Summary
PRRES20213183
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UFINISHED BASEMENT - ROOF TRUSSES
06/21/2021
06/24/2021
06/13/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $360.00 $360.00 Paid 06/24/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 06/24/2021
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/24/2021
9110078-Valuation Fee New Single Family $750.41 $750.41 Paid 06/24/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 06/24/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 06/24/2021
8331504-EFHB Middle Big Creek, Full $401.76 $401.76 Paid 10/22/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/2/2021 8/2/2021 08/02/2021
Misc
Informational
08/02/2021
APPROVED PER DAVID AINSWORTH 7/29/21
Sewer Service Inspection - R Passed 8/16/2021 08/16/2021
Water Service Inspection - R Passed 8/20/2021 (10:00) 8/20/2021 08/20/2021
Erosion Control Inspection Residential Failed 8/20/2021 8/20/2021 08/20/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
08/20/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Underslab Plumbing Inspection - Residential Passed 9/24/2021 9/24/2021 09/23/2021
Electrical Service Inspection Failed 1/4/2022 1/4/2022 01/04/2022
Misc
Corrective Action Required
01/04/2022
-Install clamp listed for rebar to GEC at UFER, separation of dissimilar metals
Gas Service Inspection - Residential Failed 1/4/2022 1/4/2022 01/04/2022
Misc
Corrective Action Required
01/04/2022
-GAS LINE BOND REQUIRED **GAS PRESSURE OK**
Misc
Corrective Action Required
01/05/2022
-GAS LINE BOND REQUIRED **GAS PRESSURE OK**
All Rough Inspection - Residential Failed 1/4/2022 1/4/2022 01/04/2022
Misc
Corrective Action Required
01/04/2022
-attic access requires 30” vertical clearance with min 22” x 36” opening per plans -secure all vertical DWV 2” or less at mid point -floor receptacle required at 1st floor stair wall -security blocking required at front door -Nail all intersecting corners (braced wall) together 12” oc -Truss hold downs at front bedroom -Truss hold downs required at dbl girder truss front bedroom -Fireblock all tub and shower traps -seal all bottom plate penetration -great room -seal all top plate penetrations - great room, master bedroom, foyer -shim or replace all Jack studs cut short of header at great room/master hall, back door -Install back door -min 16” oc stud spacing all walls requiring LIB bracing -(4) 2x4 stud packs all girder truss bearing ends per plans -Exterior wall bracing CS-PF design per plans at great room windows, see detail in plans/IRC R602.10.6.4 -Truss hold down required at dbl truss girder master bedroom -All truss hangers per plans -All truss lateral bracing per plans -Secure SCH 40 steel columns to floor -Ensure floor joists bear on plate per code, see NW basement at garage wall -Nail exterior sheathing per plans -Install clamp listed for rebar to GEC at UFER, separation of dissimilar metals -Gas line bond required
Electrical Service Inspection Passed 1/19/2022 1/19/2022 01/19/2022
Misc
Resolved
01/19/2022
Gas Service Inspection - Residential Passed 1/19/2022 1/19/2022 01/19/2022
Misc
Resolved
01/19/2022
All Rough Inspection - Residential Failed 1/19/2022 1/19/2022 01/19/2022
Misc
Corrective Action Required
01/04/2022
-secure all vertical DWV 2” or less at mid point -add floor receptacle required at 1st floor stair wall -Fireblock all tub and shower traps -seal all bottom plate penetration -great room -seal all top plate penetrations - great room, master bedroom -Install back door -Exterior wall bracing CS-PF design per plans at great room windows, see detail in plans/IRC R602.10.6.4, nail exterior sheathing -Nail exterior sheathing per plans
All Rough Inspection - Residential Passed 1/28/2022 1/28/2022 01/28/2022
Misc
Resolved
01/28/2022
Erosion Control Inspection Residential Partial 1/28/2022 1/28/2022 01/28/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
01/28/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Misc
Corrective Action Required
01/28/2022
EROSION CONTROL ACCEPTABLE AT TIME OF INSPECTION
Sidewalk Inspection Partial 4/7/2022 4/7/2022 04/07/2022
Misc
Informational
04/07/2022
On 4.7.2021 Thursday I performed a sidewalk inspection and pass the subgrade to pour concrete
Occupancy Inspection - Codes Residential Failed 4/12/2022 4/12/2022 04/12/2022
Misc
Corrective Action Required
04/12/2022
-Final driveway and sidewalk inspections required, contact development services to schedule -post address -complete final grade and sod -complete stone/siding front of house -complete all downspouts at gutters -provide splash blocks at all downspout and sump pump discharge locations, min 36" discharge from foundation -seal all penetrations in siding, seal across top of meter can and AC disconnect -GFCI protection required at outlet front entry exterior -add spark rings kitchen receptacles, not more than 1/4” box setback with non combustible surface -provide hammer arrestor for dishwasher -AFCI protection required all circuits per code IRC E3902.16, NEC 210.12(A) -GFCI protection required at unfinished basement receptacle -Sump pump receptacle either GFCI protection required or make dedicated outlet for sump pump -smoke/CO detector required outside of master bedroom -GFCI protection required at garage receptacles -AC compressor listed max over current protection 25 amps -secure AC electrical whip within 12” of disconnect -tamper resistant valve caps required at AC compressor
Occupancy Inspection - Codes Residential Failed 4/13/2022 4/13/2022 04/13/2022
Misc
Corrective Action Required
04/12/2022
-Final driveway and sidewalk inspections required, contact development services to schedule -complete final grade and sod -complete stone/siding front of house -complete all downspouts at gutters -provide splash blocks at all downspout and sump pump discharge locations, min 36" discharge from foundation -seal all penetrations in siding, seal across top of meter can and AC disconnect -Garage door to self close and latch -Complete exterior electrical at garage -AFCI protection required all circuits per code IRC E3902.16, NEC 210.12(A)-Kitchen breaker require AFCI and GFCI -tamper resistant valve caps required at AC compressor
Driveway Inspection Passed 4/1/2022 4/1/2022 04/13/2022
Occupancy Inspection - Codes Residential Temporary C of O 4/13/2022 4/13/2022 04/13/2022
Misc
Corrective Action Required
04/13/2022
TCO UNTIL 5-11-22 -Final driveway and sidewalk inspections required, contact development services to schedule -complete final grade and sod -complete all downspouts at gutters -provide splash blocks at all downspout and sump pump discharge locations, min 36" discharge from foundation -seal all penetrations in siding, seal across top of meter can and AC disconnect -tamper resistant valve caps required at AC compressor
Sidewalk Inspection Passed 4/22/2022 4/22/2022 04/22/2022
Misc
Informational
04/07/2022
On 4.7.2021 Thursday I performed a sidewalk inspection and pass the subgrade to pour concrete
Occupancy Inspection - Codes Residential Temporary C of O 5/11/2022 5/11/2022 05/11/2022
Misc
Corrective Action Required
04/13/2022
TCO UNTIL 5-27-22 -Final driveway and sidewalk inspections required, contact development services to schedule -complete final grade and sod -complete all downspouts at gutters -provide splash blocks at all downspout and sump pump discharge locations, min 36" discharge from foundation -seal all penetrations in siding, seal across top of meter can and AC disconnect -tamper resistant valve caps required at AC compressor
Occupancy Inspection - Codes Residential Temporary C of O 5/26/2022 05/26/2022
Misc
Corrective Action Required
05/11/2022
-Final driveway and sidewalk inspections required, contact development services to schedule -complete final grade and sod -complete all downspouts at gutters -provide splash blocks at all downspout and sump pump discharge locations, min 36" discharge from foundation -seal all penetrations in siding, seal across top of meter can and AC disconnect -tamper resistant valve caps required at AC compressor -correct water meter
Water Service Inspection - R Passed 6/3/2022 (11:30) 6/3/2022 06/03/2022
Erosion Control Inspection Residential Passed 06/13/2022
Misc
Resolved
06/13/2022
Plot Plan Inspection Passed 06/13/2022
Occupancy Inspection - Codes Residential Full C of O 6/13/2022 6/13/2022 06/13/2022
Misc
Resolved
06/13/2022
Documents & Images
Date Uploaded File Type Document Name
06/21/2021 OS #40 - PERMIT APP
06/21/2021 Approved Plans APPROVED PLANS
06/21/2021 Approved Plans APPROVED TRUSS DRAWINGS
06/21/2021 Approved Plans APPROVED TRUSS LAYOUT
06/22/2021 Plot Plan APPROVED PLOT PLAN
06/24/2021 Permit Codes Residential Plan Review
06/24/2021 Permit DS Building Permit
06/24/2021 Receipt Receipt for transaction:2021-004915
07/30/2021 M L Crose 2106 Sw Rutherford Dr LSMO Osage Lot 40 LSMO Sumit Homes 3rd Party Footing Inspection Report 7-29-21
08/02/2021 Letter INSPECTION SUMMARY
08/16/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
09/23/2021 Letter INSPECTION SUMMARY
10/22/2021 Receipt Receipt for transaction: 2021-008192
01/04/2022 Letter INSPECTION SUMMARY
01/04/2022 Letter INSPECTION SUMMARY
01/04/2022 Letter INSPECTION SUMMARY
01/13/2022 Letter INSPECTION SUMMARY
01/13/2022 Letter INSPECTION SUMMARY
01/19/2022 Letter INSPECTION SUMMARY
01/19/2022 Letter INSPECTION SUMMARY
01/19/2022 Letter INSPECTION SUMMARY
01/28/2022 Letter INSPECTION SUMMARY
01/28/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
04/13/2022 Letter INSPECTION SUMMARY
04/13/2022 Letter INSPECTION SUMMARY
04/13/2022 Letter INSPECTION SUMMARY
04/13/2022 Letter Codes Temporary Certificate of Occupancy
04/22/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter Codes Temporary Certificate of Occupancy
05/26/2022 Email Osage Single Family Water Meters and TCO's
05/26/2022 Letter Codes Temporary Certificate of Occupancy
05/26/2022 Email Osage Single Family Water Meters and TCO's
06/03/2022 Letter INSPECTION SUMMARY
06/13/2022 Letter Codes Final Certificate of Occupancy
06/13/2022 Letter Field Certificate of Occupancy
06/13/2022 Letter INSPECTION SUMMARY
06/13/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home