Permit Application Status

PRRES20211430


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20211430
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - PARTIAL FINISHED BASEMENT - COVERED DECK
03/30/2021
04/02/2021
09/27/2021
05/25/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
JOSH@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 04/06/2021 04/02/2021
Kim Brennan
Basement opening elevations
Corrective Action Required
04/02/2021

Minimum Building Opening Elevation (MBOE) and location on structure must be provided on the plot plan. NO MBOE'S shown on the front of this lot on the revised MDP.
Residential Plan Review Approved 04/06/2021 04/02/2021
Kim Brennan
Planning Review (RES) Approved 04/01/2021 03/31/2021
Shannon McGuire
Plot Plan Review Rejected 04/01/2021 03/31/2021
Kim Brennan
Basement opening elevations
Corrective Action Required
03/31/2021

Minimum Building Opening Elevation (MBOE) and location on structure must be provided on the plot plan. NO MBOE'S shown on the front of this lot on the revised MDP.
Residential Plan Review Approved 04/01/2021 03/30/2021
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $989.04 $989.04 Paid 04/02/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 04/02/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 04/02/2021
8331507-Sewer Connection Fee $390.00 $390.00 Paid 04/02/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 04/02/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 04/02/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 04/28/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 04/28/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 04/28/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 04/28/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 04/28/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 5/14/2021 05/14/2021
Misc
Informational
05/14/2021
3RD PARTY FOOTING BY COLBY SHAW @ RES SIGNED & SEALED BY BRADLEY HUXOL UFER LOCATED CENTER OF REAR GARAGE WALL
Underslab Plumbing Inspection - Residential Passed 6/14/2021 6/11/2021 06/11/2021
Sewer Service Inspection - R Passed 6/22/2021 06/22/2021
Water Service Inspection - R Passed 6/25/2021 (1:45) 6/25/2021 06/25/2021
All Rough Inspection - Residential Failed 9/3/2021 9/3/2021 09/03/2021
Miscellaneous Correction
Corrective Action Required
09/03/2021
: PFH PORTAL FRAME ONLY : 5/8 ANCHOR BOLTS SHALL LAMD IN MIDDLE 1/3 THE WIDTH OF PLATE OVER NOTCHED STUDS AT 5/8 ANCHOR BOLTS
Driveway Inspection Partial 11/23/2021 11/23/2021
Misc
Informational
11/23/2021
Driveway was framed up with aggregate in and compacted. Needs a section of curbing replaced at driveway. 11/23 ES
Gas Service Inspection - Residential Failed 11/23/2021 11/23/2021 11/23/2021
Misc
Corrective Action Required
11/23/2021
-no pressure at gauge
Electrical Service Inspection Passed 11/23/2021 11/23/2021 11/23/2021
All Rough Inspection - Residential Failed 11/23/2021 11/23/2021 11/23/2021
Miscellaneous Correction
Corrective Action Required
09/03/2021
: PFH PORTAL FRAME ONLY : 5/8 ANCHOR BOLTS SHALL LAND IN MIDDLE 1/3 THE WIDTH OF PLATE OVER NOTCHED STUDS AT 5/8 ANCHOR BOLTS
Misc
Corrective Action Required
11/23/2021
-Anchor bolts to begin the middle 1/3 of bottom plate Address exterior wall not tired together at NW garage -Insulate cantilever in garage -top plate structural strap where plate break less than 24” apart NE master bedroom, NW living room -address stud at oven vent kitchen wall -seal floor penetration in kitchen, dwv entry tub -fire block dead space at entry tub/laundry -address front entry wall not tied together at corners -lib per plans at bed 2 bath/closet -provide midway strap all dwv 2” smaller -address truss bracing per plan -tighten all anchor bolts threw out -provide but at anchor bolt at sliding patio door -nail double joist together per code -nail exterior sheathing per plan -Address trusses landing on trim and plywood at top plate garage and H2.5s nailed to same -Attic access requires 30” of clearance above -20 amp garage? -Protect nm at top plate near range less than 1.25” to face of stud -Expose trusses and connections at covered deck -Fireblock soffit line at beam East wall -FIreblock beam webs in finished walls -Fireblock soffit lines at fur out walls Bed 3, 4 and bath 3, -Bocca plates at bottom plate dwv bath 3 -Sister over notched studs at foundation walls
Driveway Inspection Failed 12/3/2021 12/3/2021 12/03/2021
Misc
Informational
11/23/2021
Driveway was framed up with aggregate in and compacted. Needs a section of curbing replaced at driveway. 11/23 ES
Misc
Corrective Action Required
12/03/2021
Driveway meets LS and ADA specs. Still needs to replace busted curb. RP 12-3-21
All Rough Inspection - Residential Not Ready 12/3/2021 12/3/2021 12/03/2021
Miscellaneous Correction
Corrective Action Required
11/23/2021
: PFH PORTAL FRAME ONLY : 5/8 ANCHOR BOLTS SHALL LAND IN MIDDLE 1/3 THE WIDTH OF PLATE OVER NOTCHED STUDS AT 5/8 ANCHOR BOLTS
Misc
Corrective Action Required
11/23/2021
-Anchor bolts to begin the middle 1/3 of bottom plate -Insulate cantilever in garage -provide midway strap all dwv 2” smaller -tighten all anchor bolts threw out -provide but at anchor bolt at sliding patio door -nail double joist together per code -nail exterior sheathing per plan -Address trusses landing on trim and plywood at top plate garage and H2.5s nailed to same -Attic access requires 30” of clearance above -Protect nm at top plate near range less than 1.25” to face of stud
All Rough Inspection - Residential Failed 12/7/2021 12/7/2021 12/07/2021
Miscellaneous Correction
Corrective Action Required
12/03/2021
: PFH PORTAL FRAME ONLY : 5/8 ANCHOR BOLTS SHALL LAND IN MIDDLE 1/3 THE WIDTH OF PLATE OVER NOTCHED STUDS AT 5/8 ANCHOR BOLTS
Misc
Corrective Action Required
12/03/2021
-nail exterior sheathing per plan -Attic access requires 30” of clearance above -Protect nm at top plate near range less than 1.25” to face of stud - address over notched studs at 5/8” anchor bolt between garage doors
All Rough Inspection - Residential Not Ready 12/8/2021 12/8/2021 12/08/2021
Miscellaneous Correction
Corrective Action Required
12/07/2021
: PFH PORTAL FRAME ONLY : 5/8 ANCHOR BOLTS SHALL LAND IN MIDDLE 1/3 THE WIDTH OF PLATE OVER NOTCHED STUDS AT 5/8 ANCHOR BOLTS
Misc
Corrective Action Required
12/07/2021
- 12/8/21 - INSPECTION DENIED, ADDRESS EROSION CONTROL AT FRONT OF LOT, CLEAN ALL MUD AND GRAVEL FROM STREET/CURB -nail exterior sheathing per plan -Attic access requires 30” of clearance above -Protect nm at top plate near range less than 1.25” to face of stud - address over notched studs at 5/8” anchor bolt between garage doors
Erosion Control Inspection Residential Failed 12/8/2021 12/08/2021
Misc
Corrective Action Required
12/08/2021
- 12/8/21 - INSPECTION DENIED, ADDRESS EROSION CONTROL AT FRONT OF LOT, CLEAN ALL MUD AND GRAVEL FROM STREET/CURB
All Rough Inspection - Residential Not Ready 12/10/2021 12/10/2021 12/10/2021
Miscellaneous Correction
Corrective Action Required
12/08/2021
: PFH PORTAL FRAME ONLY : 5/8 ANCHOR BOLTS SHALL LAND IN MIDDLE 1/3 THE WIDTH OF PLATE OVER NOTCHED STUDS AT 5/8 ANCHOR BOLTS
Misc
Corrective Action Required
12/08/2021
- 12/8/21 - INSPECTION DENIED, ADDRESS EROSION CONTROL AT FRONT OF LOT, CLEAN ALL MUD AND GRAVEL FROM STREET/CURB -12--10-21-INSPECTION DENIED, ADDRESS EROSION CONTROL ISSUES PER PREVIOUS INSPECTION- CLEAN MUD FROM TOP OF STORM INLET, CLEAN DEBRIS FROM INLET, REMOVE PORTA JOHN FROM TOP STORM INLET -nail exterior sheathing per plan -Attic access requires 30” of clearance above -Protect nm at top plate near range less than 1.25” to face of stud - address over notched studs at 5/8” anchor bolt between garage doors
Erosion Control Inspection Residential Not Ready 12/10/2021 12/10/2021 12/10/2021
Misc
Corrective Action Required
12/08/2021
- 12/8/21 - INSPECTION DENIED, ADDRESS EROSION CONTROL AT FRONT OF LOT, CLEAN ALL MUD AND GRAVEL FROM STREET/CURB -12-10-21- ITEMS STILL NOT CORRECTED- PROVIDE EROSION CONTROL, CLEAN DEBRIS FROM STREET,STORM INLET AND REMOVE PORTA JOHN FROM STORM INLET
All Rough Inspection - Residential Passed 12/15/2021 12/15/2021 12/15/2021
Miscellaneous Correction
Resolved
12/15/2021
: PFH PORTAL FRAME ONLY : 5/8 ANCHOR BOLTS SHALL LAND IN MIDDLE 1/3 THE WIDTH OF PLATE OVER NOTCHED STUDS AT 5/8 ANCHOR BOLTS
Misc
Resolved
12/15/2021
- 12/8/21 - INSPECTION DENIED, ADDRESS EROSION CONTROL AT FRONT OF LOT, CLEAN ALL MUD AND GRAVEL FROM STREET/CURB -12--10-21-INSPECTION DENIED, ADDRESS EROSION CONTROL ISSUES PER PREVIOUS INSPECTION- CLEAN MUD FROM TOP OF STORM INLET, CLEAN DEBRIS FROM INLET, REMOVE PORTA JOHN FROM TOP STORM INLET -nail exterior sheathing per plan -Attic access requires 30” of clearance above -Protect nm at top plate near range less than 1.25” to face of stud - address over notched studs at 5/8” anchor bolt between garage doors
Erosion Control Inspection Residential Not Ready 12/15/2021 12/15/2021 12/15/2021
Misc
Corrective Action Required
12/10/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
12/15/2021
12-15-21 *NOT READY FEE ASSESSED* EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -PROTECT STORM INLET, REMOVE PORTA JOHN FROM TOP OF INLET, CLEAN GUTTER BUDDY AND REMOVE DEBRIS FROM INLET-SEE UPLOADED PHOTO
Erosion Control Inspection Residential Partial 12/20/2021 12/20/2021 12/20/2021
Misc
Corrective Action Required
12/15/2021
DCM3 ESC REQUIRED 2 DAY
Resolved
12/20/2021
12-15-21 *NOT READY FEE ASSESSED* EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -PROTECT STORM INLET, REMOVE PORTA JOHN FROM TOP OF INLET, CLEAN GUTTER BUDDY AND REMOVE DEBRIS FROM INLET-SEE UPLOADED PHOTO
Gas Service Inspection - Residential Passed 12/30/2021 12/30/2021 12/30/2021
Misc
Resolved
12/30/2021
Sidewalk Inspection Partial 3/3/2022 3/3/2022 03/03/2022
Misc
Informational
03/03/2022
Sidewalk was framed up with aggregate in and compacted. 3/3/22 ES
Occupancy Inspection - Codes Residential Failed 3/8/2022 3/8/2022 03/08/2022
Miscellaneous Correction
Corrective Action Required
03/08/2022
- Pay outstanding fees - Sidewalk inspection still pending - Driveway inspection still pending - Obtain lawn irrigation permit &submit back flow certification - Final grading and sod - Splash blocks - Missing switch cover basement stairs - Landing off patio not done - Seal exterior penetrations - Sump must discharge 36” from foundation - Seal top of meter can and AC disconnect - Land sewer trace wire in enclosure at ground level
Sidewalk Inspection Passed 3/11/2022 3/11/2022 03/14/2022
Misc
Informational
03/03/2022
Sidewalk was framed up with aggregate in and compacted. 3/3/22 ES
Misc
Informational
03/14/2022
Sidewalk meets LS and Ada spec. 3/14/22 ES
Occupancy Inspection - Codes Residential Temporary C of O 3/15/2022 3/15/2022 03/15/2022
Miscellaneous Correction
Corrective Action Required
03/08/2022
- Pay outstanding fees - Sidewalk inspection still pending - Driveway inspection still pending - Obtain lawn irrigation permit &submit back flow certification - Final grading and sod - Splash blocks - Seal exterior penetrations - Sump must discharge 36” from foundation - Seal top of meter can and AC disconnect - Land sewer trace wire in enclosure at ground level
Plot Plan Inspection Failed 3/15/2022 03/15/2022
Misc
Corrective Action Required
03/15/2022
PROVIDE FINAL GRADE REMOVE CONSTRUCTION DEBRIS FROM LOT
Plot Plan Inspection Passed 5/16/2022 05/16/2022
Misc
Corrective Action Required
03/15/2022
PROVIDE FINAL GRADE REMOVE CONSTRUCTION DEBRIS FROM LOT
Driveway Inspection Failed 05/16/2022
Misc
Informational
12/03/2021
Driveway was framed up with aggregate in and compacted. Needs a section of curbing replaced at driveway. 11/23 ES
Misc
Corrective Action Required
12/03/2021
Driveway meets LS and ADA specs. Still needs to replace busted curb. RP 12-3-21
Misc
Corrective Action Required
05/16/2022
Curb was never replaced at driveway where chipped and cracked. Curb needs to be replaced from the joint on the north side to passed the chipped pieces of curbing on the south side or to southern most joint. Will need a contraction joint at minimum of every 10’ in new curb. Will also need rubber joint and pinned into existing curb. 5/16/22 ES
Occupancy Inspection - Codes Residential Temporary C of O 5/16/2022 5/16/2022 05/16/2022
Miscellaneous Correction
Corrective Action Required
03/15/2022
- Driveway inspection failed
Driveway Inspection Partial 5/23/2022 5/23/2022 05/23/2022
Misc
Informational
05/16/2022
Driveway was framed up with aggregate in and compacted. Needs a section of curbing replaced at driveway. 11/23 ES
Misc
Corrective Action Required
05/16/2022
Driveway meets LS and ADA specs. Still needs to replace busted curb. RP 12-3-21
Misc
Corrective Action Required
05/16/2022
Curb was never replaced at driveway where chipped and cracked. Curb needs to be replaced from the joint on the north side to passed the chipped pieces of curbing on the south side or to southern most joint. Will need a contraction joint at minimum of every 10’ in new curb. Will also need rubber joint and pinned into existing curb. 5/16/22 ES
Misc
Informational
05/23/2022
Curb was cut out and new area formed up and ready to pour. Rods in each end for support. Informed to put a joint at least every 10’. 5/23/22 ES
Driveway Inspection Passed 5/27/2022 5/27/2022 05/25/2022
Misc
Informational
05/23/2022
Driveway was framed up with aggregate in and compacted. Needs a section of curbing replaced at driveway. 11/23 ES
Misc
Corrective Action Required
05/23/2022
Driveway meets LS and ADA specs. Still needs to replace busted curb. RP 12-3-21
Misc
Corrective Action Required
05/23/2022
Curb was never replaced at driveway where chipped and cracked. Curb needs to be replaced from the joint on the north side to passed the chipped pieces of curbing on the south side or to southern most joint. Will need a contraction joint at minimum of every 10’ in new curb. Will also need rubber joint and pinned into existing curb. 5/16/22 ES
Misc
Informational
05/23/2022
Curb was cut out and new area formed up and ready to pour. Rods in each end for support. Informed to put a joint at least every 10’. 5/23/22 ES Curb was poured and coated with white cure. Joints placed ~10’ apart. 5/25/22 ES
Occupancy Inspection - Codes Residential Full C of O 5/25/2022 5/25/2022 05/25/2022
Miscellaneous Correction
Resolved
05/25/2022
Documents & Images
Date Uploaded File Type Document Name
03/30/2021 Application Form Permit Application and License Tax Form
03/30/2021 53 WOODSIDE RIDGE ROOF LAYOUT
03/30/2021 Drawing Approved Drawings
03/30/2021 Approved Plans Approved Truss Package
03/30/2021 Approved Plans Approved Truss Layout
03/31/2021 Letter Codes Residential Plan Review
04/02/2021 Plot Plan Approved Plot Plan
04/02/2021 Receipt Receipt for transaction:2021-001697
04/02/2021 Letter DS Building Permit
05/13/2021 Lot 53 Woodside Ridge Footing Inspection
05/14/2021 Letter INSPECTION SUMMARY
06/11/2021 Letter INSPECTION SUMMARY
06/22/2021 Letter INSPECTION SUMMARY
06/25/2021 Letter INSPECTION SUMMARY
09/03/2021 Letter INSPECTION SUMMARY
11/23/2021 Letter INSPECTION SUMMARY
11/23/2021 Letter INSPECTION SUMMARY
11/23/2021 Letter INSPECTION SUMMARY
11/23/2021 Letter INSPECTION SUMMARY
12/03/2021 Letter INSPECTION SUMMARY
12/03/2021 Letter INSPECTION SUMMARY
12/07/2021 Letter INSPECTION SUMMARY
12/08/2021 Letter INSPECTION SUMMARY
12/08/2021 Letter INSPECTION SUMMARY
12/10/2021 Letter INSPECTION SUMMARY
12/10/2021 Letter INSPECTION SUMMARY
12/15/2021 Letter INSPECTION SUMMARY
12/15/2021 Letter INSPECTION SUMMARY
12/15/2021 91FCC999-1E17-469B-82D3-77AB49235D31.jpeg
12/20/2021 Letter INSPECTION SUMMARY
12/30/2021 Letter INSPECTION SUMMARY
03/03/2022 Letter INSPECTION SUMMARY
03/03/2022 Letter INSPECTION SUMMARY
03/08/2022 Letter INSPECTION SUMMARY
03/08/2022 Letter INSPECTION SUMMARY
03/14/2022 Letter INSPECTION SUMMARY
03/15/2022 Letter Codes Temporary Certificate of Occupancy
03/15/2022 Letter INSPECTION SUMMARY
04/28/2022 Receipt Receipt for transaction:2022-002634
05/16/2022 Letter INSPECTION SUMMARY
05/16/2022 Letter INSPECTION SUMMARY
05/16/2022 Letter Codes Temporary Certificate of Occupancy
05/23/2022 Letter INSPECTION SUMMARY
05/25/2022 Letter INSPECTION SUMMARY
05/25/2022 Letter Codes Final Certificate of Occupancy
05/25/2022 Letter Field Certificate of Occupancy
06/01/2022 Letter Field Certificate of Occupancy
06/01/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home