Permit Application Status

PRRES20210408


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20210408
Building Permit - Residential
Certificate of Occupancy
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK
01/28/2021
03/22/2021
07/31/2021
05/02/2022
Locations
Contacts
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC, Address:13450 E STATE ROUTE 150  
SPELLERBERG ENTERPRISES LLC, Address:613 NE VIEWPARK DR, Phone:(816) 550-5535  
SPELLERBERGENTERPRISES@GMAIL.COM  
AFC HEATING AND COOLING, Address:824 NW MAIN ST , Phone:(816) 347-8388  
NEW HEIGHTS ELECTRIC LLC, Address:P O BOX 163, Phone:(816) 625-9504  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 02/03/2021 02/01/2021
Brandon Kalwei
Residential Plan Review Approved 02/03/2021 02/01/2021
Brandon Kalwei
Plot Plan Review Approved 02/02/2021 01/29/2021
Brandon Kalwei
Rear yard dimension
Corrective Action Required
01/29/2021

The rear yard demision(s) must be provided on the plot plan.
As-graded plot plan
Corrective Action Required
01/29/2021

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Approved 02/02/2021 01/29/2021
Brandon Kalwei
12 Detail required separation between garage and living area including door
Corrective Action Required
01/29/2021

Detail required separation between garage and living area including door, door closer and gypsum board. (IRC R302.5) Could not locate door information
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,043.06 $1,043.06 Paid 03/22/2021
8331507-Sewer Connection Fee $420.00 $420.00 Paid 03/22/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 03/22/2021
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 03/22/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 03/22/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 03/22/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 04/29/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed 3/22/2021 03/22/2021
Misc
Informational
03/22/2021
-FOOTING NOT COMPLETED AT TIME OF INSPECTION. TROY SHAW ON SITE AND WILL HAVE 3RD PARTY ENGINEER INSPECT FOOTING AND CONFIRM SOIL CONDITIONS WITH EXISTING GRAVEL FILL AT SE CORNER OF FOOTING
Footing Inspection - Residential Passed 4/5/2021 4/5/2021 04/05/2021
Misc
Resolved
04/05/2021
Underslab Plumbing Inspection - Residential Passed 4/7/2021 4/7/2021 04/07/2021
Sewer Service Inspection - R Passed 4/19/2021 (11:30) 4/19/2021 04/19/2021
Water Service Inspection - R Passed 4/21/2021 (8:45) 4/21/2021 04/21/2021
Erosion Control Inspection Residential Failed 5/27/2021 5/27/2021 05/27/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/27/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. MAINTAIN EROSION CONTROL ON LOT
Erosion Control Inspection Residential Failed 6/25/2021 6/25/2021 06/25/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
06/25/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/25/2021
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Erosion Control Inspection Residential Failed 7/2/2021 7/2/2021 07/02/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
06/25/2021
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Piers/Caissons Inspection - Residential Passed 8/30/2021 8/30/2021 08/30/2021
All Rough Inspection - Residential Failed 8/31/2021 8/31/2021 08/31/2021
Misc
Corrective Action Required
08/31/2021
-strap dbl top plate with plate breaks less than 24” offset-see garage, 1st floor front bath -Address rafters landing on multiple blocks and smart siding throughout, no rafter/joist/top plate connection, rafter ties, submit engineer letter -Lap and nail together ceiling joists at north side garage wall R802.5.2.1 -seal bottom plate penetrations - see laundry -security blocking rear deck door and basement walkout -protect NM at kitchen island 6” AFF -Nail stud at great room exterior wall -Add joist hanger at header 1st floor ceiling at front bed, over 4’ -(2) 2x10 joist upset with brace at sgl car garage per plans -LIB bracing at NE garage wall and entry hall per plans -Purlin struts no less than 45 degree angle -Fireblock vertical to horizontal at furred down, DWV/pex, basement bath -Add joist hangers at dbl, sgl joists to beam connection at basement mech room, over 4’ -Identify GEC at service panel -All exhaust fans to vent to exterior as noted on plans, see general notes page D2 -Nail all exterior sheathing per plans -Nail exterior sheathing to header and studs per CS-PF design, page D3, R602.10.6.4, all locations per plans -Attic access required
All Rough Inspection - Residential Failed 9/9/2021 9/9/2021 09/09/2021
Misc
Corrective Action Required
08/31/2021
-strap dbl top plate with plate breaks less than 24” offset-see garage, 1st floor front bath -Address rafters landing on multiple blocks and smart siding throughout, no rafter/joist/top plate connection, rafter ties, submit engineer letter -Lap and nail together ceiling joists at north side garage wall R802.5.2.1 -LIB bracing at entry hall per plans -Purlin struts no less than 45 degree angle -Nail exterior sheathing to header and studs per CS-PF design, page D3, R602.10.6.4, all locations per plans **OK TO INSULATE**
All Rough Inspection - Residential Passed 9/15/2021 9/15/2021 09/15/2021
Misc
Resolved
09/15/2021
Electrical Service Inspection Passed 9/15/2021 9/15/2021 09/15/2021
Gas Service Inspection - Residential Passed 9/15/2021 9/15/2021 09/15/2021
Driveway Inspection Passed 10/20/2021 10/20/2021 10/21/2021
Misc
Informational
10/21/2021
On 10/21/2021 I performed a driveway inspection and passed the inspection
Sidewalk Inspection Passed 11/10/2021 11/10/2021 11/10/2021
Misc
Informational
11/10/2021
On 11/10/2021 I performed a sidewalk inspection and pass the sub-grade to pour concrete
Erosion Control Inspection Residential Failed 3/16/2022 03/16/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
03/16/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/16/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Piers/Caissons Inspection - Residential Partial 4/5/2022 (9:45) 4/5/2022 04/05/2022
Misc
Corrective Action Required
04/05/2022
revise plans to show added piers and deck stairs inspected 2 24" piers for stairs
Plot Plan Inspection Failed 4/13/2022 04/13/2022
Misc
Resolved
05/02/2022
see back of lot
Occupancy Inspection - Codes Residential Not Ready 4/28/2022 4/28/2022 04/28/2022
Misc
Corrective Action Required
04/28/2022
inspection denied no premises identification
Occupancy Inspection - Codes Residential Failed 4/29/2022 4/29/2022 04/29/2022
Misc
Resolved
04/29/2022
inspection denied no premises identification
Misc
Corrective Action Required
04/29/2022
- irrigation permit incomplete - Label non- GFCI outlet at sump pump - IRC 507.5.1(1) install (2) 1/2” through bolts on deck beam to deck post connections - Seal exterior penetrations gas line, irrigation, - Seal top of meter can and A/C disconnect - E3901.12 provide outlet 25’ from A/C disconnect
Piers/Caissons Inspection - Residential Passed 5/2/2022 05/02/2022
Erosion Control Inspection Residential Passed 5/2/2022 05/02/2022
DCM3 ESC REQUIRED 2 DAY
Resolved
05/02/2022
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Plot Plan Inspection Passed 05/02/2022
Misc
Resolved
05/02/2022
see back of lot
Occupancy Inspection - Codes Residential Full C of O 5/2/2022 5/2/2022 05/02/2022
Misc
Resolved
05/02/2022
- irrigation permit incomplete - Label non- GFCI outlet at sump pump - IRC 507.5.1(1) install (2) 1/2” through bolts on deck beam to deck post connections - Seal exterior penetrations gas line, irrigation, - Seal top of meter can and A/C disconnect - E3901.12 provide outlet 25’ from A/C disconnect
Documents & Images
Date Uploaded File Type Document Name
01/28/2021 Application Form APPLICATION
01/28/2021 53 Summit View Farms plot plan p
01/28/2021 SVF 53-LSMO
01/29/2021 Letter Codes Residential Plan Review
01/29/2021 SVF 53-LSMO-rev1
01/29/2021 Approved Plans APPROVED PLANS
01/29/2021 Plot Plan APPROVED PLOT PLAN
03/22/2021 Receipt Receipt for transaction:2021-001442
03/22/2021 Letter DS Building Permit
03/22/2021 Letter INSPECTION SUMMARY
04/02/2021 3113 SW BLUE RIBBON ST FTG
04/02/2021 3113 SW BLUE RIBBON ST SOIL
04/05/2021 Letter INSPECTION SUMMARY
04/07/2021 Letter INSPECTION SUMMARY
04/19/2021 Letter INSPECTION SUMMARY
04/21/2021 Letter INSPECTION SUMMARY
05/27/2021 Letter INSPECTION SUMMARY
06/25/2021 Letter INSPECTION SUMMARY
07/02/2021 Letter INSPECTION SUMMARY
08/30/2021 Letter INSPECTION SUMMARY
08/31/2021 Letter INSPECTION SUMMARY
08/31/2021 Letter INSPECTION SUMMARY
09/09/2021 Letter INSPECTION SUMMARY
09/14/2021 Rough-In-01
09/15/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
10/21/2021 Letter INSPECTION SUMMARY
11/10/2021 Letter INSPECTION SUMMARY
03/16/2022 Letter INSPECTION SUMMARY
04/05/2022 Letter INSPECTION SUMMARY
04/12/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
04/13/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/29/2022 3113 SW Blue Ribbon plot plan - sprinkler
04/29/2022 Receipt Receipt for transaction:2022-002665
04/29/2022 Plot Plan APPROVED AS GRADED PLOT PLAN
04/29/2022 Letter INSPECTION SUMMARY
05/02/2022 Letter INSPECTION SUMMARY
05/02/2022 Letter INSPECTION SUMMARY
05/02/2022 Letter INSPECTION SUMMARY
05/02/2022 Letter Field Certificate of Occupancy
05/02/2022 Letter Codes Final Certificate of Occupancy
05/10/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home