Permit Application Status

PRRES20253204


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20253204
Building Permit - Residential
Certificate of Occupancy
NEW DUPLEX
NEW DUPLEX. UNFINISHED BASEMENT. Permitted under PRRES20240701 previously Andrea Sessler 07/30/2025 11:46 AM
07/30/2025
09/05/2025
03/25/2026
Locations
Contacts
Site360 LLC, Address:1813 SW Fountain Drive  
JGKELLEY2@GMAIL.COM  
COMFORT SYSTEMS HTG/CLG, Address:128 W Markey Rd, Phone:(816) 322-1013  
ELECTRICAL CONNECTIONS, Address:20112 HOPS CREEK DR, Phone:(816) 838-6946  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Additional Permit Fee $1,393.00 $1,393.00 Paid 09/05/2025
Valuation Fee for New Duplex $0.00 $0.00 $0.00 N/A
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Gas Service Inspection - Residential Passed 9/8/2025 09/08/2025
Electrical Service Inspection Failed 9/8/2025 09/08/2025
Misc
Corrective Action Required
09/08/2025
-Install bonding bushing at metallic piping through concentric knock out at disconnect
All Rough Inspection - Residential Failed 9/8/2025 09/08/2025
Miscellaneous Correction
Corrective Action Required
09/08/2025
Items are on both units unless otherwise noted: -Solid block above walls between joists at cantilevers (can install insulation first then block, or block no further than 16" from top plate and insulate later) -Missing (2) LVL in garage per plan -Nail top plate to header at PFH with 2 rows 16d sinkers 3" oc per code -Holes not permitted to be bored closer than 2" together at ceiling joists in garage, powder room, entry closet, and throughout -Install bocca plates properly where attached to nailer instead of top plate -Nail intersecting and corner wall studs 12" oc -Fireblock mechanical chase to powder room in joist space -Seal gaps at Fireblocking in ceiling line at entry closet -Fridge boxes installed are not rated for installation in 1 hour wall -Remove foam from electrical boxes and cover completely with putty packs at separation wall -Provide security blocking at front door strike plate location -Straps required at both sides of over bored load bearing wall at stairwell/ kitchen -Strap over bored top plates both sides at load bearing walls second floor per code -Support dwv max 48" oc in attic space -Provide lateral restraint at ceiling joists above all load bearing walls in 2nd floor -Protect dryer duct min 2" below plate lines -Secure/support mechanical at master bed attic space -Putty pack at master bed must cover entire box (behind sheet rock in 211) -Roof load is landing on non load bearing walls in second floor -Install header joist and Fireblock top of dwv chase -Correct gap at gable end separation wall (211) -2x10 ceiling joists required at master spanning from exterior to separation wall -Replace over bored stud and provide protection plates at dwv in master bath -Support gas piping in basement per code -Fb ceiling lines in basement -Protect all plumbing within 1.25" to face of framing -Joist cut short of beam at powder room (213) -Fireblock dead space at owner's entry (213) -Anchor bolts to be in middle third of plate in garage (213) -Joist cut short of beam at powder room (213) -Exterior wall framing over 16" oc at bed 3 (213) -Seal top plate penetration bed 3 (213) -Fur out and fireblock at line sets in basement bath
Rated Assembly Inspection Partial 09/08/2025
Misc
Corrective Action Required
09/08/2025
***Attic space only: -Screw pattern approved both units -Seal gap at gable end rafter (211) -Tape gaps around all framing members (can be seen after wall is sheet rocked and taped, before ceiling is installed)
Electrical Service Inspection Passed 9/12/2025 9/12/2025 09/12/2025
Misc
Resolved
09/12/2025
-Install bonding bushing at metallic piping through concentric knock out at disconnect
All Rough Inspection - Residential Failed 9/22/2025 9/22/2025 09/22/2025
Miscellaneous Correction
Corrective Action Required
09/08/2025
Items are on both units unless otherwise noted: -Nail intersecting and corner wall studs 12" oc-not done -Fireblock mechanical chase to powder room in joist space-seal gaps -Seal gaps at Fireblocking in ceiling line at entry closet-not done 211 -Fridge boxes installed are not rated for installation in 1 hour wall-Boxes are not rated -Remove foam from electrical boxes and cover completely with putty packs at separation wall-Not done -Straps required at both sides of over bored load bearing wall at stairwell/ kitchen-not done -Strap over bored top plates both sides at load bearing walls at second floor per code-not done -Protect dryer duct min 2" below plate lines-not done -Secure/support mechanical at master bed attic space-not done -Putty pack at master bed must cover entire box (behind sheet rock in 211)-not done -Install header joist top of dwv chase-not done -Correct gap at gable end separation wall (211)-not done -Support gas piping in basement per code-not done -Fb ceiling lines in basement-not done -Protect all plumbing within 1.25" to face of framing-not done -Joist cut short of beam at powder room (213)-not done -Fireblock dead space at owner's entry (213)-not done -Anchor bolts to be in middle third of plate in garage (213) -Joist cut short of beam at powder room (213)-not done -Seal top plate penetration bed 3 (213)-not done -Fur out and fireblock at line sets in basement bath-not done
All Rough Inspection - Residential Failed 10/8/2025 10/8/2025 10/08/2025
Miscellaneous Correction
Corrective Action Required
09/22/2025
-Protect dryer duct min 2" below plate lines-not done -Joist cut short of beam at powder room (213)-not done **OK to insulate
All Rough Inspection - Residential Passed 10/9/2025 10/9/2025 10/09/2025
Miscellaneous Correction
Resolved
10/09/2025
-Protect dryer duct min 2" below plate lines-not done -Joist cut short of beam at powder room (213)-not done **OK to insulate
Rated Assembly Inspection Failed 10/17/2025 10/17/2025 10/17/2025
Misc
Corrective Action Required
09/08/2025
***Attic space only: -Screw pattern approved both units -Seal gap at gable end rafter (211) -Tape gaps around all framing members (can be seen after wall is sheet rocked and taped, before ceiling is installed)
Misc
Corrective Action Required
10/17/2025
- Screws in separation wall approved - Could not re-inspect previous deficiencies (All covered)
Rated Assembly Inspection Failed 10/23/2025 10/23/2025 10/23/2025
Misc
Resolved
10/23/2025
***Attic space only: -Screw pattern approved both units -Tape gaps around all framing members (can be seen after wall is sheet rocked and taped, before ceiling is installed)
Misc
Corrective Action Required
10/17/2025
Install missing rock at front corner second floor both units
Rated Assembly Inspection Passed 10/24/2025 10/24/2025
Misc
Resolved
10/24/2025
Install missing rock at front corner second floor both units
Erosion Control Inspection Residential Passed 03/06/2026
Footing Inspection - Residential Passed 03/06/2026
Misc
Informational
03/06/2026
Work completed under previous permit
Underslab Plumbing Inspection - Residential Passed 03/06/2026
Misc
Informational
03/06/2026
Work completed under previous permit
Sewer Service Inspection - R Passed 03/06/2026
Misc
Informational
03/06/2026
Work completed under previous permit
Water Service Inspection - R Passed 03/06/2026
Misc
Informational
03/06/2026
Work completed under previous permit
Plot Plan Inspection Passed 03/06/2026
Occupancy Inspection - Codes Residential Failed 3/6/2026 3/6/2026 03/06/2026
Miscellaneous Correction
Corrective Action Required
03/06/2026
Both units -Driveway inspection still pending -Garage entry doors to be self closing and latching -Provide (2) 3" screws at each hinge location at entry door -GFCI protection required for all kitchen counter receptacles as well as under the sink (a single, dedicated, non gfci receptacle is permitted for garbage disposal) -Install Kitchen island receptacle -Provide secondary latch at sliding glass door per Lee's Summit Ch 7 -Provide hammer arrestors at laundry -Label all dedicated non GFCI receptacles and non gfci (sump pump) -Remove trash and install gravel for drainage at window wells -AC units to be max breaker size 25 amp 11 -Secure dishwasher discharge line above bowl of sink -Kitchen breakers 19 and 21 require AFCI protection 13 -Provide GFCI protection at garage receptacles
Driveway Inspection Passed 3/11/2026 3/11/2026 03/11/2026
Misc
Informational
03/11/2026
03/11/26 Wednesday JMJ Driveway was inspected months ago it should have been passed.
Occupancy Inspection - Codes Residential Full C of O 3/25/2026 3/25/2026 03/25/2026
Miscellaneous Correction
Resolved
03/25/2026
Both units -Driveway inspection still pending -Garage entry doors to be self closing and latching -Provide (2) 3" screws at each hinge location at entry door -GFCI protection required for all kitchen counter receptacles as well as under the sink (a single, dedicated, non gfci receptacle is permitted for garbage disposal) -Install Kitchen island receptacle -Provide secondary latch at sliding glass door per Lee's Summit Ch 7 -Provide hammer arrestors at laundry -Label all dedicated non GFCI receptacles and non gfci (sump pump) -Remove trash and install gravel for drainage at window wells -AC units to be max breaker size 25 amp 11 -Secure dishwasher discharge line above bowl of sink -Kitchen breakers 19 and 21 require AFCI protection 13 -Provide GFCI protection at garage receptacles
Documents & Images
Date Uploaded File Type Document Name
07/30/2025 Application Form APPLICATION
09/04/2025 Letter LETTER FOR PLANS TO BE USED BY NEW OWNER
09/04/2025 Approved Plans APPROVED PLANS 1
09/05/2025 Letter OWNERSHIP DOC
09/05/2025 Permit Codes Residential Plan Review
09/05/2025 Permit DS Building Permit
09/05/2025 Receipt Receipt for transaction: 2025-006933
09/05/2025 Plot Plan APPROVED PLOT PLAN
09/08/2025 Approved Plans APPROVED BASEMENT FINISH
09/08/2025 Letter INSPECTION SUMMARY
09/08/2025 Letter INSPECTION SUMMARY
09/08/2025 Letter INSPECTION SUMMARY
09/08/2025 Letter INSPECTION SUMMARY
09/12/2025 Letter INSPECTION SUMMARY
09/12/2025 Letter INSPECTION SUMMARY
09/19/2025 25-088-06 Sequoia Existing Framing Inspection - Comment Response - signed
09/22/2025 Letter INSPECTION SUMMARY
10/08/2025 Letter INSPECTION SUMMARY
10/09/2025 Letter INSPECTION SUMMARY
10/17/2025 Letter INSPECTION SUMMARY
10/23/2025 Letter INSPECTION SUMMARY
10/24/2025 Letter INSPECTION SUMMARY
03/06/2026 Letter INSPECTION SUMMARY
03/06/2026 Letter INSPECTION SUMMARY
03/06/2026 Letter INSPECTION SUMMARY
03/06/2026 Letter INSPECTION SUMMARY
03/06/2026 Letter INSPECTION SUMMARY
03/06/2026 Letter INSPECTION SUMMARY
03/06/2026 Letter INSPECTION SUMMARY
03/11/2026 Letter INSPECTION SUMMARY
03/25/2026 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home