Summary
PRRES20242432
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK
05/14/2024
05/21/2024
11/12/2024
10/21/2024
Locations
Contacts
ELEVATE DESIGN & BUILD LLC, Address:350 SW LONGVIEW BLVD, Phone:(816) 622-8826  
Elevate Design + Build , Address:350 Longview Blvd.   
Bill Seachrest, Address:350 SW Longview Blvd, Phone:(816) 786-8876  
SARA@ELEVATEDESIGNBUILDKC.COM  
5 STAR MECHANICAL, LLC, Address:PO BOX 793, Phone:(816) 679-0375  
ELECTRICAL CONNECTIONS, Address:20112 HOPS CREEK DR, Phone:(816) 838-6946  
S&B Plumbing, Inc., Address:PO Box 101, Phone:(913) 850-3445  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 05/21/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 05/21/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 05/21/2024
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 05/21/2024
8350015-Water Meter Fee $680.46 $680.46 Paid 05/21/2024
9110078-Valuation Fee New Single Family $1,386.17 $1,386.17 Paid 05/21/2024
9110080-3rd and Subsequent Inspection Fee (Per Hour) $75.00 $75.00 Paid 10/16/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 5/29/2024 5/29/2024 05/29/2024
Underslab Plumbing Inspection - Residential Passed 6/11/2024 6/11/2024 06/11/2024
Erosion Control Inspection Residential Partial 6/11/2024 6/11/2024 06/11/2024
Misc
Informational
06/11/2024
Erosion control in compliance at time of inspection.
Sewer Service Inspection - R Passed 6/11/2024 6/11/2024 06/11/2024
Water Service Inspection - R Passed 6/12/2024 06/12/2024
All Rough Inspection - Residential Partial 7/8/2024 7/8/2024 07/08/2024
Misc
Informational
07/08/2024
Garage portal frame and rear cspf inspected
Piers/Caissons Inspection - Residential Failed 7/17/2024 07/17/2024
Misc
Corrective Action Required
07/17/2024
-Piers not to plans -No further inspections until erosion control is in compliance
Erosion Control Inspection Residential Failed 7/17/2024 07/17/2024
Misc
Resolved
07/17/2024
Erosion control in compliance at time of inspection.
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/17/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/17/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Piers/Caissons Inspection - Residential Passed 7/19/2024 7/19/2024 07/19/2024
Misc
Resolved
07/19/2024
All Rough Inspection - Residential Failed 7/23/2024 7/23/2024 07/23/2024
Misc
Resolved
07/23/2024
Garage portal frame and rear cspf inspected
Misc
Corrective Action Required
07/23/2024
No further inspections until erosion control is in compliance, address overgrown vegetation -address over notched studs in garage for anchor bolts -primary closet exterior wall and garage wall top plates not tied together -boca plate to extent 2” past top plate at dwv in primary bath -provide proper slope for dwv above primary bath -missing nails in hangers above primary bed -fireblock fireplace to ceiling space -secure electrical to code in ceiling space -provide proper slope for dwv for bed 2 bath in ceiling -seal top plate penetrations at bed 2 entry -will check gb bracing screw pattern at time of drywall -address ceiling joist landing on foyer and all not load bearing -address over notched exterior wall studs for anchor bolts in basement to be -completed 10’ fireblocking see wet bar area -seal penetrations in vertical to horizontal fireblocking -fireblock furr down ends in basement -seal top plate penetration at rear basement patio wall -secured electrical in ceiling space in basement -fireblock top of furr out wall in basement bath
All Rough Inspection - Residential Failed 7/29/2024 7/29/2024 07/29/2024
Misc
Corrective Action Required
07/23/2024
-boca plate to extent 2” past top plate at dwv in primary bath -address over bored studs in primary bath/greatroom wall -seal penetrations in return air stud space in primary bed/bath wall -fireblock fireplace to ceiling space -will check gb bracing screw pattern at time of drywall -seal penetrations in vertical to horizontal fireblocking
Gas Service Inspection - Residential Failed 7/30/2024 7/30/2024 07/30/2024
Misc
Corrective Action Required
07/30/2024
No pressure at gas line for inspection
Electrical Service Inspection Passed 7/30/2024 7/30/2024 07/30/2024
Erosion Control Inspection Residential Partial 8/1/2024 08/01/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
08/01/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
08/01/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
All Rough Inspection - Residential Partial 8/1/2024 8/1/2024 08/01/2024
Misc
Corrective Action Required
07/29/2024
-will check gb bracing screw pattern at time of drywall **OK TO ROCK
Gas Service Inspection - Residential Passed 8/1/2024 8/1/2024 08/01/2024
Misc
Resolved
08/01/2024
No pressure at gas line for inspection
All Rough Inspection - Residential Failed 8/9/2024 8/9/2024 08/09/2024
Misc
Corrective Action Required
08/01/2024
-will check gb bracing screw pattern at time of drywall Gb at fire place wall both sides block and screw edges garage and entry okay **OK TO ROCK
All Rough Inspection - Residential Passed 8/12/2024 8/12/2024 08/12/2024
Misc
Resolved
08/12/2024
-will check gb bracing screw pattern at time of drywall Gb at fire place wall both sides block and screw edges garage and entry okay **OK TO ROCK
Driveway Inspection Partial 8/19/2024 08/19/2024
Misc
Informational
08/19/2024
8-19-24 Dustin A,Dw is formed and compacted, will need to maintain ADA spec through approach. Approved to pour
Sidewalk Inspection Partial 8/19/2024 08/19/2024
Misc
Informational
08/19/2024
8-19-24 Dustin A, SW has been formed and compacted. Slopes are in compliance. approved to pour
Driveway Inspection Passed 8/27/2024 8/27/2024 08/26/2024
Misc
Informational
08/19/2024
8-19-24 Dustin A,Dw is formed and compacted, will need to maintain ADA spec through approach. Approved to pour 8-26-24 Dustin A, Dw is poured to city specs and slopes are in compliance. Passed
Sidewalk Inspection Partial 8/27/2024 8/27/2024 08/26/2024
Misc
Informational
08/19/2024
8-19-24 Dustin A, SW has been formed and compacted. Slopes are in compliance. approved to pour 8-26-24 Dustin A, SW has dirt all over it cannot inspect until its cleaned. Will not pass until valve is fixed
Erosion Control Inspection Residential Partial 8/26/2024 8/26/2024 08/26/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/26/2024
8-26-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Curb and road needs to be cleaned
Erosion Control Inspection Residential Partial 8/30/2024 8/30/2024 08/30/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/26/2024
8-26-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Curb and road needs to be cleaned 8-30-24 Dustin A, Curb and road has been cleaned as well as sidewalk. Will need erosion control down from back of curb to front of sidewalk.
Sidewalk Inspection Partial 9/3/2024 9/3/2024 09/03/2024
Misc
Informational
08/26/2024
8-19-24 Dustin A, SW has been formed and compacted. Slopes are in compliance. approved to pour 8-26-24 Dustin A, SW has dirt all over it cannot inspect until its cleaned. Will not pass until valve is fixed 9-3-2024 Dustin A, conditions have not changed
Erosion Control Inspection Residential Partial 9/10/2024 9/10/2024 09/10/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/30/2024
8-26-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Curb and road needs to be cleaned 8-30-24 Dustin A, Curb and road has been cleaned as well as sidewalk. Will need erosion control down from back of curb to front of sidewalk. 9-10-24 Dustin A, Dirt is covering SW again due to insufficient erosion control. Needs to be cleaned
Erosion Control Inspection Residential Partial 9/13/2024 9/13/2024 09/13/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
09/10/2024
8-26-24 Dustin A, EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. Curb and road needs to be cleaned 8-30-24 Dustin A, Curb and road has been cleaned as well as sidewalk. Will need erosion control down from back of curb to front of sidewalk. 9-10-24 Dustin A, Dirt is covering SW again due to insufficient erosion control. Needs to be cleaned 9-13-24 Dustin A, Sufficient erosion control has been established and will need to be maintained until sod is down
Plot Plan Inspection Failed 10/11/2024 10/11/2024
Misc
Corrective Action Required
10/11/2024
Repair damaged water valve at NE corner of lot
Erosion Control Inspection Residential Passed 10/16/2024 10/16/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
10/16/2024
Plot Plan Inspection Passed 10/16/2024 10/16/2024
Misc
Resolved
10/16/2024
Repair damaged water valve at NE corner of lot
Occupancy Inspection - Codes Residential Failed 10/16/2024 10/16/2024 10/16/2024
Misc
Corrective Action Required
10/16/2024
2502 sw tracker - Pay outstanding fees - Obtain an irrigation permit - Sidewalk inspection pending - Repair damaged water valve at North East corner of lot - Laundry outlet to be GFCI protected - Center post at deck railing not secure - Open electrical at vent hood kitchen - Complete hardware at front door - Provided (2) 1/2” through bolts at deck post to beam connections - Label non GFCI outlet at sump - Sump discharge to be 36” away from foundation - Provide splash pads for gutter downspouts - Secure electrical whip at AC compressor within 12” of disconnect
Sidewalk Inspection Passed 10/17/2024 10/17/2024 10/16/2024
Misc
Informational
09/03/2024
8-19-24 Dustin A, SW has been formed and compacted. Slopes are in compliance. approved to pour 8-26-24 Dustin A, SW has dirt all over it cannot inspect until its cleaned. Will not pass until valve is fixed 9-3-2024 Dustin A, conditions have not changed 10-16-24 Dustin A, slopes are in compliance and valve is fixed. Passed
Occupancy Inspection - Codes Residential Failed 10/17/2024 10/17/2024 10/17/2024
Misc
Corrective Action Required
10/16/2024
- Obtain an issued irrigation permit - Provided (2) 1/2” through bolts at deck post to beam connections
Occupancy Inspection - Codes Residential Full C of O 10/21/2024 10/21/2024 10/21/2024
Misc
Resolved
10/21/2024
- Obtain an issued irrigation permit - Provided (2) 1/2” through bolts at deck post to beam connections
Documents & Images
Date Uploaded File Type Document Name
05/14/2024 HP 24-05-14 Somerset~ab stamped
05/14/2024 License_Tax_Application
05/14/2024 LS_tax_signed
05/14/2024 PP-24-4-12-HF128
05/14/2024 Residental Permit Application-updated
05/16/2024 Permit Codes Residential Plan Review
05/16/2024 24-5-16-Residental Permit Application-REV1
05/16/2024 24-5-16-Review Comment Response-REV1
05/16/2024 HP 24-05-14 Somerset~ab PERMIT RESPONSE 051624
05/16/2024 PP-24-5-16-HF128-REV1
05/16/2024 Permit Codes Residential Plan Review
05/16/2024 Plot Plan APPROVED PLOT PLAN
05/17/2024 Permit Codes Residential Plan Review
05/21/2024 Permit DS Building Permit
05/21/2024 Receipt Receipt for transaction:2024-003702
05/29/2024 Letter INSPECTION SUMMARY
05/30/2024 Approved Plans APPROVED REVISED PLANS
06/11/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/11/2024 Letter INSPECTION SUMMARY
06/12/2024 Letter INSPECTION SUMMARY
06/27/2024 Approved Plans APPROVED REVISED PLANS
07/08/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/19/2024 Letter INSPECTION SUMMARY
07/23/2024 Letter INSPECTION SUMMARY
07/29/2024 Letter INSPECTION SUMMARY
07/30/2024 Letter INSPECTION SUMMARY
07/30/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/02/2024 HP 24-06-26 HF 128 revised Engineering
08/09/2024 Letter INSPECTION SUMMARY
08/12/2024 Letter INSPECTION SUMMARY
08/19/2024 Letter INSPECTION SUMMARY
08/19/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/30/2024 Letter INSPECTION SUMMARY
09/03/2024 Letter INSPECTION SUMMARY
09/10/2024 Letter INSPECTION SUMMARY
09/10/2024 Letter INSPECTION SUMMARY
09/13/2024 Letter INSPECTION SUMMARY
10/10/2024 As Graded PP-24-10-10-HF128
10/10/2024 Plot Plan approved as graded plot plan
10/11/2024 Letter INSPECTION SUMMARY
10/16/2024 Letter INSPECTION SUMMARY
10/16/2024 Letter INSPECTION SUMMARY
10/16/2024 Letter INSPECTION SUMMARY
10/16/2024 Letter INSPECTION SUMMARY
10/16/2024 Receipt Receipt for transaction:2024-008362
10/16/2024 Letter INSPECTION SUMMARY
10/17/2024 Letter INSPECTION SUMMARY
10/21/2024 Letter Codes Final Certificate of Occupancy
10/21/2024 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home