Planning Application Status

PL2020137




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020137
Sequoia - FDP
Residential Final Development Plan
Residential Final Development Plan
Approved
05/08/2020
ORCHARD PARK DEVELOPMENT LLC
Townhome development
Locations
Contacts
ORCHARD PARK DEVELOPMENT LLC, Address:8 SW AA HWY  
RENAISSANCE INFRASTRUCTURE CONSULTING INC, Address:8653 PENROSE LN, Phone:(913) 317-9500  
ORCHARD PARK DEVELOPMENT LLC, Address:8 SW AA HWY  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 09/29/2023 09/26/2023
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
09/22/2023

The Engineer’s Estimate of Probable Construction Costs was not submitted for the project. The Engineering Plan Review and Inspection Fee shall be based on the approved estimate. Cost to be determined.
DE Contact Field Eng. Inspector
Corrective Action Required
09/22/2023

Contact Field Engineering Inspections at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
09/22/2023

Prior to any activities within the right-of-way that are not directly associated with a specific infrastructure or building permit, a separate right-of-way permit may be required. Contact a Right-of-Way Inspector at (816) 969-1800 to obtain the required permit.
DE Future Repair Work
Corrective Action Required
09/22/2023

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE C&O #12 Cut & Fill
Corrective Action Required
09/22/2023

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Engineering Review Corrections 09/22/2023 09/20/2023
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
09/15/2023

The Engineer’s Estimate of Probable Construction Costs was not submitted for the project. The Engineering Plan Review and Inspection Fee shall be based on the approved estimate. Cost to be determined.
DE Contact Field Eng. Inspector
Corrective Action Required
09/15/2023

Contact Field Engineering Inspections at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
09/15/2023

Prior to any activities within the right-of-way that are not directly associated with a specific infrastructure or building permit, a separate right-of-way permit may be required. Contact a Right-of-Way Inspector at (816) 969-1800 to obtain the required permit.
DE Future Repair Work
Corrective Action Required
09/15/2023

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE C&O #12 Cut & Fill
Corrective Action Required
09/15/2023

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Engineering Review Corrections 08/14/2023 08/14/2023
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
08/07/2023

The Engineer’s Estimate of Probable Construction Costs was not submitted for the project. The Engineering Plan Review and Inspection Fee shall be based on the approved estimate. Cost to be determined.
DE Contact Field Eng. Inspector
Corrective Action Required
08/07/2023

Contact Field Engineering Inspections at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
08/07/2023

Prior to any activities within the right-of-way that are not directly associated with a specific infrastructure or building permit, a separate right-of-way permit may be required. Contact a Right-of-Way Inspector at (816) 969-1800 to obtain the required permit.
DE Future Repair Work
Corrective Action Required
08/07/2023

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE C&O #12 Cut & Fill
Corrective Action Required
08/07/2023

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Engineering Review Corrections 07/05/2023 07/05/2023
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
06/27/2023

The Engineer’s Estimate of Probable Construction Costs was not submitted for the project. The Engineering Plan Review and Inspection Fee shall be based on the approved estimate. Cost to be determined.
DE Contact Field Eng. Inspector
Corrective Action Required
06/27/2023

Contact Field Engineering Inspections at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
06/27/2023

Prior to any activities within the right-of-way that are not directly associated with a specific infrastructure or building permit, a separate right-of-way permit may be required. Contact a Right-of-Way Inspector at (816) 969-1800 to obtain the required permit.
DE Future Repair Work
Corrective Action Required
06/27/2023

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE C&O #12 Cut & Fill
Corrective Action Required
06/27/2023

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
As-graded MDP Review Corrections 06/06/2023 06/06/2023
Gene Williams, P.E.
As-graded MDP Review Corrections 03/23/2023 03/23/2023
Gene Williams, P.E.
Planning Review No Comments 06/19/2020 06/19/2020
Shannon McGuire
Engineering Review Approved with Conditions 06/19/2020 06/18/2020
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
06/18/2020

The Engineer’s Estimate of Probable Construction Costs was not submitted for the project. The Engineering Plan Review and Inspection Fee shall be based on the approved estimate. Cost to be determined.
DE Contact Field Eng. Inspector
Corrective Action Required
06/18/2020

Contact Field Engineering Inspections at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
06/18/2020

Prior to any activities within the right-of-way that are not directly associated with a specific infrastructure or building permit, a separate right-of-way permit may be required. Contact a Right-of-Way Inspector at (816) 969-1800 to obtain the required permit.
DE Future Repair Work
Corrective Action Required
06/18/2020

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE C&O #12 Cut & Fill
Corrective Action Required
06/18/2020

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Fire Review No Comments 06/19/2020 06/17/2020
Jim Eden
Code Statement
Corrective Action Required
06/12/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Building Codes Review No Comments 06/19/2020 06/16/2020
Joe Frogge
Traffic Review No Comments 06/19/2020 06/16/2020
Michael Park
Planning Review Corrections 05/22/2020 05/22/2020
Shannon McGuire
Corrective Action Required
05/22/2020

The parking requirements cited in the site data table are incorrect. The number of parking spaces required for two-family, three-family or four-family residences is 2 per dwelling unit (one must be fully enclosed). Additionally, ADA stalls are not required for residential homes.
Corrective Action Required
05/22/2020

All proposed signs must comply with the sign requirements as outlined in the sign section of the ordinance.
Corrective Action Required
05/22/2020

Building 7 is violating the required 20’ rear yard setback.
Corrective Action Required
05/22/2020

On the southern property line the proposed fence looks to stop short of enclosing the project as a whole. Was this a drafting error or is this what you are proposing?
Engineering Review Corrections 05/22/2020 05/22/2020
Gene Williams, P.E.
Corrective Action Required
05/22/2020

Hydraulic grade line for the 100 year event was missing from the detention basin outlet structures. The bigger problem, however, appears to be that the system utilizes the emergency overflow spillways to manage the 100 year event. This is not acceptable. The outlet structures for each basin must be sized to manage the 100 year event, and the emergency overlfow spillway is only intended to be used in the event that 100% clogging and zero available storage exists within each basin. The outlet pipe for each basin should be sized for gravity flow, with the hydraulic grade line at or below the crown of the pipe. It is likely that a re-design and a revison to the stormwater study is required.
Corrective Action Required
05/22/2020

Trees are shown on top of City utilities. A minimum of five (5) feet from the outside of any pipe and the outside of the mature tree trunk is required.
Traffic Review No Comments 05/22/2020 05/21/2020
Michael Park
Building Codes Review No Comments 05/22/2020 05/18/2020
Joe Frogge
Fire Review Approved with Conditions 05/22/2020 05/11/2020
Jim Eden
Code Statement
Corrective Action Required
05/11/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 05/08/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
05/08/2020 Application Form 18-0251 Final Development Plan Application SIGNED
05/08/2020 Letter 18-0251 FDP Transmittal Letter
05/08/2020 Application Form 18-0251 Final Development Plan CHECKLIST
05/08/2020 Engineer Report/Study 18-0251 - Final Micro Study 2020-05-08
05/08/2020 Plans 18-0251 Street & Storm Plans Signed
05/08/2020 Plans Homes Association Declarations
05/08/2020 Plans LEGAL DESCRIPTION
05/08/2020 Plans Sequoia Residential DCCR
05/08/2020 Plans 2020-01_Sequoia Duplex B - 19
05/08/2020 Plans 18-0251 FDPs Signed
05/08/2020 Receipt Receipt for transaction:2020-002016
05/22/2020 Letter Applicant Letter - FDP (DFDP)
06/12/2020 Letter 18-0251 FDP Comment Response
06/12/2020 Engineer Report/Study 18-0251 - Micro Study 2020-06-12 Signed
06/12/2020 Plans 18-0251 FDPs 2020-06-11 Signed
06/19/2020 Letter Applicant Letter - FDP (DFDP)
06/04/2021 Plans NOT APPROVED C08 - Storm P&P
06/04/2021 Plans NOT APPROVED C10 - Pond Plan 2
02/14/2023 Plans GRADING - G1
02/14/2023 Plans 500 NE OLIVE ST GRADING SUBMITTAL
02/24/2023 Email EMAIL REJECTION WRONG PLANFEB2023
03/20/2023 Plans C09
03/23/2023 Email EMAIL REJECTION MAR2023 NUMBER 2
05/16/2023 Activity Document Addressing - Sequoia Duplexes
05/22/2023 Plans C09 5-19-23
06/06/2023 EMAIL REJECTION JUN2023
06/27/2023 Plans C09 6-26-23
06/27/2023 Engineer Report/Study Storm Study Addendum - 500 NE Olive Street - 6-26-23
07/05/2023 Email EMAIL COMMENTS
08/07/2023 Waiver/Modification Document SEQUOIA DESIGN CRITERIA MOD APP
08/07/2023 Plans C09 8-4-23
08/07/2023 Letter SEQUOIA REVIEW RESPONSE 8-4-23
08/07/2023 Engineer Report/Study SEQUOIA-SWDS-REV 8-4-23
08/14/2023 Email EMAIL REJECTION AUG2023
09/11/2023 Approved Plans Approved Sequoia FDP 6.12.2020
09/15/2023 Plans C09 9-13-23
09/15/2023 Photograph C09A 9-13-23
09/15/2023 Letter SEQUOIA REVIEW RESPONSE 9-14-23
09/15/2023 Engineer Report/Study SEQUOIA-SWDS-REV 9-13-23
09/20/2023 Approved Plans STAMPED REVISION DETENTION
09/20/2023 Email EMAIL APPROVAL DETENTION REVISIONS
09/20/2023 Email EMAIL COMMENTS STORM LINE
09/22/2023 Plans C09A 9-21-23
09/26/2023 Approved Plans STAMPED REVISION STORM LINE
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home