Permit Application Status

PRRES20204750


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20204750
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - ROOF TRUSSES - COVERED DECK
12/14/2020
12/18/2020
02/01/2023
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
PERMITTING@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review (RES) Approved 12/21/2020 12/17/2020
Shannon McGuire
Plot Plan Review Approved 12/16/2020 12/17/2020
Brandon Kalwei
Residential Plan Review Approved 12/16/2020 12/17/2020
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $942.82 $942.82 Paid 12/18/2020
8331507-Sewer Connection Fee $330.00 $330.00 Paid 12/18/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 12/18/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 12/18/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 12/18/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 12/18/2020
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 05/06/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/06/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/06/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/06/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/06/2021
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 01/25/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection - R Passed 2/5/2021 (9:15) 2/5/2021 02/05/2021
Underslab Plumbing Inspection - Residential Failed 2/8/2021 2/8/2021 02/08/2021
Misc
Corrective Action Required
02/08/2021
Connect interior underslab drain tile to sump pit
Erosion Control Inspection Residential Failed 02/08/2021
Misc
Corrective Action Required
02/08/2021
-Erosion control requires continuous maintenance. Repair damaged sections at curb and establish methods rear of lot within 48 hours -provide and maintain gravel filter -no further inspections until issues are resolved
Underslab Plumbing Inspection - Residential Failed 2/19/2021 2/19/2021 02/19/2021
Misc
Corrective Action Required
02/08/2021
Connect interior underslab drain tile to sump pit
Misc
Corrective Action Required
02/19/2021
- BASEMENT COVERED WITH TARP EXPOSE DRIAN TILE FOR INSPECTION -
Underslab Plumbing Inspection - Residential Passed 2/23/2021 2/23/2021 02/23/2021
Misc
Resolved
02/23/2021
Misc
Resolved
02/23/2021
Water Service Inspection - R Passed 2/24/2021 (1:00) 2/24/2021 02/24/2021
All Rough Inspection - Residential Failed 4/9/2021 4/9/2021 04/09/2021
Misc
Corrective Action Required
04/09/2021
inspection denied, no footing inspection on record. Third party reports are required to be uploaded to the portal within 48 hours of the pour.
Footing Inspection - Residential Passed 4/12/2021 04/12/2021
Misc
Informational
04/12/2021
- 3RD PARTY FOOTING BY DEREK PEREZ @ RES SIGNED & SEALED BY BRADLEY HUXOL - - UFER LOCATED IN CENTER OF SOUTH (REAR) GARAGE FOUNDATION WALL -
All Rough Inspection - Residential Failed 4/14/2021 4/14/2021 04/14/2021
Misc
Corrective Action Required
04/14/2021
Tighten anchor bolts garage Provide 5/8 anchor bolts sq washers PFH portal frame garage S2.0 details 12 Nails studs per code at intersecting wall corners ( at braced wall panels ) S1.0 #9 Nail sheathing front wall per code bed #2 CS-WSP S1.0 Tighten anchor bolts basement Solid block & nail sheathing west basement wall Provide anchor bolts within 12" of plate break basement Seal fire blocking ceiling at furr out Install braced wall panels on interior & exterior per plan rec room each side of windows Expose trusses covered patio to verify hangers Provide lateral support per truss details A8 Provide fire resistive rating for exterior wall projection on west side of house, less than 5' from property line, no soffit vents in these areas 2018 IRC R302.1 )
All Rough Inspection - Residential Failed 4/14/2021 04/14/2021
Miscellaneous Correction
Corrective Action Required
04/14/2021
Tighten anchor bolts garage Provide 5/8 anchor bolts sq washers PFH portal frame garage S2.0 details 12 Nails studs per code at intersecting wall corners ( at braced wall panels ) S1.0 #9 Nail sheathing front wall per code bed #2 CS-WSP S1.0 Tighten anchor bolts basement Solid block & nail sheathing west basement wall Provide anchor bolts within 12" of plate break basement Seal fire blocking ceiling at furr out Install braced wall panels on interior & exterior per plan rec room each side of windows Expose trusses covered patio to verify hangers Provide lateral support per truss details A8 Provide fire resistive rating for exterior wall projection on west side of house, less than 5' from property line, no soffit vents in these areas 2018 IRC R302.1 )
All Rough Inspection - Residential Not Ready 4/20/2021 4/20/2021 04/20/2021
Miscellaneous Correction
Corrective Action Required
04/14/2021
Tighten anchor bolts basement Provide anchor bolts within 12" of plate break basement & tighten anchor bolts Seal fire blocking ceiling at furr out basement west wall Expose trusses covered patio to verify hangers Provide fire resistive rating for exterior wall projection on west side of house, less than 5' from property line, no soffit vents in these areas 2018 IRC R302.1
Electrical Service Inspection Passed 4/21/2021 4/21/2021 04/21/2021
Gas Service Inspection - Residential Failed 4/21/2021 4/21/2021 04/21/2021
Misc
Corrective Action Required
04/21/2021
- PROVIDE GAS PIPING SUPPORT PER IRC G2424 IFGC 415.1 - - PRESSURE STEADY AT 18 PSI -
Piers/Caissons Inspection - Residential Passed 4/12/2021 04/21/2021
Misc
Informational
04/21/2021
3RD PARTY FOOTING BY DEREK PEREZ @ RES SIGNED & SEALED BY BRADLEY HUXOL PIER POURED WITH FOOTING
Gas Service Inspection - Residential Not Ready 4/27/2021 4/27/2021 04/27/2021
Misc
Corrective Action Required
04/21/2021
- PROVIDE GAS PIPING SUPPORT PER IRC G2424 IFGC 415.1 - - PRESSURE STEADY AT 18 PSI -
All Rough Inspection - Residential Not Ready 4/27/2021 4/27/2021 04/27/2021
Miscellaneous Correction
Corrective Action Required
04/20/2021
Tighten anchor bolts basement Provide anchor bolts within 12" of plate break basement & tighten anchor bolts Seal fire blocking ceiling at furr out basement west wall Expose trusses covered patio to verify hangers Provide fire resistive rating for exterior wall projection on west side of house, less than 5' from property line, no soffit vents in these areas 2018 IRC R302.1 )
All Rough Inspection - Residential Not Ready 4/28/2021 4/28/2021 04/28/2021
Miscellaneous Correction
Corrective Action Required
04/27/2021
Tighten anchor bolts basement Provide anchor bolts within 12" of plate break basement & tighten anchor bolts Seal fire blocking ceiling at furr out basement west wall Expose trusses covered patio to verify hangers Provide fire resistive rating for exterior wall projection on west side of house, less than 5' from property line, no soffit vents in these areas 2018 IRC R302.1 )
Gas Service Inspection - Residential Passed 4/30/2021 4/30/2021 04/30/2021
Misc
Resolved
04/30/2021
All Rough Inspection - Residential Passed 4/30/2021 4/30/2021 04/30/2021
Miscellaneous Correction
Resolved
04/30/2021
Driveway Inspection Partial 5/21/2021 05/21/2021
Misc
Informational
05/21/2021
John M. Jackson Driveway 5/21/21 Friday Forms and materials passed pre-inspection.
Driveway Inspection Passed 5/28/2021 5/28/2021 05/28/2021
Misc
Informational
05/21/2021
John M. Jackson Driveway 5/21/21 Friday Forms and materials passed pre-inspection.
Misc
Informational
05/28/2021
Finished driveway meets LS and ADA specs. RP 5-28-21
Occupancy Inspection - Codes Residential Failed 7/13/2021 7/13/2021 07/13/2021
Misc
Corrective Action Required
07/13/2021
SIDEWALK INSPECTION STILL PENDING PROVIDE SOD & SPLASH BLOCKS PROVIDE GUTTERS & DOWNSPOUTS PROVIDE LAWN IRRIGATION PERMIT Install range hood Land conductors in a box or listed fixture kitchen counters Complete deck & guardrail Provide hardware SGD & secondary lock Remove dust cover smoke detectors Complete stairway spindles Sump discharge 36" from foundation Provide 1 1/2 bearing deck beam Provide clamp on AC whip
Occupancy Inspection - Codes Residential Temporary C of O 7/23/2021 7/23/2021 07/23/2021
Misc
Corrective Action Required
07/13/2021
SIDEWALK INSPECTION STILL PENDING PROVIDE SOD & SPLASH BLOCKS SUBMIT BACKFLOW CERTIFICATION Complete deck & guardrail Sump discharge 36" from foundation Provide 1 1/2 bearing deck beam Provide clamp on AC whip ( MINI SPLIT ) DECK STAIRS THE RISER HEIGHT SHALL BE NOT MORE THAN 7 3/4. THE GREATEST RISER HEIGHT SHALL NOT EXCEED THE SMALLEST BY MORE THAN 3/8". : BLOCK ACCESS TO DECK UNTIL ABOVE ITEMS COMPLETE : OK TO SET UP SALES OFFICE - TCO EXPIRES IN ONE YEAR - WHEN SALES OFFICE CONVERTED BACK TO GARAGE INSPECTION REQUIRED -
Sidewalk Inspection Partial 8/12/2021 8/12/2021 08/12/2021
Misc
Corrective Action Required
08/12/2021
Forms were placed and aggregate was present and compacted. New sidewalk ends before meeting existing sidewalk. Plot plan doesn’t show them joining either, but on LS Mapper the sidewalks join together. Manhole next to sidewalk needs to be raised and the water meter needs to be lowered. RP 8-12-21
Occupancy Inspection - Codes Residential Failed 8/18/2021 8/18/2021 08/18/2021
Misc
Corrective Action Required
07/23/2021
SIDEWALK INSPECTION STILL PENDING PROVIDE SOD & SPLASH BLOCKS SUBMIT BACKFLOW CERTIFICATION Complete deck & guardrail Sump discharge 36" from foundation Provide 1 1/2 bearing deck beam Provide clamp on AC whip ( MINI SPLIT ) DECK STAIRS THE RISER HEIGHT SHALL BE NOT MORE THAN 7 3/4. THE GREATEST RISER HEIGHT SHALL NOT EXCEED THE SMALLEST BY MORE THAN 3/8". : BLOCK ACCESS TO DECK UNTIL ABOVE ITEMS COMPLETE : OK TO SET UP SALES OFFICE - TCO EXPIRES IN ONE YEAR - WHEN SALES OFFICE CONVERTED BACK TO GARAGE INSPECTION REQUIRED -
Misc
Corrective Action Required
08/18/2021
SIDEWALK INSPECTION STILL PENDING
Occupancy Inspection - Codes Residential Failed 8/20/2021 8/20/2021 08/20/2021
Misc
Corrective Action Required
08/18/2021
SIDEWALK INSPECTION STILL PENDING PROVIDE SOD-ENSURE 6" FALL IN 10' FOR FOUNDATION DRAINAGE SUBMIT BACKFLOW CERTIFICATION -PLACE TRACER WIRE IN BOX AT GRADE Complete deck-(2) 1/2" THROUGH BOLTS AT POST TO BEAM CONNECTIONS - TCO EXPIRES IN ONE YEAR - WHEN SALES OFFICE CONVERTED BACK TO GARAGE INSPECTION REQUIRED -
Misc
Corrective Action Required
08/18/2021
SIDEWALK INSPECTION STILL PENDING
Sidewalk Inspection Partial 8/20/2021 8/20/2021 08/20/2021
Misc
Corrective Action Required
08/12/2021
Forms were placed and aggregate was present and compacted. New sidewalk ends before meeting existing sidewalk. Plot plan doesn’t show them joining either, but on LS Mapper the sidewalks join together. Manhole next to sidewalk needs to be raised and the water meter needs to be lowered. RP 8-12-21
Misc
Corrective Action Required
08/20/2021
Finished sidewalk meets LS and ADA specs. Manhole still needs to be raised and sidewalk needs to connect with Pryor. RP 8-20-21
Occupancy Inspection - Codes Residential Failed 9/23/2021 9/23/2021 09/23/2021
Misc
Corrective Action Required
08/20/2021
SIDEWALK INSPECTION STILL PENDING - TCO EXPIRES IN ONE YEAR - WHEN SALES OFFICE CONVERTED BACK TO GARAGE INSPECTION REQUIRED -
Misc
Corrective Action Required
08/20/2021
SIDEWALK INSPECTION STILL PENDING
Occupancy Inspection - Codes Residential Temporary C of O 2/10/2022 02/10/2022
Misc
Corrective Action Required
09/23/2021
SIDEWALK INSPECTION STILL PENDING - TCO EXPIRES IN ONE YEAR - WHEN SALES OFFICE CONVERTED BACK TO GARAGE INSPECTION REQUIRED - :EXTEND TCO FOR SALES OFFICE UNTIL 7/20/2022:
Misc
Corrective Action Required
09/23/2021
SIDEWALK INSPECTION STILL PENDING
Occupancy Inspection - Codes Residential Failed 1/18/2023 1/18/2023 01/18/2023
Misc
Corrective Action Required
02/10/2022
SIDEWALK INSPECTION STILL PENDING - TCO EXPIRES IN ONE YEAR - WHEN SALES OFFICE CONVERTED BACK TO GARAGE INSPECTION REQUIRED - :EXTEND TCO FOR SALES OFFICE UNTIL 7/20/2022:
Misc
Corrective Action Required
02/10/2022
1/18/23 -SIDEWALK INSPECTION STILL PENDING -TCO EXPIRED ON 7/20/22 -REQUEST EXTENSION AND PAY FEE OR MAKE FINAL CORRECTIONS TO CLOSE THIS OUT
Occupancy Inspection - Codes Residential Ready for Temp CO 01/19/2023
Misc
Corrective Action Required
01/18/2023
SIDEWALK INSPECTION STILL PENDING - TCO EXPIRES IN ONE YEAR - WHEN SALES OFFICE CONVERTED BACK TO GARAGE INSPECTION REQUIRED - :EXTEND TCO FOR SALES OFFICE UNTIL 7/20/2022:
Misc
Corrective Action Required
01/18/2023
1/19/23 -SIDEWALK INSPECTION STILL PENDING
Sidewalk Inspection Passed 1/31/2023 1/31/2023 01/31/2023
Misc
Corrective Action Required
08/20/2021
Forms were placed and aggregate was present and compacted. New sidewalk ends before meeting existing sidewalk. Plot plan doesn’t show them joining either, but on LS Mapper the sidewalks join together. Manhole next to sidewalk needs to be raised and the water meter needs to be lowered. RP 8-12-21
Misc
Corrective Action Required
08/20/2021
Finished sidewalk meets LS and ADA specs. Manhole still needs to be raised and sidewalk needs to connect with Pryor. RP 8-20-21
Misc
Informational
01/31/2023
1-31-23. Sidewalk meets LS and ADA specification.
Deck Final Inspection - Residential Passed 02/01/2023
Plot Plan Inspection Passed 02/01/2023
Erosion Control Inspection Residential Passed 2/1/2023 02/01/2023
Misc
Resolved
02/01/2023
-Erosion control requires continuous maintenance. Repair damaged sections at curb and establish methods rear of lot within 48 hours -provide and maintain gravel filter -no further inspections until issues are resolved
Occupancy Inspection - Codes Residential Full C of O 2/1/2023 2/1/2023 02/01/2023
Misc
Resolved
02/01/2023
SIDEWALK INSPECTION STILL PENDING - TCO EXPIRES IN ONE YEAR - WHEN SALES OFFICE CONVERTED BACK TO GARAGE INSPECTION REQUIRED - :EXTEND TCO FOR SALES OFFICE UNTIL 7/20/2022:
Misc
Resolved
02/01/2023
1/19/23 -SIDEWALK INSPECTION STILL PENDING
Documents & Images
Date Uploaded File Type Document Name
12/14/2020 Approved Plans APPROVED TRUSS LAYOUT
12/14/2020 Approved Plans APPROVED TRUSS DRAWINGS
12/16/2020 Letter Codes Residential Plan Review
12/16/2020 Application Form APPLICATION
12/16/2020 Approved Plans APPROVED PLANS
12/18/2020 Receipt Receipt for transaction:2020-008116
12/18/2020 Plot Plan APPROVED PLOT PLAN
12/18/2020 Letter DS Building Permit
02/05/2021 Letter INSPECTION SUMMARY
02/08/2021 Letter INSPECTION SUMMARY
02/08/2021 Letter INSPECTION SUMMARY
02/19/2021 Letter INSPECTION SUMMARY
02/19/2021 Letter INSPECTION SUMMARY
02/23/2021 Letter INSPECTION SUMMARY
02/24/2021 Letter INSPECTION SUMMARY
04/09/2021 Letter INSPECTION SUMMARY
04/12/2021 W1 9 - Footing inspection
04/12/2021 Letter INSPECTION SUMMARY
04/14/2021 Letter INSPECTION SUMMARY
04/20/2021 Letter INSPECTION SUMMARY
04/20/2021 Letter INSPECTION SUMMARY
04/21/2021 Letter INSPECTION SUMMARY
04/21/2021 Letter INSPECTION SUMMARY
04/21/2021 Letter INSPECTION SUMMARY
04/21/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/28/2021 Letter INSPECTION SUMMARY
04/30/2021 Letter INSPECTION SUMMARY
04/30/2021 Letter INSPECTION SUMMARY
05/06/2021 Receipt Receipt for transaction:2021-002630
05/21/2021 Letter INSPECTION SUMMARY
05/28/2021 Letter INSPECTION SUMMARY
07/13/2021 Letter INSPECTION SUMMARY
07/23/2021 Letter Codes Temporary Certificate of Occupancy
07/23/2021 Letter Codes Temporary Certificate of Occupancy
08/12/2021 Letter INSPECTION SUMMARY
08/18/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
08/20/2021 Letter INSPECTION SUMMARY
09/23/2021 Letter INSPECTION SUMMARY
02/10/2022 Letter Codes Temporary Certificate of Occupancy
02/10/2022 Letter Codes 140 Day Letter
01/18/2023 Letter INSPECTION SUMMARY
01/19/2023 23-0119 TCOExtension Request Form
01/25/2023 Certificate/License Codes Temporary Certificate of Occupancy
01/25/2023 Receipt Receipt for transaction:2023-000498
01/31/2023 Letter INSPECTION SUMMARY
02/01/2023 Letter INSPECTION SUMMARY
02/01/2023 Letter INSPECTION SUMMARY
02/01/2023 Letter INSPECTION SUMMARY
02/01/2023 Letter Field Certificate of Occupancy
02/01/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home