PRRES20245645
Building Permit - Residential
Issued
TRUMARK CUSTOM HOMES LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 11/26/2024 12:00 AM by username 'Robb Popp'. STOP WORK ORDER removed on 11/26/2024 12:00 AM by username 'Robb Popp'.
10/24/2024
11/16/2024
04/26/2025
Locations
Contacts
TRUMARK CUSTOM HOMES LLC, Address:2924 NW THOREAU DR  
MARK A YANCIK, Address:508 nw manor dr  
TRUMARKHOMES.MARK@GMAIL.COM  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
IMPACT ELECTRICAL SOLUTIONS LLC, Address:14 ANCHOR DRIVE, Phone:(816) 674-9345  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
TRUMARK HOMES, LLC, Address:PO BOX 728, Phone:(816) 564-5613  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 11/16/2024
Right of Way Permit Fee $85.00 $85.00 Paid 11/16/2024
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 11/16/2024
Water Tap Fee $3,973.00 $3,973.00 Paid 11/16/2024
Water Meter Fee $748.03 $748.03 Paid 11/16/2024
Valuation Fee New Single Family $2,196.40 $2,196.40 Paid 11/16/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Driveway Inspection Pending
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Misc
Corrective Action Required
04/25/2025
Note from all rough: -Anchor rim joists at suspended slab-NO DETAILS ON PLANS, NO SUSPENDED SLAB INSPECTION ON FILE. -Deck framing not inspected
Erosion Control Inspection Residential Pending
Footing Inspection - Residential Failed - Stop Work 11/26/2024
Miscellaneous Correction
Corrective Action Required
11/26/2024
Footing poured without inspection
Erosion Control Inspection Residential Failed 11/26/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
11/26/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Clean silt and debris from street
Footing Inspection - Residential Passed 11/27/2024 11/27/2024 11/26/2024
Miscellaneous Correction
Informational
11/26/2024
Footing approved by David Ainsworth on 11/25/24
Underslab Plumbing Inspection - Residential Failed 12/12/2024 12/12/2024 12/12/2024
Misc
Corrective Action Required
12/12/2024
POST ADDRESS - no further inspections -no venting within 8ft of 3 floor drains at the front of the basement. -negative fall at rear plumbing. fill in basemnt and support plumbing to the floor at the over dig. - connect interior drain tile. install approved erosion control in the rear
Erosion Control Inspection Residential Failed 12/12/2024 12/12/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
11/26/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Clean silt and debris from street --- strawl waddels in the street no erosion control in the rear
DCM3 ESC REQUIRED 2 DAY
Resolved
12/12/2024
12/12/24 EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed 12/16/2024 12/16/2024 12/16/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
12/12/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Re establish silt fence at sides of lot
Underslab Plumbing Inspection - Residential Passed 12/16/2024 12/16/2024 12/16/2024
Misc
Resolved
12/16/2024
POST ADDRESS - no further inspections -no venting within 8ft of 3 floor drains at the front of the basement. -negative fall at rear plumbing. fill in basemnt and support plumbing to the floor at the over dig. - connect interior drain tile. install approved erosion control in the rear
Sewer Service Inspection - R Passed 12/18/2024 12/18/2024 12/18/2024
Water Service Inspection - R Passed 12/20/2024 12/20/2024 12/20/2024
All Rough Inspection - Residential Failed 2/25/2025 2/25/2025 02/25/2025
Misc
Corrective Action Required
02/25/2025
Inspection for PFH, front porch ceiling and covered deck ceiling: -PFH and deck ok to cover Front porch- support ridge and hip rafters to bearing locations
Erosion Control Inspection Residential Partial 4/8/2025 4/8/2025 04/08/2025
DCM2 ESC DEFICIENT INSTALLATION
Resolved
04/08/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Re establish silt fence at sides of lot
Electrical Service Inspection Passed 4/8/2025 4/8/2025 04/08/2025
Gas Service Inspection - Residential Passed 4/8/2025 4/8/2025 04/08/2025
All Rough Inspection - Residential Failed 4/8/2025 4/8/2025 04/08/2025
Misc
Informational
04/08/2025
Inspection for PFH, front porch ceiling and covered deck ceiling: -PFH, front porch and deck ok to cover
Miscellaneous Correction
Corrective Action Required
04/08/2025
House is not ready inspection, there are too many deficiencies to perform inspection. Inspection is incomplete and list is subject to change. Correct the following items before rescheduling: -Nail exterior comers per code -Nail top plate to PFH header 3” oc with 2 rows 16d sinkers -Install missing nails at PFH straps -Tighten anchor bolts throughout -Exterior sheathing not breaking on studs at 2 car bay -Nail ceiling joists to rafters per code -Install anchor bolts in middle third of plate at garage -Install missing bits at anchor bolts -Install second anchor bolt at column baseplate in garage -Strap top plates lapped less than 24” by beam -Strap top plates over notched for DWV by beam -Studs spaced beyond 16” oc at 2 car bay wall -Nail lapped ceiling joists per code -Nail multi ply stud and joist packs per code -Provide proper slope on DWV in attic space -Complete all fireblocking at dead spaces, at soffit and ceiling lines, seal all top plate penetrations etc -Fireblock top of fireplace-Use approved materials and seal gaps -Use proper materials for fireblocking throughout. 1/2” sheathing is not approved material
All Rough Inspection - Residential Failed 4/11/2025 4/11/2025 04/11/2025
Misc
Informational
04/08/2025
Inspection for PFH, front porch ceiling and covered deck ceiling: -PFH, front porch and deck ok to cover
Miscellaneous Correction
Corrective Action Required
04/08/2025
-Install second anchor bolt at column baseplate in garage-TIGHTEN NUT -Strap top plates lapped less than 24” by beam -Strap top plates over notched for DWV by beam -Nail multi ply stud and joist packs per code-NAIL DOUBLE 2x4 at garage/entry -(3) 2x10 per plan at hallway -Complete all fireblocking at dead spaces, at soffit and ceiling lines, seal all top plate penetrations etc -Fireblock top of fireplace-NOT DONE -Strap top plate lapped less than 24” at stairwell -Fireblock and seal gaps at dead space by stairwell -Complete framing and electrical at fireplace -Strap top plates at over bored and over notched at load bearing wall in kitchen/bed -Rafters over spanned near foyer -Strap top plates over bored at front bed -Protect DWV at front bed -Provide proper slope at dwv in attic space at front bed -Fireblock ceiling line at front closet -Solid shim behind hinges at front door -Missing nails in joist hangers at laundry -Provide min 1” clearance to wires at fireplace -Provide lateral restraint at beams above hallway -Complete CSPF at deck -Provide joist hangers at main bed/bath -Floating header in main bath -Strap top plate lapped less than 24” at tub exterior wall -Seal top plate at main bath -Strap top plate at master bed -Nail ALL exterior corners per code -Exterior fireplace not inspected -Install all hangers, ledger bolts and through bolts at deck -Fireblock all ceiling lines in basement -Solid block between joists above beam -Tighten anchor bolts in basement -Anchor bolts to be in middle third of plate at basement -Anchor rim joists at suspended slab -Missing nails in hanger at bottom of stairs -Install hangers at suspended slab -Support flat ceiling framing at speak easy room -Protect dwv at speak easy room -Support flat framed ceiling joists in basement -(3) studs required at exterior corner by stair landing -Protect DWV at stair -Fireblock dead space by stairs -Fireblock stair landing -Protect dwv at bed 3 -Seal plate penetrations at bed 3 -Fireblock top of fur out wall bath 3 -3 studs required at exterior corner bath 3 -Secure electrical in soffit space -Locate exhaust in ceiling space at powder room -Solid block and nail sheathing at horizontal seams -Solid block joists at cantilevers -Use proper materials for fireblocking throughout. 1/2” sheathing is not approved material
Misc
Resolved
04/11/2025
4-9-25 Inspection removed from schedule following on site conversation with contractor
All Rough Inspection - Residential Failed 4/18/2025 4/18/2025 04/18/2025
Misc
Informational
04/11/2025
Inspection for PFH, front porch ceiling and covered deck ceiling: -PFH, front porch and deck ok to cover
Miscellaneous Correction
Corrective Action Required
04/11/2025
-Strap top plates lapped less than 24” by beam-NEEDED AT LEFT SIDE OF BEAM GARAGE SIDE -Nail multi ply stud and joist packs per code-NAIL DOUBLE 2x4 at garage/entry-NAIL MIN 12” oc -Fireblock top of fireplace fur out-NEED TO CORRECT GAPS IN THE PLYWOOD FURRING STRIPS AT THE TOP -Strap top plate lapped less than 24” at stairwell-JUST LEFT OF BEAM -Fireblock and seal gaps at dead space by stairwell-SEAL GAP AT BACK OF CAVITY AT TOP PLATES -Strap top plates at over bored and over notched at load bearing wall in kitchen/bed-REQUIRED AT BOTH DWV LOCATIONS -Fireblock ceiling line at front closet-SEAL GAP AT BACK CORNER -Provide min 1” clearance to wires at fireplace-NOT DONE-SEE NM AT SIDES -Seal top plate at main bath-PEX LINE AT SHOWER -Exterior fireplace not inspected due to lack of decking-DO NOT COVER -Install all hangers, ledger bolts and through bolts at deck-NOT DONE -Fireblock all ceiling lines in basement -SEAL GAPS, PENETRATIONS AND PLATE PENETRATIONS AT SPEAK EASY ENTRYWAY -Solid block between joists above beam-NOT DONE -Tighten anchor bolts in basement-SEE BACK WALL UNDER WINDOWS AND BY DOOR -Anchor rim joists at suspended slab-NO DETAILS ON PLANS, NO SUSPENDED SLAB INSPECTION ON FILE. -Support flat framed ceiling joists in basement-SUPPORT 2x2s IN BEDROOM OVER 4’ -(3) studs required at exterior corner by stairs-SEE sCORNER AT BASEMENT BY LANDING, ONLY 1 FULL LENGTH STUD -Fireblock top of fur out wall bath 3-COMPLETE SMALL AREA MISSING BY DOOR, SEAL GAP OR COMPLETE PLYWOOD FURRING -3 studs required at exterior corner bath 3, bedroom by electrical panel stem wall-NOT COMPELTE -Solid block and nail sheathing at horizontal seams-SHEATHING IS SHORT OF TOP PLATE THROUGHOUT BASEMENT -Use proper materials for fireblocking throughout. 1/2” sheathing is not approved material-THIS OCCURS AT BASEMENT CEILING LINE FIREBLOCKING
Erosion Control Inspection Residential Partial 04/18/2025
All Rough Inspection - Residential Failed 4/22/2025 4/22/2025 04/22/2025
Misc
Resolved
04/22/2025
Inspection for PFH, front porch ceiling and covered deck ceiling: -PFH, front porch and deck ok to cover
Miscellaneous Correction
Corrective Action Required
04/18/2025
-Nail multi ply stud and joist packs per code-NAIL DOUBLE 2x4 at garage/entry-NAIL MIN 12” oc -Fireblock and seal gaps at dead space by stairwell-SEAL GAP AT BACK OF CAVITY AT TOP PLATES -Strap top plates at over bored and over notched at load bearing wall in kitchen/bed-REQUIRED AT BOTH DWV LOCATIONS-BOTH SIDES -Fireblock ceiling line at front closet-SEAL GAP AT BACK CORNER -Provide min 1” clearance to wires at fireplace-NOT DONE-SEE NM AT SIDES-RIGHT SIDE -Exterior fireplace not inspected due to lack of decking-DO NOT COVER -Install all hangers, ledger bolts and through bolts at deck-NOT DONE -Anchor rim joists at suspended slab-NO DETAILS ON PLANS, NO SUSPENDED SLAB INSPECTION ON FILE. -(3) studs required at exterior corner by stairs-SEE CORNER AT BASEMENT BY LANDING, ONLY 2 FULL LENGTH STUDS -Fireblock top of fur out wall bath 3 COMPLETE PLYWOOD FURRING AT TOP OF WALL -3 studs required at exterior bedroom by electrical panel stem wall-NOT COMPELT *ok to insulate
All Rough Inspection - Residential Passed 4/25/2025 4/25/2025 04/25/2025
Miscellaneous Correction
Resolved
04/25/2025
-Nail multi ply stud and joist packs per code-NAIL DOUBLE 2x4 at garage/entry-NAIL MIN 12” oc -Fireblock and seal gaps at dead space by stairwell-SEAL GAP AT BACK OF CAVITY AT TOP PLATES -Strap top plates at over bored and over notched at load bearing wall in kitchen/bed-REQUIRED AT BOTH DWV LOCATIONS-BOTH SIDES -Fireblock ceiling line at front closet-SEAL GAP AT BACK CORNER -Provide min 1” clearance to wires at fireplace-NOT DONE-SEE NM AT SIDES-RIGHT SIDE -Exterior fireplace not inspected due to lack of decking-DO NOT COVER -Install all hangers, ledger bolts and through bolts at deck-NOT DONE -Anchor rim joists at suspended slab-NO DETAILS ON PLANS, NO SUSPENDED SLAB INSPECTION ON FILE. -(3) studs required at exterior corner by stairs-SEE CORNER AT BASEMENT BY LANDING, ONLY 2 FULL LENGTH STUDS -Fireblock top of fur out wall bath 3 COMPLETE PLYWOOD FURRING AT TOP OF WALL -3 studs required at exterior bedroom by electrical panel stem wall-NOT COMPELT *ok to insulate
Documents & Images
Date Uploaded File Type Document Name
10/24/2024 WOODSIDE LOT 150 PERMIT EXCISE TAX APPLICATION
10/28/2024 Permit Codes Residential Plan Review
10/28/2024 Approved Plans APPROVED PLANS
10/29/2024 Permit Codes Residential Plan Review
10/29/2024 Plot Plan APPROVED PLOT PLAN
11/16/2024 Permit DS Building Permit
11/16/2024 Receipt Receipt for transaction:2024-008998
11/26/2024 Letter Stop Work Order
11/26/2024 Letter INSPECTION SUMMARY
11/26/2024 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
11/26/2024 Letter INSPECTION SUMMARY
12/04/2024 Approved Plans approved pier details
12/12/2024 Letter INSPECTION SUMMARY
12/12/2024 Letter INSPECTION SUMMARY
12/12/2024 Letter INSPECTION SUMMARY
12/12/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/18/2024 Letter INSPECTION SUMMARY
02/25/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/08/2025 Letter INSPECTION SUMMARY
04/11/2025 Letter INSPECTION SUMMARY
04/18/2025 Photograph Fireplace double sheeted and Fire stopped
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/22/2025 Letter INSPECTION SUMMARY
04/25/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home