Summary


PRSITE20212248
Development - Site
Final Completion
WEST PRYOR OWNERS ASSOCIATION INC
DEVELOPMENT COMPLETE
STREETS OF WEST PRYOR - FULL MINE REMEDIATION AND LONG TERM MONITORING CLOSED THE PERMIT AS THE REMEDIATION IS COMPLETE. WILL CONTINUE TO TRACK THE LONG TERM MONITORING - Mike Weisenborn 03/12/2024 4:06 PM
05/04/2021
06/21/2021
03/12/2024
Locations
Contacts
WEST PRYOR OWNERS ASSOCIATION INC, Address:7200 W 132ND ST STE 109  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
UES dba GEOTECHNOLOGY LLC, Address:5055 ANTIOCH RD, Phone:(913) 438-1900  
Drill Tech Drilling and Shoring, Inc, Address:8334 RUBY AVE  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 05/04/2021 06/21/2021
Dawn Bell
Engineering Review No Comments 05/17/2021 05/14/2021
Sue Pyles, P.E.
Fees
Paid Fees Amount Paid Owing Date Paid
9110071-Site Grading Fee $1,224.00 $1,224.00 Paid 06/11/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Partial 07/30/2021
Misc
Informational
07/30/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place.
Erosion Control Inspection Partial 8/2/2021 08/02/2021
Misc
Informational
07/30/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time.
Erosion Control Inspection Partial 8/3/2021 08/03/2021
Misc
Informational
08/02/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet.
Erosion Control Inspection Partial 8/4/2021 8/4/2021 08/04/2021
Misc
Informational
08/03/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time.
Erosion Control Inspection Partial 8/5/2021 8/5/2021 08/05/2021
Misc
Informational
08/04/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Erosion Control Inspection Partial 8/12/2021 08/12/2021
Misc
Informational
08/05/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
08/12/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Erosion Control Inspection Partial 8/16/2021 8/16/2021 08/16/2021
Misc
Informational
08/12/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
08/12/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
08/16/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Erosion Control Inspection Partial 8/17/2021 8/17/2021 08/17/2021
Misc
Informational
08/16/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
08/16/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
08/16/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
08/17/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Erosion Control Inspection Partial 8/18/2021 8/18/2021 08/18/2021
Misc
Informational
08/17/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
08/17/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
08/17/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
08/17/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
08/18/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Erosion Control Inspection Partial 8/19/2021 8/19/2021 08/19/2021
Misc
Informational
08/18/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
08/18/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
08/18/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
08/18/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
08/18/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
08/19/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Erosion Control Inspection Partial 8/20/2021 8/20/2021 08/23/2021
Misc
Informational
08/19/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
08/19/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
08/19/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
08/19/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
08/19/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
08/19/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
08/23/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
08/23/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Erosion Control Inspection Partial 8/24/2021 8/24/2021 08/24/2021
Misc
Informational
08/23/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
08/23/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
08/23/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
08/23/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
08/23/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
08/23/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
08/23/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
08/23/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
08/24/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Erosion Control Inspection Partial 8/25/2021 8/25/2021 08/25/2021
Misc
Informational
08/24/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
08/24/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
08/24/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
08/24/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
08/24/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
08/24/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
08/24/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
08/24/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
08/24/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
08/25/2021
Both operations are running, no issues on site. RP 8-25-21
Erosion Control Inspection Partial 8/26/2021 8/26/2021 08/26/2021
Misc
Informational
08/25/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
08/25/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
08/25/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
08/25/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
08/25/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
08/25/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
08/25/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
08/25/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
08/25/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
08/25/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
08/26/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
08/26/2021
Both operations are running, no issues on site. RP 8-26-21
Erosion Control Inspection Partial 8/27/2021 8/27/2021 08/27/2021
Misc
Informational
08/26/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
08/26/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
08/26/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
08/26/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
08/26/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
08/26/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
08/26/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
08/26/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
08/26/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
08/26/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
08/26/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
08/26/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Erosion Control Inspection Partial 8/30/2021 8/30/2021 08/30/2021
Misc
Informational
08/27/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
08/27/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
08/27/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
08/27/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
08/27/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
08/27/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
08/27/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
08/27/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
08/27/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
08/27/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
08/27/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
08/27/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
08/30/2021
Both operations are running, no issues on site. RP 8-30-21
Erosion Control Inspection Partial 8/31/2021 8/31/2021 08/31/2021
Misc
Informational
08/30/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
08/30/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
08/30/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
08/30/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
08/30/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
08/30/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
08/30/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
08/30/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
08/30/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
08/30/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
08/30/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
08/30/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
08/30/2021
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
08/31/2021
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Erosion Control Inspection Partial 9/1/2021 9/1/2021 09/01/2021
Misc
Informational
08/31/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
08/31/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
08/31/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
08/31/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
08/31/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
08/31/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
08/31/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
08/31/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
08/31/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
08/31/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
08/31/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
08/31/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
08/31/2021
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
08/31/2021
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Misc
Informational
09/01/2021
Sprayer is running, rock crusher was down for a jammed belt. Drill crew was down, replacing a broken transmission. Talked with Josh from the drill crew. He’s going to clean up the little bit of that was dragged out into the roadway. RP 9-1-21
Erosion Control Inspection Partial 9/2/2021 9/2/2021 09/02/2021
Misc
Informational
09/01/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
09/01/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
09/01/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
09/01/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
09/01/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
09/01/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
09/01/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
09/01/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
09/01/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
09/01/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
09/01/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
09/01/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
09/01/2021
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
09/01/2021
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Misc
Informational
09/01/2021
Sprayer is running, rock crusher was down for a jammed belt. Drill crew was down, replacing a broken transmission. Talked with Josh from the drill crew. He’s going to clean up the little bit of that was dragged out into the roadway. RP 9-1-21
Misc
Informational
09/02/2021
Roadway has been cleaned up and no issues to report. Everything ran smoothly today. RP 9-2-21
Erosion Control Inspection Partial 9/3/2021 9/3/2021 09/03/2021
Misc
Informational
09/02/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
09/02/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
09/02/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
09/02/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
09/02/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
09/02/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
09/02/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
09/02/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
09/02/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
09/02/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
09/02/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
09/02/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
09/02/2021
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
09/02/2021
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Misc
Informational
09/02/2021
Sprayer is running, rock crusher was down for a jammed belt. Drill crew was down, replacing a broken transmission. Talked with Josh from the drill crew. He’s going to clean up the little bit of that was dragged out into the roadway. RP 9-1-21
Misc
Informational
09/02/2021
Roadway has been cleaned up and no issues to report. Everything ran smoothly today. RP 9-2-21
Misc
Informational
09/03/2021
No erosion issues to report. RP 9-3-21
Erosion Control Inspection Partial 9/7/2021 9/7/2021 09/07/2021
Misc
Informational
09/03/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
09/03/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
09/03/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
09/03/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
09/03/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
09/03/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
09/03/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
09/03/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
09/03/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
09/03/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
09/03/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
09/03/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
09/03/2021
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
09/03/2021
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Misc
Informational
09/03/2021
Sprayer is running, rock crusher was down for a jammed belt. Drill crew was down, replacing a broken transmission. Talked with Josh from the drill crew. He’s going to clean up the little bit of that was dragged out into the roadway. RP 9-1-21
Misc
Informational
09/03/2021
Roadway has been cleaned up and no issues to report. Everything ran smoothly today. RP 9-2-21
Misc
Informational
09/03/2021
No erosion issues to report. RP 9-3-21
Misc
Informational
09/07/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-7-21
Erosion Control Inspection Partial 9/8/2021 9/8/2021 09/08/2021
Misc
Informational
09/07/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
09/07/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
09/07/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
09/07/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
09/07/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
09/07/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
09/07/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
09/07/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
09/07/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
09/07/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
09/07/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
09/07/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
09/07/2021
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
09/07/2021
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Misc
Informational
09/07/2021
Sprayer is running, rock crusher was down for a jammed belt. Drill crew was down, replacing a broken transmission. Talked with Josh from the drill crew. He’s going to clean up the little bit of that was dragged out into the roadway. RP 9-1-21
Misc
Informational
09/07/2021
Roadway has been cleaned up and no issues to report. Everything ran smoothly today. RP 9-2-21
Misc
Informational
09/07/2021
No erosion issues to report. RP 9-3-21
Misc
Informational
09/07/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-7-21
Misc
Informational
09/08/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-8-21
Erosion Control Inspection Partial 9/9/2021 9/9/2021 09/09/2021
Misc
Informational
09/08/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
09/08/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
09/08/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
09/08/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
09/08/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
09/08/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
09/08/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
09/08/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
09/08/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
09/08/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
09/08/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
09/08/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
09/08/2021
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
09/08/2021
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Misc
Informational
09/08/2021
Sprayer is running, rock crusher was down for a jammed belt. Drill crew was down, replacing a broken transmission. Talked with Josh from the drill crew. He’s going to clean up the little bit of that was dragged out into the roadway. RP 9-1-21
Misc
Informational
09/08/2021
Roadway has been cleaned up and no issues to report. Everything ran smoothly today. RP 9-2-21
Misc
Informational
09/08/2021
No erosion issues to report. RP 9-3-21
Misc
Informational
09/08/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-7-21
Misc
Informational
09/08/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-8-21
Misc
Informational
09/09/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-9-21
Erosion Control Inspection Partial 9/10/2021 9/10/2021 09/10/2021
Misc
Informational
09/09/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
09/09/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
09/09/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
09/09/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
09/09/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
09/09/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
09/09/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
09/09/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
09/09/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
09/09/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
09/09/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
09/09/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
09/09/2021
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
09/09/2021
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Misc
Informational
09/09/2021
Sprayer is running, rock crusher was down for a jammed belt. Drill crew was down, replacing a broken transmission. Talked with Josh from the drill crew. He’s going to clean up the little bit of that was dragged out into the roadway. RP 9-1-21
Misc
Informational
09/09/2021
Roadway has been cleaned up and no issues to report. Everything ran smoothly today. RP 9-2-21
Misc
Informational
09/09/2021
No erosion issues to report. RP 9-3-21
Misc
Informational
09/09/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-7-21
Misc
Informational
09/09/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-8-21
Misc
Informational
09/09/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-9-21
Misc
Informational
09/10/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-10-21
Erosion Control Inspection Partial 9/13/2021 9/13/2021 09/13/2021
Misc
Informational
09/10/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
09/10/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
09/10/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
09/10/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
09/10/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
09/10/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
09/10/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
09/10/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
09/10/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
09/10/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
09/10/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
09/10/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
09/10/2021
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
09/10/2021
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Misc
Informational
09/10/2021
Sprayer is running, rock crusher was down for a jammed belt. Drill crew was down, replacing a broken transmission. Talked with Josh from the drill crew. He’s going to clean up the little bit of that was dragged out into the roadway. RP 9-1-21
Misc
Informational
09/10/2021
Roadway has been cleaned up and no issues to report. Everything ran smoothly today. RP 9-2-21
Misc
Informational
09/10/2021
No erosion issues to report. RP 9-3-21
Misc
Informational
09/10/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-7-21
Misc
Informational
09/10/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-8-21
Misc
Informational
09/10/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-9-21
Misc
Informational
09/10/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-10-21
Misc
Informational
09/13/2021
Sprayer is running along with both operations. No erosion issues. 9-13-21
Erosion Control Inspection Partial 9/14/2021 9/14/2021 09/14/2021
Misc
Informational
09/13/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
09/13/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
09/13/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
09/13/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
09/13/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
09/13/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
09/13/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
09/13/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
09/13/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
09/13/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
09/13/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
09/13/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
09/13/2021
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
09/13/2021
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Misc
Informational
09/13/2021
Sprayer is running, rock crusher was down for a jammed belt. Drill crew was down, replacing a broken transmission. Talked with Josh from the drill crew. He’s going to clean up the little bit of that was dragged out into the roadway. RP 9-1-21
Misc
Informational
09/13/2021
Roadway has been cleaned up and no issues to report. Everything ran smoothly today. RP 9-2-21
Misc
Informational
09/13/2021
No erosion issues to report. RP 9-3-21
Misc
Informational
09/13/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-7-21
Misc
Informational
09/13/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-8-21
Misc
Informational
09/13/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-9-21
Misc
Informational
09/13/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-10-21
Misc
Informational
09/13/2021
Sprayer is running along with both operations. No erosion issues. 9-13-21
Misc
Informational
09/14/2021
No erosion issues to report. They have started switching the locations for the rock crusher and the drilling operations. RP 9-14-21
Erosion Control Inspection Partial 9/15/2021 9/15/2021 09/15/2021
Misc
Informational
09/14/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
09/14/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
09/14/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
09/14/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
09/14/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
09/14/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
09/14/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
09/14/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
09/14/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
09/14/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
09/14/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
09/14/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
09/14/2021
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
09/14/2021
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Misc
Informational
09/14/2021
Sprayer is running, rock crusher was down for a jammed belt. Drill crew was down, replacing a broken transmission. Talked with Josh from the drill crew. He’s going to clean up the little bit of that was dragged out into the roadway. RP 9-1-21
Misc
Informational
09/14/2021
Roadway has been cleaned up and no issues to report. Everything ran smoothly today. RP 9-2-21
Misc
Informational
09/14/2021
No erosion issues to report. RP 9-3-21
Misc
Informational
09/14/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-7-21
Misc
Informational
09/14/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-8-21
Misc
Informational
09/14/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-9-21
Misc
Informational
09/14/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-10-21
Misc
Informational
09/14/2021
Sprayer is running along with both operations. No erosion issues. 9-13-21
Misc
Informational
09/14/2021
No erosion issues to report. They have started switching the locations for the rock crusher and the drilling operations. RP 9-14-21
Misc
Informational
09/15/2021
Sprayer is running and both operations are running. Did get a complaint from the neighborhood about dust clouds, but didn’t see any while I was there. Called the complaintent. He said the dust cloud was gone now, but was very present earlier. RP 9-15-21
Erosion Control Inspection Failed 9/17/2021 9/17/2021 09/17/2021
Misc
Informational
09/15/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
09/15/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
09/15/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
09/15/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
09/15/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
09/15/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
09/15/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
09/15/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
09/15/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
09/15/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
09/15/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
09/15/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
09/15/2021
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
09/15/2021
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Misc
Informational
09/15/2021
Sprayer is running, rock crusher was down for a jammed belt. Drill crew was down, replacing a broken transmission. Talked with Josh from the drill crew. He’s going to clean up the little bit of that was dragged out into the roadway. RP 9-1-21
Misc
Informational
09/15/2021
Roadway has been cleaned up and no issues to report. Everything ran smoothly today. RP 9-2-21
Misc
Informational
09/15/2021
No erosion issues to report. RP 9-3-21
Misc
Informational
09/15/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-7-21
Misc
Informational
09/15/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-8-21
Misc
Informational
09/15/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-9-21
Misc
Informational
09/15/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-10-21
Misc
Informational
09/15/2021
Sprayer is running along with both operations. No erosion issues. 9-13-21
Misc
Informational
09/15/2021
No erosion issues to report. They have started switching the locations for the rock crusher and the drilling operations. RP 9-14-21
Misc
Informational
09/15/2021
Sprayer is running and both operations are running. Did get a complaint from the neighborhood about dust clouds, but didn’t see any while I was there. Called the complaintent. He said the dust cloud was gone now, but was very present earlier. RP 9-15-21
Misc
Corrective Action Required
09/17/2021
Sprayer wasn’t running into and and dust cloud was heading towards the park. Told the crusher to stop running until the sprayer is up and running. If this happens again, We already had 1 complaint this week and now I find this problem. If this continues again, I will have no problem issuing a STOP WORK ORDER. RP 9-17-21
Erosion Control Inspection Partial 9/20/2021 9/20/2021 09/28/2021
Misc
Informational
09/17/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
09/17/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
09/17/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
09/17/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
09/17/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
09/17/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
09/17/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
09/17/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
09/17/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
09/17/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
09/17/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
09/17/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
09/17/2021
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
09/17/2021
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Misc
Informational
09/17/2021
Sprayer is running, rock crusher was down for a jammed belt. Drill crew was down, replacing a broken transmission. Talked with Josh from the drill crew. He’s going to clean up the little bit of that was dragged out into the roadway. RP 9-1-21
Misc
Informational
09/17/2021
Roadway has been cleaned up and no issues to report. Everything ran smoothly today. RP 9-2-21
Misc
Informational
09/17/2021
No erosion issues to report. RP 9-3-21
Misc
Informational
09/17/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-7-21
Misc
Informational
09/17/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-8-21
Misc
Informational
09/17/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-9-21
Misc
Informational
09/17/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-10-21
Misc
Informational
09/17/2021
Sprayer is running along with both operations. No erosion issues. 9-13-21
Misc
Informational
09/17/2021
No erosion issues to report. They have started switching the locations for the rock crusher and the drilling operations. RP 9-14-21
Misc
Informational
09/17/2021
Sprayer is running and both operations are running. Did get a complaint from the neighborhood about dust clouds, but didn’t see any while I was there. Called the complaintent. He said the dust cloud was gone now, but was very present earlier. RP 9-15-21
Misc
Corrective Action Required
09/17/2021
Sprayer wasn’t running into and and dust cloud was heading towards the park. Told the crusher to stop running until the sprayer is up and running. If this happens again, We already had 1 complaint this week and now I find this problem. If this continues again, I will have no problem issuing a STOP WORK ORDER. RP 9-17-21
Misc
Informational
09/28/2021
Sprayer is running and no erosion issues were observed. RP 9-28-21
Erosion Control Inspection Partial 9/29/2021 9/29/2021 11/17/2021
Misc
Informational
09/28/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
09/28/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
09/28/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
09/28/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
09/28/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
09/28/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
09/28/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
09/28/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
09/28/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
09/28/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
09/28/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
09/28/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
09/28/2021
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
09/28/2021
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Misc
Informational
09/28/2021
Sprayer is running, rock crusher was down for a jammed belt. Drill crew was down, replacing a broken transmission. Talked with Josh from the drill crew. He’s going to clean up the little bit of that was dragged out into the roadway. RP 9-1-21
Misc
Informational
09/28/2021
Roadway has been cleaned up and no issues to report. Everything ran smoothly today. RP 9-2-21
Misc
Informational
09/28/2021
No erosion issues to report. RP 9-3-21
Misc
Informational
09/28/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-7-21
Misc
Informational
09/28/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-8-21
Misc
Informational
09/28/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-9-21
Misc
Informational
09/28/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-10-21
Misc
Informational
09/28/2021
Sprayer is running along with both operations. No erosion issues. 9-13-21
Misc
Informational
09/28/2021
No erosion issues to report. They have started switching the locations for the rock crusher and the drilling operations. RP 9-14-21
Misc
Informational
09/28/2021
Sprayer is running and both operations are running. Did get a complaint from the neighborhood about dust clouds, but didn’t see any while I was there. Called the complaintent. He said the dust cloud was gone now, but was very present earlier. RP 9-15-21
Misc
Corrective Action Required
09/28/2021
Sprayer wasn’t running into and and dust cloud was heading towards the park. Told the crusher to stop running until the sprayer is up and running. If this happens again, We already had 1 complaint this week and now I find this problem. If this continues again, I will have no problem issuing a STOP WORK ORDER. RP 9-17-21
Misc
Informational
09/28/2021
Sprayer is running and no erosion issues were observed. RP 9-28-21
Misc
Informational
11/17/2021
Water cannon was running, but the wind pick up and kept shifting. I talked with Alan running the crusher. We shut the crusher down for the day. RP 11-17-21
Erosion Control Inspection Partial 11/18/2021 11/18/2021 11/18/2021
Misc
Informational
11/17/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
11/17/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
11/17/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
11/17/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
11/17/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
11/17/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
11/17/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
11/17/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
11/17/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
11/17/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
11/17/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
11/17/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
11/17/2021
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
11/17/2021
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Misc
Informational
11/17/2021
Sprayer is running, rock crusher was down for a jammed belt. Drill crew was down, replacing a broken transmission. Talked with Josh from the drill crew. He’s going to clean up the little bit of that was dragged out into the roadway. RP 9-1-21
Misc
Informational
11/17/2021
Roadway has been cleaned up and no issues to report. Everything ran smoothly today. RP 9-2-21
Misc
Informational
11/17/2021
No erosion issues to report. RP 9-3-21
Misc
Informational
11/17/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-7-21
Misc
Informational
11/17/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-8-21
Misc
Informational
11/17/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-9-21
Misc
Informational
11/17/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-10-21
Misc
Informational
11/17/2021
Sprayer is running along with both operations. No erosion issues. 9-13-21
Misc
Informational
11/17/2021
No erosion issues to report. They have started switching the locations for the rock crusher and the drilling operations. RP 9-14-21
Misc
Informational
11/17/2021
Sprayer is running and both operations are running. Did get a complaint from the neighborhood about dust clouds, but didn’t see any while I was there. Called the complaintent. He said the dust cloud was gone now, but was very present earlier. RP 9-15-21
Misc
Corrective Action Required
11/17/2021
Sprayer wasn’t running into and and dust cloud was heading towards the park. Told the crusher to stop running until the sprayer is up and running. If this happens again, We already had 1 complaint this week and now I find this problem. If this continues again, I will have no problem issuing a STOP WORK ORDER. RP 9-17-21
Misc
Informational
11/17/2021
Sprayer is running and no erosion issues were observed. RP 9-28-21
Misc
Informational
11/17/2021
Water cannon was running, but the wind pick up and kept shifting. I talked with Alan running the crusher. We shut the crusher down for the day. RP 11-17-21
Misc
Informational
11/18/2021
Water cannon wasn’t running and dust was in the air. When I asked why, they told me the cannon was frozen. I told them to shut down until the cannon thawed out and was running again. RP 11-18-21
Erosion Control Inspection Partial 11/19/2021 11/19/2021 02/10/2022
Misc
Informational
11/18/2021
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
11/18/2021
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
11/18/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
11/18/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
11/18/2021
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
11/18/2021
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
11/18/2021
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
11/18/2021
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
11/18/2021
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
11/18/2021
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
11/18/2021
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
11/18/2021
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
11/18/2021
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
11/18/2021
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Misc
Informational
11/18/2021
Sprayer is running, rock crusher was down for a jammed belt. Drill crew was down, replacing a broken transmission. Talked with Josh from the drill crew. He’s going to clean up the little bit of that was dragged out into the roadway. RP 9-1-21
Misc
Informational
11/18/2021
Roadway has been cleaned up and no issues to report. Everything ran smoothly today. RP 9-2-21
Misc
Informational
11/18/2021
No erosion issues to report. RP 9-3-21
Misc
Informational
11/18/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-7-21
Misc
Informational
11/18/2021
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-8-21
Misc
Informational
11/18/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-9-21
Misc
Informational
11/18/2021
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-10-21
Misc
Informational
11/18/2021
Sprayer is running along with both operations. No erosion issues. 9-13-21
Misc
Informational
11/18/2021
No erosion issues to report. They have started switching the locations for the rock crusher and the drilling operations. RP 9-14-21
Misc
Informational
11/18/2021
Sprayer is running and both operations are running. Did get a complaint from the neighborhood about dust clouds, but didn’t see any while I was there. Called the complaintent. He said the dust cloud was gone now, but was very present earlier. RP 9-15-21
Misc
Corrective Action Required
11/18/2021
Sprayer wasn’t running into and and dust cloud was heading towards the park. Told the crusher to stop running until the sprayer is up and running. If this happens again, We already had 1 complaint this week and now I find this problem. If this continues again, I will have no problem issuing a STOP WORK ORDER. RP 9-17-21
Misc
Informational
11/18/2021
Sprayer is running and no erosion issues were observed. RP 9-28-21
Misc
Informational
11/18/2021
Water cannon was running, but the wind pick up and kept shifting. I talked with Alan running the crusher. We shut the crusher down for the day. RP 11-17-21
Misc
Informational
11/18/2021
Water cannon wasn’t running and dust was in the air. When I asked why, they told me the cannon was frozen. I told them to shut down until the cannon thawed out and was running again. RP 11-18-21
Misc
Informational
02/10/2022
No erosion issues to report. RP 2-10-22
Erosion Control Inspection Partial 2/14/2022 2/14/2022 02/15/2022
Misc
Informational
02/10/2022
7-30-21 2:17pm On Thursday the 29th there was a complaint about dust in the air from the rock crushing. I came on site and had them start watering. Today the 30th City Hall had a compliant again about dust in the air. When I arrived on site the water truck was spraying but it wasn’t enough to keep the dust down. The wind is blowing in the direction of the neighborhood to the west. This is where the compliant came from. I informed the contractor they will need to take more measures to keep the dust down. I spoke with Allen Fletcher and he assured me he would. They have stopped work for today and will start again on Monday the 2nd. There is a unidentified person in a grey car across the street watching the work taking place. 8-2-21 10:14am All erosion controls are in place and working at this time. 8-3-21 9:30am They are crushing rock and have water spraying. There is no dust in the air and the drive is wet. 8-4-21 10:43am The water sprayer is on and there is no dust. All other erosion controls look good at this time. 8-5-21 11:24am All erosion controls are in place and working at this time. There is little to no dust in the air.
Misc
Informational
02/10/2022
Water sprayer is running and no excess dust is in the air. I met with Billy on the the rock crusher and Josh who is spreading the rock in the the holes. RP 8-12-21
Misc
Informational
02/10/2022
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-16-21
Misc
Informational
02/10/2022
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. RP 8-17-21
Misc
Informational
02/10/2022
Erosion controls are in place, water sprayer is running and there is minimal dust in the air. The drill crew blew a water pump and are shut down for the day. RP 8-18-21
Misc
Informational
02/10/2022
Sprayer is running and little dust is in the air. RP 8-19-21
Misc
Informational
02/10/2022
Sprayer is running and little dust is in the air. RP 8-20-21
Misc
Informational
02/10/2022
Sprayer is running and little dust is in the air. RP 8-23-21
Misc
Informational
02/10/2022
Sprayer is running and little dust is in the air. RP 8-24-21
Misc
Informational
02/10/2022
Both operations are running, no issues on site. RP 8-25-21
Misc
Informational
02/10/2022
Both operations are running, no issues on site. RP 8-26-21
Misc
Informational
02/10/2022
Only the rock crusher is running today, no issues on site. RP 8-27-21
Misc
Informational
02/10/2022
Both operations are running, no issues on site. RP 8-30-21
Misc
Informational
02/10/2022
No erosion issues, sprayer was running. Drilling unit was broken down again. RP 8-31-21
Misc
Informational
02/10/2022
Sprayer is running, rock crusher was down for a jammed belt. Drill crew was down, replacing a broken transmission. Talked with Josh from the drill crew. He’s going to clean up the little bit of that was dragged out into the roadway. RP 9-1-21
Misc
Informational
02/10/2022
Roadway has been cleaned up and no issues to report. Everything ran smoothly today. RP 9-2-21
Misc
Informational
02/10/2022
No erosion issues to report. RP 9-3-21
Misc
Informational
02/10/2022
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-7-21
Misc
Informational
02/10/2022
Sprayer is running. Rock crusher and drilling team are working. No erosion issues to report. RP 9-8-21
Misc
Informational
02/10/2022
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-9-21
Misc
Informational
02/10/2022
Sprayer is running. Rock crusher and drilling team are both working. No erosion issues to report. RP 9-10-21
Misc
Informational
02/10/2022
Sprayer is running along with both operations. No erosion issues. 9-13-21
Misc
Informational
02/10/2022
No erosion issues to report. They have started switching the locations for the rock crusher and the drilling operations. RP 9-14-21
Misc
Informational
02/10/2022
Sprayer is running and both operations are running. Did get a complaint from the neighborhood about dust clouds, but didn’t see any while I was there. Called the complaintent. He said the dust cloud was gone now, but was very present earlier. RP 9-15-21
Misc
Corrective Action Required
02/10/2022
Sprayer wasn’t running into and and dust cloud was heading towards the park. Told the crusher to stop running until the sprayer is up and running. If this happens again, We already had 1 complaint this week and now I find this problem. If this continues again, I will have no problem issuing a STOP WORK ORDER. RP 9-17-21
Misc
Informational
02/10/2022
Sprayer is running and no erosion issues were observed. RP 9-28-21
Misc
Informational
02/10/2022
Water cannon was running, but the wind pick up and kept shifting. I talked with Alan running the crusher. We shut the crusher down for the day. RP 11-17-21
Misc
Informational
02/10/2022
Water cannon wasn’t running and dust was in the air. When I asked why, they told me the cannon was frozen. I told them to shut down until the cannon thawed out and was running again. RP 11-18-21
Misc
Informational
02/10/2022
No erosion issues to report. RP 2-10-22
Misc
Informational
02/15/2022
No erosion issues. RP 2-15-22
Documents & Images
Date Uploaded File Type Document Name
05/04/2021 Scope of Work Lees Summit Streets of West Pryor Rock Crushing and Test Hole Permit Request 042921
05/04/2021 Drawing SOWP ROCK CRUSHING ACTION PLAN
05/06/2021 Activity Document PRSITE20212248 SWP Mine Remediations staff comments
05/08/2021 RC Plan Review Comments Responses
05/08/2021 SOWP ROCK CRUSHING ACTION PLAN- 5-7-21
05/24/2021 Mine Remdiation Test Hole Cost Estimate 5-23-21
06/11/2021 Receipt Receipt for transaction:2021-004327
06/21/2021 Approved 6.21.21 SWP ROCK CRUSHING ACTION PLAN
06/21/2021 Letter DE-Permit
07/20/2021 The Family Ranch - Access Agreement (Executed 2021.07.10)
07/30/2021 Letter INSPECTION SUMMARY
08/02/2021 Letter INSPECTION SUMMARY
08/03/2021 Letter INSPECTION SUMMARY
08/04/2021 Letter INSPECTION SUMMARY
08/05/2021 Letter INSPECTION SUMMARY
08/12/2021 Letter INSPECTION SUMMARY
08/16/2021 Letter INSPECTION SUMMARY
08/17/2021 Letter INSPECTION SUMMARY
08/18/2021 Letter INSPECTION SUMMARY
08/19/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
08/24/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter INSPECTION SUMMARY
08/26/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter INSPECTION SUMMARY
08/30/2021 Letter INSPECTION SUMMARY
08/31/2021 Letter INSPECTION SUMMARY
09/01/2021 Letter INSPECTION SUMMARY
09/02/2021 Letter INSPECTION SUMMARY
09/03/2021 Letter INSPECTION SUMMARY
09/07/2021 Letter INSPECTION SUMMARY
09/08/2021 Letter INSPECTION SUMMARY
09/09/2021 Letter INSPECTION SUMMARY
09/10/2021 Letter INSPECTION SUMMARY
09/13/2021 Letter INSPECTION SUMMARY
09/14/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
09/17/2021 Letter INSPECTION SUMMARY
09/28/2021 Letter INSPECTION SUMMARY
09/30/2021 Approved - mine remediation report.operations
09/30/2021 approved - Field Test Evaluation Report memo
09/30/2021 Letter DE-Permit
10/11/2021 J035637_02 Lot 7a Completion Letter
10/11/2021 J035637_02 Lot 7c letter
10/13/2021 J035637_02 Lot 7c letter
10/15/2021 J035637_02 Lot 7a & 7c letter
11/17/2021 Letter INSPECTION SUMMARY
11/18/2021 Letter INSPECTION SUMMARY
02/10/2022 Letter INSPECTION SUMMARY
02/15/2022 Letter INSPECTION SUMMARY
02/23/2022 3RD Party Insp Report J035637_02 Lot 7B (Area C) Completion Letter
03/01/2022 3RD Party Insp Report J035637_02 Monitor Letter (2-4-2022)ALP
03/07/2022 3RD Party Insp Report J035637_02 Monitor Letter (3-7-2022)FINAL
04/28/2022 3RD Party Insp Report J035637_02 Monitor Letter (4-28-2022)
04/28/2022 3RD Party Insp Report J035637_02 Monitor Letter (4-28-2022)
05/03/2022 Email 5.3.22 SWP Mine Remediation Report - Long-Term Monitoring Plan Survey Data Lots 7A 7C (4282022 Letter) comments
05/12/2022 3RD Party Insp Report J035637_02 Monitor Letter (5-12-2022)
06/29/2022 3RD Party Insp Report J035637_02 Monitor Letter (6-29-2022)
08/05/2022 3RD Party Insp Report J035637_02 Monitor Letter (8-5-2022)_
09/22/2022 3RD Party Insp Report J035637_02 Long Term Monitoring Letter (9-22-2022)
12/02/2022 3RD Party Insp Report J035637_02 Monitor Letter (12-2-2022) Copy
12/13/2022 Email SWP - Long Term Survey Monitoring Report - Review Comments 10.6.22
08/14/2023 3RD Party Insp Report J035637_02_Monitoring_Letter_(1-05-2023)
08/14/2023 3RD Party Insp Report J035637_02_Monitoring_Letter_(3-09-2023)
08/14/2023 3RD Party Insp Report J035637_02_Monitoring_Letter_(6-07-2023)
11/21/2023 3RD Party Insp Report J035637_02_Monitoring_Letter_(9-28-2023)
06/27/2024 J035637_02_Monitoring_Letter_(1-18-2024)
06/27/2024 J035637_02 Monitor Letter (06-03-2024)
09/18/2024 J035637_02 Monitor_Letter_(09-11-2024)
01/23/2025 J035637_17 Monitoring_Letter_(01-23-2025)
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home