Permit Application Status

PRRES20216094


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20216094
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. COVERED DECK.
11/23/2021
11/30/2021
05/28/2022
09/11/2023
Locations
Contacts
NEW MARK HOMES - KC LLC, Address:5207 NW CROOKED ROAD, Phone:(816) 969-9010  
Ashley Kirby, Address:5207 NW Crooked Rd, Phone:(816) 969-9010  
HARRINGTON BROTHERS HEATING & COOLING, Address:15630 S KEELER ST, Phone:(913) 422-5444  
PREMIER ELECTRIC & LIGHTING DESIGN, Address:PO BOX 1311, Phone:(816) 564-7660  
R & R PLUMBING INC, Address:2001 GASLIGHT DR, Phone:(816) 772-5431  
CBRUNING@NEWMARKHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $600.00 $600.00 Paid 11/30/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 11/30/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 11/30/2021
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 11/30/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 11/30/2021
9110078-Valuation Fee New Single Family $1,514.69 $1,514.69 Paid 11/30/2021
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 01/12/2023
9110080-3rd and Subsequent Inspection Fee (Per Hour) $75.00 $75.00 Paid 08/10/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 12/17/2021 (8:00) 12/17/2021 12/17/2021
Underslab Plumbing Inspection - Residential Passed 1/18/2022 1/18/2022 01/18/2022
Sewer Service Inspection - R Passed 3/2/2022 (1:00) 3/2/2022 03/02/2022
Water Service Inspection - R Passed 3/2/2022 (1:00) 3/2/2022 03/02/2022
Miscellaneous Inspection Passed 8/29/2022 08/29/2022
Misc
Informational
08/29/2022
spoke with Craig with new mark about the progress of the home and delays they have had.
Gas Service Inspection - Residential Passed 11/22/2022 11/22/2022 11/22/2022
Electrical Service Inspection Failed 11/22/2022 11/22/2022 11/22/2022
Misc
Corrective Action Required
11/22/2022
connect ufer ground to middle grounded bus bar.
All Rough Inspection - Residential Not Ready 11/22/2022 11/22/2022 11/22/2022
Misc
Corrective Action Required
11/22/2022
COMPLETE ALL TRADES FOR INSPECTION HOME NOT READY FOR INSPECTION PARTIAL LIST. LIST WILL CHANGE, COMPLETE ALL ITEMS BEFORE REINSPECTION -address rafters landing on blocks throughout -anchor bolts to be in the middle 1/3 of sill plate -missing nut for pfh bolt -complete all hvac in home -fire block hvac chase to ceiling space -address rafter to top plate and rafter to ceiling joist connection in garage N & S wall -address over notched studs at pfh for electrical -furr out for dwv in garage -block and seal penetrations garage wall/ stairwell wall to under stairs -missing hangers on joists above utility room -all nuts and bolts at beam above gathering room/ kitchen to be tight -fire block gathering room/stairwell wall to ceiling space -missing nails in hanger above rear deck door -uncover covered deck for inspection -provide proper hanger for double 2x12 at breakfast/gathering room -cspf at breakfast W wall -address holes drilled closer than 2” to one another above entry for dwv and pex multiple places -uncover covered front porch -furr out for dwv and pex in bed 2 closet -seal penetrations in R/a owners suit entry -fire block owners suit to ceiling space -missing hangers above owners bath -over notched double joists above owners bath -missing nails in hangers above owners bath -complete bath fans -ground ufer to middle grounded bus bar
All Rough Inspection - Residential Failed 12/7/2022 12/7/2022 12/07/2022
Misc
Corrective Action Required
11/22/2022
-address rafters landing on blocks throughout -anchor bolts to be in the middle 1/3 of sill plate -missing nut for pfh bolt -address rafter to top plate and rafter to ceiling joist connection in garage N & S wall -address over notched studs at pfh for electrical -furr out for dwv in garage -block and seal penetrations garage wall/ stairwell wall to under stairs -missing hangers on joists above utility room -all nuts and bolts at beam above gathering room/ kitchen to be tight -fire block gathering room/stairwell wall to ceiling space -missing nails in hanger above rear deck door -uncover covered deck for inspection -provide proper hanger for double 2x12 at breakfast/gathering room -cspf at breakfast W wall -address holes drilled closer than 2” to one another above entry for dwv and pex multiple places -uncover covered front porch -furr out for dwv and pex in bed 2 closet -seal penetrations in R/a owners suit entry -fire block owners suit to ceiling space -missing hangers above owners bath -over notched double joists above owners bath -missing nails in hangers above owners bath -complete bath fans - solid block all cantilevers in basement - Provide anchor bolts for short return wall basement south side - Line set not ran for A/C - Provide vent for future basement bathroom - Repair floor master toilet and vanity - Complete vent ductwork bedroom 3 bathrooms - Solid block sheeting breaks at gable bedroom 4 - Complete vent ductwork bedroom 4 - Complete ductwork for bedroom 4 at garage joist space
Electrical Service Inspection Passed 12/7/2022 12/7/2022 12/07/2022
Misc
Resolved
12/07/2022
All Rough Inspection - Residential Failed 1/9/2023 1/9/2023 01/09/2023
Misc
Corrective Action Required
12/07/2022
-address rafters landing on blocks throughout -anchor bolts to be in the middle 1/3 of sill plate (see pfh) -address over notched studs at pfh for electrical -furr out for dwv in garage (not fireblock) -block and seal penetrations garage wall/ stairwell wall to under stairs -missing nails in hanger above rear deck door -uncover covered deck for inspection -cspf at breakfast W wall (repair to engineer letter specifications) -uncover covered front porch -fire block owners suit to ceiling space(SE corner) -over notched double joists above owners bath(fix to engineer specifications to be full length) - Provide anchor bolts for short return wall basement south side - Line set not ran for A/c - Provide vent for future basement bathroom
All Rough Inspection - Residential Failed 1/12/2023 1/12/2023 01/12/2023
Misc
Corrective Action Required
01/09/2023
-anchor bolts to be in the middle 1/3 of sill plate (see pfh)NOT DONE -over notched double joists above owners bath(fix to engineer specifications to be full length) waiting on updated letter - Provide anchor bolts for short return wall basement south side (2 required) OKAY TO INSULATE
All Rough Inspection - Residential Failed 1/13/2023 1/13/2023 01/13/2023
Misc
Corrective Action Required
01/12/2023
-over notched double joists above owners bath(fix to engineer specifications to be full length) OKAY TO INSULATE
Driveway Inspection Partial 3/6/2023 3/6/2023 03/06/2023
Misc
Informational
03/06/2023
3-6-23 RH. Driveway is formed up and aggreagte is placed and compacted. Approved to pour.
Piers/Caissons Inspection - Residential Passed 8/9/2023 (8:00) 8/9/2023 07/26/2023
Misc
Informational
07/26/2023
Third party inspection performed
Occupancy Inspection - Codes Residential Failed 7/26/2023 7/26/2023 07/26/2023
Misc
Corrective Action Required
07/26/2023
Address pending all rough inspection Address pending driveway inspection Provide as graded plot plan Provide tamper resistant caps at AC unit Addressed deck post to beam connection not to code
Driveway Inspection Passed 7/27/2023 7/27/2023 07/27/2023
Misc
Informational
03/06/2023
3-6-23 RH. Driveway is formed up and aggreagte is placed and compacted. Approved to pour. 7-27-23 BR Driveway is concrete to LS specification
Piers/Caissons Inspection - Residential Failed 8/9/2023 8/9/2023 08/09/2023
Misc
Corrective Action Required
08/09/2023
Pier hole full of water. Pump out water for inspection
All Rough Inspection - Residential Passed 08/10/2023
Misc
Resolved
08/10/2023
-over notched double joists above owners bath(fix to engineer specifications to be full length) OKAY TO INSULATE
Piers/Caissons Inspection - Residential Passed 8/10/2023 (8:00) 8/10/2023 08/10/2023
Misc
Resolved
08/10/2023
Pier hole full of water. Pump out water for inspection
Plot Plan Inspection Passed 8/14/2023 08/14/2023
Occupancy Inspection - Codes Residential Failed 9/1/2023 9/1/2023 09/01/2023
Misc
Corrective Action Required
07/26/2023
Addressed deck post to beam connection not to plans or code
Erosion Control Inspection Residential Passed 09/11/2023
Occupancy Inspection - Codes Residential Full C of O 9/11/2023 9/11/2023 09/11/2023
Misc
Resolved
09/11/2023
Addressed deck post to beam connection not to plans or code
Documents & Images
Date Uploaded File Type Document Name
11/29/2021 Permit Codes Residential Plan Review
11/30/2021 Application Form hkf 39_001
11/30/2021 Approved Plans APPROVED DRAWINGS
11/30/2021 Plot Plan APPROVED PLOT PLAN
11/30/2021 Permit Codes Residential Plan Review
11/30/2021 Permit DS Building Permit
11/30/2021 Receipt Receipt for transaction:2021-008988
12/17/2021 Letter INSPECTION SUMMARY
01/18/2022 Letter INSPECTION SUMMARY
03/02/2022 Letter INSPECTION SUMMARY
03/02/2022 Letter INSPECTION SUMMARY
08/11/2022 Approved Plans Approved Revised Drawings
08/29/2022 Letter Codes 180 Day Letter
08/29/2022 Letter INSPECTION SUMMARY
08/31/2022 2602 SW Farm Field Rd_DECK PIER INSP_2022-08-26
11/22/2022 Letter INSPECTION SUMMARY
11/22/2022 Letter INSPECTION SUMMARY
11/22/2022 Letter INSPECTION SUMMARY
12/07/2022 Letter INSPECTION SUMMARY
12/07/2022 Letter INSPECTION SUMMARY
01/06/2023 Rev Final_2022_12_08_Struct_LSMO_New Mark Homes
01/09/2023 Letter INSPECTION SUMMARY
01/12/2023 Receipt Receipt for transaction:2023-000205
01/12/2023 Letter INSPECTION SUMMARY
01/13/2023 Letter INSPECTION SUMMARY
01/17/2023 Rev 2 Final_2022_12_08_Struct_LSMO_New Mark Homes
03/06/2023 Letter INSPECTION SUMMARY
07/25/2023 Letter Codes Residential Plan Review
07/25/2023 Letter Codes 140 Day Letter
07/26/2023 Letter INSPECTION SUMMARY
07/26/2023 Letter INSPECTION SUMMARY
07/26/2023 Letter INSPECTION SUMMARY
07/27/2023 Letter INSPECTION SUMMARY
08/08/2023 2023_07_27_2602 SW Farm Field Rd_LSMO_City Rough In Discrepancy Response_Sealed
08/09/2023 Letter INSPECTION SUMMARY
08/10/2023 Letter INSPECTION SUMMARY
08/10/2023 Letter INSPECTION SUMMARY
08/10/2023 Letter INSPECTION SUMMARY
08/10/2023 Receipt Receipt for transaction:2023-006196
08/11/2023 Plot Plan APPROVED AS BUILT PLOT PLAN
08/14/2023 Letter INSPECTION SUMMARY
09/01/2023 Letter INSPECTION SUMMARY
09/11/2023 Letter INSPECTION SUMMARY
09/11/2023 Letter Field Certificate of Occupancy
09/11/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: