Summary
PRRES20202635
Building Permit - Residential
Certificate of Occupancy
CLAYTON PROPERTIES GROUP INC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED PATIO
08/28/2020
08/31/2020
07/26/2021
Locations
Contacts
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
MIKE@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 09/01/2020 08/28/2020
Kim Brennan
Residential Plan Review Approved 09/01/2020 08/28/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $981.03 $981.03 Paid 08/31/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 08/31/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 08/31/2020
8331507-Sewer Connection Fee $390.00 $390.00 Paid 08/31/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 08/31/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 08/31/2020
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/25/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/25/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 10/12/2020 10/12/2020
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/12/2020
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Footing Inspection - Residential Passed 11/9/2020 11/09/2020
Miscellaneous Correction
Corrective Action Required
11/09/2020
-SUBMIT ENGINEERED LETTER FOR PIER PADS -NO PIER INSPECTION PERFORMED, SUBMIT ENGINEERED LETTER STATING THAT THEY ARE PER PLAN
Underslab Plumbing Inspection - Residential Not Ready 12/16/2020 12/16/2020 12/16/2020
Misc
Corrective Action Required
12/16/2020
INSPECTION DENIED -EROSION CONTROL REQUIRED AT FRONT OF LOT - NO SILT FENCE CURRENTLY INSTALLED AT FRONT OF LOT AT STREET -POST ADDRESS -BACKFILL FOR ACCESS
Erosion Control Inspection Residential Failed 12/16/2020 12/16/2020 12/16/2020
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/12/2020
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. EROSION CONTROL REQUIRED AT FRONT OF LOT - NO SILT FENCE CURRENTLY INSTALLED AT FRONT OF LOT AT STREET
Underslab Plumbing Inspection - Residential Passed 12/17/2020 12/17/2020 12/17/2020
Misc
Resolved
12/17/2020
Piers/Caissons Inspection - Residential Passed 1/8/2021 (11:00) 1/8/2021 01/08/2021
Electrical Service Inspection Passed 3/15/2021 3/15/2021 03/15/2021
Gas Piping Inspection - Residential Failed 3/15/2021 3/15/2021 03/15/2021
Misc
Corrective Action Required
03/15/2021
-SECURE GAS FLEX LINE AT FIREPLACE
Gas Service Inspection - Residential Passed 3/15/2021 3/15/2021 03/15/2021
All Rough Inspection - Residential Failed 3/15/2021 3/15/2021 03/15/2021
Misc
Corrective Action Required
03/15/2021
-seal all top and bottom plate penetrations -seal all through floor penetrations -fireblock all tub and shower traps -anchor bolts to be within middle third of plate in garage -install all nuts on anchor bolts in garage -B vent at garage chase requires minimum 1” clearance from combustibles -secure gas flex line at fireplace -fireblock dead space at kitchen/refrigerator wall and pantry -all truss lateral bracing per plans -(4) 2x4 stud pack at all girder truss bearing ends per plans -Roof vents blocked by trusses throughout -EC#2 hold downs per plans -fireblock every 10’ vertical between foundation wall and studs -protection plate at DWV, basement bath/bedroom wall -Joist hangers required at all floor joist connection to stair rim near HVAC in mech room and den, over 4’ and not bearing 1 1/2” on plate -joist hangers at stair rim in basement, nail hangers -solid block between joists at cantilevers -dbl joist hangers at joist to lvl connection in sump pump mech room basement -dbl every other joist at cantilever above rec room per plans -Nail exterior sheathing per plans, 6” edge 12” field
Sewer Service Inspection - R Passed 3/16/2021 (8:00) 3/16/2021 03/16/2021
Water Service Inspection - R Passed 3/19/2021 03/19/2021
Erosion Control Inspection Residential Failed 3/24/2021 03/24/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
12/16/2020
3-24-2021 Inspection denied due to lack of erosion control -Erosion control requires constant maintenance. Restore silt fence at perimeter of lot or provide acceptable alternative erosion control before any further inspections EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. EROSION CONTROL REQUIRED AT FRONT OF LOT - NO SILT FENCE CURRENTLY INSTALLED AT FRONT OF LOT AT STREET
All Rough Inspection - Residential Not Ready 3/24/2021 3/24/2021 03/24/2021
Misc
Corrective Action Required
03/15/2021
3-24-2021 Inspection denied due to lack of erosion control -Erosion control requires constant maintenance. Restore silt fence at perimeter of lot or provide acceptable alternative erosion control before any further inspections -seal all top and bottom plate penetrations -seal all through floor penetrations -fireblock all tub and shower traps -anchor bolts to be within middle third of plate in garage -install all nuts on anchor bolts in garage -B vent at garage chase requires minimum 1” clearance from combustibles -secure gas flex line at fireplace -fireblock dead space at kitchen/refrigerator wall and pantry -all truss lateral bracing per plans -(4) 2x4 stud pack at all girder truss bearing ends per plans -Roof vents blocked by trusses throughout -EC#2 hold downs per plans -fireblock every 10’ vertical between foundation wall and studs -protection plate at DWV, basement bath/bedroom wall -Joist hangers required at all floor joist connection to stair rim near HVAC in mech room and den, over 4’ and not bearing 1 1/2” on plate -joist hangers at stair rim in basement, nail hangers -solid block between joists at cantilevers -dbl joist hangers at joist to lvl connection in sump pump mech room basement -dbl every other joist at cantilever above rec room per plans -Nail exterior sheathing per plans, 6” edge 12” field
All Rough Inspection - Residential Failed 3/26/2021 3/26/2021 03/26/2021
Misc
Corrective Action Required
03/24/2021
-Maintain gravel filter at front of lot, 4" lift required, clean any mud from street -anchor bolts to be within middle third of plate in garage- see garage portal bolt between dbl and sgl doors -B vent at garage chase requires minimum 1” clearance from combustibles -fireblock dead space at kitchen/refrigerator/laundry wall and pantry -(4) 2x4 stud pack at all girder truss bearing ends per plans -Roof vents blocked by trusses throughout -EC#2 hold downs per plans -dbl every other joist at cantilever above rec room per plans -Nail exterior sheathing per plans, 6” edge 12” field
All Rough Inspection - Residential Failed 3/31/2021 3/31/2021 03/31/2021
Misc
Corrective Action Required
03/31/2021
-Roof vents blocked by trusses throughout - trusses have been cut out for vents - submit engineer letter from Mitek
Gas Piping Inspection - Residential Passed 3/31/2021 3/31/2021 03/31/2021
Misc
Resolved
03/31/2021
All Rough Inspection - Residential Passed 4/7/2021 4/7/2021 04/07/2021
Misc
Resolved
04/07/2021
Driveway Inspection Passed 4/12/2021 4/12/2021 04/14/2021
Occupancy Inspection - Codes Residential Failed 5/20/2021 5/20/2021 05/20/2021
Miscellaneous Correction
Corrective Action Required
11/09/2020
-Resolve outstanding inspection fee(s) before final c of o -Final grade per approved plot plan -Sod -Splash blocks at all downspout and sump pump discharge locations, min 36" discharge from foundation -Handrail required at garage stairs, 4 rises -Install kitchen faucet and plumbing -Install spindles basement stairs -minimum (1) toilet must be operational for occupancy -install hot water heater, must be operational -clip off set screw head at anti siphon on main water line spigot at basement
Occupancy Inspection - Codes Residential Temporary C of O 5/25/2021 5/25/2021 05/25/2021
Miscellaneous Correction
Corrective Action Required
05/20/2021
-Final grade per approved plot plan -Sod -Splash blocks at all downspout and sump pump discharge locations, min 36" discharge from foundation **OK FOR TCO - TCO EXPIRES 6/22/21**
Erosion Control Inspection Residential Passed 07/26/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/24/2021
3-24-2021 Inspection denied due to lack of erosion control -Erosion control requires constant maintenance. Restore silt fence at perimeter of lot or provide acceptable alternative erosion control before any further inspections EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. EROSION CONTROL REQUIRED AT FRONT OF LOT - NO SILT FENCE CURRENTLY INSTALLED AT FRONT OF LOT AT STREET
Plot Plan Inspection Passed 07/26/2021
Occupancy Inspection - Codes Residential Full C of O 7/26/2021 7/26/2021 07/26/2021
Miscellaneous Correction
Resolved
07/26/2021
-Final grade per approved plot plan -Sod -Splash blocks at all downspout and sump pump discharge locations, min 36" discharge from foundation **OK FOR TCO - TCO EXPIRES 6/22/21**
Documents & Images
Date Uploaded File Type Document Name
08/28/2020 Application Form Permit Application and license tax form
08/28/2020 Plot Plan Approved Plot Plan
08/28/2020 Approved Plans Approved Drawings
08/28/2020 Approved Plans Approved Truss Layout
08/28/2020 Approved Plans Approved Truss Package
08/31/2020 Receipt Receipt for transaction:2020-005823
08/31/2020 Letter DS Building Permit
10/12/2020 Letter INSPECTION SUMMARY
11/03/2020 Lot 26 Creekside at Raintree Pier Inspection
11/09/2020 Letter INSPECTION SUMMARY
12/16/2020 Letter INSPECTION SUMMARY
12/16/2020 Letter INSPECTION SUMMARY
12/17/2020 Letter INSPECTION SUMMARY
01/08/2021 Letter INSPECTION SUMMARY
03/15/2021 Letter INSPECTION SUMMARY
03/15/2021 Letter INSPECTION SUMMARY
03/15/2021 Letter INSPECTION SUMMARY
03/15/2021 Letter INSPECTION SUMMARY
03/16/2021 Letter INSPECTION SUMMARY
03/19/2021 Letter INSPECTION SUMMARY
03/24/2021 Letter INSPECTION SUMMARY
03/24/2021 Letter INSPECTION SUMMARY
03/24/2021 Letter INSPECTION SUMMARY
03/24/2021 Letter INSPECTION SUMMARY
03/26/2021 Letter INSPECTION SUMMARY
03/31/2021 Letter INSPECTION SUMMARY
03/31/2021 Letter INSPECTION SUMMARY
03/31/2021 400432 - Lot 26 RT
04/05/2021 Lot 26 Structural Inspection - Signed
04/07/2021 Letter INSPECTION SUMMARY
04/14/2021 Letter INSPECTION SUMMARY
05/20/2021 Letter INSPECTION SUMMARY
05/25/2021 Receipt Receipt for transaction:2021-003472
05/25/2021 Letter Codes Temporary Certificate of Occupancy
07/26/2021 Letter INSPECTION SUMMARY
07/26/2021 Letter INSPECTION SUMMARY
07/26/2021 Letter Codes Final Certificate of Occupancy
07/26/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home