Permit Application Status

PRRES20213818


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20213818
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 08/26/2021 12:00 AM by username 'Khanh Nguyen'. STOP WORK ORDER removed on 09/01/2021 12:00 AM by username 'Khanh Nguyen'.
07/23/2021
08/09/2021
01/22/2022
07/26/2023
Locations
Contacts
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
Nick Zvacek, Address:1009 Industrial Drive, Phone:(816) 325-3440  
COMFORT SYSTEMS HTG/CLG, Address:17232 BEL-RAY PL, Phone:(816) 322-1013  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
JEFF.BOEHM@ZVACEKCONSTRUCTION.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 08/09/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 08/09/2021
8331507-Sewer Connection Fee $570.00 $570.00 Paid 08/09/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 08/09/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 08/09/2021
9110078-Valuation Fee New Single Family $1,220.54 $1,220.54 Paid 08/09/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 07/26/2023
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 07/26/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Water Service Inspection - R Partial 8/26/2021 08/26/2021
Sewer Service Inspection - R Passed 8/26/2021 08/26/2021
Footing Inspection - Residential Failed - Stop Work 8/26/2021 08/26/2021
Misc
Corrective Action Required
08/26/2021
SUBMIT THE ENGINEER LETTER FOR THE FOOTING INSPECTION. PERMIT IS PUT ON HOLD UNTIL THE FOOTING INSPECTION FORM IS SUBMITTED. NO FURTHER INSPECTION
Footing Inspection - Residential Passed 09/01/2021
Misc
Informational
09/01/2021
FOOTING APPROVED BY ENGINEER
Erosion Control Inspection Residential Failed 9/9/2021 09/09/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
09/09/2021
DEFICIENT EROSION CONTROL INSTALLATION. RESTORE EROSION CONTROL ALONG THE STREET NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Underslab Plumbing Inspection - Residential Failed 9/9/2021 9/9/2021 10/01/2021
Informational
09/09/2021
**SEE EROSION CONTROL **NEED ADDRESS POSTED OR PAINTED ON THE WALL
Underslab Plumbing Inspection - Residential Failed 10/1/2021 10/01/2021
Misc
Corrective Action Required
10/01/2021
**THE PREVIOUS INSPECTION WAS DENIED BUT ERRONEOUSLY ENTERED AS PASSED. CORRECT THE FOLLOWING DEFICIENCIES: -VENT SHOWER TRAP -DRAIN USED FOR WET-VENTING SHALL ONLY BEE ALLOWED FOR BATH GROUP. CANNOT USE 2" WASTE STACK FROM ABOVE TO WET VENT THE WATER CLOSET. CONNECT THIS WASTE STACK DRAIN TO DOWNSTREAM OF BATH GROUP -SHALL USE LONG SWEEP FITTINGS, NOT SHORT SWEEP FITTINGS FOR ALL VERTICAL-TO-HORIZONTAL CONNECTIONS
Piers/Caissons Inspection - Residential Passed 10/8/2021 10/08/2021
Informational
10/08/2021
PIERS ARE ABOUT 2 FT DOWN, BUT ON SOLID ROCK
Underslab Plumbing Inspection - Residential Passed 10/11/2021 10/11/2021 10/11/2021
Misc
Resolved
10/11/2021
**THE PREVIOUS INSPECTION WAS DENIED BUT ERRONEOUSLY ENTERED AS PASSED. CORRECT THE FOLLOWING DEFICIENCIES: -VENT SHOWER TRAP -DRAIN USED FOR WET-VENTING SHALL ONLY BEE ALLOWED FOR BATH GROUP. CANNOT USE 2" WASTE STACK FROM ABOVE TO WET VENT THE WATER CLOSET. CONNECT THIS WASTE STACK DRAIN TO DOWNSTREAM OF BATH GROUP -SHALL USE LONG SWEEP FITTINGS, NOT SHORT SWEEP FITTINGS FOR ALL VERTICAL-TO-HORIZONTAL CONNECTIONS
Erosion Control Inspection Residential Failed 10/1/2021 10/13/2021
DCM2 ESC DEFICIENT INSTALLATION
Resolved
10/01/2021
DEFICIENT EROSION CONTROL INSTALLATION. RESTORE EROSION CONTROL ALONG THE STREET NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Misc
Corrective Action Required
10/13/2021
EROSION CONTROL NEEDS TO BE PUT IN PLACE
Gas Service Inspection - Residential Failed 2/11/2022 2/11/2022 02/11/2022
Misc
Corrective Action Required
02/11/2022
Not ready
Electrical Service Inspection Passed 2/11/2022 2/11/2022 02/11/2022
All Rough Inspection - Residential Failed 2/11/2022 2/11/2022 02/11/2022
Misc
Corrective Action Required
02/11/2022
-Deck beam not double 2x12 as shown on plan. Deck posts are required to be notched for beam attachment with two 1/2” through bolts or equivalent. Have engineer address this -Fb top of fur out laundry wall -Nail master closet king stud to window header. Check all king stud nailing throughout. Min 3 nails -Reduce hip rafter span at midpoint (hip above master bath/laundry area) -Secure wirings min 1.25” away from stud surface at master bathroom area -Protect master shower water line where within 1.25” of bottom plate surface -Nail ceiling beam hangers above master bedroom -Fb gaps at backside of fireplace space -Complete gas piping to fireplace -Nail together ceiling joists to rafters with 3-10d nails -Have engineer address size of beam above great room slide door. Plan shows multiple windows instead of a slide door which is more than 12 ft -Uncover deck fireplace framing -Install hangers at lvl connections in pantry -Complete framing at front bathroom and fire block as required -Anchor basement sill plates per code -Fb basement REC room wall space, including space above windows, vertically at ten ft or less interval; Fb wall in basement bedroom closet wall and bathroom wall from ceiling space; Fb basement bedroom 3 wall from ceiling space at top gaps; use 3/4” sheathing for vertical fire blockings -Unblock return air at basement bedroom 2 and pan off return air from bathroom ceiling space -Install (3)2x10 below foyer walls per plan -Fill in gaps at basement exterior door per security code. Behind hinges and 12” above to 12” below strike plate **OK TO INSULATE
Erosion Control Inspection Residential Passed 2/11/2022 02/11/2022
Misc
Resolved
02/11/2022
EROSION CONTROL NEEDS TO BE PUT IN PLACE
Gas Service Inspection - Residential Failed 2/22/2022 2/22/2022 02/22/2022
Misc
Corrective Action Required
02/11/2022
Not ready. Pressure is still at zero
All Rough Inspection - Residential Failed 2/22/2022 2/22/2022 02/22/2022
Misc
Corrective Action Required
02/11/2022
-Deck beam not double 2x12 as shown on plan. Deck posts are required to be notched for beam attachment with two 1/2” through bolts or equivalent. **Install two 1/2” through bolts or equivalent at each beam-post connection -Protect master shower water line where within 1.25” of bottom plate surface -Complete gas piping to fireplace and pressure test -Have engineer address size of beam above great room slide door. Plan shows multiple windows instead of a slide door which is more than 12 ft -Fb basement REC room wall space, including space above windows, vertically at ten ft or less interval; Fb wall in basement bedroom closet wall and bathroom wall from ceiling space; Fb basement bedroom 3 wall from ceiling space at top gaps; use 3/4” sheathing for vertical fire blockings -Fill in gaps at basement exterior door per security code. Behind hinges and 12” above to 12” below strike plate **OK TO INSULATE **2/22/22-THIS IS A 2ND FAILED INSPECTION
All Rough Inspection - Residential Not Ready 2/25/2022 2/25/2022 02/25/2022
Misc
Corrective Action Required
02/22/2022
-Deck beam not double 2x12 as shown on plan. Deck posts are required to be notched for beam attachment with two 1/2” through bolts or equivalent. **Install two 1/2” through bolts or equivalent at each beam-post connection **The posts are not notched the whole depth of the deck beam. Get your engineer to address/ok this -Have engineer address size of beam above great room slide door. Plan shows multiple windows instead of a slide door which is more than 12 ft **The approved revised plan shows triple 11-7/8” lvl beam. Have engineer address the installed triple 9.5” lvl beam -Fb basement REC room wall space, including space above windows, vertically at ten ft or less interval; Fb wall in basement bedroom closet wall and bathroom wall from ceiling space; Fb basement bedroom 3 wall from ceiling space at top gaps; use 3/4” sheathing for vertical fire blockings **OK TO INSULATE **2/22/22-THIS IS A 2ND FAILED INSPECTION **2/25/22-NOT READY FEE ASSESSED
Gas Service Inspection - Residential Passed 2/25/2022 2/25/2022 02/25/2022
Misc
Resolved
02/25/2022
Not ready. Pressure is still at zero
All Rough Inspection - Residential Not Ready 3/1/2022 3/1/2022 03/01/2022
Misc
Corrective Action Required
02/25/2022
-Deck beam not double 2x12 as shown on plan. Deck posts are required to be notched for beam attachment with two 1/2” through bolts or equivalent. **Install two 1/2” through bolts or equivalent at each beam-post connection -Fb wall in basement bedroom closet wall and bathroom wall from ceiling space **OK TO INSULATE **2/22/22-THIS IS A 2ND FAILED INSPECTION **2/25/22-NOT READY FEE ASSESSED **3/1/22-NOT READY FEE ASSESSED **I NEED TO MEET WITH SOMEONE HERE WITH A FIRE-BLOCKING FOAM CAN AND A FEW PIECES OF INSULATION. LETS GET THIS THING DONE
All Rough Inspection - Residential Partial 3/2/2022 03/02/2022
Misc
Corrective Action Required
03/01/2022
-Deck beam not double 2x12 as shown on plan. Deck posts are required to be notched for beam attachment with two 1/2” through bolts or equivalent. **Install two 1/2” through bolts or equivalent at each beam-post connection. Install approved post cap for middle deck-post connection. Search Simpson Strong Tie for appropriate post cap **OK TO ROCK **2/22/22-THIS IS A 2ND FAILED INSPECTION **2/25/22-NOT READY FEE ASSESSED **3/1/22-NOT READY FEE ASSESSED
All Rough Inspection - Residential Passed 3/4/2022 3/4/2022 03/04/2022
Misc
Informational
03/04/2022
**OK TO ROCK **2/22/22-THIS IS A 2ND FAILED INSPECTION **2/25/22-NOT READY FEE ASSESSED **3/1/22-NOT READY FEE ASSESSED
Driveway Inspection Partial 4/22/2022 4/22/2022 04/22/2022
Misc
Informational
04/22/2022
4/22/22 AN forms are in place and aggregate is present and compacted
Driveway Inspection Passed 4/25/2022 4/25/2022 04/25/2022
Misc
Informational
04/22/2022
4/22/22 AN forms are in place and aggregate is present and compacted
Misc
Informational
04/25/2022
4-25-22 AN driveway looks good and has expansion joints at curb and right of way
Occupancy Inspection - Codes Residential Failed 10/26/2022 10/26/2022
Misc
Corrective Action Required
10/25/2022
-Not ready fees must be paid before any occupancy can be issued -Water service was not inspected and approved -As-graded plot plan is required; Provide swale per plan at south side of storm drain inlet -Fix grading around water meter. Final grade must flush with lid -Provide min 6” clearance from siding to grade -Install tamper-proof caps at AC valves -Provide sewer tracer wire port at grade -Provide handrail at garage stair -Pendant light fixture not allowed within master bath tub zone -Provide secondary lock for slide door per security code -Provide box extensions at wet bar receptacle boxes recessed more than 1/4” behind non-combustible wall finish -Provide min 12” horizontal clearance from ceiling LED light to closet storage space or install fluorescent luminaire and min 6” clearance -Screw the exterior door embedded jamb brace into studs -Support water pex line every 32” or less -Install an airtight plug for sewer clean out per code -Remove foundation wall metal ties near sewer clean out
Occupancy Inspection - Codes Residential Failed 6/14/2023 6/14/2023 06/14/2023
Misc
Corrective Action Required
10/26/2022
-Not ready fees must be paid before any occupancy can be issued -Water service was not inspected and approved -As-graded plot plan is required -Fix grading around water meter. Final grade must flush with lid -Provide min 6” clearance from siding to grade at rear corners of house -Support lawn irrigation water pex line every 32” or less -Install an airtight plug for sewer clean out per code -Seal hole at east garage exterior wall -Raise the AC platform that has sunk into the ground. Level the AC platform
Water Service Inspection - R Passed 6/27/2023 (9:00) 6/27/2023 06/27/2023
Plot Plan Inspection Passed 7/18/2023 07/18/2023
Occupancy Inspection - Codes Residential Failed 7/26/2023 7/26/2023 07/26/2023
Misc
Corrective Action Required
06/14/2023
-Not ready fees must be paid before any occupancy can be issued
Occupancy Inspection - Codes Residential Full C of O 7/26/2023 07/26/2023
Misc
Resolved
07/26/2023
-Not ready fees must be paid before any occupancy can be issued
Documents & Images
Date Uploaded File Type Document Name
07/23/2021 Lot 151 Residental Permit Application_1
07/23/2021 Lot 151 License_Tax_Application
07/26/2021 Approved Plans Approved Drawings
07/26/2021 Permit Codes Residential Plan Review
08/06/2021 Plans Approved Plot Plan
08/06/2021 Permit Codes Residential Plan Review
08/09/2021 Revised 3rd Party
08/09/2021 Permit DS Building Permit
08/09/2021 Receipt Receipt for transaction: 2021-006327
08/26/2021 Letter INSPECTION SUMMARY
08/26/2021 Letter INSPECTION SUMMARY
08/26/2021 Letter Stop Work Order
08/26/2021 Letter Stop Work Order
09/01/2021 Letter INSPECTION SUMMARY
09/09/2021 Letter INSPECTION SUMMARY
09/09/2021 Letter INSPECTION SUMMARY
10/01/2021 Letter INSPECTION SUMMARY
10/01/2021 Letter INSPECTION SUMMARY
10/01/2021 Letter INSPECTION SUMMARY
10/04/2021 Approved Plans Approved Revised Drawings
10/08/2021 Letter INSPECTION SUMMARY
10/11/2021 Letter INSPECTION SUMMARY
10/13/2021 Letter INSPECTION SUMMARY
10/13/2021 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
02/22/2022 Letter INSPECTION SUMMARY
02/22/2022 Letter INSPECTION SUMMARY
02/24/2022 Engineer Report/Study scan1892
02/25/2022 Letter INSPECTION SUMMARY
02/25/2022 Letter INSPECTION SUMMARY
03/01/2022 Letter INSPECTION SUMMARY
03/02/2022 Letter INSPECTION SUMMARY
03/04/2022 Letter INSPECTION SUMMARY
04/22/2022 Letter INSPECTION SUMMARY
04/25/2022 Letter INSPECTION SUMMARY
10/26/2022 Letter INSPECTION SUMMARY
06/14/2023 Letter INSPECTION SUMMARY
06/27/2023 Letter INSPECTION SUMMARY
07/17/2023 Plot Plan approved as graded plot plan
07/18/2023 Letter INSPECTION SUMMARY
07/26/2023 Letter INSPECTION SUMMARY
07/26/2023 Receipt Receipt for transaction: 2023-005788
07/26/2023 Letter Codes Final Certificate of Occupancy
07/26/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home