Permit Application Status

PRCOMCOM20240340


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOMCOM20240340
Building Permit - Commercial
In Plan Review
NEW COMMERCIAL
VILLAGE OF DISCOVERY PARK Lot 4 - MIXED USE BUILDING - 3 STORY BUILDING WITH 46 INDIVIDUAL DWELLING UNITS ON FLOORS 2 & 3. OPEN AIR PARKING GARAGE ON EASTERN PORTION. WHITE BOX COMMERCIAL SPACE FOR FUTURE TENANTS ON WESTERN SIDE Garage - Type 2A
01/29/2024
04/28/2025
Locations
Contacts
Intrinsic Development, L.L.C., Address:3622 Endeavor Ave., Ste. 101  
Earl Peterson - Intrinsic Development, Phone:(573) 970-8867  
  
  
  
ROSEMANN & ASSOCIATES, Address:1526 GRAND BLVD, Phone:(816) 472-1448  
UES dba GEOTECHNOLOGY LLC, Address:5055 ANTIOCH RD, Phone:(913) 438-1900  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 01/16/2025 01/23/2025
Joe Frogge
Final Development Plan
Resolved
01/13/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 10/28/24 - Acknowledged in letter.
Elevator Equipment Permit
Corrective Action Required
01/09/2025

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 10/28/24 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
01/09/2025

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 10/28/24 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
01/09/2025

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 10/28/24 - Acknowledged in letter.
Engineered truss package
Corrective Action Required
01/09/2025

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss packages or request deferral. 10/28/24 - Deferred per request.
License Tax - Payment
Corrective Action Required
01/09/2025

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee for apartments will be $25,524.48. (fee for commercial occupants will be assessed upon their submissions) 10/28/24 - Acknowledged in letter.
Misc
Resolved
01/24/2025

Pipe serving 2" meter is 3" which will not be allowed by Water Department regulations. Pipe between main and meter must be 2". Action required: Modify water riser on P501 to comply. 10/28/24 - 3" piping from main still shown on detail. Revise to comply and to match FDP which currently shows 2 separate 2" taps. If FDP plans change they must be resubmitted also.
NEC Article 210.52 (A) Receptacle spacing in dwelling units
Corrective Action Required
01/09/2025

2017 NEC Article 210.52 (A) General Provisions. In every kitchen, family room, dining room, living room, parlor, library, den, sunroom, bedroom, recreation room, or similar room or area of dwelling units, receptacle outlets shall be installed in accordance with the general provisions specified in 210.52(A)(1) through (A)(4). (1) Spacing. Receptacles shall be installed such that no point measured horizontally along the floor line of any wall space is more than 6 feet from a receptacle outlet. (2) Wall Space. As used by this section, a wall space shall include the following: 1. Any space 2 feet or more in width (including space measured around corners) and unbroken along the floor line by doorways and similar openings, fireplaces, and fixed cabinets that do not have countertops or similar work surfaces. 2. The space occupied by fixed panels in walls, excluding sliding panels. 3. The space afforded by fixed room dividers, such as freestanding bar-type counters or railings. (3) Floor Receptacles. Receptacle outlets in or on floors shall not be counted as part of the required number of receptacle outlets unless located within 18 inches of the wall. (4) Countertop and Similar Work Surface Receptacle Outlets. Receptacles installed for countertop and similar work surfaces as specified in 210.52(C) shall not be considered as the receptacle outlets required by 210.52(A). (D) Bathrooms. At least one receptacle outlet shall be installed in bathrooms within 3 ft of the outside edge of each basin. (see code for location regulations) Action required: Additional receptacles required at units. See walls 2' long and greater. 10/28/24 - Acknowledged in letter. To be verified during inspections.
Fire Plan Review Approved 01/16/2025 01/13/2025
Joe Frogge
Licensed Contractors Rejected 01/16/2025 01/10/2025
Joe Frogge
LC - MEP Subs
Corrective Action Required
01/09/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/28/24 - Acknowledged in letter.
Fire Plan Review Approved 10/29/2024 10/29/2024
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
10/22/2024

on asmoke alarms and building sfire alarm atie st2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Submit alarm plans for review and approval. Including unit interconnected single station alarms and building fire alarm notification.
Knox box required
Corrective Action Required
10/22/2024

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Provide a Knox box 6' AFF over the FDC. Order from Knoxbox.com .
Construction documents - Fire protection systems
Corrective Action Required
10/22/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for review and approval.
Portable fire extinguishers - general
Corrective Action Required
10/22/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
10/22/2024

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. Provide a Knox elevator key box in the lobby.
Miscellaneous Correction
Corrective Action Required
10/22/2024

Complete items on Final Development Plan.
Miscellaneous Correction
Corrective Action Required
10/22/2024

Provide an egress plan for the garage. There are no man doors or accessible pathways.
Miscellaneous Correction
Corrective Action Required
10/22/2024

Provide exit signage on both sides of the fire doors near the elevator lobby on each floor.
Building Plan Review Rejected 10/29/2024 10/28/2024
Joe Frogge
Final Development Plan
Corrective Action Required
10/22/2024

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 10/28/24 - Acknowledged in letter.
Elevator Equipment Permit
Corrective Action Required
10/22/2024

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 10/28/24 - Acknowledged in letter.
Elevator Equipment Inspection
Corrective Action Required
10/22/2024

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 10/28/24 - Acknowledged in letter.
Elevator Certificate of Inspection
Corrective Action Required
10/22/2024

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 10/28/24 - Acknowledged in letter.
Engineered truss package
Corrective Action Required
10/22/2024

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss packages or request deferral. 10/28/24 - Deferred per request.
License Tax - Payment
Corrective Action Required
10/22/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee for apartments will be $25,524.48. (fee for commercial occupants will be assessed upon their submissions) 10/28/24 - Acknowledged in letter.
IBC 706.1 Fire and Smoke Protection - General
Resolved
10/28/2024

2018 IBC 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Action required: Provide complete construction details for all fire rated wall types that includes nail/screw patterns. (re: non-UL listed walls and shafts)
IBC 1006.1 General - Number of exits
Resolved
10/28/2024

2018 IBC 1006.1 General. The number of exits or exit access doorways required within the means of egress system shall comply with the provisions of Section 1006.2 for spaces, including mezzanines, and Section 1006.3 for stories or occupied roofs. Action required: Provide 2 compliant egress doors out of garage.
IBC 711.2.3 Fire and Smoke Protection - fire rating of supporting construction
Resolved
10/28/2024

2018 IBC 711.2.3 Supporting Construction. The supporting construction shall be protected to afford the required fire-resistance rating of the horizontal assembly supported. (see code for exceptions. Action required: Exterior wall P46.1 must be 1 hour rated.
IBC 602.1 Type of Construction - general
Resolved
10/28/2024

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: All exterior walls within 30' of property line (see southernmost wall) must be minimum 1 hour fire rated.
IBC 716.2.3 Fire and Smoke Protection - fire doors
Resolved
10/28/2024

2018 IBC 716.2.3 Fire doors. Fire doors installed within a fire door assembly shall meet the fire rating indicated in Table 716.1(2). Action required: Amend door schedule to show 1 hour ratings for doors in fire barriers serving stairways.
Misc
Resolved
10/28/2024

Unable to find rated doors S1-2 & S1-3 in door schedule. Action required: Add doors to schedule.
IMC 607.5 Fire dampers where required
Resolved
10/28/2024

2018 IMC 607.5 Where required. Fire dampers, smoke dampers, combination fire/smoke dampers, ceiling radiation dampers and corridor dampers shall be provided at the locations prescribed in Sections 607.5.1 through 607.5.7. Where an assembly is required to have both fire dampers and smoke dampers, combination fire/smoke dampers or a fire damper and smoke damper shall be required. Action required: Provide fire dampers at penetrations through fire rated assemblies. See Mech Rooms, IT Rooms, Bike Storage, and Fire Walls. (currently showing smoke dampers only.)
NEC Article 230.2 (E) Identification of multiple services
Resolved
10/28/2024

2017 NEC Article 230.2 (E) Identification. Where a building or structure is supplied by more than one service, or any combination of branch circuits, feeders, and services, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. See 225.37. Action required: Provide permanent plaques at services to comply.
IBC 1013.1 Where required - exit sign
Resolved
10/28/2024

2018 IBC Exit Signs 1013.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Provide exit signs at: - both sides of fire wall. - exits out of parking garage (see previous comment above related to IBC 1006.1)
IPC 708.1 Cleanouts required
Resolved
10/28/2024

2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanout near where sanitary leaves footprint of building.
IPC 918.1 Air admittance valve
Resolved
10/28/2024

2018 IPC 918.1 General. (as amended by LSCO 7-412) Section 918.1 is hereby amended to read as follows: Air admittance valve are only allowed when approved by the Administrative Authority. Vent systems utilizing air admittance valves shall comply with this section. Stack-type air admittance valves shall conform to ASSE 1050. Individual- and branch-type air admittance valves shall conform to ASSE 1051. Action required: Replace air admittance valves with hard piped vents through roof.
IPC 1101.3 Prohibited drainage
Resolved
10/28/2024

2018 IPC 1101.3 Prohibited drainage. (as amended by LSCO 7-413) Sanitary sewer systems shall be designed, built and maintained in such a manner to prevent all storm or ground water from draining, discharging or entering into the sanitary sewer system. Connection of sump pumps, foundation drains, yard drains, gutter downspouts and any other storm water drainage receptacle(s) or system(s) are specifically prohibited from being connected to the sanitary sewer system. Action required: Route elevator sump to storm drain.
Misc
Corrective Action Required
10/22/2024

Pipe serving 2" meter is 3" which will not be allowed by Water Department regulations. Pipe between main and meter must be 2". Action required: Modify water riser on P501 to comply. 10/28/24 - 3" piping from main still shown on detail. Revise to comply and to match FDP which currently shows 2 separate 2" taps. If FDP plans change they must be resubmitted also.
IPC 502.1 Water heater manufacturers installation instructions
Resolved
10/28/2024

2018 IPC 502.1 General. Water heaters shall be installed in accordance with the manufacturer’s installation instructions. Oil-fired water heaters shall conform to the requirements of this code and the International Mechanical Code. Electric water heaters shall conform to the requirements of this code and provisions of NFPA 70. Gas-fired water heaters shall conform to the requirements of the International Fuel Gas Code. Action required: Provide expansion tank at water heater or provide verification that water heater installed will not require expansion tank in the manufacturer's written instructions.
NEC Article 210.52 (A) Receptacle spacing in dwelling units
Corrective Action Required
10/22/2024

2017 NEC Article 210.52 (A) General Provisions. In every kitchen, family room, dining room, living room, parlor, library, den, sunroom, bedroom, recreation room, or similar room or area of dwelling units, receptacle outlets shall be installed in accordance with the general provisions specified in 210.52(A)(1) through (A)(4). (1) Spacing. Receptacles shall be installed such that no point measured horizontally along the floor line of any wall space is more than 6 feet from a receptacle outlet. (2) Wall Space. As used by this section, a wall space shall include the following: 1. Any space 2 feet or more in width (including space measured around corners) and unbroken along the floor line by doorways and similar openings, fireplaces, and fixed cabinets that do not have countertops or similar work surfaces. 2. The space occupied by fixed panels in walls, excluding sliding panels. 3. The space afforded by fixed room dividers, such as freestanding bar-type counters or railings. (3) Floor Receptacles. Receptacle outlets in or on floors shall not be counted as part of the required number of receptacle outlets unless located within 18 inches of the wall. (4) Countertop and Similar Work Surface Receptacle Outlets. Receptacles installed for countertop and similar work surfaces as specified in 210.52(C) shall not be considered as the receptacle outlets required by 210.52(A). (D) Bathrooms. At least one receptacle outlet shall be installed in bathrooms within 3 ft of the outside edge of each basin. (see code for location regulations) Action required: Additional receptacles required at units. See walls 2' long and greater. 10/28/24 - Acknowledged in letter. To be verified during inspections.
Licensed Contractors Rejected 10/29/2024 10/28/2024
Joe Frogge
LC - General Contractor
Resolved
10/28/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
10/22/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/28/24 - Acknowledged in letter.
Special Inspections Review Approved 10/08/2024
Joe Frogge
Final Development Plan Review Approved 09/13/2024 09/13/2024
Daniel Fernandez
Building Plan Review Rejected 03/12/2024 03/13/2024
Joe Frogge
Final Development Plan
Corrective Action Required
02/01/2024

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
IBC 1704.2 Special Inspections
Resolved
10/08/2024

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Equipment Permit
Corrective Action Required
02/01/2024

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational.
Elevator Equipment Inspection
Corrective Action Required
02/01/2024

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational.
Elevator Certificate of Inspection
Corrective Action Required
02/01/2024

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational.
Engineered truss package
Corrective Action Required
02/01/2024

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide truss packages or request deferral.
License Tax - Payment
Corrective Action Required
02/01/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee for apartments will be $25,524.48. (fee for commercial occupants will be assessed upon their submissions)
IBC 706.1 Fire and Smoke Protection - General
Corrective Action Required
02/01/2024

2018 IBC 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Action required: Provide complete construction details for all fire rated wall types that includes nail/screw patterns. (re: non-UL listed walls and shafts)
IBC 1006.1 General - Number of exits
Corrective Action Required
03/12/2024

2018 IBC 1006.1 General. The number of exits or exit access doorways required within the means of egress system shall comply with the provisions of Section 1006.2 for spaces, including mezzanines, and Section 1006.3 for stories or occupied roofs. Action required: Provide 2 compliant egress doors out of garage.
IBC 711.2.3 Fire and Smoke Protection - fire rating of supporting construction
Corrective Action Required
03/12/2024

2018 IBC 711.2.3 Supporting Construction. The supporting construction shall be protected to afford the required fire-resistance rating of the horizontal assembly supported. (see code for exceptions. Action required: Exterior wall P46.1 must be 1 hour rated.
IBC 602.1 Type of Construction - general
Corrective Action Required
03/12/2024

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: All exterior walls within 30' of property line (see southernmost wall) must be minimum 1 hour fire rated.
IBC 716.2.3 Fire and Smoke Protection - fire doors
Corrective Action Required
03/12/2024

2018 IBC 716.2.3 Fire doors. Fire doors installed within a fire door assembly shall meet the fire rating indicated in Table 716.1(2). Action required: Amend door schedule to show 1 hour ratings for doors in fire barriers serving stairways.
Misc
Corrective Action Required
03/12/2024

Unable to find rated doors S1-2 & S1-3 in door schedule. Action required: Add doors to schedule.
IMC 607.5 Fire dampers where required
Corrective Action Required
03/13/2024

2018 IMC 607.5 Where required. Fire dampers, smoke dampers, combination fire/smoke dampers, ceiling radiation dampers and corridor dampers shall be provided at the locations prescribed in Sections 607.5.1 through 607.5.7. Where an assembly is required to have both fire dampers and smoke dampers, combination fire/smoke dampers or a fire damper and smoke damper shall be required. Action required: Provide fire dampers at penetrations through fire rated assemblies. See Mech Rooms, IT Rooms, Bike Storage, and Fire Walls. (currently showing smoke dampers only.)
NEC Article 230.2 (E) Identification of multiple services
Corrective Action Required
03/13/2024

2017 NEC Article 230.2 (E) Identification. Where a building or structure is supplied by more than one service, or any combination of branch circuits, feeders, and services, a permanent plaque or directory shall be installed at each service disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. See 225.37. Action required: Provide permanent plaques at services to comply.
IBC 1013.1 Where required - exit sign
Corrective Action Required
03/13/2024

2018 IBC Exit Signs 1013.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Provide exit signs at: - both sides of fire wall. - exits out of parking garage (see previous comment above related to IBC 1006.1)
IPC 708.1 Cleanouts required
Corrective Action Required
03/13/2024

2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanout near where sanitary leaves footprint of building.
IPC 918.1 Air admittance valve
Corrective Action Required
03/13/2024

2018 IPC 918.1 General. (as amended by LSCO 7-412) Section 918.1 is hereby amended to read as follows: Air admittance valve are only allowed when approved by the Administrative Authority. Vent systems utilizing air admittance valves shall comply with this section. Stack-type air admittance valves shall conform to ASSE 1050. Individual- and branch-type air admittance valves shall conform to ASSE 1051. Action required: Replace air admittance valves with hard piped vents through roof.
IPC 1101.3 Prohibited drainage
Corrective Action Required
03/13/2024

2018 IPC 1101.3 Prohibited drainage. (as amended by LSCO 7-413) Sanitary sewer systems shall be designed, built and maintained in such a manner to prevent all storm or ground water from draining, discharging or entering into the sanitary sewer system. Connection of sump pumps, foundation drains, yard drains, gutter downspouts and any other storm water drainage receptacle(s) or system(s) are specifically prohibited from being connected to the sanitary sewer system. Action required: Route elevator sump to storm drain.
Misc
Corrective Action Required
03/13/2024

Pipe serving 2" meter is 3" which will not be allowed by Water Department regulations. Pipe between main and meter must be 2". Action required: Modify water riser on P501 to comply.
IPC 502.1 Water heater manufacturers installation instructions
Corrective Action Required
03/13/2024

2018 IPC 502.1 General. Water heaters shall be installed in accordance with the manufacturer’s installation instructions. Oil-fired water heaters shall conform to the requirements of this code and the International Mechanical Code. Electric water heaters shall conform to the requirements of this code and provisions of NFPA 70. Gas-fired water heaters shall conform to the requirements of the International Fuel Gas Code. Action required: Provide expansion tank at water heater or provide verification that water heater installed will not require expansion tank in the manufacturer's written instructions.
NEC Article 210.52 (A) Receptacle spacing in dwelling units
Corrective Action Required
03/13/2024

2017 NEC Article 210.52 (A) General Provisions. In every kitchen, family room, dining room, living room, parlor, library, den, sunroom, bedroom, recreation room, or similar room or area of dwelling units, receptacle outlets shall be installed in accordance with the general provisions specified in 210.52(A)(1) through (A)(4). (1) Spacing. Receptacles shall be installed such that no point measured horizontally along the floor line of any wall space is more than 6 feet from a receptacle outlet. (2) Wall Space. As used by this section, a wall space shall include the following: 1. Any space 2 feet or more in width (including space measured around corners) and unbroken along the floor line by doorways and similar openings, fireplaces, and fixed cabinets that do not have countertops or similar work surfaces. 2. The space occupied by fixed panels in walls, excluding sliding panels. 3. The space afforded by fixed room dividers, such as freestanding bar-type counters or railings. (3) Floor Receptacles. Receptacle outlets in or on floors shall not be counted as part of the required number of receptacle outlets unless located within 18 inches of the wall. (4) Countertop and Similar Work Surface Receptacle Outlets. Receptacles installed for countertop and similar work surfaces as specified in 210.52(C) shall not be considered as the receptacle outlets required by 210.52(A). (D) Bathrooms. At least one receptacle outlet shall be installed in bathrooms within 3 ft of the outside edge of each basin. (see code for location regulations) Action required: Additional receptacles required at units. See walls 2' long and greater.
Fire Plan Review Rejected 02/12/2024 02/16/2024
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
02/16/2024

on asmoke alarms and building sfire alarm atie st2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Submit alarm plans for review and approval. Including unit interconnected single station alarms and building fire alarm notification.
Knox box required
Corrective Action Required
02/16/2024

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Provide a Knox box 6' AFF over the FDC. Order from Knoxbox.com .
Construction documents - Fire protection systems
Corrective Action Required
02/16/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for review and approval.
Portable fire extinguishers - general
Corrective Action Required
02/16/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
02/16/2024

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. Provide a Knox elevator key box in the lobby.
Miscellaneous Correction
Corrective Action Required
02/16/2024

Complete items on Final Development Plan.
Miscellaneous Correction
Corrective Action Required
02/16/2024

Provide an egress plan for the garage. There are no man doors or accessible pathways.
Miscellaneous Correction
Corrective Action Required
02/16/2024

Provide exit signage on both sides of the fire doors near the elevator lobby on each floor.
Fire Plan Review Rejected 02/12/2024 02/12/2024
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
02/12/2024

on asmoke alarms and building sfire alarm atie st2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Submit alarm plans for review and approval. Including unit interconnected single station alarms and building fire alarm notification.
Knox box required
Corrective Action Required
02/12/2024

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Provide a Knox box 6' AFF over the FDC. Order from Knoxbox.com .
Construction documents - Fire protection systems
Corrective Action Required
02/12/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for review and approval.
Portable fire extinguishers - general
Corrective Action Required
02/12/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
02/12/2024

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. Provide a Knox elevator key box in the lobby.
Miscellaneous Correction
Corrective Action Required
02/12/2024

Complete items on Final Development Plan.
Miscellaneous Correction
Corrective Action Required
02/12/2024

Provide an egress plan for the garage. There are no man doors or accessible pathways.
Miscellaneous Correction
Corrective Action Required
02/12/2024

Provide exit signage on both sides of the fire doors near the elevator lobby on each floor.
Licensed Contractors Rejected 02/12/2024 02/01/2024
Joe Frogge
LC - General Contractor
Corrective Action Required
02/01/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
02/01/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $51.00 $51.00 Paid 10/24/2024
91100C9-Water Insp Fee $1,359.60 $1,359.60 Paid 10/24/2024
9110068-Storm Fee $995.10 $995.10 Paid 10/24/2024
9110081-Paved Surface Inspection Fee $8,273.33 $8,273.33 Paid 10/24/2024
9110071-Site Grading Fee $1,276.92 $1,276.92 Paid 10/24/2024
8331401-Water Tap Fee $52,970.00 $52,970.00 Paid 10/24/2024
8350015-Water Meter Fee $7,759.92 $7,759.92 Paid 10/24/2024
8331507-Sanitary Sewer Development Fee $30,482.00 $30,482.00 Paid 10/24/2024
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sanitary Sewer Construction Inspection Pending
Storm Sewer Construction Inspection Pending
Water Line - Construction Inspection Pending
Misc
Informational
04/18/2025
4-16-25 DP. Aarons crew ran most of the 6" water line 4-17-25 DP. Aarons crew ran a hydrostatic test on the first portion of the 6" water line. It held 150 psi for 2 hours.
Water Line - Construction Inspection Partial 4/15/2025 4/15/2025 04/18/2025
Misc
Informational
04/18/2025
4-15-25 DP. Aarons crew started laying the 6" water line that runs along side lot 4 up towards lot 1.
Water Line - Construction Inspection Partial 4/16/2025 4/16/2025 04/18/2025
Misc
Informational
04/18/2025
4-16-25 DP. Aarons crew ran most of the 6" water line
Water Line - Construction Inspection Partial 4/17/2025 4/17/2025 04/18/2025
Misc
Informational
04/18/2025
4-16-25 DP. Aarons crew ran most of the 6" water line 4-17-25 DP. Aarons crew ran a hydrostatic test on the first portion of the 6" water line. It held 150 psi for 2 hours.
Documents & Images
Date Uploaded File Type Document Name
01/29/2024 Application Form APPLICATION
01/29/2024 Plans 24-0125_DPLS-Lot 4_CITY SUBMITTAL_Combined
01/29/2024 Specifications 24-0125 The Village at Discovery-Lot 4 Spec-Volume 1
01/29/2024 Specifications 24-0125 The Village at Discovery-Lot 4 Spec-Volume 2
03/12/2024 Letter License Tax Bill
07/10/2024 Letter DS P/R Corrections Document
10/08/2024 Engineer Report/Study SI Letter
10/22/2024 Plans 24-1021_DPLS Lot 4_ADD #1_complete set_
10/22/2024 Specifications 24-1022_The Village at Discovery-Lot 4 Spec-Volume 1_ADD 001
10/22/2024 Letter DPLS_Lot 4_City Response Letter
10/24/2024 Receipt Receipt for transaction:2024-008562
10/24/2024 Receipt Receipt for transaction:2024-008563
10/29/2024 Letter DS P/R Corrections Document
01/09/2025 Letter 25_0109_DPLS Lot 4 - ADD 003 - Letter to City
01/09/2025 Plans 24-1220_DPLS Lot 4_Add #3_Combined
01/23/2025 Plans 24-1030 - DPLS Alura Apartments Lot 4 - REV2 Sheets
01/23/2025 Letter DPLS_Lot 4_Round 2 Response
01/24/2025 Letter 25_0123_DPLS Lot 4 - ADD 004 - Letter to City
01/24/2025 Plans 25-0124_DPLS LOT 4_ ADD 004
09/24/2024 Approved Plans Stamped Approved Plans_FDP_PL2024021
01/30/2025 Plans 25-0130_DPLS Lot 4_Current Set
01/30/2025 Approved Plans Approved construction plans
02/10/2025 Engineer Report/Study SI Letter #1 12-28-2024..
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home