Summary
PRRES20212316
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK
05/07/2021
06/10/2021
11/08/2021
08/04/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
MIKE@SUMMITHOMESKC.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,065.80 $1,065.80 Paid 06/10/2021
Right of Way Permit Fee $80.00 $80.00 Paid 06/10/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/10/2021
8331507-Sewer Connection Fee $390.00 $390.00 Paid 06/10/2021
Water Tap Fee $3,581.00 $3,581.00 Paid 06/10/2021
Water Meter Fee $455.54 $455.54 Paid 06/10/2021
Not Ready Inspection Fee $50.00 $50.00 Paid 02/14/2022
Not Ready Inspection Fee $50.00 $50.00 Paid 02/23/2022
Not Ready Inspection Fee $50.00 $50.00 Paid 06/23/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 7/13/2021 07/13/2021
Misc
Informational
07/13/2021
3RD PARTY FOOTING BY DEREK PEREZ @ EVERSTEAD SIGNED & SEALED BY BRADLEY HUXOL UFER LOCATED CENTER LEFT OF SOUTH (REAR) GARAGE FOUNDATION WALL
Underslab Plumbing Inspection - Residential Failed 8/23/2021 8/23/2021 08/23/2021
Miscellaneous Correction
Corrective Action Required
08/23/2021
CONNECT DRAIN TILE AT SUMP PUMP
Underslab Plumbing Inspection - Residential Passed 8/26/2021 8/26/2021 08/26/2021
Miscellaneous Correction
Resolved
08/26/2021
Sewer Service Inspection - R Passed 9/7/2021 (1:30) 9/7/2021 09/07/2021
Water Service Inspection - R Passed 9/9/2021 09/09/2021
Electrical Service Inspection Passed 1/26/2022 1/26/2022 01/26/2022
Gas Service Inspection - Residential Passed 1/26/2022 1/26/2022 01/26/2022
All Rough Inspection - Residential Failed 1/26/2022 1/26/2022 01/26/2022
Miscellaneous Correction
Corrective Action Required
01/26/2022
Tighten anchor bolts basement Install SCH 40 columns per plan & provide anchor bolts Nails stud packs under beams Provide solid security blocking patio door Solid block & nail sheathing above patio door Nail studs at intersecting wall corners per code Insulate & solid block cantilever east side basement Apply sheathing to interior & exterior side of wall per plan @ patio door & window Provide joist hanger south of stairway Provide anchor bolt within 12" of plate break near furnace Complete shower drain master Fire stop fireplace Provide (4) studs at GT bearing points per plan Provide CS-PF exterior bracing per plans at SGD Nails LIBs 2 nails top, bottom every stud Provide LIBs laundry & master closet per plan Provide anchor bolt single car garage Anchor bolts garage shall land in middle 1/3 the width of plate Solid block & nail sheathing under great room window Provide attic access per plans Provide H2.5s front porch & covered patio Solid block soffits from top plate to roof deck and seal gaps on rated walls above pyro guard
All Rough Inspection - Residential Not Ready 2/11/2022 2/11/2022 02/11/2022
Miscellaneous Correction
Corrective Action Required
01/26/2022
Tighten anchor bolts basement ( NOT DONE 2018 IRC R403.1.6 ) Nails stud packs under beams ( WEST WALL REAR BEAM ) Provide solid security blocking patio door ( NOT DONE LS CHAPTER 7 ) Sec. 7-1407.1. Wood frames. Wood door frames shall comply with all of the following requirements: 1. All exterior door frames shall be set in frame openings constructed of double studding or equivalent construction, including garage doors, but excluding overhead doors. Door frames, including those with sidelights shall be reinforced in accordance with ASTM F476-84 Grade 40. 2. In wood framing, horizontal blocking shall be placed between studs at the door lock height for three stud spaces or equivalent bracing on each side of the door opening. (Ord. No. 6600, § 1, 3-13-08) Sec. 7-1407.3. Door jambs. A. Door jambs shall be installed with solid backing in a manner so no void exists between the strike side of the jamb and the frame opening for a vertical distance of twelve inches (12") each side of the strike. Filler material shall consist of a solid wood block. B. Door stops on wooden jambs for in-swinging doors shall be of one-piececonstruction. Jambs for all doors shall be constructed or protected so as toprevent violation of the strike. (Ord. No. 6600, § 1, 3-13-08) Nail studs at intersecting wall corners per code ( SHEET S1.0 NOTE # 9 2018 IRC TABLE R602.3 (1)) Apply sheathing to interior & exterior side of wall PER PLAN @ patio door & window ( NOT DONE) Fire stop fireplace ( NEEDS WORK LOOK UP ) Provide (4) studs at GT bearing points PER PLAN ( TRUSS A-18 NOT DONE) Provide CS-PF exterior bracing PER PLAN at SGD ( 2018 IRC FIGURE R602.10.6.4 METHOD CS-PF ) Nails LIBs 2 nails top, bottom every stud ( BED 3 CLOSET, PANTRY, MASTER BED, MASTER CLOSET ) Anchor bolts garage shall land in middle 1/3 the width of plate ( 2018 IRC R403.1.6 ) Provide H2.5s covered patio Solid block soffits ( seal gaps )on rated walls above pyro guard ( 2018 IRC SECTION 302 / TABLE R302.1 (1) REPAIR & SEAL EXTERIOR PENETRATIONS IN RATED WALL NEAR GAS LINE ENTRY POINT
Erosion Control Inspection Residential Failed 2/11/2022 02/11/2022
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/11/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. MAINTAIN SILT FENCE MAINTAIN GRAVEL FILTER CLEAN STREET OF MUD, GRAVEL & DEBRIS
All Rough Inspection - Residential Not Ready 2/22/2022 2/22/2022 02/22/2022
Miscellaneous Correction
Corrective Action Required
02/11/2022
Tighten anchor bolts basement ( NOT DONE 2018 IRC R403.1.6 ) : 2/22/22 WEST BASEMENT WALL NOT DONE : Nail studs at intersecting wall corners per code ( SHEET S1.0 NOTE # 9 2018 IRC TABLE R602.3 (1) ( NOT DONE) : 2/22/22 NOT DONE CORNER GREAT ROOM NEAR FIREPLACE : Provide CS-PF exterior bracing PER PLAN at SGD ( 2018 IRC FIGURE R602.10.6.4 METHOD CS-PF ) : 2/22/22 NOT DONE : Nails LIBs 2 nails top, bottom every stud ( BED 3 CLOSET, PANTRY, MASTER BED, MASTER CLOSET ) : 2/22/22 ( 2 nails top & bottom plate & every stud ) Solid block soffits ( seal gaps )on rated walls above pyro guard ( 2018 IRC SECTION 302 / TABLE R302.1 (1) REPAIR & SEAL EXTERIOR PENETRATIONS IN RATED WALL NEAR GAS LINE ENTRY POINT : 2/22/22 NOT DONE ABOVE STAIR LANDING :
Erosion Control Inspection Residential Passed 2/25/2022 02/25/2022
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
02/11/2022
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. MAINTAIN SILT FENCE MAINTAIN GRAVEL FILTER CLEAN STREET OF MUD, GRAVEL & DEBRIS
All Rough Inspection - Residential Not Ready 2/25/2022 2/25/2022 02/25/2022
Miscellaneous Correction
Corrective Action Required
02/22/2022
Nail studs at intersecting wall corners per code ( SHEET S1.0 NOTE # 9 2018 IRC TABLE R602.3 (1) ( NOT DONE) : 2/22/22 NOT DONE CORNER GREAT ROOM NEAR FIREPLACE : 2/23/22 STILL NOT DONE Provide CS-PF exterior bracing PER PLAN at SGD ( 2018 IRC FIGURE R602.10.6.4 METHOD CS-PF ) : 2/22/22 NOT DONE : : 2/23/22 NO STRAPS AS SHOWN IN ABOVE FIGURE
All Rough Inspection - Residential Passed 2/28/2022 2/28/2022 02/28/2022
Miscellaneous Correction
Resolved
02/28/2022
Driveway Inspection Partial 3/14/2022 3/14/2022 03/14/2022
Misc
Informational
03/14/2022
Driveway was framed up with aggregate in and compacted. 3/14/22 ES
Driveway Inspection Passed 3/25/2022 3/25/2022 03/25/2022
Misc
Informational
03/14/2022
Driveway was framed up with aggregate in and compacted. 3/14/22 ES
Misc
Informational
03/25/2022
Driveway meets LS and Ada spec. 3/25/22 ES
Sidewalk Inspection Partial 4/13/2022 4/13/2022 04/13/2022
Misc
Informational
04/13/2022
Forms were placed and aggregate was present and compacted. RP 4-13-22
Sidewalk Inspection Failed 4/22/2022 4/22/2022 04/22/2022
Misc
Informational
04/13/2022
Forms were placed and aggregate was present and compacted. RP 4-13-22
Misc
Corrective Action Required
04/22/2022
Sidewalk covered with silt. Need to clean off before final inspection for compliance. RP 4-22-22
Sidewalk Inspection Passed 4/29/2022 4/29/2022 05/10/2022
Misc
Informational
04/22/2022
Forms were placed and aggregate was present and compacted. RP 4-13-22
Misc
Corrective Action Required
04/22/2022
Sidewalk covered with silt. Need to clean off before final inspection for compliance. RP 4-22-22
Misc
Informational
05/10/2022
Sidewalk meets LS and Ada specs. 5/10/22
Piers/Caissons Inspection - Residential Passed 6/10/2022 06/10/2022
Miscellaneous Correction
Informational
06/10/2022
Inspection done by third party
Erosion Control Inspection Residential Failed 6/10/2022 06/10/2022
Miscellaneous Correction
Corrective Action Required
06/10/2022
Re establish erosion control No further inspection will be done until this is complete.
Occupancy Inspection - Codes Residential Failed 6/10/2022 6/10/2022 06/10/2022
Miscellaneous Correction
Corrective Action Required
06/10/2022
- Maintain erosion control - final grading and sod - Pay all fees - Submit back flow certification - Close attic access - Garage entry must be self closing and latch - Complete hardware on garage door - Sliding door at dining room needs lock and secondary lock - Provide clearance at water heater B vent - Uncover smoke detectors in basement - Provide security screws in exterior doors - Add support for ductwork 10’ or more basement next to I BEAM and stairs - Land sewer trace wire
Erosion Control Inspection Residential Passed 08/04/2022
Miscellaneous Correction
Resolved
08/04/2022
Plot Plan Inspection Passed 08/04/2022
Occupancy Inspection - Codes Residential Full C of O 8/4/2022 8/4/2022 08/04/2022
Miscellaneous Correction
Resolved
08/04/2022
- Pay all fees - Submit back flow certification - Close attic access - Garage entry must be self closing and latch - Complete hardware on garage door - Sliding door at dining room needs lock and secondary lock - Provide clearance at water heater B vent - Uncover smoke detectors in basement - Provide security screws in exterior doors - Add support for ductwork 10’ or more basement next to I BEAM and stairs - Land sewer trace wire
Documents & Images
Date Uploaded File Type Document Name
05/07/2021 W1 #24 - Permit App
05/12/2021 Permit Codes Residential Plan Review
05/20/2021 Plot Plan Approved Plot Plan
06/10/2021 Approved Plans Approved Drawings
06/10/2021 Approved Plans Approved Truss Layout
06/10/2021 Approved Plans Approved Truss Package
06/10/2021 Permit Codes Residential Plan Review
06/10/2021 Permit DS Building Permit
06/10/2021 Receipt Receipt for transaction:2021-004278
07/13/2021 W1-24 Woodside Ridge Footing inspection
07/13/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
08/26/2021 Letter INSPECTION SUMMARY
09/07/2021 Letter INSPECTION SUMMARY
09/09/2021 Letter INSPECTION SUMMARY
01/26/2022 Letter INSPECTION SUMMARY
01/26/2022 Letter INSPECTION SUMMARY
01/26/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
02/11/2022 Letter INSPECTION SUMMARY
02/14/2022 Receipt Receipt for transaction:2022-000803
02/22/2022 Letter INSPECTION SUMMARY
02/23/2022 Receipt Receipt for transaction:2022-000929
02/25/2022 Letter INSPECTION SUMMARY
02/25/2022 Letter INSPECTION SUMMARY
02/28/2022 Letter INSPECTION SUMMARY
03/14/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
04/13/2022 Letter INSPECTION SUMMARY
04/22/2022 Letter INSPECTION SUMMARY
05/10/2022 Letter INSPECTION SUMMARY
06/10/2022 Letter INSPECTION SUMMARY
06/10/2022 Letter INSPECTION SUMMARY
06/10/2022 Letter INSPECTION SUMMARY
06/23/2022 Receipt Receipt for transaction:2022-005033
08/04/2022 Letter Codes Final Certificate of Occupancy
08/04/2022 Letter Field Certificate of Occupancy
08/04/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home