Planning Application Status

PL2022174




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2022174
Lee's Summit Logistics - Lot 2
Commercial Final Development Plan
Commercial Final Development Plan
Approved
05/03/2022
SCANNELL PROPERTIES, LLC
Locations
Contacts
SCANNELL PROPERTIES, LLC, Address:8801 RIVER CROSSING BLVD, SUITE 300, Phone:(317) 218-1648  
SCANNELL PROPERTIES, LLC, Address:8801 RIVER CROSSING BLVD, SUITE 300, Phone:(317) 218-1648  
OLSSON ASSOCIATES, Address:7301 W 133RD ST #200, Phone:(913) 634-0903  
Reviews
Review Type Outcome Est. Completion Date Completed
Record Drawings Review Corrections 08/30/2024 08/30/2024
Sue Pyles, P.E.
Redesign Review No Comments 12/29/2022 12/27/2022
Sue Pyles, P.E.
Engineering Review Approved with Conditions 11/04/2022 11/04/2022
Sue Pyles, P.E.
DE Commercial Detention Basin
Corrective Action Required
11/04/2022

The applicant shall submit and the City shall accept an “As-built / As-graded” detention basin plan prior to issuance of any occupancy permit for the proposed development.
DE Contact Field Eng. Inspector
Corrective Action Required
11/04/2022

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
11/04/2022

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $46,941.85
DE Future Repair Work
Corrective Action Required
11/04/2022

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Fire Review Approved with Conditions 11/04/2022 11/01/2022
Jim Eden
Code Statement
Corrective Action Required
11/04/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Resolved
11/01/2022

22IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required-the FDC canot be supplied by a yard hydrant (red)The FDC shall be within 100 feet of a public or private hydrant. 08/15/2022- Not corrected. 09/13/2022 Not corrected 10/17/2022 Partial correction. Keep the W8 private hydrant and replace the W7 yard hydrant that was removed.
Fire Lanes - Marking
Corrective Action Required
11/04/2022

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Building Codes Review Approved with Conditions 11/04/2022 10/28/2022
Mike Weisenborn
Miscellaneous Correction
Corrective Action Required
10/28/2022

Inadequate information to complete review. Provide/address the following: - Update water utility plans. Keynotes are typed out on C6.01 but the designations are not on the actual drawings. - Specify water meter size - Specify water meter tap size. - Specify water piping material 7/7/22 - deferred to MEP building permit submittal
Traffic Review No Comments 11/04/2022 10/28/2022
Mike Weisenborn
Planning Review No Comments 11/04/2022 10/28/2022
Mike Weisenborn
Engineering Review Corrections 10/17/2022 10/19/2022
Sue Pyles, P.E.
Corrective Action Required
10/19/2022

Stream Buffer encroachment to be discussed. Once that is resolved, either plans will need revised or a waiver will need approved.
Fire Review Approved with Conditions 10/17/2022 10/18/2022
Jim Eden
Code Statement
Corrective Action Required
10/19/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Corrective Action Required
10/10/2022

22IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required-the FDC canot be supplied by a yard hydrant (red)The FDC shall be within 100 feet of a public or private hydrant. 08/15/2022- Not corrected. 09/13/2022 Not corrected 10/17/2022 Partial correction. Keep the W8 private hydrant and replace the W7 yard hydrant that was removed.
Fire Lanes - Marking
Corrective Action Required
10/19/2022

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Planning Review No Comments 10/17/2022 10/10/2022
Mike Weisenborn
Building Codes Review Approved with Conditions 10/17/2022 10/10/2022
Mike Weisenborn
Miscellaneous Correction
Corrective Action Required
10/10/2022

Inadequate information to complete review. Provide/address the following: - Update water utility plans. Keynotes are typed out on C6.01 but the designations are not on the actual drawings. - Specify water meter size - Specify water meter tap size. - Specify water piping material 7/7/22 - deferred to MEP building permit submittal
Traffic Review No Comments 10/17/2022 10/10/2022
Mike Weisenborn
Planning Review No Comments 09/23/2022 09/23/2022
Shannon McGuire
Engineering Review Corrections 09/23/2022 09/23/2022
Sue Pyles, P.E.
Corrective Action Required
09/23/2022

Please label the basins throughout the plan set.
Corrective Action Required
09/23/2022

Sheet C2.0 shows several line types at each detention basin. This is done throughout the plan set on the “general” type of sheets. Please label these lines for clarity. Not necessarily on each sheet, but on Sheet C2.0 at a minimum.
Corrective Action Required
09/23/2022

The BMP Easement arrows on Sheet C4.00 aren’t pointing at any line.
Corrective Action Required
09/23/2022

Sheet C5.1 shows the BMP Easement labeled, but is it along that contour all around the basin? If so, wouldn’t it need to be large enough to contain the entire dam? We need to discuss.
Corrective Action Required
09/23/2022

Please revise the Section Through Outlet Structure on Sheet C7.04 to show 1 column of holes in the perorated riser. I know that isn’t where the actual layout is shown, but there always seems to be questions come up so this will help the clarity.
Corrective Action Required
09/23/2022

Short-circuiting of a detention basin occurs when there is minimal separation between the inlet(s) and the outlet. The distances between B1 and the riser in Basin A-1 and between C1 and S2 in Basin B-1 do not provide enough separation to prevent short-circuiting. Basin B-1 is especially close together. Please revise. Basin B-1 would benefit from the inflow connecting to C3 rather than C-2, for instance.
Corrective Action Required
09/23/2022

Please revise Northern Basin and Southern Basin to Basin A-1 and Basin B-1 throughout the plan set.
Corrective Action Required
09/23/2022

The storm study requests a stream buffer waiver for 2 locations, but it doesn’t look like the waiver is needed. Please compare the platted stream buffer with the layout, and update either the plans or study accordingly.
Corrective Action Required
09/23/2022

I have general questions about where some calculations are located in the stormwater study. I’m not very familiar with HEC-HMS, so I’d like to set up a zoom meeting to discuss.
Fire Review Corrections 09/20/2022 09/19/2022
Jim Eden
Code Statement
Informational
09/13/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Corrective Action Required
09/13/2022

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required-the FDC canot be supplied by a yard hydrant (red)The FDC shall be within 100 feet of a public or private hydrant. 08/15/2022- Not corrected. 09/13/2022 Not corrected
Hydrants
Resolved
09/19/2022

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required- Provide hydrants around the building in accordance with TABLE C102.1 REQUIRED NUMBER AND SPACING OF FIRE HYDRANTS. The structure requires a fire flow of 3,625 gallons per minute (includes 50% reduction for fa fire sprinkler system. 7/13/2022- Not provided on resubmittal.
Fire Lanes - Marking
Informational
09/13/2022

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Building Codes Review Approved with Conditions 09/20/2022 09/13/2022
Mike Weisenborn
Miscellaneous Correction
Corrective Action Required
09/13/2022

Inadequate information to complete review. Provide/address the following: - Update water utility plans. Keynotes are typed out on C6.01 but the designations are not on the actual drawings. - Specify water meter size - Specify water meter tap size. - Specify water piping material 7/7/22 - deferred to MEP building permit submittal
Traffic Review No Comments 09/20/2022 09/13/2022
Mike Weisenborn
Engineering Review Corrections 08/24/2022 08/24/2022
Sue Pyles, P.E.
Corrective Action Required
08/24/2022

Please delineate the 100-year WSE boundary and include the elevation at each detention basin.
Corrective Action Required
08/24/2022

Please label the BMP Easement boundary at each detention basin.
Corrective Action Required
08/24/2022

Please delete the inadvertent line near the bottom of the south detention basin.
Corrective Action Required
08/24/2022

Please revise both detention basin layouts to provide for a longer path between inlet and outlet to avoid short-circuiting.
Corrective Action Required
08/24/2022

Please revise grading near the south detention basin to eliminate any grading within the stream buffer.
Corrective Action Required
08/24/2022

Please include the required and proposed detention and water quality volumes on the detention basin outflow sheets.
Corrective Action Required
08/24/2022

Please utilize the same numbering/naming convention between the plans and the Storm Drainage Study for the detention basins to avoid confusion.
Corrective Action Required
08/24/2022

Storm Drainage Study: • The City does not require any Level of Service requirements, so those sections may be deleted if you choose. If not, please clarify that the level of service requirement is not the City’s. • The minimum orifice size is 1 inch. Please revise the Water Quality calculations accordingly. • The study indicates there are 20 rows in the perforated riser, but the plans show 17 rows. Please reconcile. • The study indicates that meeting 2 of the 3 release rates is not possible. This will be considered further after the required supporting information has been submitted for review. • The study includes a “waiver” request for encroachment into the stream buffer in two locations. The plans do not seem to show any encroachment at the loading dock. The encroachment at the detention basin will not be supported by staff because sufficient justification has not been provided showing why no other options for the basin to remain outside the buffer exist. • Please include all required supporting calculations, including calculations to verify that the emergency overflow spillway has been sized appropriately.
Corrective Action Required
08/24/2022

Please submit an Engineer's Estimate of Probable Construction Costs.
Traffic Review No Comments 08/17/2022 08/17/2022
Brad Cooley, P.E., RSPI
Fire Review Corrections 08/17/2022 08/15/2022
Jim Eden
Code Statement
Informational
08/15/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Corrective Action Required
08/10/2022

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required-The FDC shall be within 100 feet of a public or private hydrant. 08/15/2022- Not corrected.
Hydrants
Corrective Action Required
08/10/2022

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required- Provide hydrants around the building in accordance with TABLE C102.1 REQUIRED NUMBER AND SPACING OF FIRE HYDRANTS. The structure requires a fire flow of 3,625 gallons per minute (includes 50% reduction for fa fire sprinkler system. 7/13/2022- Not provided on resubmittal.
Fire Lanes - Marking
Informational
08/15/2022

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Planning Review No Comments 08/17/2022 08/14/2022
Shannon McGuire
Building Codes Review Approved with Conditions 08/17/2022 08/12/2022
Joe Frogge
Miscellaneous Correction
Corrective Action Required
08/10/2022

Inadequate information to complete review. Provide/address the following: - Update water utility plans. Keynotes are typed out on C6.01 but the designations are not on the actual drawings. - Specify water meter size - Specify water meter tap size. - Specify water piping material 7/7/22 - deferred to MEP building permit submittal
Fire Review Corrections 07/14/2022 07/13/2022
Jim Eden
Code Statement
Corrective Action Required
07/07/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Corrective Action Required
07/07/2022

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required-The FDC shall be within 100 feet of a public or private hydrant.
Hydrants
Corrective Action Required
07/07/2022

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required- Provide hydrants around the building in accordance with TABLE C102.1 REQUIRED NUMBER AND SPACING OF FIRE HYDRANTS. The structure requires a fire flow of 3,625 gallons per minute (includes 50% reduction for fa fire sprinkler system. 7/13/2022- Not provided on resubmittal. Show the public hydrants along NW Main Street.
Fire Lanes - Marking
Corrective Action Required
07/07/2022

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Engineering Review Corrections 07/14/2022 07/13/2022
Sue Pyles, P.E.
Corrective Action Required
07/13/2022

Mass Grading and ESC Plans: Since the detention basins will also act as sediment basins, their information must be included with the Sediment Basin #1 information provided.
Corrective Action Required
07/13/2022

Sheet C3.00: • Why are there two medium duty and two heavy duty asphalt pavement sections? If all four are to be used, please rename for clarity and differentiate between locations of use. • The City requires a 6” granular base course between the asphalt base course and the chemically stabilized subgrade. Any deviation from this requires approval from the City Engineer. Two of the four asphalt pavement sections don’t meet this requirement.
Corrective Action Required
07/13/2022

Sheets C5.01-C5.04: Label the retaining walls A-C to match the detail sheets.
Corrective Action Required
07/13/2022

Sheet C5.01: Show and label the detention basin emergency spillway and 100-year WSE on this and all applicable sheets.
Corrective Action Required
07/13/2022

Sheet C5.02: Revise the sheet reference for the retaining wall south of the entrance.
Corrective Action Required
07/13/2022

Sheet C5.04: • Please review the contours, especially 943, in the bottom of the detention basin and revise as needed. • Show and label the detention basin emergency spillway and 100-year WSE on this and all applicable sheets.
Corrective Action Required
07/13/2022

Sheets C5.05-C5.06: • Label dimensions in addition to slopes for all ADA ramp designs. • Design and Construction Manual Section 5304, Table LS-5, specifies the maximum allowable design cross-slope to be 1.5%. Please revise the ADA ramps at the entrance as they exceed this maximum slope in areas.
Corrective Action Required
07/13/2022

Sheet C6.4: Please indicate how the backflow vault will be drained.
Corrective Action Required
07/13/2022

Sheet C6.05: Missing from plan set.
Corrective Action Required
07/13/2022

Sheet C7.01: Relocate the pipe information and the Existing Grade leader in the Storm Line A4 Profile view for clarity.
Corrective Action Required
07/13/2022

Sheet C7.02: Storm Line B Plan and Profile views don’t match.
Corrective Action Required
07/13/2022

Sheet C7.03: Please include the Structure Table.
Corrective Action Required
07/13/2022

Additional stormwater comments may be forthcoming after the revised stormwater report is submitted. The estimate will be reviewed after the stormwater review is complete.
Planning Review No Comments 07/14/2022 07/13/2022
Shannon McGuire
Building Codes Review Approved with Conditions 07/14/2022 07/07/2022
Joe Frogge
Miscellaneous Correction
Corrective Action Required
07/07/2022

Inadequate information to complete review. Provide/address the following: - Update water utility plans. Keynotes are typed out on C6.01 but the designations are not on the actual drawings. - Specify water meter size - Specify water meter tap size. - Specify water piping material 7/7/22 - deferred to MEP building permit submittal
Traffic Review No Comments 07/14/2022 07/07/2022
Mike Weisenborn
Engineering Review Corrections 06/10/2022 06/14/2022
Sue Pyles, P.E.
Corrective Action Required
06/14/2022

Please note: • Comments 2-11 refer to the “Land Disturbance” plan set. • Comments 12-28 refer to the “FDP” plan set. • All comments relating to stormwater associated with the FDP plan set will be sent by the end of the week under separate cover.
Corrective Action Required
06/14/2022

Submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
06/14/2022

Sheet LD0.0: • Please rename these plans as Mass Grading and Erosion & Sediment Control Plans. • Please revise the contact information: o The main phone number for City Hall is 816-969-1000. o The Development Services phone number is 816-969-1200. o The Utilities Service Center is the “Water” Utilities Service Center.
Corrective Action Required
06/14/2022

Sheet LD1.0: • Include riprap information (dimensions, D(50), etc.) at A7. • The south A3 graphic is covered by a contour elevation label. • Please revise the A6 & A7 sheet references in the Erosion Control Staging Chart. • Show and label the sediment basin emergency spillway. • Please clarify what description goes with the diversion berm in the Legend and what goes with the item below it on this sheet and throughout the plan set. • It appears that A11, Diversion Berm, will be removed after B1 is installed, rather than after Stage C. Please revise.
Corrective Action Required
06/14/2022

Sheet LD1.1: B2 is shown in the staging chart but not on the plans. Please revise where needed.
Corrective Action Required
06/14/2022

Sheet LD1.2: • C1 & C2 are shown in the staging chart but not on the plans. Please revise where needed. • What do “Condition A” and “Condition B” refer to in the staging chart BMP Descriptions for C2, C3, C5, and C6? Please clarify or revise. • The staging chart Note for C9 doesn’t make sense. Please revise. • Include riprap information (dimensions, D(50), etc.) at the C8 locations. • The staging chart shows the sediment basin being removed, but if the detention basins are to serve as sediment basins they must be shown as such. Please clarify on this sheet and throughout the plan set how the detention basins construction, use as sediment basins, and conversion to detention basins will be timed. The plans are contradictory and unclear.
Corrective Action Required
06/14/2022

Sheet LD1.03: Revised D1 for clarity based on previous comments, if needed.
Corrective Action Required
06/14/2022

Sheet LD1.4: • The basin is labeled as A-1 and #1 on this sheet. Please use a single reference. • Please clarify if the riprap will be constructed as a part of these plans or the Final Development Plans with the overall storm sewer.
Corrective Action Required
06/14/2022

Sheet LD1.5: • Please relocate the sediment basin label for clarity. • Please clarify if the riprap will be constructed as a part of these plans or the Final Development Plans with the overall storm sewer.
Corrective Action Required
06/14/2022

Sheet LD2.2: • Please include the required calculations for all sediment basins as required by the standard detail. • Please revise Erosion Control Note 12 to reference the correct city.
Corrective Action Required
06/14/2022

Sheet LD2.4: • What part of the plan does the Channel Report reference? Please clarify. • Please revise Erosion Control Notes 1, 2, and 9 as they reference the wrong jurisdictions. • Please revise Erosion Control Note 10 to reference a sediment basin, not sediment trap.
Corrective Action Required
06/14/2022

Submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
06/14/2022

Sheet C1.01: Please revise Erosion Control Note 2 to reference the correct city.
Corrective Action Required
06/14/2022

Sheet C2.00: Please update the pavement references in the Legend to include sheet numbers.
Corrective Action Required
06/14/2022

Sheet C3.00: The City’s asphalt pavement designs require 6” granular base course between the asphalt base and the chemically treated subgrade. Please revise.
Corrective Action Required
06/14/2022

Sheets C4.00-C4.04: Please update the pavement references in the Legend to include sheet numbers.
Corrective Action Required
06/14/2022

Sheets C4.01-C4.04: Are all keynotes intended to be used?
Corrective Action Required
06/14/2022

Sheets C5.01-C5.04: • Please label the contours. • Label all retaining walls.
Corrective Action Required
06/14/2022

Sheets C5.05-C5.06: • Label slopes and dimensions for all ADA-accessible ramps. Verify that City requirements are being met. • Notes refer to both ADA ramps and retaining walls. This is confusing since wall information is not shown on the Plan views. Please revise for clarity.
Corrective Action Required
06/14/2022

Sheets C5.07-C5.0: • What are the percentage labels (31.61%, 22.69%, etc.) on Sheet C5.07? Please clarify. • Label retaining walls in the same manner throughout the plan set. • Why do some retaining wall tables have lines all over them?
Corrective Action Required
06/14/2022

Sheets C6.01-C6.04: • Keynotes are missing from Plan views. • Label domestic water line material and size • Label water meter size. • Please include all roof drain information with the stormwater section. Profiles are required for all pipe greater than 6” diameter.
Corrective Action Required
06/14/2022

Sheet C6.05: Please include that the connection to the existing sanitary sewer MH shall be by core-drilling.
Corrective Action Required
06/14/2022

Sheet 6.06: Please revise Sanitary sewer general Notes 12 & 13 as the sanitary sewer plans are not a separate set of plans as these notes appear to imply.
Corrective Action Required
06/14/2022

Sheet C6.07: • Please revise Sanitary sewer Note 3 to reference the correct city. • Please revise the line type used in Profile view for the proposed pipe.
Corrective Action Required
06/14/2022

Sheet C6.08: Please clarify the bend shown just upstream of Sanitary Sewer Keynote S-1f in Plan view.
Corrective Action Required
06/14/2022

Sheet C8.02: Where is the Junction Box to Curb Inlet Conversion Detail used?
Corrective Action Required
06/14/2022

Sheets C8.02-C8.03: What does the red revision triangle represent?
Corrective Action Required
06/14/2022

Sheets L1.01-L1.04: • Only ornamental tree varieties are allowed within public easements or right-of-way. Please revise as needed. • The Plant Schedule appears to be cut off on Sheet L1.01. • The hatch pattern adjacent to the switch grass at the detention basins does not appear in the Plant Schedule. Please include.
Corrective Action Required
06/20/2022

Sheets C7.01-C7.06: • Show the design HGL in Profile view. • Align the invert elevation labels to the orientation of the flow. • Include the following note on any profile sheet applicable: “Compacted Fill shall be placed to a minimum 18” above the top of the pipe prior to installation.” Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity. • Please verify that all crowns of incoming pipes are at or above the crowns of the exiting pipes and that all minimum falls across structures are meeting the minimum requirements of APWA Section 5604.5. • Show invert elevations for all pipes entering a structure.
Corrective Action Required
06/20/2022

Sheet C7.01: Relocate the pipe information and the Existing Grade leader in the Storm Line A4 Profile view for clarity.
Corrective Action Required
06/20/2022

Sheet C7.02: Include Structure B5 in the Profile view and the Structure Table.
Corrective Action Required
06/20/2022

Sheet C7.03: The Structure C1 leader is not pointing to the correct location.
Corrective Action Required
06/20/2022

Sheet C7.05: Please revise Columns C & D in the Outlet Structure and Perforated Riser Information Table from feet & inches to decimal.
Corrective Action Required
06/20/2022

Sheet C7.06: Relocate the pipe information in the Southern Basin Outflow Profile view for clarity.
Fire Review Corrections 06/10/2022 06/13/2022
Jim Eden
Code Statement
Corrective Action Required
06/13/2022

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Corrective Action Required
06/13/2022

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required-Show the location of the FDC on the building and a public or private hydrant within 100 feet.
Hydrants
Corrective Action Required
06/13/2022

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required- Provide hydrants around the building in accordance with TABLE C102.1 REQUIRED NUMBER AND SPACING OF FIRE HYDRANTS. The structure requires a fire flow of 3,625 gallons per minute (includes 50% reduction for fa fire sprinkler system. Show the public hydrants along NW Main Street.
Fire Lanes - Marking
Corrective Action Required
06/13/2022

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Planning Review Corrections 06/10/2022 06/10/2022
Shannon McGuire
Corrective Action Required
06/10/2022

Please label the building setback from Main Street at the north east building corner.
Corrective Action Required
06/10/2022

Sheet C4.01 - Please label the width of the proposed sidewalk adjacent to the parking stalls.
Corrective Action Required
06/10/2022

Please show the location of all oil and/or gas wells within the subject property. If none are present please add a note stating so and cite your source of information.
Corrective Action Required
06/10/2022

Will there be any ground or roof top mounted equipment? If so please provide details in the location, size, and type of material to be used in all screening of mechanical equipment. Please also provide the manufacturer’s specification sheets for proposed mechanical equipment to be used.
Corrective Action Required
06/10/2022

Please provide a detailed drawing of enclosure and screening methods to be used in connection with trash storage containers on the property.
Corrective Action Required
06/10/2022

For any property within two miles of the airport, a Form 7460 shall be completed and submitted to the FAA, and comments received back prior to any construction.
Traffic Review No Comments 06/10/2022 06/08/2022
Brad Cooley, P.E., RSPI
Building Codes Review Corrections 06/10/2022 06/06/2022
Joe Frogge
Miscellaneous Correction
Corrective Action Required
06/06/2022

Inadequate information to complete review. Provide/address the following: - Update water utility plans. Keynotes are typed out on C6.01 but the designations are not on the actual drawings. - Specify water meter size - Specify water meter tap size. - Specify water piping material
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $1,200.00 $1,200.00 Paid 06/14/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
05/03/2022 Application Form Final Development Plan App--Building 2
05/26/2022 Engineer Report/Study 03_Final Storm Study_2022_05_17
05/26/2022 Engineer Report/Study 04_Scannell Properties Building 2 GTECH Report_OLA FOPS_B21-04157
05/26/2022 Plans 05_Final Development Plan_2022_5_12
05/26/2022 Plans 06_Land Disturbance-Erosion Control Plans_BLDG2_2022_04_28
05/26/2022 Application Form 07_Checklist_Final Development Plan_2021_10_15
05/26/2022 Specifications 08_Exterior Lighting Spec Sheet_2021_10_15
05/26/2022 Plans 09_Lees Summit Logistics Bldg B
06/14/2022 Letter Applicant Letter - FDP (DFDP)
06/14/2022 Receipt Receipt for transaction:2022-004624
07/07/2022 Plans 05_Final Development Plan_2022_6_30
07/07/2022 Plans 06_Land Disturbance-Erosion Control Plans_BLDG2_2022_06_30
07/07/2022 Letter 22-07-01_Comment Response to City of Lee's Summit App
07/07/2022 Engineers Estimate LSCC BLDG 2 Site Breakout for the City
07/14/2022 Letter Applicant Letter - FDP (DFDP)
08/10/2022 Letter 22-07-01_Comment Response to City of Lee's Summit App
08/10/2022 Engineer Report/Study 2022-08-09_Final SDS Phase II_Sealed
08/10/2022 Plans 2022_07_28_LAND DISTURBANCE - SCANNELL LEE'S SUMMIT - BUILDING 2
08/10/2022 Plans 2022_07_28_SCANNELL LEE'S SUMMIT BLDG 2_Addendum 2
08/24/2022 Letter Applicant Letter - FDP (DFDP)
09/13/2022 Letter 22-09-03_Comment Response to City of Lee's Summit App
09/13/2022 Plans 2022_09_13_SCANNELL LEE'S SUMMIT BLDG 2_Addendum 3
09/13/2022 Engineer Report/Study 2022-09-09_Final SDS Phase II_Sealed
09/13/2022 Engineers Estimate LSCC BLDG 2 Site Breakout for the City
09/26/2022 Letter Applicant Letter - FDP (DFDP)
10/10/2022 Plans 2022_10_10_SCANNELL LEE'S SUMMIT BLDG 2_Addendum 4
10/10/2022 Letter 2022-09-30_LS Logistics Lot 2 FDP_Comment Responses
10/19/2022 Letter Applicant Letter - FDP (DFDP)
10/28/2022 Plans 2022_10_27_SCANNELL LEE'S SUMMIT BLDG 2
10/28/2022 Letter 2022-10-28_LS Logistics Lot 2 FDP_Comment Responses
11/04/2022 Activity Document Fees PL2022174 LS Logistics Lot 2 FDP
11/04/2022 Letter Applicant Letter - FDP (DFDP)
11/11/2022 Plans SEE REVISED SET Approved LSCC #2 Civil PL2022174
11/23/2022 Approved Plans Approved Elevations LSCC Building 2
12/20/2022 Plans 2022_12_05_SCANNELL LEE'S SUMMIT BLDG 2_Full Set
12/30/2022 Approved Plans APPROVED REVISED LSCC #2 CIVIL PL2022174
09/22/2023 Waiver/Modification Document Waiver Request Pvmt Section Signed
08/15/2024 Engineer Report/Study Scannell Properties Building 2 - BMP Maintenance Plan
08/30/2024 Email PL2022174 LS Logistics Lot 2 BMP Maintenance Plan and Detention Basin As-Built Review Comments
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home