Summary
PRRES20212465
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK DEFERRED ENGINEERED FLOOR SYSTEM
05/13/2021
06/15/2021
11/09/2021
04/26/2023
Locations
Contacts
STEWART BUILDERS LLC, Address:12 SEQUOYAH PT, Phone:(816) 510-7850  
RANDY@STEWARTBUILDERSKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,481.81 $1,481.81 Paid 06/15/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 06/15/2021
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/15/2021
8331507-Sewer Connection Fee $540.00 $540.00 Paid 06/15/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 06/15/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 06/15/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/22/2021 7/22/2021 07/22/2021
Misc
Informational
07/22/2021
Footing approved by David Ainsworth on 7-20-21 -Unable to verify Ufer location due to foundation wall forms
Underslab Plumbing Inspection - Residential Passed 8/3/2021 8/3/2021 08/03/2021
Sewer Service Inspection - R Passed 8/19/2021 08/19/2021
Water Service Inspection - R Partial 08/19/2021
Misc
Corrective Action Required
08/19/2021
-Pex from house 10' toward meter
Water Service Inspection - R Passed 8/20/2021 (1:45) 8/20/2021 08/20/2021
Misc
Corrective Action Required
08/19/2021
-Pex from house 10' toward meter
Erosion Control Inspection Residential Failed 08/23/2021
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/23/2021
**8-23-21 DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -MAINTAIN SILT FENCE AT PERIMETER OF LOT,, CLEAN DEBRIS FROM STREETS
Electrical Service Inspection Passed 3/22/2022 3/22/2022 03/22/2022
All Rough Inspection - Residential Failed 3/22/2022 3/22/2022 03/22/2022
Misc
Corrective Action Required
03/22/2022
-Provide city approved stamped plans for inspection -Provide tension straps at PFG -Provide (2) 1/2” anchor bolts and plate washers at PFG -Address ceiling joists,hips and rafters taper cut greater than 25% with engineer throughout house -Support hips at ridge to bearing walls in garage -Nail ledger to framing at west lower roof -Address over notched hip in single car bay near entry and beam -Provide anchor bolts within 12” of all plate breaks and within 3.5” of end of plates -Fur down all mechanical in garage for R-19 insulation -Nail intersecting wall and corner studs per code -Complete solid blocking above beam and load bearing wall in garage -Strap garage side of back gay wall/exterior wall not connected at top plate -Support dwv 4’ oc max at master closet and master bath -(2) LVL at master bath taper cut greater than 25% -Support hip at ridge at master bath window -Support ridge above kitchen island -Address rafter short of ridge above kitchen island -(2) 2x4 each end at (2) 2x10 at mud room/stairs -(3) 2x4 each side at LVL great room/ stairs -Stud bored greater than 40% at exterior wall service cable in pantry -(2) 2x4 at LVL near 1/2 bath -Support dwv in joist space in half bath -Support ridge/hip in half bath -Provide security blocking at front doors -Solid block and nail seams in exterior sheathing at entry wall -(3) 2x4 each end of LVL at loft -Address over notched joist and hip in bed 2 -Double 2x10 in bed 2 tapered over 25% -Stud bored greater than 40% at dwv in bath 3/4 -Support dwv in bed 3 max 4’ oc -Support hips to bearing wall outside of bed 3/ loft and in bed 4 -Overnotched ceiling joist in bed 4 at hip -Fireblock ceiling line at bed 4 closet/exterior wall -Support hips to bearing in loft -(3) columns in basement to be 3.5” schedule 40 -All I joist to be protected at final -Exterior nailing pattern to be 6” on perimeter and 12” in field throughout
All Rough Inspection - Residential Failed 4/12/2022 4/12/2022 04/12/2022
Misc
Corrective Action Required
03/22/2022
-Provide tension straps at PFG-STRAPS NEED TO EXTEND FROM TOP PLATE TO JACK STUDS -Provide (2) 1/2” anchor bolts and plate washers at PFG-TIGHTEN NUTS -(3) columns in basement to be 3.5” schedule 40-NOT ADDRESSED -All I joist to be protected at final **OK TO INSULATE
Gas Service Inspection - Residential Passed 4/13/2022 4/13/2022 04/13/2022
All Rough Inspection - Residential Passed 4/22/2022 4/22/2022 04/22/2022
Misc
Resolved
04/22/2022
-Provide tension straps at PFG-STRAPS NEED TO EXTEND FROM TOP PLATE TO JACK STUDS -Provide (2) 1/2” anchor bolts and plate washers at PFG-TIGHTEN NUTS -(3) columns in basement to be 3.5” schedule 40-NOT ADDRESSED -All I joist to be protected at final **OK TO INSULATE
Piers/Caissons Inspection - Residential Passed 8/12/2022 8/12/2022 08/12/2022
Driveway Inspection Passed 08/22/2022
Misc
Informational
08/22/2022
On Monday, 8-22-2022. I performed a visual inspection of and existing driveway that visually meets city standards. I well pass the driveway for exceptance.
Sidewalk Inspection Passed 08/22/2022
Misc
Informational
08/22/2022
On Monday, 8-22-2022. I performed and passed city sidewalk for concrete installation.
Plot Plan Inspection Passed 11/3/2022 11/03/2022
Erosion Control Inspection Residential Failed 11/14/2022
DCM2 ESC DEFICIENT INSTALLATION
Resolved
11/14/2022
**8-23-21 DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -MAINTAIN SILT FENCE AT PERIMETER OF LOT,, CLEAN DEBRIS FROM STREETS
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
11/14/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. EROSION CONTROL REQUIRED UNTIL SOD IS PLACED
Occupancy Inspection - Codes Residential Failed 4/5/2023 4/5/2023 04/05/2023
Miscellaneous Correction
Corrective Action Required
04/05/2023
-garage door to house self closing hinge is not working -hard rail in garage does not meet code -garage stairs are not within riser code -electrical out cover missing in garage -lower handrail in basement does not go down to the lower tread nosing -a/c disconnect top needs to be sealed -address numbers are not properly illuminated -water meter is covered with sod
Occupancy Inspection - Codes Residential Failed 4/26/2023 4/26/2023 04/26/2023
Miscellaneous Correction
Corrective Action Required
04/05/2023
-garage door to house self closing hinge is not fully closing to lock -kitchen hardwired appliances need to have a lock out installed at the breaker
Erosion Control Inspection Residential Passed 4/26/2023 04/26/2023
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
04/26/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. EROSION CONTROL REQUIRED UNTIL SOD IS PLACED
Occupancy Inspection - Codes Residential Full C of O 4/27/2023 4/26/2023 04/26/2023
Miscellaneous Correction
Resolved
04/26/2023
-garage door to house self closing hinge is not fully closing to lock -kitchen hardwired appliances need to have a lock out installed at the breaker
Documents & Images
Date Uploaded File Type Document Name
05/13/2021 Application Form Permit Application
05/13/2021 Application Form License Tax Form
05/13/2021 Permit Codes Residential Plan Review
05/24/2021 Plot Plan Approved Plot Plan
06/03/2021 Approved Plans Approved Drawings
06/03/2021 Permit Codes Residential Plan Review
06/15/2021 Permit DS Building Permit
06/15/2021 Receipt Receipt for transaction:2021-004419
07/21/2021 M L Crose 536 SE Carter Rd LSMO Stewart Permit 2021-2465 Footing Inspection Report 7-20-21
07/22/2021 Letter INSPECTION SUMMARY
08/03/2021 Letter INSPECTION SUMMARY
08/19/2021 Letter INSPECTION SUMMARY
08/19/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
03/18/2022 Approved Plans Approved I-Joist Plan
03/22/2022 Letter INSPECTION SUMMARY
03/22/2022 Letter INSPECTION SUMMARY
04/11/2022 DW FRAMING REPORT[1]
04/12/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
04/13/2022 Letter INSPECTION SUMMARY
04/21/2022 DW FRAMING REPORT UPDATED
04/22/2022 Letter INSPECTION SUMMARY
08/12/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
11/02/2022 Plot Plan Approved As-Graded Plot Plan
11/03/2022 Letter INSPECTION SUMMARY
11/03/2022 Letter INSPECTION SUMMARY
11/14/2022 Letter INSPECTION SUMMARY
04/03/2023 Letter Codes 140 Day Letter
04/05/2023 Letter INSPECTION SUMMARY
04/26/2023 Letter INSPECTION SUMMARY
04/26/2023 Letter INSPECTION SUMMARY
04/26/2023 Letter Field Certificate of Occupancy
04/26/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: