Permit Application Status

PRRES20244115


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20244115
Building Permit - Residential
Temporary Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - ROOF TRUSSES - COVERED PATIO STOP WORK ORDER generated on 01/08/2025 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 01/09/2025 12:00 AM by username 'Mitchell Schwarz'.
08/07/2024
08/19/2024
02/04/2025
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
CMH PARKS INC, Address:5000 CLAYTON RD  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
Bruce Roach, Address:120 SE 30th St., Phone:(816) 434-5074 Ext:321  
BRUCER@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 08/19/2024
Right of Way Permit Fee $85.00 $85.00 Paid 08/19/2024
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 08/19/2024
Water Tap Fee $3,973.00 $3,973.00 Paid 08/19/2024
Water Meter Fee $748.03 $748.03 Paid 08/19/2024
Valuation Fee New Single Family $1,650.94 $1,650.94 Paid 08/19/2024
Not Ready Inspection Fee $75.00 $75.00 Paid 03/13/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 03/13/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 03/13/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 08/19/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 08/19/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 08/19/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 08/19/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 08/19/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 09/18/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Misc
Corrective Action Required
09/18/2025
As graded plot plan needed
Occupancy Inspection - Codes Residential Pending 10/18/2025
Misc
Corrective Action Required
09/18/2025
-provide as graded plot plan
Misc
Corrective Action Required
09/18/2025
As graded plot plan needed
Sewer Service Inspection - R Passed 10/21/2024 10/21/2024 10/21/2024
Water Service Inspection - R Passed 10/22/2024 10/22/2024
Underslab Plumbing Inspection - Residential Passed 10/29/2024 10/29/2024 10/29/2024
Erosion Control Inspection Residential Failed 10/29/2024 10/29/2024 10/29/2024
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
10/29/2024
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/29/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
All Rough Inspection - Residential Partial 12/4/2024 12/4/2024 12/04/2024
Misc
Corrective Action Required
12/04/2024
Garage portal frame inspection only. Okay to cover
All Rough Inspection - Residential Passed 12/6/2024 12/6/2024 12/06/2024
Misc
Corrective Action Required
12/04/2024
Garage portal frame inspection only. Okay to cover
All Rough Inspection - Residential Failed 1/8/2025 1/8/2025 01/08/2025
Misc
Informational
01/08/2025
Garage portal frame nailing inspected and okay to cover
Corrective Action Required
01/08/2025
REQUESTED INSPECTION DENIED. FOOTING POURED WITHOUT INSPECTION.
Gas Service Inspection - Residential Failed 1/8/2025 1/8/2025 01/08/2025
Misc
Corrective Action Required
01/08/2025
REQUESTED INSPECTION DENIED. FOOTING POURED WITHOUT INSPECTION.
Electrical Service Inspection Failed 1/8/2025 1/8/2025 01/08/2025
Misc
Corrective Action Required
01/08/2025
REQUESTED INSPECTION DENIED. FOOTING POURED WITHOUT INSPECTION.
Footing Inspection - Residential Failed - Stop Work 1/8/2025 01/08/2025
Misc
Corrective Action Required
01/08/2025
FOOTING POURED WITHOUT INSPECTION. STOP WORK ISSUED.
Footing Inspection - Residential Passed 1/9/2025 1/9/2025 01/09/2025
Misc
Resolved
01/09/2025
FOOTING POURED WITHOUT INSPECTION. STOP WORK ISSUED.
All Rough Inspection - Residential Not Ready 1/10/2025 1/10/2025 01/10/2025
Misc
Corrective Action Required
01/10/2025
No city stamped plans on site. Inspection denied.
Gas Service Inspection - Residential Failed 1/14/2025 1/14/2025 01/14/2025
Misc
Resolved
01/14/2025
REQUESTED INSPECTION DENIED. FOOTING POURED WITHOUT INSPECTION.
G2417.4 Test pressure measurement
Corrective Action Required
01/14/2025
INSPECTION, TESTING AND PURGING. Test pressure shall be measured with a manometer or with a pressure-measuring device designed and calibrated to read, record, or indicate a pressure loss caused by leakage during the pressure test period. The source of pressure shall be isolated before the pressure tests are made. Mechanical gauges used to measure test pressures shall have a range such that the highest end of the scale is not greater than five times the test pressure.
Electrical Service Inspection Passed 1/14/2025 1/14/2025 01/14/2025
Misc
Resolved
01/14/2025
REQUESTED INSPECTION DENIED. FOOTING POURED WITHOUT INSPECTION.
All Rough Inspection - Residential Failed 1/14/2025 1/14/2025 01/14/2025
Misc
Resolved
01/14/2025
No city stamped plans on site. Inspection denied.
Misc
Corrective Action Required
01/14/2025
-nail lib bracing to code -nail girder trusses together to plans -seal top plate penetration bed 2 -anchor all steel columns in basement
Gas Service Inspection - Residential Not Ready 1/16/2025 1/16/2025 01/16/2025
G2417.4 Test pressure measurement
Corrective Action Required
01/14/2025
INSPECTION, TESTING AND PURGING. Test pressure shall be measured with a manometer or with a pressure-measuring device designed and calibrated to read, record, or indicate a pressure loss caused by leakage during the pressure test period. The source of pressure shall be isolated before the pressure tests are made. Mechanical gauges used to measure test pressures shall have a range such that the highest end of the scale is not greater than five times the test pressure.
All Rough Inspection - Residential Passed 1/16/2025 1/16/2025 01/16/2025
Misc
Resolved
01/16/2025
-nail lib bracing to code -nail girder trusses together to plans -seal top plate penetration bed 2 -anchor all steel columns in basement
Gas Service Inspection - Residential Passed 1/21/2025 1/21/2025 01/21/2025
G2417.4 Test pressure measurement
Resolved
01/21/2025
INSPECTION, TESTING AND PURGING. Test pressure shall be measured with a manometer or with a pressure-measuring device designed and calibrated to read, record, or indicate a pressure loss caused by leakage during the pressure test period. The source of pressure shall be isolated before the pressure tests are made. Mechanical gauges used to measure test pressures shall have a range such that the highest end of the scale is not greater than five times the test pressure.
Driveway Inspection Partial 2/7/2025 2/7/2025 02/07/2025
Misc
Informational
02/07/2025
2-6-25 Dustin A, Dw formed and compacted. Approved to pour
Sidewalk Inspection Partial 2/7/2025 2/7/2025 02/07/2025
Misc
Informational
02/07/2025
2-6-25 Dustin A, SW formed and compacted. Slopes are in compliance. Approved to pour
Driveway Inspection Partial 2/14/2025 2/14/2025 02/13/2025
Misc
Informational
02/07/2025
2-6-25 Dustin A, Dw formed and compacted. Approved to pour 2-13-25 Jamie S, DW is covered in snow, cannot inspect until it is cleared.
Sidewalk Inspection Partial 2/14/2025 2/14/2025 02/13/2025
Misc
Informational
02/07/2025
2-6-25 Dustin A, SW formed and compacted. Slopes are in compliance. Approved to pour 2-13-25 Jamie S, DW is covered in snow, cannot inspect until it is cleared.
Sidewalk Inspection Partial 02/13/2025
Misc
Informational
02/13/2025
2-6-25 Dustin A, SW formed and compacted. Slopes are in compliance. Approved to pour 2-13-25 Jamie S, SW is covered in snow, cannot inspect until it is cleared.
Erosion Control Inspection Residential Failed 3/3/2025 3/3/2025 03/03/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
10/29/2024
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/29/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/03/2025
3-3-25 Dustin A, No erosion control on west side ( left ) of lot .EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Partial 3/6/2025 3/6/2025 03/06/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
03/03/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/03/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/03/2025
3-3-25 Dustin A, No erosion control on west side ( left ) of lot .EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS .3-6-25 Dustin A EROSION control is in place. Must be maintained
Occupancy Inspection - Codes Residential Failed 3/7/2025 3/7/2025 03/07/2025
Misc
Corrective Action Required
03/07/2025
-provide as graded plot plan -address pending driveway and sidewalk inspection -final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation -provide guard rail at front stoop where required by code.
Occupancy Inspection - Codes Residential Ready for Temp CO 3/13/2025 3/13/2025 03/13/2025
Misc
Corrective Action Required
03/07/2025
-provide as graded plot plan -address pending driveway and sidewalk inspection -final grade and sod -splash blocks and sump pump discharge to extend 36” from foundation
Occupancy Inspection - Codes Residential Failed 8/18/2025 8/18/2025 08/18/2025
Misc
Corrective Action Required
03/13/2025
-provide as graded plot plan -address pending driveway and sidewalk inspections
Driveway Inspection Passed 8/20/2025 08/20/2025
Misc
Informational
02/13/2025
2-6-25 Dustin A, Dw formed and compacted. Approved to pour 2-13-25 Jamie S, DW is covered in snow, cannot inspect until it is cleared. 8-20-25 Dustin A. dw is poured to city specs ,pass
Sidewalk Inspection Passed 8/20/2025 08/20/2025
Misc
Informational
02/13/2025
2-6-25 Dustin A, SW formed and compacted. Slopes are in compliance. Approved to pour 2-13-25 Jamie S, SW is covered in snow, cannot inspect until it is cleared. 8-20-25 Dustin A. sw is poured to city specs
Plot Plan Inspection Failed 9/18/2025 09/18/2025
Misc
Corrective Action Required
09/18/2025
As graded plot plan needed
Occupancy Inspection - Codes Residential Failed 9/18/2025 09/18/2025
Misc
Corrective Action Required
08/18/2025
-provide as graded plot plan
Misc
Corrective Action Required
09/18/2025
As graded plot plan needed
Erosion Control Inspection Residential Passed 9/18/2025 09/18/2025
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
03/06/2025
REQUESTED INSPECTION(S) DENIED. STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/06/2025
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/06/2025
3-3-25 Dustin A, No erosion control on west side ( left ) of lot .EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS .3-6-25 Dustin A EROSION control is in place. Must be maintained
Occupancy Inspection - Codes Residential Ready for Temp CO 9/18/2025 09/18/2025
Misc
Corrective Action Required
09/18/2025
-provide as graded plot plan
Misc
Corrective Action Required
09/18/2025
As graded plot plan needed
Documents & Images
Date Uploaded File Type Document Name
08/08/2024 Approved Plans APPROVED PLANS
08/08/2024 Approved Plans APPROVED TRUSS LAYOUT
08/08/2024 Approved Plans APPROVED TRUSS PACKAGE
08/08/2024 Permit Codes Residential Plan Review
08/08/2024 Permit Codes Residential Plan Review
08/08/2024 Application Form HT #75 - PERMIT APP
08/19/2024 Permit Codes Residential Plan Review
08/19/2024 Permit Codes Residential Plan Review
08/19/2024 Plot Plan APPROVED PLOT PLAN
08/19/2024 Permit DS Building Permit
08/19/2024 Permit DS Building Permit
08/19/2024 Receipt Receipt for transaction:2024-006990
10/21/2024 Letter INSPECTION SUMMARY
10/21/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/06/2024 Letter INSPECTION SUMMARY
12/06/2024 Letter INSPECTION SUMMARY
12/06/2024 Letter INSPECTION SUMMARY
01/08/2025 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
01/14/2025 Letter INSPECTION SUMMARY
01/14/2025 Letter INSPECTION SUMMARY
01/14/2025 Letter INSPECTION SUMMARY
01/14/2025 Letter INSPECTION SUMMARY
01/14/2025 Letter INSPECTION SUMMARY
01/14/2025 Letter INSPECTION SUMMARY
01/16/2025 Letter INSPECTION SUMMARY
01/16/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
01/21/2025 Letter INSPECTION SUMMARY
02/07/2025 Letter INSPECTION SUMMARY
02/07/2025 Letter INSPECTION SUMMARY
02/07/2025 Letter INSPECTION SUMMARY
02/07/2025 Letter INSPECTION SUMMARY
02/07/2025 Letter INSPECTION SUMMARY
02/13/2025 Letter INSPECTION SUMMARY
02/13/2025 Letter INSPECTION SUMMARY
03/03/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter Stop Work Order
03/07/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter Stop Work Order
03/07/2025 Letter INSPECTION SUMMARY
03/07/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
03/13/2025 Certificate/License Codes Temporary Certificate of Occupancy
03/13/2025 Certificate/License Codes Temporary Certificate of Occupancy
03/13/2025 Receipt Receipt for transaction:2025-001535
07/31/2025 Letter Codes 140 Day Letter
07/31/2025 Letter Codes 140 Day Letter
08/18/2025 Letter INSPECTION SUMMARY
08/18/2025 Letter INSPECTION SUMMARY
08/19/2025 Certificate/License Codes Temporary Certificate of Occupancy
08/19/2025 Certificate/License Codes Temporary Certificate of Occupancy
08/19/2025 Certificate/License Codes Temporary Certificate of Occupancy
08/19/2025 Certificate/License Codes Temporary Certificate of Occupancy
08/19/2025 Certificate/License Codes Temporary Certificate of Occupancy
08/19/2025 Certificate/License Codes Temporary Certificate of Occupancy
08/19/2025 Certificate/License Codes Temporary Certificate of Occupancy
08/19/2025 Certificate/License Codes Temporary Certificate of Occupancy
08/19/2025 Certificate/License Codes Temporary Certificate of Occupancy
08/19/2025 Certificate/License Codes Temporary Certificate of Occupancy
08/19/2025 Receipt Receipt for transaction:2025-006514
08/20/2025 Letter INSPECTION SUMMARY
08/20/2025 Letter INSPECTION SUMMARY
08/20/2025 Letter INSPECTION SUMMARY
09/09/2025 HT #75 - TCO Extension 9_9_25
09/18/2025 Letter INSPECTION SUMMARY
09/18/2025 Letter INSPECTION SUMMARY
09/18/2025 Letter INSPECTION SUMMARY
09/18/2025 Letter INSPECTION SUMMARY
09/18/2025 Certificate/License Codes Temporary Certificate of Occupancy
09/18/2025 Certificate/License Codes Temporary Certificate of Occupancy
09/18/2025 Receipt Receipt for transaction:2025-007192
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home