Permit Application Status

PRCOMCOM20251638


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOMCOM20251638
Building Permit - Commercial
Issued
MIDWEST DIVISION LSH LLC
ADDITION COMMERCIAL
LEE'S SUMMIT MEDICAL CENTER - ADDITION AND INTERIOR ALTERATIONS TO EXPAND ED DEPARTMENT
04/22/2025
08/19/2025
01/10/2026
Locations
Contacts
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
BRADY MYERS, Address:JE DUNN, Phone:(816) 292-8619  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
STACO ELECTRIC CONSTRUCTION COMPANY INC, Address:11030 HICKMAN MILLS DR, Phone:(816) 765-7112  
RAND CONSTRUCTION COMPANY, Address:1428 W 9TH ST, Phone:(816) 421-4143  
Devenney Group, Address:6900 East Camelback Road, Phone:(602) 943-8950  
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 01/08/2026 01/08/2026
Craig Hill
Sprinkler Plan Review Released for Construction 11/27/2025 11/25/2025
Craig Hill
Fire Plan Review Approved with Conditions 11/25/2025 11/21/2025
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
11/18/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
11/18/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Building Plan Review Approved with Conditions 11/25/2025 11/21/2025
Joe Frogge
License Tax - Payment
Corrective Action Required
11/18/2025

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $6,913.50 (Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process). 7/13/2025 - Not addressed.
Fire Plan Review Approved with Conditions 08/15/2025 08/14/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
08/08/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
08/08/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Building Plan Review Approved with Conditions 08/15/2025 08/12/2025
Joe Frogge
License Tax - Payment
Corrective Action Required
08/08/2025

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $6,913.50 (Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process). 7/13/2025 - Not addressed.
IBC 1704.2 Special Inspections
Resolved
08/12/2025

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. Note: Receipt of final, approved inspection report must be received prior to occupancy. 7/13/2025 - Not addressed. 8/12/2025 - footprint too small to require tracking
Misc
Resolved
08/12/2025

Incorrect structural calculations uploaded into portal. (Denver, CO) Action required: Upload correct report. (Note: We are currently enforcing 2018 IBC.) 7/13/2025 - Not addressed.
Misc
Resolved
08/12/2025

Inadequate information to complete review. Actions required: - Provide complete details for fire rated walls that include UL#, type, rating, and nail/screw patterns 7/13/2025 - Not addressed. -
Licensed Contractors Approved 08/15/2025 08/12/2025
Joe Frogge
Licensed Contractors Approved 07/11/2025 08/01/2025
Joe Frogge
LC - General Contractor
Resolved
08/01/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide the name, email address & phone number for the on-site contact. 7/13/2025 - Not addressed.
LC - MEP Subs
Resolved
08/01/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 7/13/2025 - Not addressed.
Fire Plan Review Approved with Conditions 07/11/2025 07/14/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
07/14/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
07/14/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Building Plan Review Rejected 07/11/2025 07/13/2025
Joe Frogge
License Tax - Payment
Corrective Action Required
07/03/2025

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $6,913.50 (Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process). 7/13/2025 - Not addressed.
IBC 1704.2 Special Inspections
Corrective Action Required
07/03/2025

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. Note: Receipt of final, approved inspection report must be received prior to occupancy. 7/13/2025 - Not addressed.
Misc
Corrective Action Required
07/03/2025

Incorrect structural calculations uploaded into portal. (Denver, CO) Action required: Upload correct report. (Note: We are currently enforcing 2018 IBC.) 7/13/2025 - Not addressed.
IBC 602.1 Type of Construction - general
Resolved
07/13/2025

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Amend Project Data on sheet GI101 to show correct type of construction which is 1B.
Misc
Corrective Action Required
07/03/2025

Inadequate information to complete review. Actions required: - Provide complete details for fire rated walls that include UL#, type, rating, and nail/screw patterns 7/13/2025 - Not addressed. -
IBC 1103.2 General exceptions - accessibility
Resolved
07/13/2025

2018 IBC 1103.2 General exceptions. Sites, buildings, structures, facilities, elements and spaces shall be exempt from this chapter to the extent specified in this section. 2018 IBC 1103.2.1 Specific requirements. Accessibility is not required in buildings and facilities, or portions thereof, to the extent permitted by Sections 1104 through 1111. 2018 IBC 1103.2.2 Employee work areas. Spaces and elements within employee work areas shall only be required to comply with Sections 907.5.2.3.1, 1009 and 1104.3.1 and shall be designed and constructed so that individual with disabilities can approach, enter and exit the work area. Work areas, or portions of work areas, other than raised courtroom stations in accordance with Section 1108.4.1.4, that are less than 300 square feet in area and located 7 inches or more above or below the ground or finished floor where the change in elevation is essential to the function of the space shall be exempt from all requirements. (see code for additional exemptions) Action required: Provide enough room in nurse work HSK 1-1453 for an employee to approach, enter, and exit.
Final Development Plan Review Approved 05/15/2025 05/15/2025
Daniel Fernandez
Fire Plan Review Approved 05/06/2025 05/05/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
05/05/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
05/05/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Building Plan Review Rejected 05/06/2025 05/02/2025
Joe Frogge
License Tax - Payment
Corrective Action Required
05/01/2025

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $6,913.50 (Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process).
IBC 1704.2 Special Inspections
Corrective Action Required
05/01/2025

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. Note: Receipt of final, approved inspection report must be received prior to occupancy.
Misc
Corrective Action Required
05/01/2025

Incorrect structural calculations uploaded into portal. (Denver, CO) Action required: Upload correct report. (Note: We are currently enforcing 2018 IBC.)
IBC 602.1 Type of Construction - general
Corrective Action Required
05/01/2025

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Amend Project Data on sheet GI101 to show correct type of construction which is 1B.
Misc
Corrective Action Required
05/01/2025

Inadequate information to complete review. Actions required: - Provide complete details for fire rated walls that include UL#, type, rating, and nail/screw patterns - Provide plumbing pipe material schedule.
IBC 1103.2 General exceptions - accessibility
Corrective Action Required
05/02/2025

2018 IBC 1103.2 General exceptions. Sites, buildings, structures, facilities, elements and spaces shall be exempt from this chapter to the extent specified in this section. 2018 IBC 1103.2.1 Specific requirements. Accessibility is not required in buildings and facilities, or portions thereof, to the extent permitted by Sections 1104 through 1111. 2018 IBC 1103.2.2 Employee work areas. Spaces and elements within employee work areas shall only be required to comply with Sections 907.5.2.3.1, 1009 and 1104.3.1 and shall be designed and constructed so that individual with disabilities can approach, enter and exit the work area. Work areas, or portions of work areas, other than raised courtroom stations in accordance with Section 1108.4.1.4, that are less than 300 square feet in area and located 7 inches or more above or below the ground or finished floor where the change in elevation is essential to the function of the space shall be exempt from all requirements. (see code for additional exemptions) Action required: Provide enough room in nurse work HSK 1-1453 for an employee to approach, enter, and exit.
Licensed Contractors Rejected 05/06/2025 05/01/2025
Joe Frogge
LC - General Contractor
Corrective Action Required
05/01/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
05/01/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Special Inspections Review Pending
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Storm Sewer Inspection Fee $60.00 $60.00 Paid 08/18/2025
Paved Surface Inspection Fee $1,791.83 $1,791.83 Paid 08/18/2025
Site Grading Fee $171.00 $171.00 Paid 08/18/2025
Parks Impact Fee Non-Residential - Zone 2 $589.00 $589.00 Paid 08/18/2025
Valuation Fee for Addition to Commercial $28,700.00 $28,700.00 Paid 08/18/2025
Commercial Excise Tax Fee $1,600.50 $1,600.50 Paid 08/18/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Pending
Water Service Inspection Pending
Electrical Service Inspection Pending
Gas Service Inspection - Commercial Pending
In-wall Inspection Pending
Above Ceiling Inspection Pending
Curb - Proof Roll Pending
Pavement-Proof Roll Pending
Sprinkler - Hydrostatic Test Pending
Sprinkler - Flow Test Pending
Underslab Plumbing Inspection - Commercial Pending
Misc
Corrective Action Required
12/16/2025
Stub from exsisting building into future space.
Sprinkler - Hydrostatic Test Pending
Footing Inspection - Commercial Pending
Misc
Informational
01/13/2026
The following areas inspected and marked on plans in trailer -k.4-L.2
Misc
Corrective Action Required
01/13/2026
2 W most piers against building for canopy 6 #7 bars EW 12” OC 24” off top of grade 5’x5’x6’ Provide engineer letters
Site Visit Pending
Misc
Corrective Action Required
01/22/2026
11/7/25 Tyler S. Talked to Don and they are patching some asphalt where the temporary water line is for the kitchen was dug. Next week they will mill it out wider and role it and recap. Wants to use concrete this time. Calling an early friday. 11/12/25 Tyler S. Working on excavating out the pit for the grease trap. 12/03/25 Tyler S. No work due to snow for the past few days. They do have a fire inspection today. other than that, no work. 1/5/26 Tyler S. More building work. Installing insulation 1/22/26 Tyler S Work on the building.
Water Service Inspection Partial 10/24/2025 10/24/2025 10/24/2025
Misc
Corrective Action Required
10/24/2025
10/24/25 Tyler S. This inspection is for the temporary water service the temporary kitchen. Temporary water line for kitchen and water fire line was installed too shallow at 30".
Site Visit Partial 11/7/2025 11/7/2025 11/07/2025
Misc
Corrective Action Required
11/07/2025
11/7/25 Tyler S. Talked to Don and they are patching some asphalt where the temporary water line is for the kitchen was dug. Next week they will mill it out wider and role it and recap. Wants to use concrete this time. Calling an early friday.
Site Visit Partial 11/12/2025 11/12/2025 11/12/2025
Misc
Corrective Action Required
11/07/2025
11/7/25 Tyler S. Talked to Don and they are patching some asphalt where the temporary water line is for the kitchen was dug. Next week they will mill it out wider and role it and recap. Wants to use concrete this time. Calling an early friday. 11/12/25 Tyler S. Working on excavating out the pit for the grease trap.
Erosion Control Inspection Passed 11/21/2025 11/21/2025 11/21/2025
Misc
Corrective Action Required
11/21/2025
11/21/25 Tyler S. Erosion control is in compliance with city standards.
Site Visit Partial 12/3/2025 12/3/2025 12/03/2025
Misc
Corrective Action Required
11/12/2025
11/7/25 Tyler S. Talked to Don and they are patching some asphalt where the temporary water line is for the kitchen was dug. Next week they will mill it out wider and role it and recap. Wants to use concrete this time. Calling an early friday. 11/12/25 Tyler S. Working on excavating out the pit for the grease trap. 12/03/25 Tyler S. No work due to snow for the past few days. They do have a fire inspection today. other than that, no work.
Underslab Plumbing Inspection - Commercial Failed 12/12/2025 12/12/2025 12/12/2025
Misc
Corrective Action Required
12/12/2025
Pluming must be pressurized for inspection
Underslab Plumbing Inspection - Commercial Partial 12/15/2025 12/15/2025 12/15/2025
Misc
Resolved
12/15/2025
Pluming must be pressurized for inspection
Misc
Informational
12/15/2025
The following areas inspected -staff lounge -exam 22 -exam 21 -email lounge -trauma room
Underground Plumbing Inspection - Commercial Partial 12/16/2025 12/16/2025 12/16/2025
Misc
Corrective Action Required
12/16/2025
Stub from exsisting building into future space.
Underslab Plumbing Inspection - Commercial Partial 12/17/2025 12/17/2025 12/16/2025
Misc
Informational
12/15/2025
The following areas inspected -staff lounge -exam 22 -exam 21 -email lounge -trauma room -corridor 1447, 1441 -bariatric toilet
Footing Inspection - Commercial Partial 12/17/2025 12/17/2025 12/17/2025
Misc
Informational
12/17/2025
The following areas inspected and marked on plans in trailer -k.4-L.2
Underslab Plumbing Inspection - Commercial Partial 12/19/2025 12/19/2025 12/19/2025
Misc
Informational
12/16/2025
The following areas inspected -staff lounge -exam 22 -exam 21 -email lounge -trauma room -corridor 1447, 1441 -bariatric toilet -Pat toilet 1444 -Meds 1443
Underslab Plumbing Inspection - Commercial Partial 12/30/2025 12/30/2025 12/30/2025
Misc
Informational
12/19/2025
The following areas inspected -staff lounge -exam 22 -exam 21 -email lounge -trauma room -corridor 1447, 1441 -bariatric toilet -Pat toilet 1444 -Meds 1443 -4” trunk into new addition
Underslab Plumbing Inspection - Commercial Partial 1/2/2026 01/02/2026
Misc
Informational
12/30/2025
The following areas inspected -staff lounge -exam 22 -exam 21 -email lounge -trauma room -corridor 1447, 1441 -bariatric toilet -Pat toilet 1444 -Meds 1443 -4” trunk into new addition - New addition off of trunk line inspected on 30th
Site Visit Partial 1/5/2026 1/5/2026 01/05/2026
Misc
Corrective Action Required
12/03/2025
11/7/25 Tyler S. Talked to Don and they are patching some asphalt where the temporary water line is for the kitchen was dug. Next week they will mill it out wider and role it and recap. Wants to use concrete this time. Calling an early friday. 11/12/25 Tyler S. Working on excavating out the pit for the grease trap. 12/03/25 Tyler S. No work due to snow for the past few days. They do have a fire inspection today. other than that, no work. 1/5/26 Tyler S. More building work. Installing insulation
Footing Inspection - Commercial Failed 1/13/2026 01/13/2026
Misc
Informational
12/17/2025
The following areas inspected and marked on plans in trailer -k.4-L.2
Misc
Corrective Action Required
01/13/2026
2 W most piers against building for canopy 6 #7 bars EW 12” OC 24” off top of grade 5’x5’x6’ Provide engineer letters
Site Visit Partial 1/22/2026 1/22/2026 01/22/2026
Misc
Corrective Action Required
01/05/2026
11/7/25 Tyler S. Talked to Don and they are patching some asphalt where the temporary water line is for the kitchen was dug. Next week they will mill it out wider and role it and recap. Wants to use concrete this time. Calling an early friday. 11/12/25 Tyler S. Working on excavating out the pit for the grease trap. 12/03/25 Tyler S. No work due to snow for the past few days. They do have a fire inspection today. other than that, no work. 1/5/26 Tyler S. More building work. Installing insulation 1/22/26 Tyler S Work on the building.
Storm - Pipe Passed 2/5/2026 2/5/2026 02/05/2026
Misc
Corrective Action Required
02/05/2026
2/5/26 Tyler S. Installed about 60' of storm pipe and connected to existing. Pipe is bedded in clean rock.
Erosion Control Inspection Failed 2/13/2026 2/13/2026 02/13/2026
Misc
Corrective Action Required
02/13/2026
2/13/26 Tyler S. Concrete and metal and debris have been dumped in parking lot at shenandoah and cumberland, just north of the new parking lot. 2 day stop work order is issued. will have 2 day to get this cleaned up or a failed STOP WORK order will be issued.
Erosion Control Inspection Passed 2/17/2026 2/17/2026 02/17/2026
Misc
Corrective Action Required
02/13/2026
2/13/26 Tyler S. Concrete and metal and debris have been dumped in parking lot at shenandoah and cumberland, just north of the new parking lot. 2 day stop work order is issued. will have 2 day to get this cleaned up or a failed STOP WORK order will be issued. 2/17/26 Tyler S. Erosion control in compliance.
Documents & Images
Date Uploaded File Type Document Name
04/22/2025 Application Form Commercial Permit Application - ED Expansion - Revised
04/23/2025 Engineer Report/Study Structural Calculations_Rev A and B
04/23/2025 Plans LSMC ED EXP_ARCH-CIVIL-LAND-STRUC-INT-DWGS_250418
04/23/2025 Plans LSMC ED EXP_PLUMB-MECH-ELEC-TECH-VENDOR-DWGS_250418
04/23/2025 Letter Project narrative - All projects scope at Medical Center
05/02/2025 Letter License Tax Bill
05/06/2025 Letter DS P/R Corrections Document
07/03/2025 Plans 250624_COMBINED DWG SET - ADD A & B - REVISED
07/03/2025 Letter 250624_NARRATIVE - ADD A
07/03/2025 Letter 250624_NARRATIVE - ADD B
07/03/2025 Letter 000000 Cover_ADD B
07/03/2025 Letter 000001 - TABLE OF CONTENTS_ADD B
07/03/2025 Specifications 044313_13 - Anchored Stone Masonry Veneer - ADD B
07/03/2025 Specifications 047200 - CAST STONE MASONRY_ADD B
07/03/2025 Specifications 087100 - DOOR HARDWARE SPECIFICATION
07/14/2025 Letter DS P/R Corrections Document
08/08/2025 Letter 250730_LSMC ED_DELTA C CHANGE LOG
08/08/2025 Plans 250730_LSMC ED_DELTA CDE COMBINED DWGS
08/08/2025 Letter 250730_LSMC ED_DELTA D CHANGE LOG
08/08/2025 Letter 250730_LSMC ED_DELTA E CHANGE LOG
08/08/2025 Specifications 000001 - TABLE OF CONTENTS
08/08/2025 Specifications 084243 - INTENSIVE CARE UNIT - CRITICAL CARE UNIT (ICU-CCU) ENTRANCES
08/08/2025 Specifications 087100 - DOOR HARDWARE SPECIFICATION
08/14/2025 Approved Plans Approved Constr Plans - Vol1
08/14/2025 Approved Plans Approved Constr Plans - Vol2
08/18/2025 Receipt Receipt for transaction: 2025-006473
08/19/2025 Letter DS Building Permit
08/21/2025 Plans Stamped Approved FDP Plans_PL2025054
10/24/2025 Letter INSPECTION SUMMARY
11/07/2025 Letter INSPECTION SUMMARY
11/12/2025 Letter INSPECTION SUMMARY
11/13/2025 Engineer Report/Study 20935M AREA #1 - sealed
11/13/2025 Plans 20935M - HCA Lees Summit ED Expansion Approval - Sealed
11/13/2025 Engineer Report/Study 20935M AREA #1 - sealed
11/18/2025 Letter 20250925_HCA - CHANGE LOG - ASI-001 - DESIGN COORDINATION
11/18/2025 Plans 20250925_HCA - LSMC ED Expansion_ASI-001 - DESIGN COORDINATION
11/18/2025 Plans ASI-002 - DESIGN COORDINATION
11/18/2025 Letter HCA_LSMC ED_Change Log - ASI 002 - DESIGN COORDINATION
11/25/2025 20935M - HCA Lees Summit ED Expansion Approval - Sealed RFC
11/25/2025 Letter Fire (Sprinkler) Plan Review
12/03/2025 Letter INSPECTION SUMMARY
12/04/2025 Plans 092216-001_Non-StructuralMetalFraming_AAN-12_03_25
12/04/2025 Plans 078100-011_AppliedFireproofing_AAN-12_03_25
12/04/2025 Approved Plans Approved non-struct framing
12/12/2025 Letter INSPECTION SUMMARY
12/15/2025 Letter INSPECTION SUMMARY
12/16/2025 Letter INSPECTION SUMMARY
12/16/2025 Letter INSPECTION SUMMARY
12/16/2025 251216 - ASI-002 - Full Set - Part 2
12/16/2025 251216 - ASI-002 - Full Set - Part 1
12/17/2025 Approved Plans Approved Volume 1 Construction plans
12/17/2025 Approved Plans Approved Volume 2 Construction plans
12/17/2025 Letter INSPECTION SUMMARY
12/19/2025 Letter INSPECTION SUMMARY
12/30/2025 Letter INSPECTION SUMMARY
12/31/2025 20935M - HCA Lee's Summit ED Expansion - Revised
01/02/2026 Letter INSPECTION SUMMARY
01/05/2026 Letter INSPECTION SUMMARY
01/05/2026 Specifications 078400-078443_Firestopping-001_LS
01/08/2026 Specifications 20935M - HCA Lee's Summit ED Expansion - Revised RFC
01/08/2026 Letter Fire (Sprinkler) Plan Review
01/19/2026 Specifications 092216-002_Non-StructuralMetalFraming-PartialReview-01_16_25
01/22/2026 Letter INSPECTION SUMMARY
02/03/2026 Specifications 092116-001_GypBoardShaftwallAssemblies_AAN-02_01_26
02/03/2026 Specifications 084113-003_AluminumFramedEntrances&Storefront_AAN-02_01_26
02/05/2026 Letter INSPECTION SUMMARY
02/13/2026 Letter INSPECTION SUMMARY
02/13/2026 Letter INSPECTION SUMMARY
02/17/2026 Letter INSPECTION SUMMARY
03/04/2026 101400-001-R1_ExteriorSignage_AAN-03_03_26
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home