Permit Application Status

PRCOM20255581


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20255581
Building Permit - Commercial
In Plan Review
FORT WAYNE MATADOR INC
NEW COMMERCIAL
COSTCO WHOLESALE WAREHOUSE - ONE STORY MECHANTILE BUILDING FOR RETAIL USE, HIGH PILE STORAGE, FOOD PREPERATION, AND REFRIGERATED GOODS store - 10 SE Oldham Pkwy
12/23/2025
09/14/2026
Locations
Contacts
  
  
  
  
MG2 CORPORATION P.C., Address:1101 SECOND AVE. SUITE 100, Phone:(206) 962-6500  
FORT WAYNE MATADOR INC, Address:4900 E DUBLIN GRANVILLE RD  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved 04/01/2026 04/01/2026
Craig Hill
Racking
Building Plan Review Approved with Conditions 03/17/2026 03/26/2026
Joe Frogge
Final Development Plan
Resolved
03/26/2026

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 3/17/26 - Noted in letter to be approved but FDP is still under 'in plan review' status.
License Tax - Payment
Corrective Action Required
03/17/2026

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $361,102.50 3/17/26 - Acknowledged in letter.
Health Dept Inspection
Corrective Action Required
03/17/2026

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 3/17/26 - Acknowledged in letter.
IMC 306.5 Equipment on roofs
Corrective Action Required
03/17/2026

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Amend 10/A202 to show 30" side railing extender. 3/17/26 - Response letter refers us to sheet A202 which is not found in this submittal.
NEC Article 110.26 (C)(2) Large equipment
Resolved
03/17/2026

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Actions required: - Provide 2 exits out of MSB Room 192. Doors are required to swing outward and be equipped with panic hardware. - Doors out of rooms with panels H6, H7, SD-1, & SD-3 are required to swing outward and be equipped with panic hardware. (We assume the hardware is in spec? We don't have a copy of the spec)
IBC 502.1 - Address Identification
Corrective Action Required
03/17/2026

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: This building has been assigned the address of 10 SE Oldham Pkwy. Please update your records and inform your client. The gas pump station permit has not yet been created but will be 20 SE Oldham Pkwy. 3/17/26 - Acknowledged in letter. To be field verified.
IPC 604.9 Water hammer
Resolved
03/17/2026

2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Air chambers not allowed. Modify detail 009/P-0.1 to comply.
IPC 708.1 Cleanouts required
Resolved
03/17/2026

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanouts near where sanitary exits foundation.
IPC 604.8 Water pressure reducing valve
Resolved
03/17/2026

2018 IPC 604.8 Water Pressure reducing valve or regulator. Where water pressure within a building exceeds 80 psi static, an approved water-pressure reducing valve conforming to ASSE 1003 or CSA B356 with strainer shall be installed to reduce the pressure in the building water distribution piping to not greater than 80 psi static. Action required: Provide PRV at water entry. (regardless of pressure per our Water Dept)
IBC 1013.1 Where required - exit sign
Resolved
03/17/2026

2018 IBC Exit Signs 1013.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Provide exit signs at doors 62 & 62A at Hallway 185.
NEC Article 250.24 Grounding Service-supplied AC Systems
Resolved
03/17/2026

2017 NEC Article 250.24 Grounding Service-Supplied Alternating-Current Systems. (A) System Grounding Connections. A premises wiring system supplied by a grounded ac service shall have a grounding electrode conductor connected to the grounded service conductor, at each service, in accordance with 250.24(A)(1) through (A)(5). (1) General. The grounding electrode conductor connection shall be made at any accessible point from the load end of the overhead service conductors, service drop, underground service conductors, or service lateral to, and including the terminal or bus to which the grounded service conductor is connected at the service disconnecting means. Action required: Provide service grounding to building steel.
Project cost
Resolved
03/17/2026

The project cost, which is used to establish the permit fee, has not been provided. Action required: Provide cost estimate for fuel facility. (permit to be created at a later date)
Alarm Plan Review Released for Construction 03/18/2026 03/18/2026
Craig Hill
Licensed Contractors Rejected 03/17/2026 03/17/2026
Joe Frogge
LC - General Contractor
Corrective Action Required
03/17/2026

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact. 3/17/26 - Acknowledged in letter.
LC - MEP Subs
Corrective Action Required
03/17/2026

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 3/17/26 - Acknowledged in letter.
Sprinkler Plan Review Rejected 03/18/2026 03/17/2026
Craig Hill
Misc
Corrective Action Required
03/17/2026

Fire sprikler flow calculations have not been provided. Action Required: Provide Flow calculations for the sprinkler system.
Fire Plan Review Approved 03/17/2026 03/17/2026
Craig Hill
Special Inspections Review Approved 03/10/2026
Joe Frogge
Health Department Review Approved 03/10/2026
Joe Frogge
Alarm Plan Review Released for Construction 01/14/2026 01/15/2026
Craig Hill
Sprinkler Plan Review Rejected 01/14/2026 01/15/2026
Craig Hill
Misc
Corrective Action Required
01/13/2026

Fire sprikler flow calculations have not been provided. Action Required: Provide Flow calculations for the sprinkler system.
Miscellaneous Correction
Corrective Action Required
01/13/2026

Ball drip not shown on the FDC Action Required: Provide ball drip on FDC pipe.
Fire Plan Review Rejected 01/14/2026 01/14/2026
Craig Hill
Misc
Corrective Action Required
01/14/2026

1013.1 Where required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit or the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that any point in an exit access corridor or exit passageway is within 100 feet (30 480 mm) or the listed viewing distance of the sign, whichever is less, from the nearest visible exit sign. Action required: Provide exit signs at doors 62 & 62A at Hallway 185.
Building Plan Review Rejected 01/14/2026 01/14/2026
Joe Frogge
Final Development Plan
Corrective Action Required
01/13/2026

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
License Tax - Payment
Corrective Action Required
01/13/2026

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $361,102.50
Health Dept Review
Resolved
03/10/2026

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7162. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational.
Health Dept Inspection
Corrective Action Required
01/13/2026

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational.
IBC 1704.2 Special Inspections
Resolved
03/10/2026

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
IMC 306.5 Equipment on roofs
Corrective Action Required
01/13/2026

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Amend 10/A202 to show 30" side railing extender.
NEC Article 110.26 (C)(2) Large equipment
Corrective Action Required
01/13/2026

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Actions required: - Provide 2 exits out of MSB Room 192. Doors are required to swing outward and be equipped with panic hardware. - Doors out of rooms with panels H6, H7, SD-1, & SD-3 are required to swing outward and be equipped with panic hardware. (We assume the hardware is in spec? We don't have a copy of the spec)
IBC 502.1 - Address Identification
Corrective Action Required
01/14/2026

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: This building has been assigned the address of 10 SE Oldham Pkwy. Please update your records and inform your client. The gas pump station permit has not yet been created but will be 20 SE Oldham Pkwy.
IPC 604.9 Water hammer
Corrective Action Required
01/14/2026

2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Air chambers not allowed. Modify detail 009/P-0.1 to comply.
IPC 708.1 Cleanouts required
Corrective Action Required
01/14/2026

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanouts near where sanitary exits foundation.
IPC 604.8 Water pressure reducing valve
Corrective Action Required
01/14/2026

2018 IPC 604.8 Water Pressure reducing valve or regulator. Where water pressure within a building exceeds 80 psi static, an approved water-pressure reducing valve conforming to ASSE 1003 or CSA B356 with strainer shall be installed to reduce the pressure in the building water distribution piping to not greater than 80 psi static. Action required: Provide PRV at water entry. (regardless of pressure per our Water Dept)
IBC 1013.1 Where required - exit sign
Corrective Action Required
01/14/2026

2018 IBC Exit Signs 1013.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Provide exit signs at doors 62 & 62A at Hallway 185.
NEC Article 250.24 Grounding Service-supplied AC Systems
Corrective Action Required
01/14/2026

2017 NEC Article 250.24 Grounding Service-Supplied Alternating-Current Systems. (A) System Grounding Connections. A premises wiring system supplied by a grounded ac service shall have a grounding electrode conductor connected to the grounded service conductor, at each service, in accordance with 250.24(A)(1) through (A)(5). (1) General. The grounding electrode conductor connection shall be made at any accessible point from the load end of the overhead service conductors, service drop, underground service conductors, or service lateral to, and including the terminal or bus to which the grounded service conductor is connected at the service disconnecting means. Action required: Provide service grounding to building steel.
Project cost
Corrective Action Required
01/15/2026

The project cost, which is used to establish the permit fee, has not been provided. Action required: Provide cost estimate for fuel facility. (permit to be created at a later date)
Licensed Contractors Rejected 01/12/2026 01/13/2026
Joe Frogge
LC - General Contractor
Corrective Action Required
01/13/2026

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
01/13/2026

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
None $0.00 $0.00 $0.00
Outstanding Fees Amount Paid Owing Date Paid
Parks Impact Fee Non-Residential - Zone 2 $33,159.40 $0.00 $33,159.40 Not Paid
Valuation Fee for New Commercial $85,792.00 $0.00 $85,792.00 Not Paid
Sanitary Sewer Insp Fees $8,406.54 $0.00 $8,406.54 Not Paid
Water Insp Fee $18,321.03 $0.00 $18,321.03 Not Paid
Storm Sewer Inspection Fee $22,811.04 $0.00 $22,811.04 Not Paid
Site Grading Fee $2,742.81 $0.00 $2,742.81 Not Paid
Water Test Fee $100.00 $0.00 $100.00 Not Paid
Water Meter Fee $4,132.50 $0.00 $4,132.50 Not Paid
Water Tap Fee $146,870.00 $0.00 $146,870.00 Not Paid
Sanitary Sewer Development Fee $86,328.00 $0.00 $86,328.00 Not Paid
Right of Way Permit Fee $85.00 $0.00 $85.00 Not Paid
Paved Surface Inspection Fee $32,857.29 $0.00 $32,857.29 Not Paid


$441,605.61    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sprinkler - Hydrostatic Test Pending
Sprinkler - Flow Test Pending
Sprinkler - Hydrostatic Test Pending
Sprinkler - Hydrostatic Test Pending
Alarm Test Pending
Sprinkler - Hydrostatic Test Pending
Alarm Test Pending
Documents & Images
Date Uploaded File Type Document Name
12/23/2025 Application Form APPLICATION
12/23/2025 Plans Lee's Summit, MO (WH) - Civil Permit Set_122225
12/23/2025 Plans Lee's Summit, MO (WH) - Electrical Permit Set_122225
12/23/2025 Plans Lee's Summit, MO (WH) - FA Permit Set_122225
12/23/2025 Plans Lee's Summit, MO (WH) - FP Permit Set_122225
12/23/2025 Plans Lee's Summit, MO (WH) - Irrigation Permit Set_122225
12/23/2025 Plans Lee's Summit, MO (WH) - Landscape Permit Set_122225
12/23/2025 Plans Lee's Summit, MO (WH) - Mechanical Permit Set_122225
12/23/2025 Plans Lee's Summit, MO (WH) - Refrigeration Elec Permit Set_122225
12/23/2025 Plans Lee's Summit, MO (WH) - Refrigeration Permit Set_122225
12/23/2025 Engineer Report/Study Lee's Summit, MO (WH) - Structural Calc_122225
12/23/2025 Plans Lee's Summit, MO (WH) - Structure Permit Set_122225
12/23/2025 Engineer Report/Study Lee's Summit, MO (WH) - Final GEO Report_122225
12/23/2025 Plans Lee's Summit, MO (WH) - Architectural Permit Set_122225
12/31/2025 Letter License Tax Bill
01/15/2026 Letter DS P/R Corrections Document
01/15/2026 Letter Fire (Sprinkler) Plan Review
01/15/2026 Letter Fire (Sprinkler) Plan Review
01/15/2026 Lee's Summit, MO (WH) - FA Permit Set_122225 RFC
01/15/2026 Letter Fire (Alarm) Plan Review Notice
03/10/2026 3rd Party Permit/Approval Health Dept
03/10/2026 Plans CW Lee's Summit, MO Arch - Permit Revision 01_031026
03/10/2026 Plans CW Lee's Summit, MO Elec - Permit Revision 01_030326
03/10/2026 Plans CW Lee's Summit, MO FP Permit Revision 01_021626
03/10/2026 Plans CW Lee's Summit, MO Mechanical-Plumbing Revision 01_030326
03/10/2026 Letter CW Lee's Summit_Building Permit Comment Response
03/10/2026 Letter CW Lee's Summit_Fire Review Comment Response
03/10/2026 Specifications Door Hardware Specification
03/10/2026 Plans Lee's Summit, MO (WH) - Civil Permit Set_122225
03/10/2026 Plans Lee's Summit, MO (WH) - FA Permit Set_122225
03/10/2026 Plans Lee's Summit, MO (WH) - Irrigation Permit Set_122225
03/10/2026 Plans Lee's Summit, MO (WH) - Landscape Permit Set_122225
03/10/2026 Plans Lee's Summit, MO (WH) - Refrigeration Elec Permit Set_122225
03/10/2026 Plans Lee's Summit, MO (WH) - Refrigeration Permit Set_122225
03/10/2026 Plans Lee's Summit, MO (WH) - Structure Permit Set_122225
03/10/2026 Specifications Roof Hatch Specification
03/10/2026 Engineer Report/Study Costco Lees Summit Letter Of Intent - Terracon
03/17/2026 Letter DS P/R Corrections Document
03/18/2026 Lee's Summit, MO (WH) - FA Permit Set_122226 RFC
03/18/2026 Letter Fire (Alarm) Plan Review Notice
03/25/2026 Engineer Report/Study 2603106-Structure Calcs-RidgURak-1838-LeesSummitMO
03/25/2026 Plans 2603106-Structure Details-RidgURak-1838-LeesSummitMO
03/25/2026 Plans 2603106-Structure-RidgURak-1838-LeesSummitMO
03/26/2026 Approved Plans Approved construction plans
03/26/2026 Approved Plans Approved FDP_Costco_PL2025320_3.26.2026
04/01/2026 Approved Plans Approved Racking Plans
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home