.
Corrective Action Required
06/09/2022

The stormwater study states on Page 3 flood insurance is not required. This is not entirely correct. The lending institution is responsible for this determination, not the engineer. Please revise.
Corrective Action Required
06/09/2022

Table IV.3 in the stormwater report presents the results of the calculated allowable versus the proposed peak flows for POI P-1 and P-2. Both points of interest (POIs) exceed the allowable for at least one of the storm events. The City will not support a waiver to the allowables for the POI P-1 or P-2. Please evaluate and provide a re-design.
Corrective Action Required
06/09/2022

The stormwater report proposes several waivers to the allowable release rate for POI P-4, P-5, and P-6. It does not appear a waiver is required for these areas because the improvements are linear in nature (i.e., roads), and no other development is occurring. Please revise the stormwater report to remove these waiver requests, or simply discuss at your discretion.
Corrective Action Required
06/09/2022

The City would consider a waiver at POI P-3. This appears to be a "peripheral drainage area" issue related to pre-versus-post developed grading. Recommend obtaining the waiver prior to Planning Commission.
Corrective Action Required
06/09/2022

A Final Stormwater Report shall be required when final engineering plans have been submitted. An additional review of the report shall be conducted at that time.
Corrective Action Required
06/09/2022

A separate grading plan is required for the on-site grading, and a concept grading plan for the off-site grading in relation to the traffic improvements to Hook Rd. to the west.
Corrective Action Required
06/17/2022

A separate utility plan is required for all on-site utilities. This is in addition to the concept plan for off-site utilities discussed elsewhere within this applicant letter.
Corrective Action Required
06/17/2022

Sanitary sewer manholes shall be placed under pavement, in either driving aisle and centered within said driving aisle outside of the wheel track. Please revise.
Corrective Action Required
06/17/2022

An evaluation of sanitary sewer depths shall be performed to ensure there are adequate easements widths for the sanitary sewer (i.e., twice the flowline depth of the sanitary sewer), and to ensure the maximum depth of 20 feet is not exceeded.
Corrective Action Required
06/17/2022

Application was incomplete due to the lack of the preliminary plans discussed elsewhere within this applicant letter. Further review shall be required on rebsubmittal on a ten (10) day basis rather than the normal five (5) day basis.
Corrective Action Required
06/17/2022

Water mains are shown crossing the street where it is unneccessary to cross the street. This shall be discussed at the applicant meeting.
Corrective Action Required
06/17/2022

Hydraulic modeling was completed of the sanitary sewer infrastructure downstream for the two proposed connection points for the Colton’s Crossing development based upon the Preliminary Plat. Modeling results indicate that downstream improvements will be required to offset the impacts of the proposed development. This shall be discussed further at the applicant meeting.
Fire Review Corrections 06/17/2022 06/14/2022
Jim Eden
Code Statement
Informational
06/13/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Miscellaneous Correction
Corrective Action Required
06/13/2022

Jacob Drive is already used in another part of the city. Action required- Select a different name.
Water Supply
Corrective Action Required
06/14/2022

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required- There shall be adequate fire flow for the structures being built. Work with Water Utilities to confirm adequate fire flow.
Misc.
Resolved
11/22/2022

Is there a phasing plan?
Planning Review Corrections 06/17/2022 06/10/2022
Victoria Nelson
Corrective Action Required
06/08/2022

Access Restriction. Add a note to all lots with frontage along SW Hook Rd stating that they shall not be allowed driveway access onto said street.
Corrective Action Required
06/08/2022

Geotechnical Report. Add a note to Lots 127 and 128 indicating that a geotechnical report shall be required at the time of building permit submittal due to the presence of the pond that is being filled in.
Corrective Action Required
06/08/2022

Street Name. “Coltons Crossing Drive” is not an acceptable street name. It exceeds the number of allowable characters, which is limited to 12 (including spaces). Additionally, “Crossing” is on the list of street name suffixes (e.g. Street, Lane, etc.) for the City and as such is not allowed to be a part of the actual street name.
Corrective Action Required
06/08/2022

Adjacent Development. Label the uses, not just the zoning, of the surrounding properties.
Corrective Action Required
06/08/2022

Rezoning Map. Please show the current Ag zoning for the area you are developing. Also add the overall square footage of the property being rezoned.
Corrective Action Required
06/08/2022

Legal Description. Please upload a legal description in a Microsoft word format.
Corrective Action Required
06/08/2022

Single family elevations. As a proposed planned zoning district, elevations for all proposed buildings (including single-family homes) are required to be submitted. Please upload single family elevations.
Corrective Action Required
06/08/2022

Oil and gas wells. Please state whether or not there are active, inactive, or capped wells within the are on the plat. Refer to DNR Well Database and reference the site.
Corrective Action Required
06/08/2022

Existing vegetation. Please show the cloud line for the existing vegetation in the legend.
Corrective Action Required
06/08/2022

Monument signs. Will there be any monument signs?
Corrective Action Required
06/08/2022

Sidewalks. Please show sidewalks on both sides in the duplex areas. Refer to UDO SEC 7.280. Sidewalks shall also be shown along both sides of SW Hook Rd.
Corrective Action Required
06/08/2022

Corrective Action Required
06/08/2022

A Comp Plan Amendment application is needed. Please submit a Comp Plan Amendment, the Ignite plan shows Residential 1 for this area. The proposed use falls under a Residential 2 designation.)
Corrective Action Required
06/08/2022

Building setbacks. Regarding the building setbacks listed on Sheet 1, are you wanting to go with the larger side and rear yard setbacks on the duplex lots? The duplex standard is 5’ and 20’ for the sides and rear, respectively. You are citing the “multi-family” standard, which is only required for 3-plex and above.
Corrective Action Required
06/08/2022

•Project Summary Table. oRevise the listed building types to read Single-family House and Duplex. The UDO only considers tri-plex and above as “multi-family”, which are subject to different and more restrictive standards. oProvide a breakdown of the total number of lots by single-family and duplex lots. oList the total number of dwelling units for the development.
Corrective Action Required
06/09/2022

Club house and pool area. Please show elevations for the club house and pool area. Also need to show the required landscape screening refer to UDO Division III Landscaping, Buffer, and tree protection requirments. Need to show ADA parking and the dimensions for the parking signs. Need to show the required and provided parking spaces. Are you planning on having any lighting around the pool, if so please refere to sec 6.510 in the UDO. Are you planning on having any lighting around the parking lot or on the building, if so please refer to sec 8.250 in the UDO.
Corrective Action Required
06/10/2022

Elevation cover sheets. Please change the cover sheet to say Lee's Summit and please change the vicinity map. Please delete the wording stating that this a second phase.
Traffic Review Corrections 06/17/2022 06/08/2022
Brad Cooley, P.E., RSPI
Corrective Action Required
06/08/2022

Incomplete submittal. Please include a Traffic Impact Study, per the Access Management Code.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Residential Rezoning and Preliminary Development Plan fee $3,625.00 $3,625.00 Paid 05/26/2022
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 05/26/2022
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 05/26/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 02/23/2023 5:00 PM Council Chambers 02/23/2023 05:00 PM
Public Hearing Review
Approved
02/23/2023
City Council Public Hearing 04/18/2023 6:00 PM Council Chambers 04/18/2023 06:00 PM
Public Hearing Review
Pending
03/21/2023
City Council Ordinance 2nd Reading 05/02/2023 6:00 PM Council Chambers 05/02/2023 06:00 PM
Public Hearing Review
Pending
Documents & Images
Date Uploaded File Type Document Name
05/26/2022 Receipt Receipt for transaction:2022-003992
05/26/2022 Rezoning and Preliminary Development Plan Application (1)
05/26/2022 Drawing THE PDP DRAWING JUN2022
05/26/2022 Duplex Plan A
05/26/2022 Duplex Plan B
05/26/2022 Duplex Plan C
05/26/2022 Plans Rezoning With PDP Rev July 2021
05/27/2022 Engineer Report/Study Preliminary Stormwater Management Study-20220527
06/02/2022 Engineer Report/Study Colton Crossing_Traffic_Memo
06/09/2022 Colton Crossing_Traffic_Report
06/09/2022 Colton's Crossing Preliminary Stormwater Management Study-20220527
06/17/2022 Letter Applicant Letter - Dev. Apps (DRCP)
07/28/2022 EMAIL 3 JEFF THORN COLTONS CROSSING JUL2022
07/28/2022 EMAIL JEFF THORN COLTONS CROSSING JUL2022
07/28/2022 EMAIL2 JEFF THORN COLTONS CROSSING JUL2022
11/14/2022 Clubhouse Building Elevation
11/14/2022 Comment Response Letter
11/14/2022 Duplex Building Elevation
11/14/2022 Hook Road Profile
11/14/2022 Legal Description Word Document
11/14/2022 Preliminary Plat
11/14/2022 Preliminary Sanitary Sewer Plans
11/14/2022 Preliminary Stormwater Management Study
11/14/2022 Single Family Building Elevation
11/14/2022 Stream Buffer Evaluation
11/14/2022 Street and Storm Sewer
11/14/2022 2012-11-14 Colton's Crossing - Traffic Report
11/14/2022 Plans 2012-11-14 Colton's Crossing - Water Line Plans
11/14/2022 Plans Comp Plan Amendment App-Signed
12/01/2022 Letter Applicant Letter - Dev. Apps (DRCP)
12/06/2022 Letter Applicant Letter - Dev. Apps (DRCP)
12/22/2022 Plans Hook Road Profile
12/22/2022 Letter Legal Description Word Document
12/22/2022 Plans Preliminary Sanitary Sewer Plans
12/22/2022 Engineer Report/Study Preliminary Stormwater Management Study
12/22/2022 Engineer Report/Study Stream Buffer Evaluation
12/22/2022 Plans Street and Storm Sewer
12/22/2022 Plans Water Line Plans
12/22/2022 Letter Comment Response Letter
12/22/2022 Plans Preliminary Plat
12/22/2022 Waiver/Modification Document 2012-12-22 Colton's Crossing - Stormwater Waiver
12/22/2022 Plans COLOR ELEVATION PRESENTATION - 2022-12-22
12/22/2022 Engineer Report/Study Traffic_Study - Revised
12/22/2022 Plans Duplex Elevations-Revised
01/05/2023 Letter Applicant Letter - Dev. Apps (DRCP)
01/10/2023 Applicant Letter - Dev_ Apps (DRCP)-Responses
01/10/2023 Colton Crossing_Traffic_Study - Revised_2023_01_10_Complete
01/10/2023 2023-01-10 Colton's Crossing - Stormwater Waiver
01/18/2023 Letter Applicant Letter - Dev. Apps (DRCP)
01/30/2023 Colton Crossing_Traffic_Study - Revised_2023_01_30_Complete
02/02/2023 Public Notice Document LEGAL PL2022-217 REZ PDP
02/06/2023 Colton's Crossing property owner list
02/14/2023 Public Notice Document PL2022-217
02/16/2023 Drawing Location Map
02/17/2023 Engineer Report/Study PL2022217 Colton's Crossing TIA
02/17/2023 Engineer Report/Study Preliminary Stormwater Management Study_abridged
02/17/2023 Engineer Report/Study Colton Crossing_Traffic_Study - Revised_2023_01_30_abridged
02/19/2023 Neighborhood Meeting - Hamblen Road
02/17/2023 Letter Staff Report
02/23/2023 Engineer Report/Study PL2022217 Colton's Crossing TIA_revised
03/27/2023 Colton's Crossing property owner list
03/30/2023 Public Notice Document LEGAL PL2022-217 REZ PDP
04/03/2023 Letter Affidavit of Notice to Property Owners Within 300 Feet
04/03/2023 Drawing Colton's Crossing- Preliminary Plat
04/03/2023 Letter Notice to Property Owners Planning Commission & City Council
10/23/2023 Ordinance 9661
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home