Summary
PRRES20244613
Building Permit - Residential
Certificate of Occupancy
CLAYTON PROPERTIES GROUP INC
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. ROOF TRUSSES.
08/28/2024
09/11/2024
03/02/2025
05/16/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
SEANM@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 09/11/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 09/11/2024
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 09/11/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 09/11/2024
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 09/11/2024
9110078-Valuation Fee New Single Family $1,191.67 $1,191.67 Paid 09/11/2024
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 01/06/2025
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 02/14/2025
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 02/14/2025
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 03/10/2025
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 03/10/2025
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 03/13/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed 9/26/2024 09/26/2024
Miscellaneous Correction
Corrective Action Required
09/26/2024
Footing inspection failed. No address posted on site
Sewer Service Inspection - R Passed 10/4/2024 10/4/2024 10/04/2024
Water Service Inspection - R Passed 10/4/2024 10/04/2024
Erosion Control Inspection Residential Partial 10/10/2024 10/10/2024
Miscellaneous Correction
Informational
10/10/2024
Full erosion control measures are in place and must be properly maintained until CofO
Footing Inspection - Residential Passed 10/10/2024 10/10/2024
Miscellaneous Correction
Resolved
10/10/2024
Footing inspection failed. No address posted on site
Miscellaneous Correction
Informational
10/10/2024
Footing was passed by a third party. Exterior piers were not mentioned in the footing report
Underslab Plumbing Inspection - Residential Passed 10/10/2024 10/10/2024 10/10/2024
Erosion Control Inspection Residential Partial 11/5/2024 11/05/2024
Miscellaneous Correction
Informational
10/10/2024
Full erosion control measures are in place and must be properly maintained until CofO
All Rough Inspection - Residential Failed 12/9/2024 12/9/2024 12/09/2024
Misc
Corrective Action Required
12/09/2024
Portal frame and porch cover inspection only Approved
Electrical Service Inspection Passed 12/11/2024 12/11/2024
Gas Service Inspection - Residential Failed 12/11/2024 12/11/2024
Misc
Corrective Action Required
12/11/2024
-Install gauge and provide test pressure
Erosion Control Inspection Residential Partial 12/11/2024 12/11/2024
Miscellaneous Correction
Informational
11/05/2024
Full erosion control measures are in place and must be properly maintained until CofO
All Rough Inspection - Residential Failed 12/11/2024 12/11/2024 12/11/2024
Misc
Resolved
12/11/2024
Portal frame and porch cover inspection only Approved
Misc
Corrective Action Required
12/11/2024
**Not ready. Not a complete list. Correct all below. Provide plan on site -Frame around SE cable in garage -Fur down below ceiling return air space above garage for R-19 insulation -Complete pan off return air above garage; pan off RA from soffit and seal all penetrations -Fasten down the half bathroom sill plate -Protect plumbing in half bathroom -Install cantilevered (4) 9.25” lvl to support girder truss at rear end; solid block cantilevered lvl to bearing wall -Nail hanger at lvl connection (inside space underneath stair, above/near door) -Secure sump pump receptacle box and wiring per code -Complete water service line installation -Fb front rec room wall vertically at max 10 ft intervals; fb rec rm wall from soffit space; fb all wall plate penetrations -Complete electrical per code at front entry; same in bedroom 3 -Nail together girder trusses per truss detail; tie down GT to walls -Install (4) studs in garage underneath girder truss point load -Nail corner studs 16d@12” oc or equivalent nailing; nail studs at intersection -Protect wiring within 6 ft of attic access
All Rough Inspection - Residential Failed 12/16/2024 12/16/2024 12/16/2024
Misc
Corrective Action Required
12/11/2024
**Not ready. Not a complete list. Correct all below. Provide plan on site -Fur down below ceiling return air space above garage for R-19 insulation -Complete pan off return air above garage; pan off RA from soffit and seal all penetrations -Fasten down the half bathroom sill plate **The sink wall is still crooked. Straighten and fasten wall in place -Nail hanger at lvl connection (inside space underneath stair, above/near door) -Complete water service line installation **Water line is cut -Fb front rec room wall vertically at max 10 ft intervals; fb rec rm wall from soffit space; fb all wall plate penetrations -Complete electrical per code at front entry; same in bedroom 3 -Nail together girder trusses per truss detail; tie down GT to walls -Install (4) studs in garage underneath girder truss point load -Nail corner studs 16d@12” oc or equivalent nailing; nail studs at intersection -Protect wiring within 6 ft of attic access **DO NOT INSULATE **12/16-Almost nothing done to correct the deficiencies. This is a 2nd failed inspection. Each 3rd and subsequent failed inspection will incure a re-inspection fee
Gas Service Inspection - Residential Passed 12/16/2024 12/16/2024 12/16/2024
Misc
Resolved
12/16/2024
-Install gauge and provide test pressure
Erosion Control Inspection Residential Partial 12/16/2024 12/16/2024
Miscellaneous Correction
Informational
12/11/2024
Full erosion control measures are in place and must be properly maintained until CofO
All Rough Inspection - Residential Not Ready 12/18/2024 12/18/2024 12/18/2024
Misc
Resolved
12/18/2024
**Not ready. Not a complete list. Correct all below. Provide plan on site -Fur down below ceiling return air space above garage for R-19 insulation -Complete pan off return air above garage; pan off RA from soffit and seal all penetrations -Fasten down the half bathroom sill plate **The sink wall is still crooked. Straighten and fasten wall in place -Nail hanger at lvl connection (inside space underneath stair, above/near door) -Complete water service line installation **Water line is cut -Fb front rec room wall vertically at max 10 ft intervals; fb rec rm wall from soffit space; fb all wall plate penetrations -Complete electrical per code at front entry; same in bedroom 3 -Nail together girder trusses per truss detail; tie down GT to walls -Install (4) studs in garage underneath girder truss point load -Nail corner studs 16d@12” oc or equivalent nailing; nail studs at intersection -Protect wiring within 6 ft of attic access **DO NOT INSULATE **12/16-Almost nothing done to correct the deficiencies. This is a 2nd failed inspection. Each 3rd and subsequent failed inspection will incure a re-inspection fee
Miscellaneous Correction
Corrective Action Required
12/18/2024
Not ready. Not a complete list. Correct all below. Provide plan on site -Fur down below ceiling return air space above garage for R-19 insulation -Complete pan off return air above garage; pan off RA from soffit and seal all penetrations -Fasten down the half bathroom sill plate **The sink wall is still crooked. Straighten and fasten wall in place -Nail hanger at lvl connection (inside space underneath stair, above/near door) -Complete water service line installation **Water line is cut -Fb front rec room wall vertically at max 10 ft intervals; fb rec rm wall from soffit space; fb all wall plate penetrations -Complete electrical per code at front entry; same in bedroom 3 -Nail together girder trusses per truss detail; tie down GT to walls -Install (4) studs in garage underneath girder truss point load -Nail corner studs 16d@12” oc or equivalent nailing; nail studs at intersection -Protect wiring within 6 ft of attic access **DO NOT INSULATE **12/16-Almost nothing done to correct the deficiencies. This is a 2nd failed inspection. Each 3rd and subsequent failed inspection will incure a re-inspection fee Construction workers are still inside working on corrections Not ready for re inspection 12/18/24. KBEARD 10:58am
All Rough Inspection - Residential Passed 12/23/2024 12/23/2024 12/23/2024
Miscellaneous Correction
Resolved
12/23/2024
-Fur down below ceiling return air space above garage for R-19 insulation -Complete pan off return air above garage; pan off RA from soffit and seal all penetrations -Fasten down the half bathroom sill plate **The sink wall is still crooked. Straighten and fasten wall in place -Nail hanger at lvl connection (inside space underneath stair, above/near door) -Complete water service line installation **Water line is cut -Fb front rec room wall vertically at max 10 ft intervals; fb rec rm wall from soffit space; fb all wall plate penetrations -Complete electrical per code at front entry; same in bedroom 3 -Nail together girder trusses per truss detail; tie down GT to walls -Install (4) studs in garage underneath girder truss point load -Nail corner studs 16d@12” oc or equivalent nailing; nail studs at intersection -Protect wiring within 6 ft of attic access **DO NOT INSULATE **12/16-Almost nothing done to correct the deficiencies. This is a 2nd failed inspection. Each 3rd and subsequent failed inspection will incure a re-inspection fee Construction workers are still inside working on corrections Not ready for re inspection 12/18/24. KBEARD 10:58am
Erosion Control Inspection Residential Partial 1/27/2025 01/27/2025
Miscellaneous Correction
Informational
12/16/2024
Full erosion control measures are in place and must be properly maintained until CofO
Driveway Inspection Partial 2/3/2025 2/3/2025 02/03/2025
Misc
Informational
02/03/2025
2-3-25 Dustin A dw is formed and compacted , Approved to pour
Sidewalk Inspection Partial 2/3/2025 2/3/2025 02/03/2025
Misc
Informational
02/03/2025
2-3-25 Dustin A sw is formed on north side , slopes are in compliance , Approved to pour north side ( left side of approach)
Driveway Inspection Partial 2/10/2025 2/10/2025 02/03/2025
Misc
Informational
02/03/2025
2-3-25 Dustin A dw is formed and compacted , Approved to pour
Sidewalk Inspection Passed 2/10/2025 2/10/2025 02/10/2025
Misc
Informational
02/03/2025
2-3-25 Dustin A sw is formed on north side , slopes are in compliance , Approved to pour north side ( left side of approach) 02-10-25 Jamie S, SW slopes are incompliance with city standards
Driveway Inspection Passed 2/10/2025 2/10/2025 02/10/2025
Misc
Informational
02/03/2025
2-3-25 Dustin A dw is formed and compacted , Approved to pour 02-10-25 Jamie S, DW slopes are incompliance with city standards
Erosion Control Inspection Residential Failed 2/11/2025 02/11/2025
Miscellaneous Correction
Resolved
02/11/2025
Full erosion control measures are in place and must be properly maintained until CofO
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
02/11/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Erosion control measures at the front of the lot are either missing and or torn down in areas - Dirt spoil pile does not have erosion control around it -NO ADDRESS POSTED
Occupancy Inspection - Codes Residential Not Ready 2/11/2025 2/11/2025 02/11/2025
Miscellaneous Correction
Corrective Action Required
02/11/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Erosion control measures at the front of the lot are either missing and or torn down in areas - Dirt spoil pile does not have erosion control around it -NO ADDRESS POSTED - sidewalk has been installed - front porch guard rail has been installed THIS IS NOT A COMPLETE LIST Not ready for inspection WALK YOUR PROPERTY BEFORE SCHEDULING YOUR INSPECTIONS
Occupancy Inspection - Codes Residential Not Ready 2/13/2025 2/13/2025 02/13/2025
Miscellaneous Correction
Resolved
02/13/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Erosion control measures at the front of the lot are either missing and or torn down in areas - Dirt spoil pile does not have erosion control around it -NO ADDRESS POSTED - sidewalk has been installed - front porch guard rail has been installed THIS IS NOT A COMPLETE LIST Not ready for inspection WALK YOUR PROPERTY BEFORE SCHEDULING YOUR INSPECTIONS
Miscellaneous Correction
Corrective Action Required
02/13/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Erosion control measures at the front of the lot are either missing and or torn down in areas - Dirt spoil pile does not have erosion control around it - sidewalk has been installed - front porch guard rail has been installed THIS IS NOT A COMPLETE LIST Not ready for inspection WALK YOUR PROPERTY BEFORE SCHEDULING YOUR INSPECTIONS The City of Lees Summit has a policy to decline inspections until proper erosion control measures are in place. Please correct erosion control and reschedule inspections. 02/13/25. KBEARD 9:30am
Erosion Control Inspection Residential Partial 2/14/2025 02/14/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
02/14/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Erosion control measures at the front of the lot are either missing and or torn down in areas - Dirt spoil pile does not have erosion control around it -NO ADDRESS POSTED
Misc
Corrective Action Required
02/14/2025
- Erosion control in place at time of inspection
Occupancy Inspection - Codes Residential Failed 2/14/2025 2/14/2025 02/14/2025
Miscellaneous Correction
Resolved
02/14/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - Erosion control measures at the front of the lot are either missing and or torn down in areas - Dirt spoil pile does not have erosion control around it - sidewalk has been installed - front porch guard rail has been installed THIS IS NOT A COMPLETE LIST Not ready for inspection WALK YOUR PROPERTY BEFORE SCHEDULING YOUR INSPECTIONS The City of Lees Summit has a policy to decline inspections until proper erosion control measures are in place. Please correct erosion control and reschedule inspections. 02/13/25. KBEARD 9:30am
Misc
Corrective Action Required
02/14/2025
- pay all fees - Provide gutters and downspouts and splash pads - Sump discharge to be 36” away from foundation - Final grading and sod Provide - Uncover water meter for inspection - Secure garage door rails within 18” of the bottom - Fire block penetrations in ceiling at electrical panel - Secure electrical whip at water heater - Provide landing for deck stairs - Pier inspection pending Sidewalk - Revise plot plan to show deck location
Piers/Caissons Inspection - Residential Passed 2/14/2025 02/14/2025
Erosion Control Inspection Residential Partial 2/18/2025 02/18/2025
Misc
Corrective Action Required
02/14/2025
- Erosion control in place at time of inspection
Occupancy Inspection - Codes Residential Failed 2/18/2025 2/18/2025 02/18/2025
Misc
Corrective Action Required
02/14/2025
- missing side walk - Provide gutters and downspouts and splash pads - Sump discharge to be 36” away from foundation - Final grading and sod Provide - Uncover water meter for inspection - Secure garage door rails within 18” of the bottom - Fire block penetrations in ceiling at electrical panel - Provide landing for deck stairs - Sidewalk inspection pending - Revise plot plan to show deck location
Occupancy Inspection - Codes Residential Not Ready 2/24/2025 2/24/2025 02/24/2025
Misc
Resolved
02/24/2025
- missing side walk - Provide gutters and downspouts and splash pads - Sump discharge to be 36” away from foundation - Final grading and sod Provide - Uncover water meter for inspection - Secure garage door rails within 18” of the bottom - Fire block penetrations in ceiling at electrical panel - Provide landing for deck stairs - Sidewalk inspection pending - Revise plot plan to show deck location
Miscellaneous Correction
Corrective Action Required
02/24/2025
missing side walk - Provide gutters and downspouts and splash pads - Sump discharge to be 36” away from foundation - Final grading and sod Provide - Uncover water meter for inspection - Secure garage door rails within 18” of the bottom - Fire block penetrations in ceiling at electrical panel - Provide landing for deck stairs - Sidewalk inspection pending - Revise plot plan to show deck location No improvements since last inspection Please walk your property before scheduling inspections Not ready. KBEARD 02/24/25. 9am
Sidewalk Inspection Partial 2/26/2025 2/26/2025 02/26/2025
Misc
Informational
02/26/2025
02/26/2025 - Jamie S, SW is compacted, and forms are sloped to city standards, approved to pour
Occupancy Inspection - Codes Residential Failed 3/3/2025 3/3/2025 03/03/2025
Miscellaneous Correction
Resolved
03/03/2025
missing side walk - Provide gutters and downspouts and splash pads - Sump discharge to be 36” away from foundation - Final grading and sod Provide - Uncover water meter for inspection - Secure garage door rails within 18” of the bottom - Fire block penetrations in ceiling at electrical panel - Provide landing for deck stairs - Sidewalk inspection pending - Revise plot plan to show deck location No improvements since last inspection Please walk your property before scheduling inspections Not ready. KBEARD 02/24/25. 9am
Miscellaneous Correction
Corrective Action Required
03/03/2025
- Provide gutters and downspouts and splash pads - Final grading and sod Provide - Uncover water meter for inspection - Secure garage door rails within 18” of the bottom - Fire block penetrations in ceiling at electrical panel - Seal under stairs access hatch - Revise plot plan to show deck location Pay $125 fee associated with this permit
Sidewalk Inspection Failed 3/6/2025 3/6/2025 03/06/2025
Misc
Informational
02/26/2025
02/26/2025 - Jamie S, SW is compacted, and forms are sloped to city standards, approved to pour 03-06-25 Jamie S, SW failed third panel south of DW needs to be replaced with expansion joints on both sides
Occupancy Inspection - Codes Residential Failed 3/10/2025 3/10/2025 03/10/2025
Miscellaneous Correction
Corrective Action Required
03/03/2025
- Provide splash pads - Final grading and sod - Fire block penetrations in ceiling at electrical panel - Seal under stairs access hatch **Enclosed and accessible space underneath the stair shall have wall and ceiling protected by 1/2" gypsum - Revise plot plan to show deck location **Complete final grading and submit as-graded plot plan for inspection prior to sodding - Pay $125 fee associated with this permit
Sidewalk Inspection Partial 3/11/2025 3/11/2025 03/11/2025
Misc
Informational
03/06/2025
02/26/2025 - Jamie S, SW is compacted, and forms are sloped to city standards, approved to pour 03-06-25 Jamie S, SW failed third panel south of DW needs to be replaced with expansion joints on both sides 3-11-25 DP. SW was pulled, aggregate was compacted, cross slopes still in compliance and expansion joint added. Approved to pour.
Sidewalk Inspection Passed 3/12/2025 3/12/2025 03/12/2025
Misc
Informational
03/11/2025
02/26/2025 - Jamie S, SW is compacted, and forms are sloped to city standards, approved to pour 03-06-25 Jamie S, SW failed third panel south of DW needs to be replaced with expansion joints on both sides 3-11-25 DP. SW was pulled, aggregate was compacted, cross slopes still in compliance and expansion joint added. Approved to pour. 3-12-25 DP. SW was poured, forms have been removed. Please clear off sidewalk and remove caution tape. Passed.
Plot Plan Inspection Failed 3/13/2025 03/13/2025
Misc
Corrective Action Required
03/13/2025
- Revise plot plan to show deck location **Complete final grading and submit as-graded plot plan for inspection prior to sodding
Erosion Control Inspection Residential Partial 3/13/2025 03/13/2025
Misc
Corrective Action Required
02/18/2025
- Erosion control in place at time of inspection
Occupancy Inspection - Codes Residential Ready for Temp CO 3/13/2025 3/13/2025 03/13/2025
Miscellaneous Correction
Corrective Action Required
03/10/2025
- Provide splash pads - Uncover water meter pit for inspec - Final grading and sod - Revise plot plan to show deck location **Complete final grading and submit as-graded plot plan for inspection prior to sodding
Erosion Control Inspection Residential Passed 05/16/2025
Misc
Resolved
05/16/2025
- Erosion control in place at time of inspection
Plot Plan Inspection Passed 5/16/2025 5/16/2025 05/16/2025
Misc
Resolved
05/16/2025
- Revise plot plan to show deck location **Complete final grading and submit as-graded plot plan for inspection prior to sodding
Occupancy Inspection - Codes Residential Full C of O 5/16/2025 5/16/2025 05/16/2025
Miscellaneous Correction
Resolved
05/16/2025
- Provide splash pads - Uncover water meter pit for inspec - Final grading and sod - Revise plot plan to show deck location **Complete final grading and submit as-graded plot plan for inspection prior to sodding
Documents & Images
Date Uploaded File Type Document Name
08/28/2024 CB #9 - PERMIT APP
09/03/2024 Permit Codes Residential Plan Review
09/05/2024 Approved Plans APPROVED PLANS
09/05/2024 Approved Plans APPROVED TRUSS PACKAGE
09/05/2024 Approved Plans APPROVED TRUSS LAYOUT
09/11/2024 Plot Plan APPROVED PLOT PLAN
09/11/2024 Permit Codes Residential Plan Review
09/11/2024 Permit DS Building Permit
09/11/2024 Receipt Receipt for transaction:2024-007603
09/24/2024 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
09/26/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/10/2024 Letter INSPECTION SUMMARY
10/10/2024 Letter INSPECTION SUMMARY
10/10/2024 Letter INSPECTION SUMMARY
11/05/2024 Letter INSPECTION SUMMARY
12/09/2024 Letter INSPECTION SUMMARY
12/11/2024 Letter INSPECTION SUMMARY
12/11/2024 Letter INSPECTION SUMMARY
12/11/2024 Letter INSPECTION SUMMARY
12/11/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/18/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
01/06/2025 Receipt Receipt for transaction:2025-000051
01/27/2025 Letter INSPECTION SUMMARY
02/03/2025 Letter INSPECTION SUMMARY
02/03/2025 Letter INSPECTION SUMMARY
02/03/2025 Letter INSPECTION SUMMARY
02/10/2025 Letter INSPECTION SUMMARY
02/10/2025 Letter INSPECTION SUMMARY
02/11/2025 Letter INSPECTION SUMMARY
02/11/2025 Letter INSPECTION SUMMARY
02/11/2025 Letter INSPECTION SUMMARY
02/13/2025 Letter INSPECTION SUMMARY
02/14/2025 Letter INSPECTION SUMMARY
02/14/2025 Letter INSPECTION SUMMARY
02/14/2025 Letter INSPECTION SUMMARY
02/14/2025 Receipt Receipt for transaction:2025-000936
02/18/2025 Letter INSPECTION SUMMARY
02/18/2025 Letter INSPECTION SUMMARY
02/24/2025 Letter INSPECTION SUMMARY
02/26/2025 Letter INSPECTION SUMMARY
03/03/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/10/2025 Receipt Receipt for transaction:2025-001405
03/10/2025 Letter INSPECTION SUMMARY
03/11/2025 Letter INSPECTION SUMMARY
03/12/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
03/13/2025 Certificate/License Codes Temporary Certificate of Occupancy
03/13/2025 Receipt Receipt for transaction:2025-001527
03/27/2025 Scope of Work APPROVED AS BUILT PLOT PLAN
05/16/2025 Letter INSPECTION SUMMARY
05/16/2025 Letter INSPECTION SUMMARY
05/16/2025 Letter Codes Final Certificate of Occupancy
05/16/2025 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.