Permit Application Status

PRPWFC20162552


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRPWFC20162552
Public Works Infrastructure Permit - Commercial
Final Acceptance
TOWNSEND SUMMIT LLC
DEVELOPMENT COMPLETE
COMPLETE INFRUSTRUCTURE FOR APARTMENT COMPLEXE
10/05/2016
11/15/2016
03/05/2018
Locations
Contacts
EMERY SAPP AND SONS INC, Address:2301 I-70 DR NW, Phone:(573) 445-8331  
TOWNSEND SUMMIT LLC, Address:11311 MCCORMICK RD STE 470  
NORTHPOINT DEVELOPMENT, Address:8015 NW CANAL ST, Phone:(816) 888-7390  
THHINC MCCLURE ENGINEERING CO, Address:1901 PENNSYLVANIA DRIVE, Phone:(573) 814-1568  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 10/05/2016 10/10/2016
Development Center
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $960.68 $960.68 Paid 10/10/2016
91100C9-Water Insp Fee $7,427.45 $7,427.45 Paid 10/10/2016
9110072-Water Test Fee $400.00 $400.00 Paid 10/10/2016
9110068-Storm Sewer Inspection Fee $5,088.06 $5,088.06 Paid 10/10/2016
9110081-Paved Surface Inspection Fee $23,473.59 $23,473.59 Paid 10/10/2016
$23,473.58
9110071-Site Grading Fee $870.00 $870.00 Paid 10/10/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Passed 04/20/2017
Fire Line - Flush Passed 4/19/2017 04/20/2017
PW-Misc
Informational
04/20/2017
It was brought to my attention that the fire hydrants were not in service, so I did a complete flush of the fire lines. All the fire hydrants have been flushed and are now in service.Steve Robbins 04/20/2017 4:21 PM
Fire Line - Hydrostatic Test Partial 4/20/2017 04/20/2017
PW-Misc
Informational
04/20/2017
The hydrostatic pressure test for the fire lines has been completed. 200 for 2 hrs. Building 3 and 7 do not have there fire line into the building yet, we will complete the test when it gets installed. We will test from the valve to the building.Steve Robbins 04/20/2017 4:27 PM
Pavement-Surface Partial 4/18/2017 04/28/2017
PW-Misc
Informational
04/28/2017
The base rock and geo-grid has been installed on part of the north entrance. We had a proofroll for this section of the parking lot.Steve Robbins 04/28/2017 3:12 PM
Commercial Curb Inspection Partial 4/19/2017 04/28/2017
Informational
04/28/2017
A portion of the curbs were installed on the north end of the parking lot.Steve Robbins 04/28/2017 3:15 PM
Commercial Curb Inspection Partial 5/8/2017 05/08/2017
Informational
05/08/2017
They are also installing more curbs today on the lower level of the site. Steve Robbins 05/08/2017 1:12 PM
Curb - Proof Roll Partial 5/1/2017 05/11/2017
PW-Misc
Informational
05/11/2017
We completed a proofroll on the lower level before the curbs were installed.Steve Robbins 05/11/2017 7:11 AM
Pavement-Proof Roll Partial 5/9/2017 05/11/2017
PW-Misc
Informational
05/11/2017
We did a proofroll for the lower parking lot and and parking garages on the lower level by the north entrance. This portion passed except for on area that we marked with paint and they came back and dug in out and let it dry and replaced with more rock. We did another proofroll and it was good.Steve Robbins 05/11/2017 7:16 AM
Pavement-Proof Roll Partial 5/9/2017 05/11/2017
PW-Misc
Informational
05/11/2017
We did a proofroll for the lower parking lot and and parking garages on the lower level by the north entrance. This portion passed except for on area that we marked with paint and they came back and dug in out and let it dry and replaced with more rock. We did another proofroll and it was good.Steve Robbins 05/11/2017 7:16 AM
Pavement-Surface Partial 5/10/2017 05/11/2017
PW-Misc
Informational
04/28/2017
The base rock and geo-grid has been installed on part of the north entrance. We had a proofroll for this section of the parking lot.Steve Robbins 04/28/2017 3:12 PM
PW-Misc
Informational
05/08/2017
They are putting down more rock and geo-grid for the parking lot they are on the lower level of where the parking will be.Steve Robbins 05/08/2017 1:01 PM
PW-Misc
Informational
05/11/2017
The base rock aphlalt has been installed on the lower level of the north entrance.Steve Robbins 05/11/2017 7:21 AM
Pavement-Surface Partial 5/10/2017 05/11/2017
PW-Misc
Informational
05/08/2017
They are putting down more rock and geo-grid for the parking lot they are on the lower level of where the parking will be.Steve Robbins 05/08/2017 1:01 PM
PW-Misc
Informational
05/08/2017
The base rock and geo-grid has been installed on part of the north entrance. We had a proofroll for this section of the parking lot.Steve Robbins 04/28/2017 3:12 PM
Fire Line - Hydrostatic Test Passed 5/8/2017 05/11/2017
PW-Misc
Informational
04/20/2017
The hydrostatic pressure test for the fire lines has been completed. 200 for 2 hrs. Building 3 and 7 do not have there fire line into the building yet, we will complete the test when it gets installed. We will test from the valve to the building.Steve Robbins 04/20/2017 4:27 PM
PW-Misc
Informational
05/11/2017
The hydrostatic pressure test for the fire line has been completed, the remaining lines going to the buildings were installed and tested. This completes the fire line testing.Steve Robbins 05/11/2017 1:35 PM
Commercial Curb Inspection Partial 5/11/2017 05/11/2017
Informational
05/11/2017
They have installed some more curbs on the lower level by buildings 1,2, and 3. All the rock has been installed. We will still need to do a proofroll before the ashplat goes in.Steve Robbins 05/11/2017 2:40 PM
Pavement-Stabilized Subgrade Partial 5/12/2017 05/12/2017
Informational
05/12/2017
The subgrade rock has been installed on all the lower level apartments, they are now installing the curbs.Steve Robbins 05/12/2017 3:56 PM
Commercial Curb Inspection Partial 5/15/2017 05/12/2017
Informational
05/12/2017
They installed curbs today on the lower level. They were formed by hand on the turns.Steve Robbins 05/12/2017 4:00 PM
Commercial Curb Inspection Partial 5/15/2017 05/15/2017
Informational
05/15/2017
The base rock has all been installed on the north side of the parking lot. They are getting ready for the curbs to be installed they have about half of the area finished with curbs.Steve Robbins 05/15/2017 8:03 AM
Commercial Curb Inspection Partial 5/17/2017 05/17/2017
Informational
05/17/2017
All the curbs for the next phase on the lower level has been installed except for the round -about circle Steve Robbins 05/17/2017 3:33 PM
Commercial Curb Inspection Partial 5/22/2017 05/18/2017
Informational
05/18/2017
All the curbs have been installed by buildings 3 and 4, including the round about that connects the other buildings. The subgrade is installed and they are ready fSteve Robbins 05/18/2017 3:48 PMor a proofroll.
Commercial Curb Inspection Partial 5/23/2017 05/23/2017
Informational
05/23/2017
After a proofroll they have installed all the curbs by buildings 3 and 4. They still need a proofroll for the asphalt.Steve Robbins 05/23/2017 3:34 PM
Pavement-Proof Roll Passed 5/24/2017 05/24/2017
PW-Misc
Informational
05/11/2017
We did a proofroll for the lower parking lot and and parking garages on the lower level by the north entrance. This portion passed except for on area that we marked with paint and they came back and dug in out and let it dry and replaced with more rock. We did another proofroll and it was good.Steve Robbins 05/11/2017 7:16 AM
PW-Misc
Informational
05/24/2017
The proofroll has been completed and passed for the road in front of and around buildings 3 and 4.Steve Robbins 05/24/2017 7:29 AM
Pavement-Surface Passed 5/24/2017 05/24/2017
PW-Misc
Informational
05/24/2017
The base asphalt has been installed in front of buildings 3 and 4 and the road for the round about.Steve Robbins 05/24/2017 7:32 AM
Pavement-Stabilized Subgrade Partial 5/26/2017 05/26/2017
PW-Misc
Informational
05/26/2017
I talked with Jonathon Meyers and they are hoping to put the surface coat of asphalt on the phase 1 of the parking lot , probably next wednesday.They have rolled and compacted all the subgrade bb buildig 3 and 4.Steve Robbins 05/26/2017 2:32 PM
Curb - Proof Roll Passed 5/30/2017 06/02/2017
PW-Misc
Informational
05/11/2017
We completed a proofroll on the lower level before the curbs were installed.Steve Robbins 05/11/2017 7:11 AM
PW-Misc
Informational
06/02/2017
Proofroll has been done for buildings 1,2, and 3 and it has passed.Steve Robbins 06/02/2017 2:52 PM
Street - Surface Course Partial 6/2/2017 06/02/2017
PW-Misc
Informational
06/02/2017
The surface has been installed from the south side of the area to the north side on the lower level. Steve Robbins 06/02/2017 2:58 PM
Street - Surface Course Partial 6/5/2017 06/07/2017
PW-Misc
Informational
06/02/2017
The surface has been installed from the south side of the area to the north side on the lower level. Steve Robbins 06/02/2017 2:58 PM
PW-Misc
Informational
06/07/2017
They have installed the surface for all the lower level and have striped the parking lots.Steve Robbins 06/07/2017 10:15 AM
Pavement-Stabilized Subgrade Partial 6/13/2017 06/14/2017
PW-Misc
Informational
05/26/2017
I talked with Jonathon Meyers and they are hoping to put the surface coat of asphalt on the phase 1 of the parking lot , probably next wednesday.They have rolled and compacted all the subgrade bb buildig 3 and 4.Steve Robbins 05/26/2017 2:32 PM
PW-Misc
Informational
06/14/2017
All of the base rock has been installed for the remainder of the parking lot and private street. We will be doing a proofroll after they get in compacted.Steve Robbins 06/14/2017 3:37 PM
Pavement-Stabilized Subgrade Passed 6/16/2017 06/19/2017
PW-Misc
Informational
06/14/2017
I talked with Jonathon Meyers and they are hoping to put the surface coat of asphalt on the phase 1 of the parking lot , probably next wednesday.They have rolled and compacted all the subgrade bb buildig 3 and 4.Steve Robbins 05/26/2017 2:32 PM
PW-Misc
Informational
06/14/2017
All of the base rock has been installed for the remainder of the parking lot and private street. We will be doing a proofroll after they get in compacted.Steve Robbins 06/14/2017 3:37 PM
PW-Misc
Corrective Action Required
06/19/2017
All the subgrade rock has been installed for parking lots and streets. They have compacted the rock and now they are installing the remaining curbs that are leading up to the north entrance.Steve Robbins 06/19/2017 11:15 AM
Commercial Curb Inspection Partial 6/19/2017 06/19/2017
Informational
06/19/2017
Today they are installing the curbs for the private road. They will probably be done with all the curbs today.Steve Robbins 06/19/2017 11:21 AM
Commercial Curb Inspection Passed 6/20/2017 06/22/2017
Informational
06/22/2017
All of th curbs for the parking lot and private road have been installed.Steve Robbins 06/22/2017 3:04 PM
Pavement-Proof Roll Passed 6/23/2017 06/27/2017
PW-Misc
Informational
06/27/2017
We have done a proofroll for the final portion of the parking lot and private street. We did a proofroll in the morning and now they are ready for the base asphalt.Steve Robbins 06/27/2017 7:55 AM
Pavement-Surface Partial 6/27/2017 06/27/2017
PW-Misc
Informational
06/27/2017
Yesterday and today they are installing base asphalt in the upper level heading around to the entrance. Steve Robbins 06/27/2017 1:45 PM
Pavement-Surface Passed 6/28/2017 06/28/2017
PW-Misc
Informational
06/27/2017
Yesterday and today they are installing base asphalt in the upper level heading around to the entrance. Steve Robbins 06/27/2017 1:45 PM
PW-Misc
Informational
06/28/2017
All the base asphlat has been installed for this project. I talked with the contractor and they will probably install the surface next week.Steve Robbins 06/28/2017 3:47 PM
Street - Surface Course Passed 7/6/2017 07/07/2017
PW-Misc
Informational
06/07/2017
The surface has been installed from the south side of the area to the north side on the lower level. Steve Robbins 06/02/2017 2:58 PM
PW-Misc
Informational
06/07/2017
They have installed the surface for all the lower level and have striped the parking lots.Steve Robbins 06/07/2017 10:15 AM
PW-Misc
Informational
07/07/2017
The entire private street and private parking lot has had all the surface installed through the parking lot and street. In the next few days they will finish striping.Steve Robbins 07/07/2017 11:55 AM
Water Line - Coliform Test 1 Partial 7/18/2017 07/18/2017
PW-Misc
Informational
07/18/2017
All the 4" waterline has been flushed and we chlorinated all the lines going into the apartments. Tomorrow we will de-chlorinate and flush all lines. Steve Robbins 07/18/2017 3:48 PM
Water Line - Coliform Test 1 Partial 7/19/2017 07/20/2017
PW-Misc
Informational
07/18/2017
All the 4" waterline has been flushed and we chlorinated all the lines going into the apartments. Tomorrow we will de-chlorinate and flush all lines. Steve Robbins 07/18/2017 3:48 PM
PW-Misc
Informational
07/20/2017
We are not going to dechlorinate today because we cannot get the samples to be read by friday. We will dechlorinate and take samples on monday.Steve Robbins 07/20/2017 2:13 PM
Water Line - Coliform Test 1 Partial 7/21/2017 07/24/2017
PW-Misc
Informational
07/20/2017
All the 4" waterline has been flushed and we chlorinated all the lines going into the apartments. Tomorrow we will de-chlorinate and flush all lines. Steve Robbins 07/18/2017 3:48 PM
PW-Misc
Informational
07/20/2017
We are not going to dechlorinate today because we cannot get the samples to be read by friday. We will dechlorinate and take samples on monday.Steve Robbins 07/20/2017 2:13 PM
PW-Misc
Informational
07/24/2017
The lines have been flushed and dechlorinated. Tomorrow we will take the first sample for each building.Steve Robbins 07/24/2017 2:54 PM
Water Line - Coliform Test 1 Partial 7/25/2017 07/31/2017
PW-Misc
Informational
07/24/2017
All the 4" waterline has been flushed and we chlorinated all the lines going into the apartments. Tomorrow we will de-chlorinate and flush all lines. Steve Robbins 07/18/2017 3:48 PM
PW-Misc
Informational
07/24/2017
We are not going to dechlorinate today because we cannot get the samples to be read by friday. We will dechlorinate and take samples on monday.Steve Robbins 07/20/2017 2:13 PM
PW-Misc
Informational
07/24/2017
The lines have been flushed and dechlorinated. Tomorrow we will take the first sample for each building.Steve Robbins 07/24/2017 2:54 PM
PW-Misc
Informational
07/31/2017
Building 4 and 5 have both passed 2 days of samples. Buildings 1, 2, 3, 6, and 7 all failed. We are flushing the lines again and testing the ones that failed again.Steve Robbins 07/31/2017 3:58 PM
Erosion Control Inspection Partial 8/7/2017 08/07/2017
PW-Misc
Informational
08/07/2017
This job site has mulch berms all around the outside of the site. After the rain on saturday the berm is still in place, there are 2 areas that got washed out, the location is on the east side of the property behing the garages. I will talk with Jonothan Meyers today.Steve Robbins 08/07/2017 8:44 AM
Water Line - Coliform Test 1 Partial 8/3/2017 08/14/2017
PW-Misc
Informational
07/31/2017
All the 4" waterline has been flushed and we chlorinated all the lines going into the apartments. Tomorrow we will de-chlorinate and flush all lines. Steve Robbins 07/18/2017 3:48 PM
PW-Misc
Informational
07/31/2017
We are not going to dechlorinate today because we cannot get the samples to be read by friday. We will dechlorinate and take samples on monday.Steve Robbins 07/20/2017 2:13 PM
PW-Misc
Informational
07/31/2017
The lines have been flushed and dechlorinated. Tomorrow we will take the first sample for each building.Steve Robbins 07/24/2017 2:54 PM
PW-Misc
Informational
07/31/2017
Building 4 and 5 have both passed 2 days of samples. Buildings 1, 2, 3, 6, and 7 all failed. We are flushing the lines again and testing the ones that failed again.Steve Robbins 07/31/2017 3:58 PM
PW-Misc
Informational
08/14/2017
We have 7 buildings, buildings 2-6 have passed. We had to flush and chlorinate and dechlorinate the 2 lines that failed. We will be taking a sample for buildings 1 and 7 tomorrow.Steve Robbins 08/14/2017 3:48 PM
Water Line - Coliform Test 1 Partial 8/16/2017 at 12:05 PM 08/16/2017
PW-Misc
Informational
08/14/2017
All the 4" waterline has been flushed and we chlorinated all the lines going into the apartments. Tomorrow we will de-chlorinate and flush all lines. Steve Robbins 07/18/2017 3:48 PM
PW-Misc
Informational
08/14/2017
We are not going to dechlorinate today because we cannot get the samples to be read by friday. We will dechlorinate and take samples on monday.Steve Robbins 07/20/2017 2:13 PM
PW-Misc
Informational
08/14/2017
The lines have been flushed and dechlorinated. Tomorrow we will take the first sample for each building.Steve Robbins 07/24/2017 2:54 PM
PW-Misc
Informational
08/14/2017
Building 4 and 5 have both passed 2 days of samples. Buildings 1, 2, 3, 6, and 7 all failed. We are flushing the lines again and testing the ones that failed again.Steve Robbins 07/31/2017 3:58 PM
PW-Misc
Informational
08/14/2017
We have 7 buildings, buildings 2-6 have passed. We had to flush and chlorinate and dechlorinate the 2 lines that failed. We will be taking a sample for buildings 1 and 7 tomorrow.Steve Robbins 08/14/2017 3:48 PM
PW-Misc
Informational
08/16/2017
The line was chlorinated and flushed so we could take samples on building 1 and 7. I am taking the samples down to the lab today.Steve Robbins 08/16/2017 12:24 PM
Water Line - Coliform Test 1 Failed 8/17/2017 at 3:36 PM 08/17/2017
PW-Misc
Informational
08/16/2017
All the 4" waterline has been flushed and we chlorinated all the lines going into the apartments. Tomorrow we will de-chlorinate and flush all lines. Steve Robbins 07/18/2017 3:48 PM
PW-Misc
Informational
08/16/2017
We are not going to dechlorinate today because we cannot get the samples to be read by friday. We will dechlorinate and take samples on monday.Steve Robbins 07/20/2017 2:13 PM
PW-Misc
Informational
08/16/2017
The lines have been flushed and dechlorinated. Tomorrow we will take the first sample for each building.Steve Robbins 07/24/2017 2:54 PM
PW-Misc
Informational
08/16/2017
Building 4 and 5 have both passed 2 days of samples. Buildings 1, 2, 3, 6, and 7 all failed. We are flushing the lines again and testing the ones that failed again.Steve Robbins 07/31/2017 3:58 PM
PW-Misc
Informational
08/16/2017
We have 7 buildings, buildings 2-6 have passed. We had to flush and chlorinate and dechlorinate the 2 lines that failed. We will be taking a sample for buildings 1 and 7 tomorrow.Steve Robbins 08/14/2017 3:48 PM
PW-Misc
Informational
08/16/2017
The line was chlorinated and flushed so we could take samples on building 1 and 7. I am taking the samples down to the lab today.Steve Robbins 08/16/2017 12:24 PM
PW-Misc
Informational
08/17/2017
The samples I took for building 1 and 7 have failed. I called the contractor and they will have to chlorinate and flush the line again. Steve Robbins 08/17/2017 3:38 PM
Water Line - Coliform Test 1 Partial 8/18/2017 at 1:00 PM 08/18/2017
PW-Misc
Informational
08/17/2017
All the 4" waterline has been flushed and we chlorinated all the lines going into the apartments. Tomorrow we will de-chlorinate and flush all lines. Steve Robbins 07/18/2017 3:48 PM
PW-Misc
Informational
08/17/2017
We are not going to dechlorinate today because we cannot get the samples to be read by friday. We will dechlorinate and take samples on monday.Steve Robbins 07/20/2017 2:13 PM
PW-Misc
Informational
08/17/2017
The lines have been flushed and dechlorinated. Tomorrow we will take the first sample for each building.Steve Robbins 07/24/2017 2:54 PM
PW-Misc
Informational
08/17/2017
Building 4 and 5 have both passed 2 days of samples. Buildings 1, 2, 3, 6, and 7 all failed. We are flushing the lines again and testing the ones that failed again.Steve Robbins 07/31/2017 3:58 PM
PW-Misc
Informational
08/17/2017
We have 7 buildings, buildings 2-6 have passed. We had to flush and chlorinate and dechlorinate the 2 lines that failed. We will be taking a sample for buildings 1 and 7 tomorrow.Steve Robbins 08/14/2017 3:48 PM
PW-Misc
Informational
08/17/2017
The line was chlorinated and flushed so we could take samples on building 1 and 7. I am taking the samples down to the lab today.Steve Robbins 08/16/2017 12:24 PM
PW-Misc
Informational
08/17/2017
The samples I took for building 1 and 7 have failed. I called the contractor and they will have to chlorinate and flush the line again. Steve Robbins 08/17/2017 3:38 PM
PW-Misc
Informational
08/18/2017
The 4" water line has been chlorinated and will sit over the weekend.
Water Line - Coliform Test 1 Partial 8/21/2017 at 2:00 PM 08/21/2017
PW-Misc
Informational
08/18/2017
All the 4" waterline has been flushed and we chlorinated all the lines going into the apartments. Tomorrow we will de-chlorinate and flush all lines. Steve Robbins 07/18/2017 3:48 PM
PW-Misc
Informational
08/21/2017
Chlorinated the water lines for building 1 and 7.
PW-Misc
Informational
08/18/2017
We are not going to dechlorinate today because we cannot get the samples to be read by friday. We will dechlorinate and take samples on monday.Steve Robbins 07/20/2017 2:13 PM
PW-Misc
Informational
08/18/2017
The lines have been flushed and dechlorinated. Tomorrow we will take the first sample for each building.Steve Robbins 07/24/2017 2:54 PM
PW-Misc
Informational
08/18/2017
Building 4 and 5 have both passed 2 days of samples. Buildings 1, 2, 3, 6, and 7 all failed. We are flushing the lines again and testing the ones that failed again.Steve Robbins 07/31/2017 3:58 PM
PW-Misc
Informational
08/18/2017
We have 7 buildings, buildings 2-6 have passed. We had to flush and chlorinate and dechlorinate the 2 lines that failed. We will be taking a sample for buildings 1 and 7 tomorrow.Steve Robbins 08/14/2017 3:48 PM
PW-Misc
Informational
08/18/2017
The line was chlorinated and flushed so we could take samples on building 1 and 7. I am taking the samples down to the lab today.Steve Robbins 08/16/2017 12:24 PM
PW-Misc
Informational
08/18/2017
The samples I took for building 1 and 7 have failed. I called the contractor and they will have to chlorinate and flush the line again. Steve Robbins 08/17/2017 3:38 PM
PW-Misc
Informational
08/18/2017
The 4" water line has been chlorinated and will sit over the weekend.
Water Line - Coliform Test 1 Partial 8/30/2017 at 11:00 AM 08/30/2017
PW-Misc
Informational
08/21/2017
Chlorinated the water lines for building 1 and 7.
PW-Misc
Informational
08/30/2017
Taking samples for bulding 1 and 7. sample 1
PW-Misc
Informational
08/21/2017
All the 4" waterline has been flushed and we chlorinated all the lines going into the apartments. Tomorrow we will de-chlorinate and flush all lines. Steve Robbins 07/18/2017 3:48 PM
PW-Misc
Informational
08/21/2017
We are not going to dechlorinate today because we cannot get the samples to be read by friday. We will dechlorinate and take samples on monday.Steve Robbins 07/20/2017 2:13 PM
PW-Misc
Informational
08/21/2017
The lines have been flushed and dechlorinated. Tomorrow we will take the first sample for each building.Steve Robbins 07/24/2017 2:54 PM
PW-Misc
Informational
08/21/2017
Building 4 and 5 have both passed 2 days of samples. Buildings 1, 2, 3, 6, and 7 all failed. We are flushing the lines again and testing the ones that failed again.Steve Robbins 07/31/2017 3:58 PM
PW-Misc
Informational
08/21/2017
We have 7 buildings, buildings 2-6 have passed. We had to flush and chlorinate and dechlorinate the 2 lines that failed. We will be taking a sample for buildings 1 and 7 tomorrow.Steve Robbins 08/14/2017 3:48 PM
PW-Misc
Informational
08/21/2017
The line was chlorinated and flushed so we could take samples on building 1 and 7. I am taking the samples down to the lab today.Steve Robbins 08/16/2017 12:24 PM
PW-Misc
Informational
08/21/2017
The samples I took for building 1 and 7 have failed. I called the contractor and they will have to chlorinate and flush the line again. Steve Robbins 08/17/2017 3:38 PM
PW-Misc
Informational
08/21/2017
The 4" water line has been chlorinated and will sit over the weekend.
Water Line - Coliform Test 1 Partial 8/31/2017 at 1:30 PM 08/31/2017
PW-Misc
Informational
08/30/2017
Taking samples for bulding 1 and 7. sample 1
PW-Misc
Informational
08/30/2017
Chlorinated the water lines for building 1 and 7.
PW-Misc
Informational
08/30/2017
All the 4" waterline has been flushed and we chlorinated all the lines going into the apartments. Tomorrow we will de-chlorinate and flush all lines. Steve Robbins 07/18/2017 3:48 PM
PW-Misc
Informational
08/30/2017
We are not going to dechlorinate today because we cannot get the samples to be read by friday. We will dechlorinate and take samples on monday.Steve Robbins 07/20/2017 2:13 PM
PW-Misc
Informational
08/30/2017
The lines have been flushed and dechlorinated. Tomorrow we will take the first sample for each building.Steve Robbins 07/24/2017 2:54 PM
PW-Misc
Informational
08/30/2017
Building 4 and 5 have both passed 2 days of samples. Buildings 1, 2, 3, 6, and 7 all failed. We are flushing the lines again and testing the ones that failed again.Steve Robbins 07/31/2017 3:58 PM
PW-Misc
Informational
08/30/2017
We have 7 buildings, buildings 2-6 have passed. We had to flush and chlorinate and dechlorinate the 2 lines that failed. We will be taking a sample for buildings 1 and 7 tomorrow.Steve Robbins 08/14/2017 3:48 PM
PW-Misc
Informational
08/30/2017
The line was chlorinated and flushed so we could take samples on building 1 and 7. I am taking the samples down to the lab today.Steve Robbins 08/16/2017 12:24 PM
PW-Misc
Informational
08/30/2017
The samples I took for building 1 and 7 have failed. I called the contractor and they will have to chlorinate and flush the line again. Steve Robbins 08/17/2017 3:38 PM
PW-Misc
Informational
08/30/2017
The 4" water line has been chlorinated and will sit over the weekend.
PW-Misc
Informational
08/31/2017
The samples for building 1 and 7 have passed for the first day. This afternoon I took the second set of samples to the lab.
Erosion Control Inspection Passed 9/5/2017 at 3:00 PM 09/05/2017
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
Water Line - Coliform Test 1 Passed 9/5/2017 at 11:00 AM 09/05/2017
PW-Misc
Informational
08/31/2017
Taking samples for bulding 1 and 7. sample 1
PW-Misc
Informational
08/31/2017
Chlorinated the water lines for building 1 and 7.
PW-Misc
Informational
08/31/2017
All the 4" waterline has been flushed and we chlorinated all the lines going into the apartments. Tomorrow we will de-chlorinate and flush all lines. Steve Robbins 07/18/2017 3:48 PM
PW-Misc
Informational
08/31/2017
We are not going to dechlorinate today because we cannot get the samples to be read by friday. We will dechlorinate and take samples on monday.Steve Robbins 07/20/2017 2:13 PM
PW-Misc
Informational
08/31/2017
The lines have been flushed and dechlorinated. Tomorrow we will take the first sample for each building.Steve Robbins 07/24/2017 2:54 PM
PW-Misc
Informational
08/31/2017
Building 4 and 5 have both passed 2 days of samples. Buildings 1, 2, 3, 6, and 7 all failed. We are flushing the lines again and testing the ones that failed again.Steve Robbins 07/31/2017 3:58 PM
PW-Misc
Informational
08/31/2017
We have 7 buildings, buildings 2-6 have passed. We had to flush and chlorinate and dechlorinate the 2 lines that failed. We will be taking a sample for buildings 1 and 7 tomorrow.Steve Robbins 08/14/2017 3:48 PM
PW-Misc
Informational
08/31/2017
The line was chlorinated and flushed so we could take samples on building 1 and 7. I am taking the samples down to the lab today.Steve Robbins 08/16/2017 12:24 PM
PW-Misc
Informational
08/31/2017
The samples I took for building 1 and 7 have failed. I called the contractor and they will have to chlorinate and flush the line again. Steve Robbins 08/17/2017 3:38 PM
PW-Misc
Informational
08/31/2017
The 4" water line has been chlorinated and will sit over the weekend.
PW-Misc
Informational
08/31/2017
The samples for building 1 and 7 have passed for the first day. This afternoon I took the second set of samples to the lab.
PW-Misc
Resolved
09/05/2017
The water samples for building 1 and 7 have passed the bac-t test. All buildings 1-7 have passed the bac-t tests.
Erosion Control Inspection Partial 9/20/2017 at 1:30 PM 09/20/2017
PW-Misc
Informational
08/07/2017
This job site has mulch berms all around the outside of the site. After the rain on saturday the berm is still in place, there are 2 areas that got washed out, the location is on the east side of the property behing the garages. I will talk with Jonothan Meyers today.Steve Robbins 08/07/2017 8:44 AM
PW-Misc
Informational
09/20/2017
The erosion control is still in good condition after the rains for the week.Steve Robbins 09/20/2017 2:03 PM
Erosion Control Inspection Partial 10/11/2017 at 11:00 AM 10/11/2017
PW-Misc
Informational
10/11/2017
The erosion control is in good condition and has no problems at this time.
Miscellaneous PWORKS Inspection Partial 10/18/2017 at 7:15 AM 10/18/2017
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
09/05/2017
The berms have been fixed and are in place.
PW-Misc
Informational
10/18/2017
The contractors are working on cleaning up and getting the vegetation established for the clubhouse.Steve Robbins 10/18/2017 7:30 AM
Erosion Control Inspection Partial 11/6/2017 at 7:00 AM 11/06/2017
PW-Misc
Informational
10/11/2017
The erosion control is in good condition and has no problems at this time.
PW-Misc
Informational
11/06/2017
The erosion control is in place. There are no issues at this time.
Miscellaneous PWORKS Inspection Passed 10/31/2017 11/06/2017
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Devices for Erosion and Sediment Control
Informational
10/18/2017
The berms have been fixed and are in place.
PW-Misc
Informational
10/18/2017
The contractors are working on cleaning up and getting the vegetation established for the clubhouse.Steve Robbins 10/18/2017 7:30 AM
Erosion Control Inspection Partial 12/22/2017 at 9:00 AM 12/27/2017
PW-Misc
Informational
11/06/2017
The erosion control is in good condition and has no problems at this time.
PW-Misc
Informational
11/06/2017
The erosion control is in place. There are no issues at this time.
PW-Misc
Informational
12/27/2017
The erosion control is in place.Steve Robbins 12/27/2017 1:32 PM
Erosion Control Inspection Partial 1/19/2018 at 9:00 AM 01/19/2018
PW-Misc
Informational
12/27/2017
The erosion control is in good condition and has no problems at this time.
PW-Misc
Informational
12/27/2017
The erosion control is in place. There are no issues at this time.
PW-Misc
Informational
12/27/2017
The erosion control is in place.Steve Robbins 12/27/2017 1:32 PM
PW-Misc
Informational
01/19/2018
The erosion control behind the buildings is in place and seems to be working. Steve Robbins 01/19/2018 2:18 PM
Erosion Control Inspection Partial 2/1/2018 at 1:15 PM 02/01/2018
PW-Misc
Informational
01/19/2018
The erosion control is in good condition and has no problems at this time.
PW-Misc
Informational
01/19/2018
The erosion control is in place. There are no issues at this time.
PW-Misc
Informational
01/19/2018
The erosion control is in place.Steve Robbins 12/27/2017 1:32 PM
PW-Misc
Informational
01/19/2018
The erosion control behind the buildings is in place and seems to be working. Steve Robbins 01/19/2018 2:18 PM
PW-Misc
Informational
02/01/2018
The erosion control is in place , they are using mulch berms instead of silt fence. Everything looks good.Steve Robbins 02/01/2018 1:45 PM
Erosion Control Inspection Failed 2/20/2018 at 10:45 AM 02/20/2018
PW-Misc
Informational
02/01/2018
The erosion control is in good condition and has no problems at this time.
PW-Misc
Informational
02/01/2018
The erosion control is in place. There are no issues at this time.
PW-Misc
Informational
02/01/2018
The erosion control is in place.Steve Robbins 12/27/2017 1:32 PM
PW-Misc
Informational
02/01/2018
The erosion control behind the buildings is in place and seems to be working. Steve Robbins 01/19/2018 2:18 PM
PW-Misc
Informational
02/01/2018
The erosion control is in place , they are using mulch berms instead of silt fence. Everything looks good.Steve Robbins 02/01/2018 1:45 PM
PW-Misc
Corrective Action Required
02/20/2018
There is some run-off by building 6 , I talked with Jonathon Myers and they will get some silt fence up as soon as the weather lets up in the next day or so.Steve Robbins 02/20/2018 11:04 AM
Erosion Control Inspection Failed 2/27/2018 at 9:15 AM 02/27/2018
PW-Misc
Informational
02/20/2018
The erosion control is in good condition and has no problems at this time.
PW-Misc
Informational
02/20/2018
The erosion control is in place. There are no issues at this time.
PW-Misc
Informational
02/20/2018
The erosion control is in place.Steve Robbins 12/27/2017 1:32 PM
PW-Misc
Informational
02/20/2018
The erosion control behind the buildings is in place and seems to be working. Steve Robbins 01/19/2018 2:18 PM
PW-Misc
Informational
02/20/2018
The erosion control is in place , they are using mulch berms instead of silt fence. Everything looks good.Steve Robbins 02/01/2018 1:45 PM
PW-Misc
Corrective Action Required
02/20/2018
There is some run-off by building 6 , I talked with Jonathon Myers and they will get some silt fence up as soon as the weather lets up in the next day or so.Steve Robbins 02/20/2018 11:04 AM
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/27/2018
There are problems with the erosion control devices on your site. They did not get the silt fence up, I asked the on- site contractor to take care of it and the mud in the parking lot. He said he would today.Steve Robbins 02/27/2018 4:10 PM
Erosion Control Inspection Failed 2/28/2018 at 11:00 AM 02/28/2018
PW-Misc
Informational
02/27/2018
The erosion control is in good condition and has no problems at this time.
PW-Misc
Informational
02/27/2018
The erosion control is in place. There are no issues at this time.
PW-Misc
Informational
02/27/2018
The erosion control is in place.Steve Robbins 12/27/2017 1:32 PM
PW-Misc
Informational
02/27/2018
The erosion control behind the buildings is in place and seems to be working. Steve Robbins 01/19/2018 2:18 PM
PW-Misc
Informational
02/27/2018
The erosion control is in place , they are using mulch berms instead of silt fence. Everything looks good.Steve Robbins 02/01/2018 1:45 PM
PW-Misc
Corrective Action Required
02/27/2018
There is some run-off by building 6 , I talked with Jonathon Myers and they will get some silt fence up as soon as the weather lets up in the next day or so.Steve Robbins 02/20/2018 11:04 AM
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/27/2018
There are problems with the erosion control devices on your site. They did not get the silt fence up, I asked the on- site contractor to take care of it and the mud in the parking lot. He said he would today.Steve Robbins 02/27/2018 4:10 PM
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/28/2018
John Borns said he is not doing an inspection until the silt fence is up. I called Jonathon Meyers and he said he would get in up today.Steve Robbins 02/28/2018 2:19 PM
Erosion Control Inspection Passed 3/5/2018 at 8:00 AM 03/05/2018
PW-Misc
Informational
02/28/2018
The erosion control is in good condition and has no problems at this time.
PW-Misc
Informational
02/28/2018
The erosion control is in place. There are no issues at this time.
PW-Misc
Informational
02/28/2018
The erosion control is in place.Steve Robbins 12/27/2017 1:32 PM
PW-Misc
Informational
02/28/2018
The erosion control behind the buildings is in place and seems to be working. Steve Robbins 01/19/2018 2:18 PM
PW-Misc
Informational
02/28/2018
The erosion control is in place , they are using mulch berms instead of silt fence. Everything looks good.Steve Robbins 02/01/2018 1:45 PM
PW-Misc
Corrective Action Required
02/28/2018
There is some run-off by building 6 , I talked with Jonathon Myers and they will get some silt fence up as soon as the weather lets up in the next day or so.Steve Robbins 02/20/2018 11:04 AM
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/28/2018
There are problems with the erosion control devices on your site. They did not get the silt fence up, I asked the on- site contractor to take care of it and the mud in the parking lot. He said he would today.Steve Robbins 02/27/2018 4:10 PM
PW-Devices for Erosion and Sediment Control
Corrective Action Required
02/28/2018
John Borns said he is not doing an inspection until the silt fence is up. I called Jonathon Meyers and he said he would get in up today.Steve Robbins 02/28/2018 2:19 PM
PW-Misc
Resolved
03/05/2018
The silt fence has been installed in the ares's that were needed.Steve Robbins 03/05/2018 2:37 PM
Erosion Control Inspection Failed 3/26/2018 03/26/2018
PW-Devices for Erosion and Sediment Control
Informational
03/26/2018
There are problems with the erosion control devices on your site. I talked with Jonathan from Emery Sapp about the run-off coming down the north side to the parking lot. They installed alot of silt fence to try and correct this, but it did not work. Jonathan said they are going to move some dirt around and try to change the grade to try and divert the water run-off.Steve Robbins 03/26/2018 2:28 PM
Erosion Control Inspection Partial 3/30/2018 at 11:00 AM 03/30/2018
PW-Devices for Erosion and Sediment Control
Informational
03/26/2018
There are problems with the erosion control devices on your site. I talked with Jonathan from Emery Sapp about the run-off coming down the north side to the parking lot. They installed alot of silt fence to try and correct this, but it did not work. Jonathan said they are going to move some dirt around and try to change the grade to try and divert the water run-off.Steve Robbins 03/26/2018 2:28 PM
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/30/2018
There are problems with the erosion control devices on your site. I spoke with Jonathan Meyers and he was going out to the site yesterday to take a look at what needs to be done.Steve Robbins 03/30/2018 3:44 PM
Erosion Control Inspection Partial 4/13/2018 at 10:45 AM 04/13/2018
PW-Devices for Erosion and Sediment Control
Informational
03/30/2018
There are problems with the erosion control devices on your site. I talked with Jonathan from Emery Sapp about the run-off coming down the north side to the parking lot. They installed alot of silt fence to try and correct this, but it did not work. Jonathan said they are going to move some dirt around and try to change the grade to try and divert the water run-off.Steve Robbins 03/26/2018 2:28 PM
PW-Devices for Erosion and Sediment Control
Corrective Action Required
03/30/2018
There are problems with the erosion control devices on your site. I spoke with Jonathan Meyers and he was going out to the site yesterday to take a look at what needs to be done.Steve Robbins 03/30/2018 3:44 PM
PW-Misc
Partial Correction
04/13/2018
I talked with Emery Sapp about some silt fence, they put some up a few weeks ago and it didn't fix all the problems. They added some more silt fence so we will see how this works on the next rain. I have also talked with Neighbors Construction about getting the parking lots cleaned up.Steve Robbins 04/13/2018 11:12 AM
Erosion Control Inspection Partial 5/31/2018 at 11:15 AM 05/31/2018
PW-Devices for Erosion and Sediment Control
Informational
04/13/2018
There are problems with the erosion control devices on your site. I talked with Jonathan from Emery Sapp about the run-off coming down the north side to the parking lot. They installed alot of silt fence to try and correct this, but it did not work. Jonathan said they are going to move some dirt around and try to change the grade to try and divert the water run-off.Steve Robbins 03/26/2018 2:28 PM
PW-Devices for Erosion and Sediment Control
Corrective Action Required
04/13/2018
There are problems with the erosion control devices on your site. I spoke with Jonathan Meyers and he was going out to the site yesterday to take a look at what needs to be done.Steve Robbins 03/30/2018 3:44 PM
PW-Misc
Partial Correction
04/13/2018
I talked with Emery Sapp about some silt fence, they put some up a few weeks ago and it didn't fix all the problems. They added some more silt fence so we will see how this works on the next rain. I have also talked with Neighbors Construction about getting the parking lots cleaned up.Steve Robbins 04/13/2018 11:12 AM
PW-Misc
Partial Correction
05/31/2018
Emery Sapp is on-site to cleaning up some mud and sand that is in the parking lot and also cleaning up the storm boxes in the parking lot.Steve Robbins 05/31/2018 2:17 PM
Erosion Control Inspection Partial 7/11/2018 at 10:30 AM 07/13/2018
PW-Devices for Erosion and Sediment Control
Informational
05/31/2018
There are problems with the erosion control devices on your site. I talked with Jonathan from Emery Sapp about the run-off coming down the north side to the parking lot. They installed alot of silt fence to try and correct this, but it did not work. Jonathan said they are going to move some dirt around and try to change the grade to try and divert the water run-off.Steve Robbins 03/26/2018 2:28 PM
PW-Devices for Erosion and Sediment Control
Corrective Action Required
05/31/2018
There are problems with the erosion control devices on your site. I spoke with Jonathan Meyers and he was going out to the site yesterday to take a look at what needs to be done.Steve Robbins 03/30/2018 3:44 PM
PW-Misc
Partial Correction
05/31/2018
I talked with Emery Sapp about some silt fence, they put some up a few weeks ago and it didn't fix all the problems. They added some more silt fence so we will see how this works on the next rain. I have also talked with Neighbors Construction about getting the parking lots cleaned up.Steve Robbins 04/13/2018 11:12 AM
PW-Misc
Partial Correction
05/31/2018
Emery Sapp is on-site to cleaning up some mud and sand that is in the parking lot and also cleaning up the storm boxes in the parking lot.Steve Robbins 05/31/2018 2:17 PM
PW-Erosion and Sediment Control
Informational
07/13/2018
They have done some more grading and have cleaned up the mudd by the storm box. They still have some more cleaning up to do in the parking lot and on the side of the hill.Steve Robbins 07/13/2018 3:44 PM
Erosion Control Inspection Partial 8/24/2018 at 8:30 AM 08/24/2018
PW-Devices for Erosion and Sediment Control
Informational
07/13/2018
There are problems with the erosion control devices on your site. I talked with Jonathan from Emery Sapp about the run-off coming down the north side to the parking lot. They installed alot of silt fence to try and correct this, but it did not work. Jonathan said they are going to move some dirt around and try to change the grade to try and divert the water run-off.Steve Robbins 03/26/2018 2:28 PM
PW-Devices for Erosion and Sediment Control
Corrective Action Required
07/13/2018
There are problems with the erosion control devices on your site. I spoke with Jonathan Meyers and he was going out to the site yesterday to take a look at what needs to be done.Steve Robbins 03/30/2018 3:44 PM
PW-Misc
Partial Correction
07/13/2018
I talked with Emery Sapp about some silt fence, they put some up a few weeks ago and it didn't fix all the problems. They added some more silt fence so we will see how this works on the next rain. I have also talked with Neighbors Construction about getting the parking lots cleaned up.Steve Robbins 04/13/2018 11:12 AM
PW-Misc
Partial Correction
07/13/2018
Emery Sapp is on-site to cleaning up some mud and sand that is in the parking lot and also cleaning up the storm boxes in the parking lot.Steve Robbins 05/31/2018 2:17 PM
PW-Erosion and Sediment Control
Informational
07/13/2018
They have done some more grading and have cleaned up the mudd by the storm box. They still have some more cleaning up to do in the parking lot and on the side of the hill.Steve Robbins 07/13/2018 3:44 PM
PW-Misc
Informational
08/24/2018
The contractors have appeared to have corrected the silt fence problem. We had alot of rain the last few days and everything seem to be good.Steve Robbins 08/24/2018 2:08 PM
ESC - (Vegetation/Ground Cover) Passed 9/20/2018 at 8:00 AM 09/20/2018
PW-Misc
Informational
09/20/2018
The vegetation for this site has been established. After each building was completed sod was installed at each building. On the back side/east of the apartments the vegetation has been established. Right now the work trailors are sitting on the property where the next phase is ready to begin in a few weeks. I am not going to make them dig this up and plant seed here when a parking lot will be going in its place.The vegetation has been established.Steve Robbins 09/20/2018 11:52 AM
Erosion Control Inspection Partial 9/21/2018 at 9:00 AM 09/25/2018
PW-Devices for Erosion and Sediment Control
Informational
08/24/2018
There are problems with the erosion control devices on your site. I talked with Jonathan from Emery Sapp about the run-off coming down the north side to the parking lot. They installed alot of silt fence to try and correct this, but it did not work. Jonathan said they are going to move some dirt around and try to change the grade to try and divert the water run-off.Steve Robbins 03/26/2018 2:28 PM
PW-Devices for Erosion and Sediment Control
Corrective Action Required
08/24/2018
There are problems with the erosion control devices on your site. I spoke with Jonathan Meyers and he was going out to the site yesterday to take a look at what needs to be done.Steve Robbins 03/30/2018 3:44 PM
PW-Misc
Partial Correction
08/24/2018
I talked with Emery Sapp about some silt fence, they put some up a few weeks ago and it didn't fix all the problems. They added some more silt fence so we will see how this works on the next rain. I have also talked with Neighbors Construction about getting the parking lots cleaned up.Steve Robbins 04/13/2018 11:12 AM
PW-Misc
Partial Correction
08/24/2018
Emery Sapp is on-site to cleaning up some mud and sand that is in the parking lot and also cleaning up the storm boxes in the parking lot.Steve Robbins 05/31/2018 2:17 PM
PW-Erosion and Sediment Control
Informational
08/24/2018
They have done some more grading and have cleaned up the mudd by the storm box. They still have some more cleaning up to do in the parking lot and on the side of the hill.Steve Robbins 07/13/2018 3:44 PM
PW-Misc
Informational
08/24/2018
The contractors have appeared to have corrected the silt fence problem. We had alot of rain the last few days and everything seem to be good.Steve Robbins 08/24/2018 2:08 PM
PW-Misc
Informational
09/25/2018
The erosion control is in place in between where the new phase is going to start, all other erosion control has been removed because it has been sodded or has seed that has been established.Steve Robbins 09/25/2018 7:10 AM
Miscellaneous PWORKS Inspection Passed 10/17/2018 10/17/2018
PW-Misc
Informational
10/17/2018
The punch list that was given for substantial completion has been finished. There is an agreement for vegetation to be established on the off-site when the first round of garages are installed on the next phase. Steve Robbins 10/17/2018 3:03 PM
Documents & Images
Date Uploaded File Type Document Name
10/10/2016 Receipt Receipt for transaction: 2016-006305
11/15/2016 Letter PW-Permit
11/15/2016 Letter PW-Permit
04/20/2017 Letter PW-Daily Inspection Summary
04/20/2017 Letter PW-Daily Inspection Summary
04/28/2017 Letter PW-Daily Inspection Summary
04/28/2017 Letter PW-Daily Inspection Summary
05/08/2017 Letter PW-Daily Inspection Summary
05/08/2017 Letter PW-Daily Inspection Summary
05/11/2017 Letter PW-Daily Inspection Summary
05/11/2017 Letter PW-Daily Inspection Summary
05/11/2017 Letter PW-Daily Inspection Summary
05/11/2017 Letter PW-Daily Inspection Summary
05/12/2017 Letter PW-Daily Inspection Summary
05/12/2017 Letter PW-Daily Inspection Summary
05/15/2017 Letter PW-Daily Inspection Summary
05/17/2017 Letter PW-Daily Inspection Summary
05/18/2017 Letter PW-Daily Inspection Summary
05/23/2017 Letter PW-Daily Inspection Summary
05/24/2017 Letter PW-Daily Inspection Summary
05/24/2017 Letter PW-Daily Inspection Summary
05/26/2017 Letter PW-Daily Inspection Summary
06/02/2017 Letter PW-Daily Inspection Summary
06/02/2017 Letter PW-Daily Inspection Summary
06/07/2017 Letter PW-Daily Inspection Summary
06/14/2017 Letter PW-Daily Inspection Summary
06/19/2017 Letter PW-Daily Inspection Summary
06/19/2017 Letter PW-Daily Inspection Summary
06/22/2017 Letter PW-Daily Inspection Summary
06/27/2017 Letter PW-Daily Inspection Summary
06/28/2017 Letter PW-Daily Inspection Summary
07/07/2017 Letter PW-Daily Inspection Summary
07/18/2017 Letter PW-Daily Inspection Summary
07/20/2017 Letter PW-Daily Inspection Summary
07/24/2017 Letter PW-Daily Inspection Summary
07/31/2017 Letter PW-Daily Inspection Summary
08/07/2017 Letter PW-Daily Inspection Summary
08/14/2017 Letter PW-Daily Inspection Summary
08/16/2017 Letter PW-Daily Inspection Summary
08/17/2017 Letter PW-Daily Inspection Summary
08/18/2017 Letter PW-Daily Inspection Summary
08/21/2017 Letter PW-Daily Inspection Summary
08/30/2017 Letter DE-Daily Inspection Summary
08/31/2017 Letter DE-Daily Inspection Summary
09/05/2017 Letter DE-Daily Inspection Summary
09/05/2017 Letter DE-Daily Inspection Summary
09/20/2017 Letter DE-Daily Inspection Summary
10/10/2017 DOC101017-10102017154826
10/11/2017 Letter DE-Daily Inspection Summary
10/18/2017 Letter DE-Daily Inspection Summary
10/18/2017 Letter DE-Certificate of Substantial Completion Single Lot
10/18/2017 Letter DE-Punch List
10/19/2017 DOC101917-10192017074428
11/06/2017 Letter DE-Daily Inspection Summary
12/13/2017 Letter DE-Certificate of Substantial Completion Single Lot
12/27/2017 Letter DE-Daily Inspection Summary
01/19/2018 Letter DE-Daily Inspection Summary
02/01/2018 Letter DE-Daily Inspection Summary
02/12/2018 Letter DE-Certificate of Substantial Completion Single Lot
02/20/2018 Letter DE-Daily Inspection Summary
02/27/2018 Letter DE-Daily Inspection Summary
02/28/2018 Letter DE-Daily Inspection Summary
03/05/2018 Letter DE-Daily Inspection Summary
03/26/2018 Letter DE-Daily Inspection Summary
03/30/2018 Letter DE-Daily Inspection Summary
04/13/2018 Letter DE-Daily Inspection Summary
05/31/2018 Letter DE-Daily Inspection Summary
05/31/2018 Letter DE-Daily Inspection Summary
05/31/2018 Letter DE-Daily Inspection Summary
05/31/2018 Letter DE-Certificate of Substantial Completion Single Lot
07/13/2018 Letter DE-Daily Inspection Summary
08/24/2018 Letter DE-Daily Inspection Summary
09/20/2018 Letter DE-Daily Inspection Summary
09/21/2018 Letter DE-Punch List
09/21/2018 Letter DE-Certificate of Substantial Completion Single Lot
09/25/2018 Letter DE-Daily Inspection Summary
09/25/2018 Summit Square Apartments Substantial and Punch List
10/12/2018 Summit Square Apartments Substantial and Punch List
10/17/2018 Letter DE-Daily Inspection Summary
10/17/2018 Letter DE-Certificate of Final Acceptance (Commercial)
10/17/2018 Vegetation Requirements For Summit Square Apartments
10/17/2018 Summit Square Apartments Final Acceptance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home