Summary


PRSUBD20182652
Public Infrastructure
Final Acceptance
EAGLE CREEK HOMEOWNERS ASSOCIATION
DEVELOPMENT COMPLETE
FULL DEVELOPMENT FOR RESIDENTIAL SINGLE FAMILY PERMIT
08/14/2018
09/23/2019
08/24/2023
Locations
Address
2366 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2362 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2358 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2354 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2350 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2365 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2361 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2357 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2353 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2349 SW RIVER TRAIL RD, LEES SUMMIT, MO 64082

Address
2366 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2362 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2358 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2354 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2350 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2346 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2342 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2338 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2334 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2330 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2361 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2357 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2353 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2349 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2345 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2341 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2337 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2333 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2329 SW OLD PORT RD, LEES SUMMIT, MO 64082

Address
2366 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2362 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2358 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2354 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2350 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2346 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2345 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2349 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2353 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2357 SW HICKORY LN, LEES SUMMIT, MO 64082

Address
2361 SW HICKORY LN, LEES SUMMIT, MO 64082

Property
69220052200000000

Property
69220051900000000

Property
69220051800000000

Property
69220052000000000

Property
69220052100000000

Property
69220051700000000

Property
69220051100000000

Property
69220051600000000

Property
69220051500000000

Property
69220051400000000

Property
69220051200000000

Property
69220051300000000

Property
69220051000000000

Property
69220050200000000

Property
69220050300000000

Property
69220050400000000

Property
69220050500000000

Property
69220050900000000

Property
69220050600000000

Property
69220050800000000

Property
69220050700000000

Property
69220042300000000

Property
69220042200000000

Property
69220042100000000

Property
69220042000000000

Property
69220041900000000

Property
69220041800000000

Property
69220041700000000

Property
69220041600000000

Property
69220041500000000

Property
69220041400000000

Property
69220040900000000

Property
69220041000000000

Property
69220041100000000

Property
69220041200000000

Property
69220041300000000

Property
69220011400000000

Property
69220011500000000

Property
69220011600000000

Property
69220011700000000

Property
69220011800000000

Address
2251 SW LADDERBACK DR, LEES SUMMIT, MO 64082

Contacts
HUNT MIDWEST RESIDENTIAL LLC, Address:8300 NE UNDERGROUND DR  
Terry Owens, Address:Hunt Midwest Real Estate Development, Inc, Phone:(816) 455-2500 Ext:116  
EAGLE CREEK HOMEOWNERS ASSOCIATION, Address:8300 NE UNDERGROUND DR  
FRANKLIN MARIA, Address:2345 SW HICKORY LN  
BULLARD VIRLEN & ROBERT, Address:2349 SW HICKORY LN  
FARRELL BRIAN & LAURA, Address:2353 SW HICKORY LN  
JOHNSON TREVELYN R, Address:2357 SW HICKORY LN  
LEBOURVREAU NICKOLAS & BRITTANY, Address:2361 SW HICKORY LN  
KOCH BENJAMIN D & KILEY B, Address:2346 SW HICKORY LN  
ROTHSCHILD BRIAN, Address:2350 SW HICKORY LN  
MCFARLAND DALTON BUILDERS INC, Address:120 SW MONROE ST  
WIEST TREVOR & LINDSAY, Address:2358 SW HICKORY LN  
BLAND JASON, Address:2362 SW HICKORY LN  
DICKERSON RONALD E, Address:2366 SW HICKORY LN  
TARTAGLIA JOSE SARRATUD, Address:2329 SW OLD PORT RD  
BARCLAY VICTORIA P, Address:7420 N DONNELLY AVE  
MCFADDEN JOHN III & AMANDA, Address:2337 SW OLD PORT RD  
GONZALEZ ROBERT M II & STEPHANIE K, Address:2508 SW HICKORY LN  
HEGELE PAUL F & JULIE P, Address:2345 SW OLD PORT RD  
DOZIER TAD & AMY, Address:2349 SW OLD PORT RD  
REASBY RICHARD, Address:2353 SW OLD PORT RD  
STOECKLEIN JEFFERY T & ANGELA L, Address:2357 SW OLD PORT RD  
BIRK TIMOTHY & SARAH, Address:2361 SW OLD PORT RD  
FORTE NATALIE A, Address:2330 SW OLD PORT RD  
SANCHEZ AMY, Address:2334 SW OLD PORT RD  
ULLOA CRLOS R & BARAHONA BRENDA Y, Address:2338 SW OLD PORT RD  
NIEHAUS ANDREW & MORGAN, Address:2342 SW OLD PORT RD  
LEACH KRISTIE N, Address:2346 SW OLD PORT RD  
BEX-BANJO OLUWASEYI, Address:2350 SW OLD PORT RD  
SALVA MITCHELL JOSEPH & ALEXIS D BRIDGES, Address:2354 SW OLD PORT RD  
JOHNSON NEIL & MICHELLE, Address:2358 SW OLD PORT RD  
ONUZURUIKE NGOZICHUKWUKA, Address:2362 SW OLD PORT RD  
JEWELL ETHAN & HOLLY, Address:2366 SW OLD PORT RD  
SIERRA DANIELLE, Address:2349 SW RIVER TRAIL RD  
BUCHHEIT TONI L, Address:2353 SW RIVER TRAIL RD  
SLEEK RUSSELL E JR & BEVERLY R, Address:2357 SW RIVER TRAIL RD  
MCFARLAND DALTON BUILDERS LLC, Address:120 SW MONROE ST  
MILLS GENA L & JOHN T, Address:2365 SW RIVER TRAIL RD  
SIMS RUSSELL A & HEIDI P, Address:2350 SW RIVER TRAIL RD  
CROSSWHITE MELISSA & JON, Address:2358 SW RIVER TRAIL RD  
BURNER MICHAEL & ANGELA, Address:2362 SW RIVER TRAIL RD  
LACKEY JASON AARON & AYSSA, Address:2366 SW RIVER TRAIL RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/14/2018 09/16/2019
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
91100C9-Water Insp Fee $2,641.90 $2,641.90 Paid 09/04/2019
91100C8-Sanitary Sewer Insp Fees $4,003.60 $4,003.60 Paid 09/04/2019
9110072-Water Test Fee $1,000.00 $1,000.00 Paid 09/04/2019
9110068-Storm Fee $3,305.76 $3,305.76 Paid 09/04/2019
9110081-Paved Surface Inspection Fee $6,664.87 $6,664.87 Paid 09/04/2019
9110071-Site Grading Fee $4,845.07 $4,845.07 Paid 09/04/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sanitary - Material Verification Passed 09/25/2019
Misc
Informational
09/25/2019
I verified that the sanitary sewer materials on site meet the City of Lee’s Design & Construction Standards.
Erosion Control Inspection Partial 9/24/2019 09/25/2019
Misc
Informational
09/25/2019
The Erosion and Sediment Control devices have been installed according to the ESC Phase 1 sheet of the approved plans.
Sanitary Sewer Construction Inspection Partial 09/25/2019
Misc
Informational
09/25/2019
The Redford Construction crew is on site starting the sanitary sewer install. The crew exposed the base of the existing MH on site near the intersection of SW Ladderback Dr. and SW River Trail Dr. The crew plans to core into the MH this afternoon and prepare to start laying pipe tomorrow. I will return for further inspection of the core and sewer line tomorrow morning.
Sanitary Sewer Construction Inspection Partial 9/26/2019 09/26/2019
Misc
Informational
09/26/2019
The Redford Construction crew cored into the existing MH 21-029 at station 10+00 and stubbed the 8” pipe into the MH. The crew installed 3 sections of pipe on line 1. Photos of the work are uploaded.
Sanitary Sewer Construction Inspection Partial 9/26/2019 09/26/2019
Misc
Informational
09/26/2019
The Redford Construction crew is on site starting the sanitary sewer install. The crew exposed the base of the existing MH on site near the intersection of SW Ladderback Dr. and SW River Trail Dr. The crew plans to core into the MH this afternoon and prepare to start laying pipe tomorrow. I will return for further inspection of the core and sewer line tomorrow morning.
Misc
Informational
09/26/2019
The Redford crew has laid an additional 100’ ft of the sanitary line A. The install appears to meet the design and construction standards. Photos of the work are uploaded. Olsson Testing is on site taking proctors for compaction testing.
Erosion Control Inspection Partial 9/27/2019 10/03/2019
Misc
Informational
09/25/2019
The Erosion and Sediment Control devices have been installed according to the ESC Phase 1 sheet of the approved plans.
Misc
Informational
10/03/2019
The erosion control devices appear to be intact and controlling the site run off efficiently./
Sanitary Sewer Construction Inspection Partial 9/27/2019 10/03/2019
Misc
Informational
09/26/2019
The Redford Construction crew is on site starting the sanitary sewer install. The crew exposed the base of the existing MH on site near the intersection of SW Ladderback Dr. and SW River Trail Dr. The crew plans to core into the MH this afternoon and prepare to start laying pipe tomorrow. I will return for further inspection of the core and sewer line tomorrow morning.
Misc
Informational
09/26/2019
The Redford crew has laid an additional 100’ ft of the sanitary line A. The install appears to meet the design and construction standards. Photos of the work are uploaded. Olsson Testing is on site taking proctors for compaction testing.
Misc
Informational
10/03/2019
The Redford crew is continuing the sanitary sewer install for line 2. The crew cored into the existing MH at Old Port and Ladderback and ran the line approx. 200’ ft.
Sanitary Sewer Construction Inspection Partial 10/4/2019 10/04/2019
Misc
Informational
10/03/2019
The Redford Construction crew is on site starting the sanitary sewer install. The crew exposed the base of the existing MH on site near the intersection of SW Ladderback Dr. and SW River Trail Dr. The crew plans to core into the MH this afternoon and prepare to start laying pipe tomorrow. I will return for further inspection of the core and sewer line tomorrow morning.
Misc
Informational
10/03/2019
The Redford crew has laid an additional 100’ ft of the sanitary line A. The install appears to meet the design and construction standards. Photos of the work are uploaded. Olsson Testing is on site taking proctors for compaction testing.
Misc
Informational
10/03/2019
The Redford crew is continuing the sanitary sewer install for line 2. The crew cored into the existing MH at Old Port and Ladderback and ran the line approx. 200’ ft.
Misc
Informational
10/04/2019
The Redford crew is on site and installed the invert for existing MH 21-029. The crew installed the trench checks on the service lines for lots 718 & 728. The crew is currently working on the invert install for existing MH 30-132. I will do a fallow up inspection for the inverts this afternoon. Photos of the trench checks are uploaded to the system.
Erosion Control Inspection Partial 10/08/2019
Misc
Informational
10/03/2019
The Erosion and Sediment Control devices have been installed according to the ESC Phase 1 sheet of the approved plans.
Misc
Informational
10/03/2019
The erosion control devices appear to be intact and controlling the site run off efficiently./
Misc
Informational
10/08/2019
ESC devices are intact. Site runoff is being properly controlled.
Sanitary Sewer Construction Inspection Partial 10/08/2019
Misc
Informational
10/04/2019
The Redford Construction crew is on site starting the sanitary sewer install. The crew exposed the base of the existing MH on site near the intersection of SW Ladderback Dr. and SW River Trail Dr. The crew plans to core into the MH this afternoon and prepare to start laying pipe tomorrow. I will return for further inspection of the core and sewer line tomorrow morning.
Misc
Informational
10/04/2019
The Redford crew has laid an additional 100’ ft of the sanitary line A. The install appears to meet the design and construction standards. Photos of the work are uploaded. Olsson Testing is on site taking proctors for compaction testing.
Misc
Informational
10/04/2019
The Redford crew is continuing the sanitary sewer install for line 2. The crew cored into the existing MH at Old Port and Ladderback and ran the line approx. 200’ ft.
Misc
Informational
10/04/2019
The Redford crew is on site and installed the invert for existing MH 21-029. The crew installed the trench checks on the service lines for lots 718 & 728. The crew is currently working on the invert install for existing MH 30-132. I will do a fallow up inspection for the inverts this afternoon. Photos of the trench checks are uploaded to the system.
Misc
Informational
10/08/2019
The Redford crew set MH 2-1 and ran approximately 100’ ft of the 8” line to the east. Photos of the work are uploaded to the system.
Erosion Control Inspection Partial 10/11/2019 10/14/2019
Misc
Informational
10/08/2019
The Erosion and Sediment Control devices have been installed according to the ESC Phase 1 sheet of the approved plans.
Misc
Informational
10/08/2019
The erosion control devices appear to be intact and controlling the site run off efficiently./
Misc
Informational
10/08/2019
ESC devices are intact. Site runoff is being properly controlled.
Misc
Informational
10/14/2019
ESC devices are intact. Site runoff is being properly controlled.
Sanitary Sewer Construction Inspection Partial 10/14/2019
Misc
Informational
10/08/2019
The Redford Construction crew is on site starting the sanitary sewer install. The crew exposed the base of the existing MH on site near the intersection of SW Ladderback Dr. and SW River Trail Dr. The crew plans to core into the MH this afternoon and prepare to start laying pipe tomorrow. I will return for further inspection of the core and sewer line tomorrow morning.
Misc
Informational
10/08/2019
The Redford crew has laid an additional 100’ ft of the sanitary line A. The install appears to meet the design and construction standards. Photos of the work are uploaded. Olsson Testing is on site taking proctors for compaction testing.
Misc
Informational
10/08/2019
The Redford crew is continuing the sanitary sewer install for line 2. The crew cored into the existing MH at Old Port and Ladderback and ran the line approx. 200’ ft.
Misc
Informational
10/08/2019
The Redford crew is on site and installed the invert for existing MH 21-029. The crew installed the trench checks on the service lines for lots 718 & 728. The crew is currently working on the invert install for existing MH 30-132. I will do a fallow up inspection for the inverts this afternoon. Photos of the trench checks are uploaded to the system.
Misc
Informational
10/08/2019
The Redford crew set MH 2-1 and ran approximately 100’ ft of the 8” line to the east. Photos of the work are uploaded to the system.
Misc
Informational
10/14/2019
The Redford crew is on site continuing the sanitary sewer line 2 install. The crew is into a significant amount of rock breaking and the install is moving slower than normal. The crew is averaging approximately 1 stick of pipe every three hours for install times. The crew is set to approximately station 14+00. Photos of the current work have been uploaded.
Sanitary Sewer Construction Inspection Partial 10/17/2019
Misc
Informational
10/14/2019
The Redford Construction crew is on site starting the sanitary sewer install. The crew exposed the base of the existing MH on site near the intersection of SW Ladderback Dr. and SW River Trail Dr. The crew plans to core into the MH this afternoon and prepare to start laying pipe tomorrow. I will return for further inspection of the core and sewer line tomorrow morning.
Misc
Informational
10/14/2019
The Redford crew has laid an additional 100’ ft of the sanitary line A. The install appears to meet the design and construction standards. Photos of the work are uploaded. Olsson Testing is on site taking proctors for compaction testing.
Misc
Informational
10/14/2019
The Redford crew is continuing the sanitary sewer install for line 2. The crew cored into the existing MH at Old Port and Ladderback and ran the line approx. 200’ ft.
Misc
Informational
10/14/2019
The Redford crew is on site and installed the invert for existing MH 21-029. The crew installed the trench checks on the service lines for lots 718 & 728. The crew is currently working on the invert install for existing MH 30-132. I will do a fallow up inspection for the inverts this afternoon. Photos of the trench checks are uploaded to the system.
Misc
Informational
10/14/2019
The Redford crew set MH 2-1 and ran approximately 100’ ft of the 8” line to the east. Photos of the work are uploaded to the system.
Misc
Informational
10/14/2019
The Redford crew is on site continuing the sanitary sewer line 2 install. The crew is into a significant amount of rock breaking and the install is moving slower than normal. The crew is averaging approximately 1 stick of pipe every three hours for install times. The crew is set to approximately station 14+00. Photos of the current work have been uploaded.
Misc
Informational
10/17/2019
The Redford crew is installing the service lines and trench checks for line 2. Photos of the work are uploaded into the system.
Sanitary Sewer Construction Inspection Partial 10/17/2019 10/22/2019
Misc
Informational
10/17/2019
The Redford Construction crew is on site starting the sanitary sewer install. The crew exposed the base of the existing MH on site near the intersection of SW Ladderback Dr. and SW River Trail Dr. The crew plans to core into the MH this afternoon and prepare to start laying pipe tomorrow. I will return for further inspection of the core and sewer line tomorrow morning.
Misc
Informational
10/17/2019
The Redford crew has laid an additional 100’ ft of the sanitary line A. The install appears to meet the design and construction standards. Photos of the work are uploaded. Olsson Testing is on site taking proctors for compaction testing.
Misc
Informational
10/17/2019
The Redford crew is continuing the sanitary sewer install for line 2. The crew cored into the existing MH at Old Port and Ladderback and ran the line approx. 200’ ft.
Misc
Informational
10/17/2019
The Redford crew is on site and installed the invert for existing MH 21-029. The crew installed the trench checks on the service lines for lots 718 & 728. The crew is currently working on the invert install for existing MH 30-132. I will do a fallow up inspection for the inverts this afternoon. Photos of the trench checks are uploaded to the system.
Misc
Informational
10/17/2019
The Redford crew set MH 2-1 and ran approximately 100’ ft of the 8” line to the east. Photos of the work are uploaded to the system.
Misc
Informational
10/17/2019
The Redford crew is on site continuing the sanitary sewer line 2 install. The crew is into a significant amount of rock breaking and the install is moving slower than normal. The crew is averaging approximately 1 stick of pipe every three hours for install times. The crew is set to approximately station 14+00. Photos of the current work have been uploaded.
Misc
Informational
10/17/2019
The Redford crew is installing the service lines and trench checks for line 2. Photos of the work are uploaded into the system.
Misc
Informational
10/22/2019
The Redford crew was continuing the install of sanitary lines 2 & 3. The crew has the mains installed and is working on the service laterals at this time. The crew plans to pour trench checks for the laterals this afternoon. I will return for further inspection tomorrow morning. Photos are uploaded to the system.
Storm Sewer Construction Inspection Partial 11/05/2019
Misc
Informational
11/05/2019
The Redford crew tied into the existing storm curb inlet at station 10+00. The crew ran the pipe to station 11+78.94 and installed the two curb inlets and storm manhole between the run. I verified that the install matches the approved plans and that the proper materials were used. Photos of the work are uploaded.
Storm Sewer Construction Inspection Partial 11/06/2019
Misc
Informational
11/05/2019
The Redford crew tied into the existing storm curb inlet at station 10+00. The crew ran the pipe to station 11+78.94 and installed the two curb inlets and storm manhole between the run. I verified that the install matches the approved plans and that the proper materials were used. Photos of the work are uploaded.
Misc
Informational
11/06/2019
The Redford crew is continuing the storm install. The crew installed the line from station 11+78.94 to 13+79.02 The crew set the 2 storm manholes and field inlet 1-5. Photos of the work are uploaded.
Storm Sewer Construction Inspection Partial 11/07/2019
Misc
Informational
11/06/2019
The Redford crew tied into the existing storm curb inlet at station 10+00. The crew ran the pipe to station 11+78.94 and installed the two curb inlets and storm manhole between the run. I verified that the install matches the approved plans and that the proper materials were used. Photos of the work are uploaded.
Misc
Informational
11/06/2019
The Redford crew is continuing the storm install. The crew installed the line from station 11+78.94 to 13+79.02 The crew set the 2 storm manholes and field inlet 1-5. Photos of the work are uploaded.
Misc
Informational
11/07/2019
The Redford crew is continuing the storm sewer install. The concrete truck is on site to pour the collars and inverts for field inlet 1-5 and MH 1-6. I will return for further inspections after lunch.
Storm Sewer Construction Inspection Partial 11/14/2019
Misc
Informational
11/07/2019
The Redford crew tied into the existing storm curb inlet at station 10+00. The crew ran the pipe to station 11+78.94 and installed the two curb inlets and storm manhole between the run. I verified that the install matches the approved plans and that the proper materials were used. Photos of the work are uploaded.
Misc
Informational
11/07/2019
The Redford crew is continuing the storm install. The crew installed the line from station 11+78.94 to 13+79.02 The crew set the 2 storm manholes and field inlet 1-5. Photos of the work are uploaded.
Misc
Informational
11/07/2019
The Redford crew is continuing the storm sewer install. The concrete truck is on site to pour the collars and inverts for field inlet 1-5 and MH 1-6. I will return for further inspections after lunch.
Misc
Informational
11/14/2019
The Redford crew is continuing the storm line 2 install. The crew set inlet 2-1 and has the pipe stubbed in. The crew plans to pour the collars and inverts this afternoon. I will return for further inspection tomorrow. Photos of the work are uploaded.
Sanitary Sewer - Air Test Passed 12/26/2019 12/26/2019
Misc
Informational
12/26/2019
John DiMauro 12/26/2019 3:42 PM I observed the Redford Construction crew perform the air pressure test of the new sanitary sewer lines 1 - 3. Line 1: Existing MH 21-029 to MH 1-1 the test passed It held at 4psi for 7min 34sec with no drop on the gauge. Line 2: Existing MH 30-132 to MH 2-1 the test passed It held at 4psi for 7min 34sec with no drop on the gauge. MH 2-1 to MH 2-2 the test passed It held at 4psi for 7min 34sec with no drop on the gauge. MH 2-2 to 2-3 the test passed I observed a drop from 4psi to 3.5 psi in the 7min & 34 sec test time. Line 3: Existing MH 30-294 to MH 3-1 the test passed It held at 4psi for 7min 34sec with no drop on the gauge. MH 3-1 to 3-2 the test passed It held at 4psi for 7min 34sec with no drop on the gauge.
Sanitary Sewer - Mandrel Passed 12/26/2019 12/26/2019
Misc
Informational
12/26/2019
John DiMauro 12/26/2019 3:57 PM I verified the correct mandrel was used for the pipe diameter. I observed the mandrel pulled through all three lines with no deflection.
Sanitary Sewer - Vacuum Partial 12/26/2019 12/26/2019
Misc
Informational
12/26/2019
John DiMauro 12/26/2019 4:00 PM MH 1-1: 11.5'ft deep Held for 2.5 min with no drop Test passed. MH 2-1: 14'ft deep Held for 2.5 min with no drop Test passed. MH 2-2: 13'ft deep Held for 2.5 min with no drop Test passed. MH 2-3: 13'ft deep I observed a drop on the gauge from 10 to 9.25 in the 2.5 min test. Test passed. MH 3-1: 13'ft deep I observed a drop on the gauge from 10 to 9.5 in the 2.5 min test. Test Passed. MH 3-2: 13'ft deep I observed a drop on the gauge of more than 1" within the 2.5 min test time. TEST FAILED The crew plans to make corrections to the MH tomorrow morning and will call back for another test.
Sanitary Sewer - Vacuum Passed 12/27/2019 12/31/2019
Misc
Informational
12/26/2019
John DiMauro 12/26/2019 4:00 PM MH 1-1: 11.5'ft deep Held for 2.5 min with no drop Test passed. MH 2-1: 14'ft deep Held for 2.5 min with no drop Test passed. MH 2-2: 13'ft deep Held for 2.5 min with no drop Test passed. MH 2-3: 13'ft deep I observed a drop on the gauge from 10 to 9.25 in the 2.5 min test. Test passed. MH 3-1: 13'ft deep I observed a drop on the gauge from 10 to 9.5 in the 2.5 min test. Test Passed. MH 3-2: 13'ft deep I observed a drop on the gauge of more than 1" within the 2.5 min test time. TEST FAILED The crew plans to make corrections to the MH tomorrow morning and will call back for another test.
Misc
Informational
12/31/2019
John DiMauro 12/31/2019 8:34 AM On Friday 12/27/2019 The Redford crew made corrections to MH 3-2 and vacuum tested it again. Marquelle Williams observed the test and verified that the MH passed Testing. The MH is 13'ft deep and held for 2.5 minutes with no drop on the gauge.
Erosion Control Inspection Failed 01/03/2020
Misc
Informational
10/14/2019
The Erosion and Sediment Control devices have been installed according to the ESC Phase 1 sheet of the approved plans.
Misc
Informational
10/14/2019
The erosion control devices appear to be intact and controlling the site run off efficiently./
Misc
Informational
10/14/2019
ESC devices are intact. Site runoff is being properly controlled.
Misc
Informational
10/14/2019
ESC devices are intact. Site runoff is being properly controlled.
Misc
Corrective Action Required
01/03/2020
The north storm curb inlet box at the intersection of SW Hickory LN & SW Ladderback DR has straw / hay built up and washed into it. Please remove the straw / hay and replace the inlet protection fencing to avoid straw / hay collecting into the storm system.
Water - Material Verification Passed 01/27/2020
Misc
Informational
01/27/2020
I verified that the materials on site for the water line install meet the City of LS design criteria.
Water Line - Construction Inspection Partial 01/28/2020
Misc
Informational
01/28/2020
The Redford crew was on site yesterday 1/28 and today working on the Water lines 1 & 3 install. The crew installed approx. 334’FT of line 1. The crew has currently installed approx. 150’FT of water line 2. The install appears to meet the city specs and photos of the lines are uploaded into the system.
Water Line - Construction Inspection Partial 01/30/2020
Misc
Informational
01/30/2020
The Redford crew completed the water line 3 install. Photos of the work have been uploaded. The crew is currently working on the line 2 install on the east end. I will return this afternoon for further inspection.
Water Line - Construction Inspection Partial 01/30/2020
Misc
Informational
01/30/2020
The Redford crew completed the water line 3 install. Photos of the work have been uploaded. The crew is currently working on the line 2 install on the east end. I will return this afternoon for further inspection.
Misc
Informational
01/30/2020
The Redford crew started the install of water line 2 on the east end of the line at station 16+70.11 and installed approximately 300’ft of the line. The crew also poured thrust blocks on the line. Photos of the work are uploaded into the system.
Water Line - Construction Inspection Partial 1/31/2020 01/31/2020
Misc
Informational
01/30/2020
The Redford crew completed the water line 3 install. Photos of the work have been uploaded. The crew is currently working on the line 2 install on the east end. I will return this afternoon for further inspection.
Misc
Informational
01/30/2020
The Redford crew started the install of water line 2 on the east end of the line at station 16+70.11 and installed approximately 300’ft of the line. The crew also poured thrust blocks on the line. Photos of the work are uploaded into the system.
Misc
Informational
01/31/2020
The Redford crew tied onto the existing valve on the west end of line 1. I verified that the materials and install meet the City of LS Standards. The water was restored and the crew plans to hydrostatic test the 3 lines next week.
Water Line - Construction Inspection Partial 02/04/2020
Misc
Informational
01/31/2020
The Redford crew completed the water line 3 install. Photos of the work have been uploaded. The crew is currently working on the line 2 install on the east end. I will return this afternoon for further inspection.
Misc
Informational
01/31/2020
The Redford crew started the install of water line 2 on the east end of the line at station 16+70.11 and installed approximately 300’ft of the line. The crew also poured thrust blocks on the line. Photos of the work are uploaded into the system.
Misc
Informational
01/31/2020
The Redford crew tied onto the existing valve on the west end of line 1. I verified that the materials and install meet the City of LS Standards. The water was restored and the crew plans to hydrostatic test the 3 lines next week.
Misc
Informational
02/04/2020
The Redford construction crew is continuing the water line 2 install. The crew installed approximately 200’ft of the 8” line before running into significant amount of rock that slowed down progress. The crew plans to have the new line ready to tie onto the existing line at station 10+00 tomorrow. Photos of the work are uploaded into the system.
Water Line - Hydrostatic Test Partial 02/10/2020
Misc
Informational
02/10/2020
I observed the hydrostatic pressure test for Water Lines 1&3. Line 1 held 163 psi for two hours. Test Passed. Line 3 held 155 psi for two hours. Test Passed. The crew plans to return after lunch to hydro test Water Line 2.
Water Line - Hydrostatic Test Passed 2/10/2020 02/11/2020
Misc
Informational
02/10/2020
I observed the hydrostatic pressure test for Water Lines 1&3. Line 1 held 163 psi for two hours. Test Passed. Line 3 held 155 psi for two hours. Test Passed. The crew plans to return after lunch to hydro test Water Line 2.
Misc
Informational
02/11/2020
I observed the hydro test for Water Line 2. The line held at 163 psi for two hours. Test Passed.
Water Line - Coliform Test 1 Passed 02/18/2020
Misc
Informational
02/18/2020
The day 1 bacteria results passed. The Keystone Lab Results have been uploaded into the system.
Water Line - Coliform Test 2 Passed 02/18/2020
Misc
Informational
02/18/2020
The day 2 bacteria test results passed. The results from Keystone Labs have been uploaded into the system.
Erosion Control Inspection Failed 03/09/2020
Misc
Resolved
03/09/2020
The Erosion and Sediment Control devices have been installed according to the ESC Phase 1 sheet of the approved plans.
Misc
Resolved
03/09/2020
The erosion control devices appear to be intact and controlling the site run off efficiently./
Misc
Resolved
03/09/2020
ESC devices are intact. Site runoff is being properly controlled.
Misc
Resolved
03/09/2020
ESC devices are intact. Site runoff is being properly controlled.
Misc
Resolved
03/09/2020
The north storm curb inlet box at the intersection of SW Hickory LN & SW Ladderback DR has straw / hay built up and washed into it. Please remove the straw / hay and replace the inlet protection fencing to avoid straw / hay collecting into the storm system.
Misc
Corrective Action Required
03/09/2020
EROSION CONTROL INSPECTION FAILED There are areas on site along SW LADDERBACK DR where the silt fence has failed and is allowing silt and mud to run into the storm water collection system. Please make corrections to the silt fence asap to contain the silt and mud on the site.
Erosion Control Inspection Failed 03/11/2020
Misc
Corrective Action Required
03/09/2020
EROSION CONTROL INSPECTION FAILED There are areas on site along SW LADDERBACK DR where the silt fence has failed and is allowing silt and mud to run into the storm water collection system. Please make corrections to the silt fence asap to contain the silt and mud on the site.
Misc
Corrective Action Required
03/11/2020
EROSION CONTROL INSPECTION FAILED There are areas on site where the silt fence is down and needs corrected. At the intersection of LADDERBACK & RIVER TRAIL there is mud and silt washing from the site and collecting on the street and in the storm system. Please clean the street and correct the ESC devices asap.
Erosion Control Inspection Failed 03/17/2020
Misc
Resolved
03/17/2020
EROSION CONTROL INSPECTION FAILED There are areas on site along SW LADDERBACK DR where the silt fence has failed and is allowing silt and mud to run into the storm water collection system. Please make corrections to the silt fence asap to contain the silt and mud on the site.
Misc
Resolved
03/17/2020
EROSION CONTROL INSPECTION FAILED There are areas on site where the silt fence is down and needs corrected. At the intersection of LADDERBACK & RIVER TRAIL there is mud and silt washing from the site and collecting on the street and in the storm system. Please clean the street and correct the ESC devices asap.
Misc
Corrective Action Required
03/17/2020
EROSION CONTROL INSPECTION FAILED The silt fence along the perimeter of the site has been corrected and appears to be containing the silt and mud from leaving the site. Please continue to monitor and make corrections if need to the silt fence after rain events. The existing road that connects to the proposed through street on SW RIVER TRAIL RD & SW LADDERBACK DR needs to have erosion control devices installed to keep the mud from leaving the site. Install a proper construction entrance of some other type of erosion control device to control the run off. There is a significant amount of mud collecting on the road at this location. Photos of this area are uploaded to the system.
Erosion Control Inspection Failed 03/27/2020
Misc
Corrective Action Required
03/17/2020
EROSION CONTROL INSPECTION FAILED The silt fence along the perimeter of the site has been corrected and appears to be containing the silt and mud from leaving the site. Please continue to monitor and make corrections if need to the silt fence after rain events. The existing road that connects to the proposed through street on SW RIVER TRAIL RD & SW LADDERBACK DR needs to have erosion control devices installed to keep the mud from leaving the site. Install a proper construction entrance of some other type of erosion control device to control the run off. There is a significant amount of mud collecting on the road at this location. Photos of this area are uploaded to the system.
Misc
Corrective Action Required
03/27/2020
EROSION CONTROL INSPECTION FAILED The silt fence along the perimeter of the site has been corrected and appears to be containing the silt and mud from leaving the site. Please continue to monitor and make corrections if need to the silt fence after rain events. The existing road that connects to the proposed through street on SW RIVER TRAIL RD & SW LADDERBACK DR needs to have erosion control devices installed to keep the mud from leaving the site. Install a proper construction entrance of some other type of erosion control device to control the run off. There is a significant amount of mud collecting on the road at this location and needs to be cleaned up asap. Photos of this area are uploaded to the system.
Pavement-Stabilized Subgrade Partial 4/2/2020 04/02/2020
Misc
Informational
04/02/2020
Randy Spalding Excavating’s crew is on site installing the FlyAsh sub grade stabilization for the roads. The crew appears to be using the proper equipment and methods for the install. I have been spot checking for depth periodically throughout the site and they appear to be mixing in a sufficient amount of FlyAsh. Olsson Testing is on site for the density testing. The field tester for Olsson has preliminarily said that the densities look good. We will be provided with a copy of the reports after the samples have been lab tested.
Storm - Pipe Partial 04/07/2020
Misc
Informational
04/07/2020
The Redford Construction Crew is on site installing the three under drain crossings for the streets. I verified the correct materials used. 6” HDPE pipe being installed and fabric lining under. The install appears to correspond with the approved plans. Photos of the work have been uploaded to the system. The crew plans to return tomorrow to grout and seal the inside of the storm inlet boxes. I will return for further inspection.
Pavement-Stabilized Subgrade Passed 04/08/2020
Misc
Informational
04/02/2020
Randy Spalding Excavating’s crew is on site installing the FlyAsh sub grade stabilization for the roads. The crew appears to be using the proper equipment and methods for the install. I have been spot checking for depth periodically throughout the site and they appear to be mixing in a sufficient amount of FlyAsh. Olsson Testing is on site for the density testing. The field tester for Olsson has preliminarily said that the densities look good. We will be provided with a copy of the reports after the samples have been lab tested.
Pavement-Proof Roll Partial 04/08/2020
Misc
Corrective Action Required
04/08/2020
I observed the proof roll test for the FlyAsh treated sub-grade on all three proposed streets. I verified the correct load weight and truck was used. There were a few sections in the lower lying “sump” areas of the roads that failed the test. The crew is going to make corrections to these areas and and test again later this week.
Storm - Pipe Passed 4/8/2020 04/08/2020
Misc
Informational
04/07/2020
The Redford Construction Crew is on site installing the three under drain crossings for the streets. I verified the correct materials used. 6” HDPE pipe being installed and fabric lining under. The install appears to correspond with the approved plans. Photos of the work have been uploaded to the system. The crew plans to return tomorrow to grout and seal the inside of the storm inlet boxes. I will return for further inspection.
Misc
Informational
04/08/2020
All six curb inlet under drain penetrations have been grout and sealed in side the boxes. Photos are uploaded to the system.
Storm - Inlets Clean Failed 04/08/2020
Misc
Corrective Action Required
04/08/2020
A number of the storm curb inlets have silt, mud and construction debris built up in them. Please flush and clean the inlets out asap to avoid the debris from collecting and clogging the public storm water collection system.
Pavement-Proof Roll Passed 4/9/2020 04/09/2020
Misc
Corrective Action Required
04/08/2020
I observed the proof roll test for the FlyAsh treated sub-grade on all three proposed streets. I verified the correct load weight and truck was used. There were a few sections in the lower lying “sump” areas of the roads that failed the test. The crew is going to make corrections to these areas and and test again later this week.
Misc
Informational
04/09/2020
The Spalding Excavating crew made corrections to the soft areas of the street yesterday. I observed a second proof roll test this morning of the corrected areas and the roll test passed.
Curb - Proof Roll Partial 04/20/2020
Misc
Corrective Action Required
04/20/2020
I observed the curb proof roll for the three streets on this project. At this time there are a few areas on each street that were soft and had some deflection. The crew is going to work some of the soft areas and perform another roll test tomorrow ahead any curb going in. I verified the correct load weight and equipment used for the test.
Curb - Proof Roll Failed 4/21/2020 04/21/2020
Misc
Corrective Action Required
04/20/2020
I observed the curb proof roll for the three streets on this project. At this time there are a few areas on each street that were soft and had some deflection. The crew is going to work some of the soft areas and perform another roll test tomorrow ahead any curb going in. I verified the correct load weight and equipment used for the test.
Misc
Corrective Action Required
04/21/2020
On 4/20/2020 at 4:00pm another proof roll test was performed due to the rain event earlier in the morning. The roll test failed. The crew will try again later in the week before curbs will be allowed to be installed.
Erosion Control Inspection Failed 04/29/2020
Misc
Resolved
04/29/2020
EROSION CONTROL INSPECTION FAILED The silt fence along the perimeter of the site has been corrected and appears to be containing the silt and mud from leaving the site. Please continue to monitor and make corrections if need to the silt fence after rain events. The existing road that connects to the proposed through street on SW RIVER TRAIL RD & SW LADDERBACK DR needs to have erosion control devices installed to keep the mud from leaving the site. Install a proper construction entrance of some other type of erosion control device to control the run off. There is a significant amount of mud collecting on the road at this location. Photos of this area are uploaded to the system.
Misc
Resolved
04/29/2020
EROSION CONTROL INSPECTION FAILED The silt fence along the perimeter of the site has been corrected and appears to be containing the silt and mud from leaving the site. Please continue to monitor and make corrections if need to the silt fence after rain events. The existing road that connects to the proposed through street on SW RIVER TRAIL RD & SW LADDERBACK DR needs to have erosion control devices installed to keep the mud from leaving the site. Install a proper construction entrance of some other type of erosion control device to control the run off. There is a significant amount of mud collecting on the road at this location and needs to be cleaned up asap. Photos of this area are uploaded to the system.
Misc
Corrective Action Required
04/29/2020
FAILED EROSION CONTROL INSPECTION THE SILT FENCE ALONG SW LADDERBACK DR AND JUST EAST OF SW HICKORY LN HAS FAILED AND IS ALLOWING SILT AND MUD TO COLLECT INTO THE STORM WATER COLLECTION SYSTEM. MAKE CORRECTIONS TO THE SILT FENCE AND CLEAN THE MUD FROM THE INLET ASAP.
Curb - Proof Roll Passed 04/29/2020
Misc
Corrective Action Required
04/21/2020
I observed the curb proof roll for the three streets on this project. At this time there are a few areas on each street that were soft and had some deflection. The crew is going to work some of the soft areas and perform another roll test tomorrow ahead any curb going in. I verified the correct load weight and equipment used for the test.
Misc
Corrective Action Required
04/21/2020
On 4/20/2020 at 4:00pm another proof roll test was performed due to the rain event earlier in the morning. The roll test failed. The crew will try again later in the week before curbs will be allowed to be installed.
Misc
Informational
04/29/2020
I observed the curb proof roll for the public streets this afternoon. Approx 95% of the roll test passed. There is a small section approx 25’ ft in the HICKORY cul-de-sac that was a little soft and showed some deflection. Tomorrow, the curb crew is going to start installing curb on the north side of the project and are going to leave the questionable section until the end. Another proof roll test will be performed prior to any curb being laid on the questionable section.
Public Curb Inspection Partial 04/30/2020
Misc
Informational
04/30/2020
JK Concrete was on site and installed the majority of the CG-2 Public curb. I verified that the equipment and methods used are in compliance with the City of Lee’s Summit specs. I verified that the crew used KCMMB mix. The crew plans to return tomorrow to pour the curb inlet sections.
Public Curb Inspection Partial 5/1/2020 05/01/2020
Misc
Informational
04/30/2020
JK Concrete was on site and installed the majority of the CG-2 Public curb. I verified that the equipment and methods used are in compliance with the City of Lee’s Summit specs. I verified that the crew used KCMMB mix. The crew plans to return tomorrow to pour the curb inlet sections.
Misc
Informational
05/01/2020
JK Concrete is on site finishing up the curb pours. The crew is pouring the curb inlet sections of the project. I verified the correct mix type and that the install meets the city guidelines. Olsson testing has been on site both days during the install to collect samples. We will get the results of the tests in the near future. I will return Monday for follow up final inspections of the curbs.
Site Visit Complete 05/05/2020
Misc
Informational
05/05/2020
I met on site with Brian from JK Concrete to look at the proposed sidewalk along SW Ladderback. There is an AT&T utility box right in the path of the sidewalk that will need to be relocated if there is not enough ROW space to divert around the box. I will look at the ROW maps and make a determination if the box can stay or go. I will reach out to AT&T if the box needs relocated.
Pavement-Proof Roll Passed 05/05/2020
Misc
Informational
05/05/2020
I observed the proof roll for the streets prior to asphalt install. I verified the correct load weight and equipment used. The roll test passed with with no deflection. Superior Bowen will be on site tomorrow morning to start the asphalt base layer.
Sidewalk Inspection Partial 05/06/2020
Misc
Informational
05/06/2020
JK Concrete formed the section of sidewalk along Eagle View Dr. The majority of the sidewalk is ready to pour but there is a section near the ADA ramp that has an AT&T utility box in the way. The crew is going to pour that section tying into the ADA ramp at a later date. AT&T has been notified and a work order to move the box has been created. I will return for a post pour inspection later this week.
Pavement-Surface Passed 05/06/2020
Misc
Informational
05/06/2020
Superior Bowen was on site installing the base asphalt lift for the roads. I verified that the correct mix type and temperature was used during the install. I verified that the correct equipment and install procedure was used during the install as well. The density testing lab was on site during the install and the preliminary results were in compliance. We will receive the testing results in the near future. The crew plans to install the surface lift tomorrow morning 5/7/2020.
Street - Surface Course Passed 5/7/2020 05/07/2020
Misc
Informational
05/07/2020
Superior Bowen was on site installing the surface asphalt lift for the roads. I verified that the correct mix type and temperature was used during the install. I verified that the correct equipment and install procedure was used during the install as well. The density testing lab was on site during the install and the preliminary results were in compliance. We will receive the testing results in the near future.
Public Curb Inspection Passed 5/4/2020 06/02/2020
Misc
Informational
05/01/2020
JK Concrete was on site and installed the majority of the CG-2 Public curb. I verified that the equipment and methods used are in compliance with the City of Lee’s Summit specs. I verified that the crew used KCMMB mix. The crew plans to return tomorrow to pour the curb inlet sections.
Misc
Informational
05/01/2020
JK Concrete is on site finishing up the curb pours. The crew is pouring the curb inlet sections of the project. I verified the correct mix type and that the install meets the city guidelines. Olsson testing has been on site both days during the install to collect samples. We will get the results of the tests in the near future. I will return Monday for follow up final inspections of the curbs.
Misc
Informational
06/02/2020
The public curbs are installed according to the approved plans and the compressive concrete strength reports have been received.
Storm Sewer Construction Inspection Failed 5/6/2020 06/02/2020
Misc
Resolved
06/02/2020
The Redford crew tied into the existing storm curb inlet at station 10+00. The crew ran the pipe to station 11+78.94 and installed the two curb inlets and storm manhole between the run. I verified that the install matches the approved plans and that the proper materials were used. Photos of the work are uploaded.
Misc
Resolved
06/02/2020
The Redford crew is continuing the storm install. The crew installed the line from station 11+78.94 to 13+79.02 The crew set the 2 storm manholes and field inlet 1-5. Photos of the work are uploaded.
Misc
Resolved
06/02/2020
The Redford crew is continuing the storm sewer install. The concrete truck is on site to pour the collars and inverts for field inlet 1-5 and MH 1-6. I will return for further inspections after lunch.
Misc
Resolved
06/02/2020
The Redford crew is continuing the storm line 2 install. The crew set inlet 2-1 and has the pipe stubbed in. The crew plans to pour the collars and inverts this afternoon. I will return for further inspection tomorrow. Photos of the work are uploaded.
Misc
Corrective Action Required
06/02/2020
The storm sewer curb inlets are installed and the curb throats are poured. The inside of the storm boxes still need grouted (specifically where the curb throats were poured) prior to acceptance. Additionally, the line needs flushed of construction debris prior to acceptance. Call before flushing the line to make sure that an inspector is on site to witness the flush and collection of debris.
Sidewalk Inspection Partial 5/11/2020 06/02/2020
Misc
Informational
05/06/2020
JK Concrete formed the section of sidewalk along Eagle View Dr. The majority of the sidewalk is ready to pour but there is a section near the ADA ramp that has an AT&T utility box in the way. The crew is going to pour that section tying into the ADA ramp at a later date. AT&T has been notified and a work order to move the box has been created. I will return for a post pour inspection.
Misc
Corrective Action Required
06/02/2020
The majority of the sidewalk is installed. There is approx a 23’ ft section that has not been installed yet due to an AT&T utility box in the way that needs moved. A service request was sent to AT&T on 05/05/2020 to have the box relocated but they have not responded yet with a date for that box to be moved. The sidewalk that is currently installed meets ADA guidelines and is acceptable.
Erosion Control Inspection Partial 07/09/2020
Misc
Resolved
07/09/2020
FAILED EROSION CONTROL INSPECTION THE SILT FENCE ALONG SW LADDERBACK DR AND JUST EAST OF SW HICKORY LN HAS FAILED AND IS ALLOWING SILT AND MUD TO COLLECT INTO THE STORM WATER COLLECTION SYSTEM. MAKE CORRECTIONS TO THE SILT FENCE AND CLEAN THE MUD FROM THE INLET ASAP.
Misc
Informational
07/09/2020
The ESC devices remain installed and intact at this time.
Storm - Inlets Clean Passed 07/14/2020
Misc
Informational
07/14/2020
A Redford Construction crew was on site today to clean the storm inlets. The crew also grouted the curb throats and removed the lift rings / cables.
Install Street and Stop Signs Passed 08/19/2020
Misc
Informational
08/19/2020
I have verified that all the street and stop signs have been installed and correctly match the approved plans as well as meet the City of LS detail criteria.
Sidewalk Inspection Passed 08/24/2020
Misc
Informational
06/02/2020
JK Concrete formed the section of sidewalk along Eagle View Dr. The majority of the sidewalk is ready to pour but there is a section near the ADA ramp that has an AT&T utility box in the way. The crew is going to pour that section tying into the ADA ramp at a later date. AT&T has been notified and a work order to move the box has been created. I will return for a post pour inspection.
Misc
Corrective Action Required
06/02/2020
The majority of the sidewalk is installed. There is approx a 23’ ft section that has not been installed yet due to an AT&T utility box in the way that needs moved. A service request was sent to AT&T on 05/05/2020 to have the box relocated but they have not responded yet with a date for that box to be moved. The sidewalk that is currently installed meets ADA guidelines and is acceptable.
Water Line - Valve Passed 08/24/2020
Water Line - Fire Hydrant Passed 08/24/2020
Water Line - Thrust Restraint Passed 08/24/2020
Water Line - Construction Taps Removed Passed 08/24/2020
Sanitary Sewer - Invert Passed 08/24/2020
Install Street and Stop Signs Passed 08/24/2020
Curb - Compression Strength Passed 08/24/2020
Storm - Material Verification Passed 08/24/2020
Storm - Swales Passed 08/24/2020
Water - Material Verification Passed 08/24/2020
Sanitary - Material Verification Passed 08/24/2020
Storm - Material Verification Passed 08/24/2020
Sanitary Sewer Construction Inspection Passed 08/24/2020
Misc
Informational
10/22/2019
The Redford Construction crew is on site starting the sanitary sewer install. The crew exposed the base of the existing MH on site near the intersection of SW Ladderback Dr. and SW River Trail Dr. The crew plans to core into the MH this afternoon and prepare to start laying pipe tomorrow. I will return for further inspection of the core and sewer line tomorrow morning.
Misc
Informational
10/22/2019
The Redford crew has laid an additional 100’ ft of the sanitary line A. The install appears to meet the design and construction standards. Photos of the work are uploaded. Olsson Testing is on site taking proctors for compaction testing.
Misc
Informational
10/22/2019
The Redford crew is continuing the sanitary sewer install for line 2. The crew cored into the existing MH at Old Port and Ladderback and ran the line approx. 200’ ft.
Misc
Informational
10/22/2019
The Redford crew is on site and installed the invert for existing MH 21-029. The crew installed the trench checks on the service lines for lots 718 & 728. The crew is currently working on the invert install for existing MH 30-132. I will do a fallow up inspection for the inverts this afternoon. Photos of the trench checks are uploaded to the system.
Misc
Informational
10/22/2019
The Redford crew set MH 2-1 and ran approximately 100’ ft of the 8” line to the east. Photos of the work are uploaded to the system.
Misc
Informational
10/22/2019
The Redford crew is on site continuing the sanitary sewer line 2 install. The crew is into a significant amount of rock breaking and the install is moving slower than normal. The crew is averaging approximately 1 stick of pipe every three hours for install times. The crew is set to approximately station 14+00. Photos of the current work have been uploaded.
Misc
Informational
10/22/2019
The Redford crew is installing the service lines and trench checks for line 2. Photos of the work are uploaded into the system.
Misc
Informational
10/22/2019
The Redford crew was continuing the install of sanitary lines 2 & 3. The crew has the mains installed and is working on the service laterals at this time. The crew plans to pour trench checks for the laterals this afternoon. I will return for further inspection tomorrow morning. Photos are uploaded to the system.
Storm Sewer Construction Inspection Passed 08/24/2020
Misc
Corrective Action Required
06/02/2020
The storm sewer curb inlets are installed and the curb throats are poured. The inside of the storm boxes still need grouted (specifically where the curb throats were poured) prior to acceptance. Additionally, the line needs flushed of construction debris prior to acceptance. Call before flushing the line to make sure that an inspector is on site to witness the flush and collection of debris.
Water - Material Verification Passed 08/24/2020
Sanitary Sewer - Camera Test Passed 9/23/2020 08/24/2020
Documents & Images
Date Uploaded File Type Document Name
09/04/2019 Receipt Receipt for transaction: 2019-005993
09/23/2019 Letter DE-Permit
09/23/2019 Eagle Creek 16th Plat Signed Permit
09/25/2019 Sanitary Materials
09/25/2019 Sanitary materials 0
09/25/2019 Sanitary materials 1
09/25/2019 Sanitary materials 2
09/25/2019 Sanitary materials 3
09/25/2019 Sanitary materials 4
09/25/2019 Sanitary materials 5
09/25/2019 Sanitary materials 6
09/25/2019 Sanitary materials 7
09/25/2019 Letter INSPECTION SUMMARY
09/25/2019 Letter INSPECTION SUMMARY
09/25/2019 Letter INSPECTION SUMMARY
09/26/2019 Core into MH
09/26/2019 Sanitary Line
09/26/2019 Letter INSPECTION SUMMARY
09/26/2019 Sanitary line A
09/26/2019 Sanitary line A0
09/26/2019 Letter INSPECTION SUMMARY
10/03/2019 Letter INSPECTION SUMMARY
10/03/2019 Letter INSPECTION SUMMARY
10/04/2019 Letter INSPECTION SUMMARY
10/04/2019 Trench check lot 718
10/04/2019 Trench check lot 728
10/08/2019 Letter INSPECTION SUMMARY
10/08/2019 MH 2-1
10/08/2019 Letter INSPECTION SUMMARY
10/14/2019 Letter INSPECTION SUMMARY
10/14/2019 Sanitary sewer line 2
10/14/2019 Letter INSPECTION SUMMARY
10/17/2019 image
10/17/2019 Letter INSPECTION SUMMARY
10/22/2019 Letter INSPECTION SUMMARY
11/05/2019 Letter INSPECTION SUMMARY
11/05/2019 Storm MH
11/05/2019 Storm MH0
11/05/2019 Storm Curb inlet 1-2
11/05/2019 Storm curb inlet 1-3
11/06/2019 Storm MH 1-5 to 1-6 connection
11/06/2019 Storm pipe & collar for MH 1-5
11/06/2019 Storm MH invert
11/06/2019 Letter INSPECTION SUMMARY
11/07/2019 Letter INSPECTION SUMMARY
11/14/2019 Storm box 2-1
11/14/2019 Storm box 2-2
11/14/2019 Letter INSPECTION SUMMARY
12/26/2019 Letter DE-Daily Inspection Summary
12/26/2019 Letter DE-Daily Inspection Summary
12/26/2019 Letter DE-Daily Inspection Summary
12/31/2019 Letter DE-Daily Inspection Summary
01/03/2020 Letter INSPECTION SUMMARY
01/03/2020 Failed Erosion Control
01/27/2020 Water Line materials
01/27/2020 Water Line materials 0
01/27/2020 Water line materials 1
01/27/2020 Water line materials 2
01/27/2020 Water line materials 3
01/27/2020 Water line materials 4
01/27/2020 Letter INSPECTION SUMMARY
01/27/2020 Letter INSPECTION SUMMARY
01/27/2020 Letter INSPECTION SUMMARY
01/27/2020 Letter INSPECTION SUMMARY
01/27/2020 Letter INSPECTION SUMMARY
01/28/2020 Water line 3
01/28/2020 Water line 4
01/28/2020 Letter INSPECTION SUMMARY
01/30/2020 Water Line 2
01/30/2020 Water line 3 Thrust
01/30/2020 Water line 3 Thrust0
01/30/2020 Water line 3 thrust1
01/30/2020 Water line 3 thrust2
01/30/2020 Water line 3 thrust3
01/30/2020 Water line 3 thrust
01/30/2020 Water line 3 thrust 0
01/30/2020 Water line 3 thrust4
01/30/2020 Water line 3 thrust 1
01/30/2020 Water line 3 thrust 2
01/30/2020 Letter INSPECTION SUMMARY
01/30/2020 Letter INSPECTION SUMMARY
01/30/2020 Water line 2 thrust
01/30/2020 Water line 2 thrust0
01/31/2020 Water line 1 tie in
01/31/2020 Letter INSPECTION SUMMARY
02/04/2020 Letter INSPECTION SUMMARY
02/04/2020 Water Line 2
02/04/2020 Water Line 3
02/04/2020 Water Line 4
02/10/2020 Letter INSPECTION SUMMARY
02/11/2020 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
02/18/2020 Letter INSPECTION SUMMARY
03/02/2020 WO#1B00821 - City of Lees Summit
03/02/2020 WO#1B00887 - City of Lees Summit
03/09/2020 Letter INSPECTION SUMMARY
03/11/2020 Letter INSPECTION SUMMARY
03/17/2020 Letter INSPECTION SUMMARY
03/17/2020 Letter INSPECTION SUMMARY
03/17/2020 20
03/17/2020 21
03/27/2020 Letter INSPECTION SUMMARY
04/02/2020 Letter INSPECTION SUMMARY
04/07/2020 Under Drain River Trail
04/07/2020 Under Drain Old Port Rd
04/07/2020 Letter INSPECTION SUMMARY
04/08/2020 Letter INSPECTION SUMMARY
04/08/2020 Letter INSPECTION SUMMARY
04/08/2020 Hickory Under drain inlet
04/08/2020 Hickory LN inlet under drain
04/08/2020 Old Port Inlet under drain
04/08/2020 Old Port inlet under drain 0
04/08/2020 River Trail inlet under drain
04/08/2020 River trail inlet under drain
04/08/2020 Letter INSPECTION SUMMARY
04/08/2020 Letter INSPECTION SUMMARY
04/09/2020 Letter INSPECTION SUMMARY
04/20/2020 Letter INSPECTION SUMMARY
04/21/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/29/2020 Letter INSPECTION SUMMARY
04/30/2020 Letter INSPECTION SUMMARY
05/01/2020 Letter INSPECTION SUMMARY
05/05/2020 Letter INSPECTION SUMMARY
05/06/2020 Letter INSPECTION SUMMARY
05/06/2020 Letter INSPECTION SUMMARY
05/07/2020 Letter INSPECTION SUMMARY
06/01/2020 Plans 20-06-01_Eagle_Creek_16_Water_As-built_Plans
06/01/2020 20-06-01_Eagle_Creek_16_MDNR_Submittals_Letter
06/01/2020 20-06-01_Eagle_Creek_16_Sanitary_As-built_Plans
06/01/2020 Plans 20-06-01_Eagle_Creek_16_Street_&_Storm_As-built_Plans
06/02/2020 Letter INSPECTION SUMMARY
06/02/2020 Letter INSPECTION SUMMARY
06/02/2020 Letter INSPECTION SUMMARY
07/09/2020 Letter INSPECTION SUMMARY
07/14/2020 Letter INSPECTION SUMMARY
08/19/2020 Letter INSPECTION SUMMARY
08/24/2020 Letter DE-Certificate of Substantial Completion Multiple Lot
08/24/2020 Letter DE-Punch List
08/24/2020 Letter Eagle Creek 16th Plat Signed Certificate of Substantial Completion
08/24/2020 Letter Eagle Creek 16th Plat Signed Punch List
04/02/2021 Letter scan_98809_2019-09-23-11-14-15
04/02/2021 3RD Party Insp Report WO#1B00821 - City of Lees Summit
04/02/2021 3RD Party Insp Report WO#1B00887 - City of Lees Summit
08/24/2023 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: