Planning Application Status

PL2018055




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2018055
FASCINATION NORTH LOT 44
Commercial Final Development Plan
Commercial Final Development Plan
Expired
04/05/2018
M-III LONGVIEW LLC
3290 SW FASCINATION DR to include some "off-site" parking.
Locations
Contacts
M-III LONGVIEW LLC, Address:4601 COLLEGE BLVD STE 300, Phone:(816) 561-3796  
KLOVER ARCHITECTS, Address:10955 LOWELL AVE, Phone:(913) 649-8181  
OLSSON , Address:7301 W 133RD ST STE 200, Phone:(913) 381-1170  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 06/07/2018 06/29/2018
Jennifer Thompson
Corrective Action Required
06/07/2018

Eleven proposed parking spaces are shown on Lot 43. These spaces will be needed for the parking demand for Lot 44. An executed shared parking agreement is needed between Lots 44 and 43. This documentation will be needed prior to occupancy for Lot 44.
Corrective Action Required
06/29/2018

As a reminder and as mentioned in previous staff comment letters, a revised parking model for the overall development of the New Longview area is needed. Staff will evaulate the parking model as part of the Kessler View application.
Building Codes Review No Comments 06/07/2018 06/08/2018
Joe Frogge
Fire Review Approved with Conditions 06/07/2018 06/07/2018
Jim Eden
Code Statement
Carried Forward
06/07/2018

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Review time extended from 5/10 to 5/11. CHRIS HUGHEY 05/10/2018 3:23 PM
Traffic Review Corrections 06/07/2018 06/05/2018
Michael Park
Corrective Action Required
06/05/2018

The change of use to include restaurant generates a parking shortage; even with considerations of shared parking as tabulated. There are 77 needed parking spaces and only 56 provided for Lot 44. The only existing parking "off-site" within the shared model is already occupied/assigned during the same periods of demand by the theatre (unless the garage is proposed at this time to supply additional parking for shared displacement in the area in support of the proposed uses on Lot 44). Other shared parking concerns associated with this development, model comments and timing of available parking are related to a separate application (Kessler View).
Review time extended from 5/10 to 5/11. CHRIS HUGHEY 05/10/2018 3:23 PM
Engineering Review Approved with Conditions 06/07/2018 06/05/2018
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
06/05/2018

Private parking lots shall follow Article 12 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
06/05/2018

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Future Repair Work
Corrective Action Required
06/05/2018

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE Engineers Estimate
Corrective Action Required
06/05/2018

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $14,043.73
Review time extended from 5/10 to 5/11. CHRIS HUGHEY 05/10/2018 3:23 PM
Planning Review Corrections 05/10/2018 05/11/2018
Jennifer Thompson
Corrective Action Required
05/10/2018

It was noted the proposed screen wall will match the existing screen wall in front of CVS. For purposes of this final development plan, please provide a detail of the proposed screen wall that is connecting into the existing screen wall. The detail should indicate height and materials.
Corrective Action Required
05/10/2018

Label the existing cross access easements and private drive easements and any other utility easements not already shown.
Corrective Action Required
05/10/2018

Is there a estimate at this time of how this space will be utilized as far as the ratio of potential restaurant use, office use, or retail? The parking needs would be dramatically affected if by chance the entire space was occupied by restaurants.
Corrective Action Required
05/11/2018

An updated shared parking study/model is needed for the overall New Longview Commercial area. The recent activity and development in the New Longview area including the theatre, the proposed Kessler Apartments, this project, and the recently submitted Kessler View project have raised concerns or at least questions of the overall parking needs, and how they will be met, for the New Longview Commercial area. Additional discussion may be needed to address this comment.
Corrective Action Required
05/11/2018

Please indicate on the elevations by a dashed line the limits of RTU in relationship to the parapet for a typical RTU normally associated with a restaurant user or other high intense user.
Review time extended from 5/10 to 5/11. CHRIS HUGHEY 05/10/2018 3:23 PM
Building Codes Review No Comments 05/10/2018 05/10/2018
Joe Frogge
Review time extended from 5/10 to 5/11. CHRIS HUGHEY 05/10/2018 3:23 PM
Fire Review Approved with Conditions 05/10/2018 05/10/2018
Jim Eden
Code Statement
Carried Forward
05/10/2018

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Review time extended from 5/10 to 5/11. CHRIS HUGHEY 05/10/2018 3:23 PM
Engineering Review Approved with Conditions 05/10/2018 05/10/2018
Chris Hughey
Corrective Action Required
05/11/2018

Revision Nos. 1, 2 and 3 are acceptable. Receipt of the Engineer's Estimate is acknowledged; final review of estimate pending final submittal. **Comments sent under separate cover.
Review time extended from 5/10 to 5/11. CHRIS HUGHEY 05/10/2018 3:23 PM
Traffic Review Approved with Conditions 05/10/2018 05/09/2018
Michael Park
Corrective Action Required
05/09/2018

Consider the addition of bicycle rack(s).
Corrective Action Required
05/09/2018

Consider eliminating the western most angle parking stall near the roundabout and increasing the pedestrian area.
Review time extended from 5/10 to 5/11. CHRIS HUGHEY 05/10/2018 3:23 PM
Building Codes Review No Comments 04/19/2018 04/20/2018
Joe Frogge
Engineering Review Corrections 04/19/2018 04/20/2018
Sue Pyles, P.E.
Corrective Action Required
04/20/2018

Sheet C003: Include the effective date in Note 2.
Corrective Action Required
04/20/2018

Sheet C009: • Include the exact location of the proposed water meter. • Include a label for note 12 in the Plan view. • Revise the arrow for note 13 to point to the storm structure in the Plan view.
Corrective Action Required
04/20/2018

Include standard details for all storm structures, as well as the sanitary sewer service connection.
Corrective Action Required
04/20/2018

Submit an Engineer's Estimate of Probable Construction Costs.
Planning Review Corrections 04/19/2018 04/19/2018
Chris Hughey
Corrective Action Required
04/19/2018

Within the vicinity map, revise the street name for View High Drive to SW Longview Blvd. Also provide a north arrow for the vicinity map.
Corrective Action Required
04/19/2018

The drive aisle widths at all bump outs/island areas do not meet the 24-foot drive aisle width. The flat part of the curb is not be calculated as part of the drive aisle width. Please revise all these locations to have a minimum of 24-foot width.
Corrective Action Required
04/19/2018

Provide land use schedule that includes the following: total floor area, land area, number of required and proposed parking spaces, impervious coverage, floor area ratio.
Corrective Action Required
04/19/2018

Revise the caliper sizes for the elm, honey locust and maple trees to 3" caliper size. This is the required size per ordinance.
Corrective Action Required
04/19/2018

All signs shall be submitted for review and approval through the Development Services department.
Corrective Action Required
04/19/2018

Label the right-of-way widths for SW Longview Blvd and SW Fascination Dr.
Corrective Action Required
04/19/2018

Indicate whether ground mounted or roof mounted units are proposed and show location. Provide information on how these units will be screened. Please refer to Article 7 of the Unified Development Ordinance for allowed screening methods.
Corrective Action Required
04/19/2018

Provide a statement indicating if there are any abandoned oil or gas wells located within the property boundary. Reference where this information was obtained.
Corrective Action Required
04/19/2018

Label all existing easements (i.e. cross access easements, private drive easements, utility easements, etc.)
Corrective Action Required
04/19/2018

Label the platted building setback line.
Corrective Action Required
04/19/2018

Provide the surrounding property information.
Corrective Action Required
04/19/2018

Provide a trash enclosure detail.
Corrective Action Required
04/19/2018

Provide a detail of the proposed screening wall. What is the height of the screening wall?
Corrective Action Required
04/19/2018

Can you provide more detail on what appears to be proposed fencing on sheet A200?
Traffic Review No Comments 04/19/2018 04/18/2018
Chris Hughey
Fire Review Corrections 04/19/2018 04/16/2018
Jim Eden
Code Statement
Carried Forward
04/16/2018

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
FDC
Resolved
05/10/2018

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: Show the location of the FDC on the building.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 04/05/2018
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
04/05/2018 Receipt Receipt for transaction: 2018-001278
04/05/2018 Letter Routing Sheet - FDP
04/05/2018 Plans C015 EROSION CONTROL PLAN - PHASE 1
04/05/2018 Plans C016 EROSION CONTROL PLAN - PHASE 2
04/05/2018 Plans C017 EROSION CONTROL PLAN - PHASE 3
04/05/2018 Plans C018 EROSION CONTROL DETAIL SHEET
04/05/2018 Plans C002 GENERAL NOTES
04/05/2018 Plans C003 EXISTING CONDITIONS & DEMOLITION PLAN
04/05/2018 Plans C004 GRADING PLAN
04/05/2018 Plans C005 SITE PLAN
04/05/2018 Plans C006 GEOMETRIC PLAN
04/05/2018 Plans C007 SPOT ELEVATIONS
04/05/2018 Plans C010 DRAINAGE PLAN
04/05/2018 Plans C011 DRAINAGE TABLES
04/05/2018 Plans C012 DETAIL SHEET
04/05/2018 Plans C013 DETAIL SHEET
04/05/2018 Plans C014 EROSION CONTROL GENERAL NOTES
04/21/2018 Letter Applicant Letter - FDP (DFDP)
05/03/2018 Letter Resubmittal Routing Sheet - FDP
05/23/2018 Engineer Report/Study 18.04.27.CostEstimate
05/23/2018 Plans A200-A200
05/23/2018 Plans A201-A201
05/23/2018 Plans AS100
05/23/2018 Plans AS102-AS102
05/23/2018 Plans L001_Lot44_180501
05/23/2018 Letter Applicant Letter - FDP (DFDP)
05/24/2018 Engineer Report/Study 18.05.24.CostEstimate
05/31/2018 Plans A201
05/31/2018 Plans 18.05.24.CostEstimate
05/31/2018 Plans 2018.05.30.FinalDevelopmentPlan
05/31/2018 Plans A200
05/31/2018 Letter Resubmittal Routing Sheet - FDP
06/29/2018 Letter Applicant Letter - FDP (DFDP)
10/18/2018 Activity Document Fees PL2018055 Fascination North Lot 44 FDP
01/22/2020 Letter Expiration Notice (Planning)
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home