Summary
PRRES20211575
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASENENT - COVERED PATIO
04/06/2021
04/21/2021
10/03/2021
04/20/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
JOSH@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 04/23/2021 04/21/2021
Kim Brennan
Right-of-way
Corrective Action Required
04/21/2021

The right-of-way with dimensions must be provided on the plot plan. Please show row along NW Joshua Drive
Basement opening elevations
Corrective Action Required
04/21/2021

Minimum Building Opening Elevation (MBOE) and location on structure must be provided on the plot plan. All MLO's were taken off oin this lot on the revised MDP
As-graded plot plan
Corrective Action Required
04/21/2021

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Approved 04/23/2021 04/21/2021
Kim Brennan
Planning Review (RES) Approved 04/08/2021 04/06/2021
Shannon McGuire
Plot Plan Review Rejected 04/08/2021 04/06/2021
Kim Brennan
Right-of-way
Corrective Action Required
04/06/2021

The right-of-way with dimensions must be provided on the plot plan. Please show row along NW Joshua Drive
Basement opening elevations
Corrective Action Required
04/06/2021

Minimum Building Opening Elevation (MBOE) and location on structure must be provided on the plot plan. All MLO's were taken off oin this lot on the revised MDP
As-graded plot plan
Corrective Action Required
04/06/2021

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Approved 04/08/2021 04/06/2021
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,107.93 $1,107.93 Paid 04/21/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 04/21/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 04/21/2021
8331507-Sewer Connection Fee $450.00 $450.00 Paid 04/21/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 04/21/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 04/21/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 01/26/2022
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 01/26/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 01/26/2022
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 01/26/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Passed 6/16/2021 6/15/2021 06/15/2021
Sewer Service Inspection - R Passed 8/3/2021 (11:15) 8/3/2021 08/03/2021
Water Service Inspection - R Passed 8/4/2021 (1:00) 8/4/2021 08/04/2021
All Rough Inspection - Residential Failed 9/14/2021 9/14/2021 09/14/2021
Miscellaneous Correction
Corrective Action Required
09/14/2021
: PFH GARAGE PORTAL FRAME ONLY :
All Rough Inspection - Residential Partial 9/24/2021 09/24/2021
Miscellaneous Correction
Corrective Action Required
09/14/2021
: PFH GARAGE PORTAL FRAME ONLY : OK TO COVER EXTERIOR FRONT OF GARAGE
Driveway Inspection Partial 10/20/2021 10/20/2021 10/20/2021
Misc
Informational
10/20/2021
Driveway ready, curb had areas that need patched and grouted. 10/20 ES
Driveway Inspection Passed 10/29/2021 10/29/2021 10/29/2021
Misc
Informational
10/20/2021
Driveway ready, curb had areas that need patched and grouted. 10/20 ES
Misc
Informational
10/29/2021
Driveway meets LS spec. 10/29 ES
Gas Service Inspection - Residential Passed 1/4/2022 1/4/2022 01/04/2022
Electrical Service Inspection Passed 1/4/2022 1/4/2022 01/04/2022
All Rough Inspection - Residential Failed 1/4/2022 1/4/2022 01/04/2022
Miscellaneous Correction
Informational
01/04/2022
: PFH GARAGE PORTAL FRAME ONLY : OK TO COVER EXTERIOR FRONT OF GARAGE
Miscellaneous Correction
Corrective Action Required
01/04/2022
-Provide solid blocking between joist @ 48" OC extend blocking one joist bay past each side of island above per plan -Fireblock bump out for DWV garage wall -Address overbored dbl 2x10 joist for DWV at garage -pan off cantilever garage wall -add stud shoes at studs bored for DWV 1st floor north 1/2 bath -seal bottom plate penetration at 1/2 bath, garage entry, foyer -address floor joist cut for DWV 1st floor pantry -seal all penetrations through air returns -security blocking at back door -address (2) 2x10 joists that have been overbored for DWV at 1st floor great room ceiling -b vent requires 1” clearance, see chase at garage entry -address tpl joist bored less than 2” from bottom of joist for NM, front entry closet -address top plates not connect at 1st floor stair wall great room -block sheathing front entry wall -attic access garage per plans -LIB bracing both side of kitchen/garage wall per plans -support beam with lateral restraint for covered patio at kitchen breakfast -Complete nailing pattern at exterior sheathing-back -Truss screws at back porch to be installed through both plates -Provide truss screws at front porch truss by garage wall -Seal gaps in dead space fireblocking at entry -PFH exterior? -Address siding not nailed to top plate bed 4 -2 nails per stud and plates at LIB -Address exterior walls not connected at W.I. Closet/ master bed and Front stair wall/bed 2 -Solid block and nail horizontal seam at master bed exterior wall -Provide H2.5 or equivalent at both plies of girder truss master bed
All Rough Inspection - Residential Failed 1/10/2022 1/10/2022 01/10/2022
Miscellaneous Correction
Informational
01/04/2022
: PFH GARAGE PORTAL FRAME ONLY : OK TO COVER EXTERIOR FRONT OF GARAGE
Miscellaneous Correction
Corrective Action Required
01/04/2022
-Address overbored dbl 2x10 joist for DWV at garage-Have engineer address correction -add stud shoes at studs bored for DWV 1st floor north 1/2 bath -address floor joist cut for DWV 1st floor pantry-Hanger at header. Pantry wall is non load bearing -security blocking at back door-provide solid shims behind hinges -address (2) 2x10 joists that have been overbored for DWV at 1st floor great room ceiling-Have engineer address correction -address tpl joist bored less than 2” from bottom of joist for NM, front entry closet-Have engineer address correction -address top plates not connect at 1st floor stair wall great room-Have engineer address correction -attic access garage per plans-Requires 30” min head space and min opening of 22”x30” -Complete nailing pattern at exterior sheathing-back -Provide truss screws at front porch truss by garage wall-DO NOT COVER THIS AREA-also missing truss screws on all trusses at 2x6 entry wall -Address siding not nailed to top plate bed 4 -2 nails per stud and plates at LIB-bed 4 closet -Address exterior walls not connected at W.I. Closet/ master bed and Front stair wall/bed 2-Have engineer address correction
All Rough Inspection - Residential Not Ready 1/12/2022 1/12/2022 01/12/2022
Miscellaneous Correction
Informational
01/10/2022
: PFH GARAGE PORTAL FRAME ONLY : OK TO COVER EXTERIOR FRONT OF GARAGE
Miscellaneous Correction
Corrective Action Required
01/10/2022
-Address overbored dbl 2x10 joist for DWV at garage-Have engineer address correction -add stud shoes at studs bored for DWV 1st floor north 1/2 bath -address floor joist cut for DWV 1st floor pantry-Hanger at header. Pantry wall is non load bearing -address (2) 2x10 joists that have been overbored for DWV at 1st floor great room ceiling-Have engineer address correction -address tpl joist bored less than 2” from bottom of joist for NM, front entry closet-Have engineer address correction -address top plates not connect at 1st floor stair wall great room-Have engineer address correction -attic access garage per plans-Requires 30” min head space and min opening of 22”x30” -Complete nailing pattern at exterior sheathing-back -Address siding not nailed to top plate bed 4 -2 nails per stud and plates at LIB-bed 4 closet -Address exterior walls not connected at W.I. Closet/ master bed and Front stair wall/bed 2-Have engineer address correction
All Rough Inspection - Residential Not Ready 1/19/2022 1/19/2022 01/19/2022
Miscellaneous Correction
Informational
01/12/2022
: PFH GARAGE PORTAL FRAME ONLY : OK TO COVER EXTERIOR FRONT OF GARAGE
Miscellaneous Correction
Corrective Action Required
01/12/2022
-add stud shoes at studs bored for DWV 1st floor north 1/2 bath ( no stud shoes) -address floor joist cut for DWV 1st floor pantry-Hanger at header. Pantry wall is non load bearing -address (2) 2x10 joists that have been overbored for DWV at 1st floor great room ceiling-Have engineer address correction ( straps are not 32" per engineers letter ) -address tpl joist bored less than 2” from bottom of joist for NM, front entry closet-Have engineer address correction ( not 12" CS-16 per engineers letter) -address top plates not connect at 1st floor stair wall great room-Have engineer address correction -attic access garage per plans-Requires 30” min head space and min opening of 22”x30” -Complete nailing pattern at exterior sheathing-back -2 nails per stud and plates at LIB-bed 4 closet ( not nailed ) -Address exterior walls not connected at W.I. Closet/ master bed and Front stair wall/bed 2-Have engineer address correction
All Rough Inspection - Residential Passed 1/26/2022 1/26/2022 01/26/2022
Miscellaneous Correction
Informational
01/19/2022
: PFH GARAGE PORTAL FRAME ONLY : OK TO COVER EXTERIOR FRONT OF GARAGE
Miscellaneous Correction
Corrective Action Required
01/19/2022
-address floor joist cut for DWV 1st floor pantry-Hanger at header. Pantry wall is non load bearing -address (2) 2x10 joists that have been overbored for DWV at 1st floor great room ceiling-Have engineer address correction ( straps are not 32" per engineers letter ) -address tpl joist bored less than 2” from bottom of joist for NM, front entry closet-Have engineer address correction ( not 12" CS-16 per engineers letter) -address top plates not connect at 1st floor stair wall great room-Have engineer address correction -attic access garage per plans-Requires 30” min head space and min opening of 22”x30” -Complete nailing pattern at exterior sheathing-back -Address exterior walls not connected atand Front stair wall/bed 2-Have engineer address correction
Footing Inspection - Residential Passed 3/29/2022 03/29/2022
Misc
Informational
03/29/2022
3RD PARTY FOOTING BY COLBY SHAW AT RES SIGNED & SEALED BY BRADLEY HUXOL UFER LOCATED NEAR THE CENTER OF REAR GARAGE WALL
Occupancy Inspection - Codes Residential Failed 3/29/2022 3/29/2022 03/29/2022
Miscellaneous Correction
Corrective Action Required
03/29/2022
Provide guard ( spindles ) garage stairs : 2018 IRC R312.1.1 Submit as graded Plot plan Seal top of exterior light fixtures Land sewer tracer wire in a box at grade level Provide gutters & downspouts Provide splash blocks Sump shall discharge 36" from foundation Provide (2) 3" screws in each exterior door hinge & strike plate Provide missing spindle guardrail next to fireplace 4" sphere shall not pass through Remove dust covers smoke detectors Basement handrail end shall be returned or shall terminate in newel post Remove concrete forms back patio near meter can Seal top of ac disconnect
Plot Plan Inspection Passed 4/20/2022 04/20/2022
Occupancy Inspection - Codes Residential Full C of O 4/20/2022 4/20/2022 04/20/2022
Miscellaneous Correction
Resolved
04/20/2022
Documents & Images
Date Uploaded File Type Document Name
04/06/2021 Application Form Permit Application and License Tax Form
04/06/2021 Approved Plans Approved Drawings
04/06/2021 Approved Plans Approved Truss Layout
04/06/2021 Approved Plans Approved Truss Package
04/06/2021 Letter Codes Residential Plan Review
04/21/2021 Plot Plan Approved Plot Plan
04/21/2021 Receipt Receipt for transaction:2021-002097
04/21/2021 Letter DS Building Permit
05/19/2021 Lot 68 Woodside Ridge Footing Inspection
06/15/2021 Letter INSPECTION SUMMARY
08/03/2021 Letter INSPECTION SUMMARY
08/04/2021 Letter INSPECTION SUMMARY
08/04/2021 Letter INSPECTION SUMMARY
09/14/2021 Letter INSPECTION SUMMARY
09/24/2021 Letter INSPECTION SUMMARY
10/08/2021 68 Woodside Ridge continuous steel beam letter
10/20/2021 Letter INSPECTION SUMMARY
10/29/2021 Letter INSPECTION SUMMARY
01/04/2022 Letter INSPECTION SUMMARY
01/04/2022 Letter INSPECTION SUMMARY
01/04/2022 Letter INSPECTION SUMMARY
01/04/2022 Letter INSPECTION SUMMARY
01/04/2022 Letter INSPECTION SUMMARY
01/10/2022 Letter INSPECTION SUMMARY
01/12/2022 Letter INSPECTION SUMMARY
01/17/2022 68 Woodside Ridge Field Issue
01/19/2022 Letter INSPECTION SUMMARY
01/26/2022 Letter INSPECTION SUMMARY
01/26/2022 Receipt Receipt for transaction:2022-000445
03/29/2022 Letter INSPECTION SUMMARY
03/29/2022 Letter INSPECTION SUMMARY
04/19/2022 Plot Plan Approved As Graded Plot Plan
04/20/2022 Letter INSPECTION SUMMARY
04/20/2022 Letter Field Certificate of Occupancy
04/20/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home