Permit Application Status

PRRES20201772


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20201772
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO
06/30/2020
07/14/2020
04/25/2022
Locations
Contacts
CARDINAL CREST HOMES, Address:1539 SWIFT AVE, Phone:(816) 499-3156  
MCDANIEL FURNACE & SHEET METAL, Address:2905 S M 291 FRONTAGE RD, Phone:(816) 373-6370  
JOE KILOWATT INC, Address:6506 ROYAL, Phone:(816) 792-4888  
HAMPTON PLUMBING INC, Address:P O BOX 552, Phone:(816) 628-5069  
JAMES@CARDINALCRESTHOMES.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 07/02/2020 07/14/2020
Kim Brennan
Misc
Corrective Action Required
06/30/2020

The address must be listed on all pages of the drawings
Plot Plan Review Approved 07/02/2020 07/01/2020
Kim Brennan
Basement opening elevations
Corrective Action Required
06/30/2020

Minimum Building Opening Elevation (MBOE) and location on structure must be provided on the plot plan. Please show the MBOE as 950.00 for the front and back per the approved MDP
Basement egress
Corrective Action Required
06/30/2020

Basement egress location(s) and elevation of the lowest adjacent grade must be provided on the plot plan.
City infrustructure
Corrective Action Required
06/30/2020

Show all manholes, water valve boxes, fire hydrants, and stormwater structures. Please show manhole located in the alley at the rear of the lot
As-graded plot plan
Corrective Action Required
06/30/2020

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Planning Review (RES) Approved 07/02/2020 07/01/2020
Victoria Nelson
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,379.67 $1,379.67 Paid 07/14/2020
Right of Way Permit Fee $80.00 $80.00 Paid 07/14/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 07/13/2020
$1,077.12
8331507-Sewer Connection Fee $570.00 $570.00 Paid 07/14/2020
Water Tap Fee $3,477.00 $3,477.00 Paid 07/14/2020
Water Meter Fee $425.02 $425.02 Paid 07/14/2020
Not Ready Inspection Fee $50.00 $50.00 Paid 02/22/2021
Not Ready Inspection Fee $50.00 $50.00 Paid 02/22/2021
Not Ready Inspection Fee $50.00 $50.00 Paid 08/19/2021
Not Ready Inspection Fee $50.00 $50.00 Paid 08/19/2021
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/17/2020 08/18/2020
Misc
Informational
08/18/2020
- 3RD PARTY FOOTING INSPECTION SIGNED & SEALED BY DAVID AINSWORTH - - COMMENTS : UFER LOCATED IN REAR END WALL ABOUT 22' NORTH OF SW CORNER -
Underslab Plumbing Inspection - Residential Passed 9/4/2020 9/4/2020 09/04/2020
Sewer Service Inspection - R Passed 9/14/2020 (9:30) 9/14/2020 09/14/2020
Water Service Inspection - R Passed 9/14/2020 (9:30) 9/14/2020 09/14/2020
Erosion Control Inspection Residential Failed 11/06/2020
Miscellaneous Correction
Corrective Action Required
11/06/2020
-Deficient erosion control, methods require continuous maintenance. Reestablish erosion control at curb lines within two days. -Immediate Street clean up required -No further inspections until issues are resolved
Gas Piping Inspection - Residential Passed 12/7/2020 12/7/2020 12/07/2020
Gas Service Inspection - Residential Passed 2/22/2021 2/22/2021 12/07/2020
Erosion Control Inspection Residential Failed 12/08/2020
Miscellaneous Correction
Corrective Action Required
11/06/2020
-Immediate Street clean up required -No further inspections until resolved
All Rough Inspection - Residential Failed 1/8/2021 1/8/2021 01/08/2021
Misc
Corrective Action Required
01/08/2021
Inspection denied. No compliance with erosion control inspection report dated 12/08/2020
Erosion Control Inspection Residential Failed 01/08/2021
Miscellaneous Correction
Corrective Action Required
12/08/2020
-Immediate Street clean up required -No further inspections until resolved
All Rough Inspection - Residential Failed 1/12/2021 1/12/2021 01/12/2021
Misc
Corrective Action Required
01/08/2021
Inspection denied. No compliance with recent erosion control inspection reports. Remove debris from street and reschedule inspection
Erosion Control Inspection Residential Passed 01/13/2021
Miscellaneous Correction
Resolved
01/13/2021
-Immediate Street clean up required -No further inspections until resolved
All Rough Inspection - Residential Failed 1/14/2021 1/14/2021 01/14/2021
Misc
Resolved
01/14/2021
Inspection denied. No compliance with recent erosion control inspection reports. Remove debris from street and reschedule inspection
Misc
Corrective Action Required
01/14/2021
-Minimum 12” field 6” edge exterior sheathing fastening. Top edge of second story exterior sheathing is below the double top plate in bedrooms 2 & 4 -Properly fasten truss hanger, upstairs bedroom -Provide truss anchors at girder truss bearing locations -Complete gas fireplace flue termination through the roof -Make up all outlet boxes and mechanically fasten all spliced equipment grounding conductors -Hanging whip above living room and covered patio, provide outlet boxes -Fireblock all top/bottom plate penetrations and all through floor penetrations throughout -Fasten fireplace to framing -Fireblock vertical to horizontal either side of fireplace - fire block between floor levels backside of fireplace/book shelf wall, first to second story and second story into attic space -Protect NM conductors from physical damage minimum 6” AFF at floor penetrations -1st & 2nd floor exterior walls and garage/dwelling separation wall bottom plate fastening 12” oc per plan -Nail plate protection at conductor stud penetrations in dining room, master bed, den, bed 2, bed 4, entry area, main level chase and fireplace/book shelf area -Fireblock penetration in wood fireblock at ceiling level, dining room west wall -Conductor nail plate protection top plate penetration, wall between kitchen and stairs -replace removed wood fireblock above sliding glass door and also open space between studs into attic space left side of sliding door -Pan return chase main level to ensure air is drawn from intended location, Sheetrock nailers indicate air could be drawn from concealed space at gas fireplace -Two rows of 16D sinker nails 3” oc at portal opening top plate per plan, see section view of detail -Provide interior tension straps at portal frame -Provide stud shoes master bath DWV stud penetrations -Provide minimum 16g galvanized metal ties 1.5” wide at over bored top plates of interior load bearing walls. Fasten ties across and to the plate at each side of the opening with minimum 4-10dx1.5” at each side. The metal tie must extend a minimum of 6” past the opening. See figure R602.6.1 -Fireblock second story mechanical closet ceiling penetrations -Provide stud shoes at DWV stud penetrations second story bath -complete HVAC line set installations -Furr out or penetrate top plate for HVAC line set, second story bath -Identify white insulated conductors to be used as current carrying conductors at both points of termination -Complete plumbing installation, above basement window -Address top flange penetrations of engineered Joists, first floor framing -Unable to locate water heater circuit -12” oc fastening, stud to stud and abutting studs at intersecting braced walls
Electrical Service Inspection Passed 1/14/2021 1/14/2021 01/14/2021
All Rough Inspection - Residential Failed 2/1/2021 2/1/2021 02/01/2021
Misc
Corrective Action Required
01/14/2021
-Complete gas fireplace flue termination through the roof -Fireblock all top/bottom plate penetrations and all through floor penetrations throughout. Right side of man door in garage, master bed/closet wall, master bed/den wall, bed 4 closet/bath wall including concealed space by tub -Fasten fireplace to framing -1st & 2nd floor exterior bottom plate fastening 12” oc per plan -Fireblock penetration in wood fireblock at ceiling level, dining room west wall -fireblock penetration in wood fireblock above sliding glass door and also open space between studs into attic space left side of sliding door -Two rows of 16D sinker nails 3” oc at portal opening top plate per plan, see section view of detail -Provide stud shoes master bath DWV stud penetrations -Provide minimum 16g galvanized metal ties 1.5” wide at over bored top plates of interior load bearing walls. Fasten ties across and to the plate at each side of the opening with minimum 4-10dx1.5” at each side. The metal tie must extend a minimum of 6” past the opening. See figure R602.6.1 -Fireblock second story mechanical closet ceiling penetrations -Provide stud shoes at DWV stud penetrations second story bath -Identify white insulated conductors to be used as current carrying conductors at both points of termination -Complete DWV plumbing installation, above basement window -Address top flange penetrations of engineered Joists, first floor framing -Unable to locate water heater circuit -12” oc fastening, stud to stud and abutting studs at intersecting braced walls -Complete and pressure test gas piping extension
All Rough Inspection - Residential Not Ready 2/12/2021 2/12/2021 02/12/2021
Misc
Corrective Action Required
02/01/2021
Fireblock bed 4 bath concealed space by tub & all through floor penetrations -1st & 2nd floor exterior bottom plate fastening 12” oc per plan -Two rows of 16D sinker nails 3” oc at portal opening top plate per plan, see section view of detail -Provide stud shoes master bath DWV stud penetrations -Provide minimum 16g galvanized metal ties 1.5” wide at over bored top plates of interior load bearing walls. Fasten ties across and to the plate at each side of the opening with minimum 4-10dx1.5” at each side. The metal tie must extend a minimum of 6” past the opening. See figure R602.6.1 -Provide stud shoes at DWV stud penetrations second story bath -Complete DWV plumbing installation, above basement window -Address top flange penetrations of engineered Joists, first floor framing -Unable to locate water heater circuit -Work done since last inspection- -Pressure test gas piping extension to entry -Provide proper nail plate protection of gas tubing at top and bottom plate Penetrations per manufacturers installation instructions -Replace removed return air plenum pan in basement
Piers/Caissons Inspection - Residential Passed 02/12/2021
All Rough Inspection - Residential Not Ready 2/18/2021 2/18/2021 02/18/2021
Misc
Corrective Action Required
02/12/2021
-Fireblock bed 4 bath concealed space by tub at HVAC line set -fireblock through floor penetration, master bath -Provide minimum 16g galvanized metal ties 1.5” wide at over bored top plates of interior load bearing walls. Fasten ties across and to the plate at each side of the opening with minimum 4-10dx1.5” at each side. The metal tie must extend a minimum of 6” past the opening. See figure R602.6.1 -Complete DWV plumbing installation, above basement window to master bath -Provide engineered solution for repair of multiple top flange penetrations of engineered Joists, first floor framing -Provide water heater circuit -pressure test gas piping extension to entry -Provide proper nail plate protection of gas CSST at top and bottom plate Penetrations per manufacturers installation instructions, methods installed not per manufacturer -Replace damaged/removed return air pans in basement **Installation of insulation has not been approved, do not continue with installation. Approval will be given once inspection items are resolved.**
All Rough Inspection - Residential Not Ready 2/22/2021 2/22/2021 02/22/2021
Misc
Corrective Action Required
02/18/2021
-Fireblock bed 4 bath concealed space by tub at HVAC line set -fireblock through floor penetration, master bath -Provide engineered solution for repair of multiple top flange penetrations of engineered Joists, first floor framing -Provide water heater circuit
All Rough Inspection - Residential Not Ready 2/25/2021 2/25/2021 02/25/2021
Misc
Corrective Action Required
02/22/2021
-Fireblock bed 4 bath concealed space by tub at HVAC line set -fireblock through floor penetration, master bath -Provide engineered solution for repair of I-joist top flange penetrations, two pex and 1 conductor left of furnace in basement for laundry above -Complete HE water heater gas piping, exhaust vent and electrical
All Rough Inspection - Residential Passed 3/1/2021 3/1/2021 03/01/2021
Misc
Resolved
03/01/2021
-Fireblock bed 4 bath concealed space by tub at HVAC line set -fireblock through floor penetration, master bath -Provide engineered solution for repair of I-joist top flange penetrations, two pex and 1 conductor left of furnace in basement for laundry above -Complete HE water heater gas piping, exhaust vent and electrical
Driveway Inspection Partial 6/9/2021 6/9/2021 06/09/2021
Misc
Informational
06/09/2021
Forms were placed and aggregate was present and compacted. Approach was set at 37 feet. Had them move the wings in until we were at 36 feet. RP 6-9-21
Sidewalk Inspection Partial 6/9/2021 6/9/2021 06/09/2021
Misc
Informational
06/09/2021
Forms were placed and aggregate was present and compacted. The contractor (Mead Concrete) formed up sidewalks on both Pergola Park and Grandstand Circle. Plot plans show no sidewalk on Grandstand Circle. Called Dev Tech Kim to verify no sidewalk. She checked plot and plat plans and agreed, no sidewalk on Grandstand Circle. Contractor is going to check with developer on adding the sidewalk and how to proceeded on designing the ADA ramp. RP 6-9-21
Sidewalk Inspection Partial 6/23/2021 6/23/2021 06/23/2021
Misc
Informational
06/09/2021
Forms were placed and aggregate was present and compacted. The contractor (Mead Concrete) formed up sidewalks on both Pergola Park and Grandstand Circle. Plot plans show no sidewalk on Grandstand Circle. Called Dev Tech Kim to verify no sidewalk. She checked plot and plat plans and agreed, no sidewalk on Grandstand Circle. Contractor is going to check with developer on adding the sidewalk and how to proceeded on designing the ADA ramp. RP 6-9-21
Misc
Informational
06/23/2021
The sidewalk was approved for both sides of the property. Forms were placed and aggregate was present and compacted. Type B ADA ramp has also been formed. They removed existing curbing too. RP 6-23-21
Driveway Inspection Passed 7/2/2021 7/2/2021 07/02/2021
Misc
Informational
06/09/2021
Forms were placed and aggregate was present and compacted. Approach was set at 37 feet. Had them move the wings in until we were at 36 feet. RP 6-9-21
Misc
Informational
07/02/2021
Finished driveway is 35 1/2 feet wide and meets LS and ADA specs. RP 7-2-21
Sidewalk Inspection Passed 7/2/2021 7/2/2021 07/02/2021
Misc
Informational
06/23/2021
Forms were placed and aggregate was present and compacted. The contractor (Mead Concrete) formed up sidewalks on both Pergola Park and Grandstand Circle. Plot plans show no sidewalk on Grandstand Circle. Called Dev Tech Kim to verify no sidewalk. She checked plot and plat plans and agreed, no sidewalk on Grandstand Circle. Contractor is going to check with developer on adding the sidewalk and how to proceeded on designing the ADA ramp. RP 6-9-21
Misc
Informational
06/23/2021
The sidewalk was approved for both sides of the property. Forms were placed and aggregate was present and compacted. Type B ADA ramp has also been formed. They removed existing curbing too. RP 6-23-21
Misc
Informational
07/02/2021
Finished sidewalk and ADA ramp meets LS and ADA specs. RP 7-2-21
Occupancy Inspection - Codes Residential Failed 8/19/2021 8/19/2021 08/19/2021
Misc
Corrective Action Required
08/19/2021
-Maintain erosion control until sodding -Exterior not ready for inspection. Address, exterior lighting, uncover all receptacles for testing, sealing, etc -Water meter lid shall be at grade level with meter-lid distance of 14”-18” -Obtain lawn irrigation permit and submit the backflow test report to city -As-graded plot plan is required prior to sodding -Final grade, sod, roof gutters, downspouts and sump pump extensions -Make sure that the sewer tracer wire and port are installed and available at grade level -Remove all items from garage wall -Install security strike plate for garage exterior door -Install box extensions for switch & receptacle boxes recessed more than 1/4” behind kitchen countertop backsplash -Kitchen countertop receptacles shall be spaced, such that at any point along the countertop wall, there is a receptacle within 24” -Provide backflow preventer for water supply to dish washer -Luminaire in the master closet shall be enclosed-lamp type -Protect I joists in basement per code -Securely fasten NM cable at max 4.5 ft interval in basement
Occupancy Inspection - Codes Residential Temporary C of O 8/20/2021 8/20/2021 08/20/2021
Misc
Corrective Action Required
08/19/2021
-Maintain erosion control until sodding -permanent address -Water meter lid shall be at grade level with meter-lid distance of 14”-18” -Obtain lawn irrigation permit and submit the backflow test report to city -As-graded plot plan is required prior to sodding -Final grade, sod, roof gutters, downspouts and sump pump extensions -Make sure that the sewer tracer wire and port are installed and available at grade level OK FOR TCO - TCO EXPIRES 9/20/21
Occupancy Inspection - Codes Residential Full C of O 4/25/2022 04/25/2022
Misc
Corrective Action Required
08/20/2021
Documents & Images
Date Uploaded File Type Document Name
06/30/2020 Letter Permit Application and license tax form
06/30/2020 Letter Codes Residential Plan Review
07/14/2020 Drawing Approved Drawings
07/14/2020 Receipt Receipt for transaction:2020-004465
07/14/2020 Letter DS Building Permit
08/04/2020 Drawing Approved I-Joist Layout
08/04/2020 Drawing Approved Revised Drawings
08/04/2020 Drawing Approved Truss Package
08/04/2020 Drawing Approved Truss Layout
08/17/2020 M L Crose 3202 SW Pergola LSMO Cardinal Crest Permit 2020-1772 Footing Inspection Report 8-17-20
08/18/2020 Letter INSPECTION SUMMARY
09/04/2020 Letter INSPECTION SUMMARY
09/14/2020 Letter INSPECTION SUMMARY
09/14/2020 Letter INSPECTION SUMMARY
09/30/2020 Final_2020_09_24_Slab_LSMO_Cardinal Crest
11/06/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/08/2020 Letter INSPECTION SUMMARY
01/08/2021 Letter INSPECTION SUMMARY
01/08/2021 Letter INSPECTION SUMMARY
01/12/2021 Letter INSPECTION SUMMARY
01/13/2021 Letter INSPECTION SUMMARY
01/14/2021 Letter INSPECTION SUMMARY
01/14/2021 Letter INSPECTION SUMMARY
02/01/2021 Letter INSPECTION SUMMARY
02/12/2021 Letter INSPECTION SUMMARY
02/12/2021 Letter INSPECTION SUMMARY
02/18/2021 Letter INSPECTION SUMMARY
02/22/2021 Receipt Receipt for transaction:2021-000817
02/22/2021 Letter INSPECTION SUMMARY
02/24/2021 1-Joist_Plan (1)
02/24/2021 joist with header
02/24/2021 extra joist
02/25/2021 Letter INSPECTION SUMMARY
02/26/2021 #T20210226568
03/01/2021 Letter INSPECTION SUMMARY
06/09/2021 Letter INSPECTION SUMMARY
06/09/2021 Letter INSPECTION SUMMARY
06/10/2021 Plot Plan Approved Plot Plan
06/23/2021 Letter INSPECTION SUMMARY
07/02/2021 Letter INSPECTION SUMMARY
07/02/2021 Letter INSPECTION SUMMARY
08/19/2021 Letter INSPECTION SUMMARY
08/19/2021 Receipt Receipt for transaction:2021-006691
08/20/2021 Letter Codes Temporary Certificate of Occupancy
03/15/2022 3202 SW Pergola Park Dr (Sprinkler Release)
04/05/2022 Pergola Park 81 Final Grading 22_0405b
04/25/2022 Letter Codes Final Certificate of Occupancy
04/25/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home