Summary
PRRES20246286
Building Permit - Residential
Issued
NEW DUPLEX
NEW DUPLEX - SUSPENDED SLAB FINISHED AND UNFINISHED BASEMENT - COVERED PORCH STOP WORK ORDER generated on 07/21/2025 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 07/31/2025 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER generated on 07/31/2025 12:00 AM by username 'Dustin Agcopra'. STOP WORK ORDER removed on 08/04/2025 12:00 AM by username 'Dustin Agcopra'.
12/06/2024
12/27/2024
06/07/2025
Locations
Contacts
ROCK CREEK HOMES, Address:6126 METCALF LANE, Phone:(913) 522-1945  
Kevin Guinan, Address:6126 Metcalf Lane  
KEVIN@ROCKCREEKHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
PRIDE SERVICES INC, Address:3842 GEORGIA TERR, Phone:(785) 242-9700  
BILL'S PLUMBING SERVICE LLC, Address:308 E PARK STREET, Phone:(913) 829-8213  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Duplex $2,574.57 $2,574.57 Paid 12/27/2024
Sanitary Sewer Development Fee $4,570.00 $4,570.00 Paid 12/27/2024
Right of Way Permit Fee $85.00 $85.00 Paid 12/27/2024
Water Tap Fee $7,946.00 $7,946.00 Paid 12/27/2024
Water Meter Fee $1,496.06 $1,496.06 Paid 12/27/2024
Residential Excise Tax Fee $1,240.32 $1,240.32 Paid 12/27/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Plot Plan Inspection Pending
Foundation Inspection - Commercial Pending
Occupancy Inspection - Codes Residential Pending
Sidewalk Inspection Pending
Sidewalk Inspection Pending
Erosion Control Inspection Residential Pending
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/04/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - REPAIR DOWNED SILT FENCE AROUND LOT - MAINTAIN GRAVEL ENTRANCE
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/04/2025
7-17-25 Dustin A, Silt fence is down road and curb line needs to be cleaned. Concrete washout area needs to be cleaned up and maintained. Storm inlets need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 7-21-25 Dustin A, Nothing has been done to correct this. 8-4-25 Dustin A, All corrections had been made, esc must be maintained throughout project.
Footing Inspection - Residential Passed 4/18/2025 04/18/2025
Misc
Informational
04/18/2025
- INSPECTION DONE BY THIRD PARTY
Erosion Control Inspection Residential Failed 4/18/2025 04/18/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
04/18/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/18/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - PROTECT STOCK PILE - POST ADDRESS
Sewer Service Inspection - R Passed 5/16/2025 5/16/2025 05/16/2025
Resolved
05/16/2025
Water Service Inspection - R Partial 5/16/2025 5/16/2025 05/16/2025
Misc
Corrective Action Required
05/16/2025
PARTIAL - Poly out of foundation 20 ft.
Water Service Inspection - R Passed 5/19/2025 5/19/2025 05/19/2025
Misc
Resolved
05/19/2025
PARTIAL - Poly out of foundation 20 ft.
Erosion Control Inspection Residential Failed 5/19/2025 5/19/2025 05/19/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
05/19/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
04/18/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - REPAIR DOWNED SILT FENCE AROUND LOT - MAINTAIN GRAVEL ENTRANCE
Underslab Electrical Inspection - Residential Passed 5/22/2025 5/22/2025 05/22/2025
Underslab Plumbing Inspection - Residential Passed 6/3/2025 6/3/2025 06/03/2025
Erosion Control Inspection Residential Failed 7/17/2025 7/17/2025 07/17/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
05/19/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - REPAIR DOWNED SILT FENCE AROUND LOT - MAINTAIN GRAVEL ENTRANCE
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/17/2025
7-17-25 Dustin A, Silt fence is down road and curb line and storm inlet needs to be cleaned. Concrete washout area needs to be cleaned up and maintained. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed - Stop Work 7/21/2025 7/21/2025 07/31/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/17/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - REPAIR DOWNED SILT FENCE AROUND LOT - MAINTAIN GRAVEL ENTRANCE
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/17/2025
7-17-25 Dustin A, Silt fence is down road and curb line needs to be cleaned. Concrete washout area needs to be cleaned up and maintained. Storm inlets need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 7-21-25 Dustin A, Nothing has been done to correct this. 7-31-25 Dustin A, All properties on Winthrop are STOP WORKED due to non compliance . 1. Concrete washout area is over flowing onto street. All concrete debris needs to be removed from street, washout needs to be maintained. 2. All silt needs to be cleaned from street and proper erosion control needs to be in place to keep this from happening. 3. Storm drains need to be protected, silt socks need to be replaced if they are compacted with mud or debris . Should not have grass growing out of them . After installed they need to be maintained . 4. All properties need to have erosion control in place and in working order. Must be maintained throughout 5. Before any work can be done on site an erosion control inspection will need to be scheduled. 6. NO WORK is allowed on site until these issues have been corrected.
Erosion Control Inspection Residential Partial 8/4/2025 8/4/2025 08/04/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/21/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - REPAIR DOWNED SILT FENCE AROUND LOT - MAINTAIN GRAVEL ENTRANCE
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/21/2025
7-17-25 Dustin A, Silt fence is down road and curb line needs to be cleaned. Concrete washout area needs to be cleaned up and maintained. Storm inlets need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 7-21-25 Dustin A, Nothing has been done to correct this. 8-4-25 Dustin A, All corrections had been made, esc must be maintained throughout project.
Sidewalk Inspection Failed 8/4/2025 8/4/2025 08/04/2025
Misc
Informational
08/04/2025
8-4-25 Dustin A, Section of sidewalk had been replaced across from 1336 and 1338 without a city pre pour inspection for the water service tap across the street
Suspended Slab Inspection Passed 8/12/2025 08/12/2025
All Rough Inspection - Residential Failed 8/14/2025 8/14/2025 08/14/2025
Misc
Corrective Action Required
08/14/2025
1336 SW Winthrop - fire blocking needed at top of wall to right of post in wall of bed 3/ bed 3 closet - Fire blocking needed at top of wall transition at end of basement hallway to ceiling in bedroom 3 closet - Fire blocking needed at north end of soffit face to wall transition in basement bedroom 4 - 3rd stud required under LVL at entryway/BA 2 wall -
Electrical Service Inspection Passed 8/14/2025 8/14/2025 08/14/2025
Gas Service Inspection - Residential Failed 8/14/2025 8/14/2025 08/14/2025
Misc
Corrective Action Required
08/14/2025
Gas line not bonded
Rated Assembly Inspection Partial 8/14/2025 8/14/2025 08/14/2025
Misc
Informational
08/14/2025
Partial- Attic area and floor joists inspected, ok
All Rough Inspection - Residential Passed 8/18/2025 8/18/2025 08/18/2025
Misc
Resolved
08/18/2025
1336 SW Winthrop - fire blocking needed at top of wall to right of post in wall of bed 3/ bed 3 closet - Fire blocking needed at top of wall transition at end of basement hallway to ceiling in bedroom 3 closet - Fire blocking needed at north end of soffit face to wall transition in basement bedroom 4 - 3rd stud required under LVL at entryway/BA 2 wall -
Gas Service Inspection - Residential Passed 8/18/2025 8/18/2025 08/18/2025
Misc
Resolved
08/18/2025
Gas line not bonded
Rated Assembly Inspection Passed 9/2/2025 9/2/2025 09/02/2025
Misc
Resolved
09/02/2025
Partial- Attic area and floor joists inspected, ok
Documents & Images
Date Uploaded File Type Document Name
12/06/2024 Application Form Application - Lot 44
12/06/2024 Application Form Tax Form - Lot 44
12/09/2024 Approved Plans APPROVED PLANS
12/09/2024 Permit Codes Residential Plan Review
12/16/2024 Permit Codes Residential Plan Review
12/16/2024 Plot Plan APPROVED PLOT PLAN
12/27/2024 Permit DS Building Permit
12/27/2024 Receipt Receipt for transaction: 2024-009675
04/15/2025 Approved Plans APPROVED PLANS
04/18/2025 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
05/16/2025 Letter INSPECTION SUMMARY
05/16/2025 Letter INSPECTION SUMMARY
05/19/2025 Letter INSPECTION SUMMARY
05/19/2025 Letter INSPECTION SUMMARY
05/22/2025 Letter INSPECTION SUMMARY
06/03/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/21/2025 Letter Stop Work Order
07/21/2025 Letter Stop Work Order
07/31/2025 Letter INSPECTION SUMMARY
07/31/2025 Letter Stop Work Order
08/04/2025 Letter INSPECTION SUMMARY
08/04/2025 Letter INSPECTION SUMMARY
08/04/2025 Letter INSPECTION SUMMARY
08/04/2025 Letter INSPECTION SUMMARY
08/05/2025 Lot 44 Suspended Slab Inspection
08/12/2025 Letter INSPECTION SUMMARY
08/14/2025 Letter INSPECTION SUMMARY
08/14/2025 Letter INSPECTION SUMMARY
08/14/2025 Letter INSPECTION SUMMARY
08/14/2025 Letter INSPECTION SUMMARY
08/18/2025 Letter INSPECTION SUMMARY
08/18/2025 Letter INSPECTION SUMMARY
09/02/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home