PRCOM20225640
Building Permit - Commercial
Certificate of Occupancy
LEE NICHOLAS A
NEW COMMERCIAL
NEW CONSTRUCTION OF POOL STORE WITH SHOW ROOM OFFICES AND STORAGE SPACE
11/09/2022
01/04/2023
05/27/2023
04/09/2024
Locations
Contacts
LEE NICHOLAS A, Address:401 SE OLDHAM PKWY  
Sands Construction LLC, Address:1284 Eisenhower Rd, Phone:(913) 306-4015  
Jessica Meacham, Address:1284 Eisenhower Rd, Phone:(913) 278-0050  
ELITE ELECTRIC KC LLC, Address:P O BOX 368, Phone:(913) 724-1645  
MCS CONSTRUCTION LLC, Address:8624 W WAYNE AVE, Phone:(816) 645-4047  
Dennis ORoark, Address:5007 W 63rd Terrace, Phone:(913) 461-4325  
Mr. Breeze Heating and Cooling, LLC, Address:1296 Eisenhower Road  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved 04/03/2023 04/02/2023
Jim Eden
Building Plan Review Approved 04/03/2023 03/31/2023
Joe Frogge
Fire Plan Review Approved 01/03/2023 01/03/2023
Ben Hicks
Knox box required
Resolved
01/03/2023

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
Portable fire extinguishers - general
Resolved
01/03/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Miscellaneous Correction
Resolved
01/03/2023

5003.11.1 Maximum allowable quantity per control area in Group M or S occupancies. The aggregate quantity of nonflammable solid and nonflammable or noncombustible liquid hazardous materials stored and displayed within a single control area of a Group M occupancy, or an outdoor control area, or stored in a single control area of a Group S occupancy, is allowed to exceed the maximum allowable quantity per control area indicated in Section 5003.1 where in accordance with Sections 5003.11.1 through 5003.11.3.11. 5003.11.1 Maximum allowable quantity per control area in Group M or S occupancies. The aggregate amount of nonflammable solid and nonflammable or noncombustible liquid hazardous materials stored and displayed within a single control area of a Group M occupancy or stored in a single control area of a Group S occupancy shall not exceed the amounts set forth in Table 5003.11.1. 5003.11.2 Maximum allowable quantity per outdoor control area in Group M or S occupancies. The aggregate amount of nonflammable solid and nonflammable non-combustible liquid hazardous materials stored and displayed within a single outdoor control area of a Group M occupancy shall not exceed the amounts set forth in Table 5003.11.1. 5003.11.3 Storage and display. Storage and display shall be in accordance with Sections 5003.11.3.1 through 5003.11.3.11. 5003.11.3.1 Density. Storage and display of solids shall not exceed 200 pounds per square foot (976 kg/m2) of floor area actually occupied by solid merchandise. Storage and display of liquids shall not exceed 20 gallons per square foot (0.50 L/m2) of floor area actually occupied by liquid merchandise. 5003.11.3.2 Storage and display height. Display height shall not exceed 6 feet (1829 mm) above the finished floor in display areas of Group M occupancies. Storage height shall not exceed 8 feet (2438 mm) above the finished floor in storage areas of Group M and Group S occupancies. Confirm amounts ad storage arrangements.
Misc
Resolved
01/03/2023

5001.5.2 Hazardous Materials Inventory Statement (HMIS). Where required by the fire code official, an application for a permit shall include an HMIS, such as Superfund Amendments and Reauthorization Act of 1986 (SARA) Title III, Tier II Report or other approved statement. The HMIS shall include the following information: 1. Product name. 2. Component. 3. Chemical Abstract Service (CAS) number. 4. Location where stored or used. 5. Container size. 6. Hazard classification. 7. Amount in storage. 8. Amount in use-closed systems. 9. Amount in use-open systems. Provide a HM Inventory list by hazard classification and quantity.
Duct smoke detectors
Resolved
01/03/2023

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. Provide remote annunciator and reset switches.
Building Plan Review Approved 01/03/2023 12/22/2022
Joe Frogge
Licensed Contractors Approved 01/03/2023 12/22/2022
Joe Frogge
LC - MEP Subs
Resolved
12/22/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (Mr. Breeze not currently licensed with us)
Building Plan Review Approved 11/23/2022 12/14/2022
Joe Frogge
Final Development Plan
Resolved
12/14/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Misc
Resolved
11/28/2022

Demolition permit required to remove old building. Action required: Comment is informational.
Final Development Plan Review Approved 12/13/2022 12/14/2022
Scott Ready
The Water Hole Rebuild
Fire Plan Review Rejected 11/23/2022 11/28/2022
Jim Eden
Knox box required
Resolved
04/02/2023

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
Portable fire extinguishers - general
Resolved
04/02/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Miscellaneous Correction
Resolved
04/02/2023

5003.11.1 Maximum allowable quantity per control area in Group M or S occupancies. The aggregate quantity of nonflammable solid and nonflammable or noncombustible liquid hazardous materials stored and displayed within a single control area of a Group M occupancy, or an outdoor control area, or stored in a single control area of a Group S occupancy, is allowed to exceed the maximum allowable quantity per control area indicated in Section 5003.1 where in accordance with Sections 5003.11.1 through 5003.11.3.11. 5003.11.1 Maximum allowable quantity per control area in Group M or S occupancies. The aggregate amount of nonflammable solid and nonflammable or noncombustible liquid hazardous materials stored and displayed within a single control area of a Group M occupancy or stored in a single control area of a Group S occupancy shall not exceed the amounts set forth in Table 5003.11.1. 5003.11.2 Maximum allowable quantity per outdoor control area in Group M or S occupancies. The aggregate amount of nonflammable solid and nonflammable non-combustible liquid hazardous materials stored and displayed within a single outdoor control area of a Group M occupancy shall not exceed the amounts set forth in Table 5003.11.1. 5003.11.3 Storage and display. Storage and display shall be in accordance with Sections 5003.11.3.1 through 5003.11.3.11. 5003.11.3.1 Density. Storage and display of solids shall not exceed 200 pounds per square foot (976 kg/m2) of floor area actually occupied by solid merchandise. Storage and display of liquids shall not exceed 20 gallons per square foot (0.50 L/m2) of floor area actually occupied by liquid merchandise. 5003.11.3.2 Storage and display height. Display height shall not exceed 6 feet (1829 mm) above the finished floor in display areas of Group M occupancies. Storage height shall not exceed 8 feet (2438 mm) above the finished floor in storage areas of Group M and Group S occupancies. Confirm amounts ad storage arrangements.
Misc
Resolved
04/02/2023

5001.5.2 Hazardous Materials Inventory Statement (HMIS). Where required by the fire code official, an application for a permit shall include an HMIS, such as Superfund Amendments and Reauthorization Act of 1986 (SARA) Title III, Tier II Report or other approved statement. The HMIS shall include the following information: 1. Product name. 2. Component. 3. Chemical Abstract Service (CAS) number. 4. Location where stored or used. 5. Container size. 6. Hazard classification. 7. Amount in storage. 8. Amount in use-closed systems. 9. Amount in use-open systems. Provide a HM Inventory list by hazard classification and quantity.
Duct smoke detectors
Resolved
04/02/2023

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. Provide remote annunciator and reset switches.
Licensed Contractors Rejected 11/23/2022 11/18/2022
Joe Frogge
LC - MEP Subs
Corrective Action Required
11/18/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (Mr. Breeze not currently licensed with us)
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Commercial $4,629.29 $4,629.29 Paid 01/04/2023
Commercial Excise Tax Fee $7,631.25 $7,631.25 Paid 01/05/2023
$7,631.25
Temporary Occupancy Fee $50.00 $50.00 Paid 02/14/2024
Temporary Occupancy Fee $50.00 $50.00 Paid 03/18/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Site Visit Partial 3/15/2023 3/15/2023 03/15/2023
Misc
Corrective Action Required
03/15/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be.
Site Visit Partial 3/16/2023 3/16/2023 03/16/2023
Misc
Corrective Action Required
03/15/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today
Site Visit Partial 3/17/2023 3/17/2023 03/17/2023
Misc
Corrective Action Required
03/16/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development
Site Visit Partial 3/20/2023 3/20/2023 03/20/2023
Misc
Corrective Action Required
03/17/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be.
Site Visit Partial 3/21/2023 3/21/2023 03/21/2023
Misc
Corrective Action Required
03/20/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today
Site Visit Partial 3/22/2023 3/22/2023 03/22/2023
Misc
Corrective Action Required
03/21/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today
Site Visit Partial 3/23/2023 3/23/2023 03/23/2023
Misc
Corrective Action Required
03/22/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today
Site Visit Partial 3/24/2023 3/24/2023 03/24/2023
Misc
Corrective Action Required
03/23/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today
Site Visit Partial 3/30/2023 3/30/2023 03/30/2023
Misc
Corrective Action Required
03/24/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today
Site Visit Partial 3/31/2023 3/31/2023 03/31/2023
Misc
Corrective Action Required
03/30/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today
Site Visit Partial 4/3/2023 4/3/2023 04/03/2023
Misc
Corrective Action Required
03/31/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development
Site Visit Partial 4/11/2023 4/11/2023 04/11/2023
Misc
Corrective Action Required
04/03/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site
Site Visit Partial 4/12/2023 4/12/2023 04/12/2023
Misc
Corrective Action Required
04/11/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction
Site Visit Partial 4/14/2023 4/14/2023 04/14/2023
Misc
Corrective Action Required
04/12/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing
Site Visit Partial 4/17/2023 4/17/2023 04/17/2023
Misc
Corrective Action Required
04/14/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing
Site Visit Partial 4/18/2023 4/18/2023 04/18/2023
Misc
Corrective Action Required
04/17/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing
Site Visit Partial 4/19/2023 4/19/2023 04/19/2023
Misc
Corrective Action Required
04/18/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing
Site Visit Partial 4/20/2023 4/20/2023 04/20/2023
Misc
Corrective Action Required
04/19/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today
Site Visit Partial 4/21/2023 4/21/2023 04/21/2023
Misc
Corrective Action Required
04/20/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today
Site Visit Partial 4/24/2023 4/24/2023 04/24/2023
Misc
Corrective Action Required
04/21/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today
Site Visit Partial 4/25/2023 4/25/2023 04/25/2023
Misc
Corrective Action Required
04/24/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today
Site Visit Partial 4/26/2023 4/26/2023 04/26/2023
Misc
Corrective Action Required
04/25/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today
Site Visit Partial 4/28/2023 4/28/2023 04/28/2023
Misc
Corrective Action Required
04/26/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today
Site Visit Partial 5/1/2023 5/1/2023 05/01/2023
Misc
Corrective Action Required
04/28/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today
Site Visit Partial 5/2/2023 5/2/2023 05/02/2023
Misc
Corrective Action Required
05/01/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today
Site Visit Partial 5/3/2023 5/3/2023 05/03/2023
Misc
Corrective Action Required
05/02/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today
Site Visit Partial 5/5/2023 5/5/2023 05/05/2023
Misc
Corrective Action Required
05/03/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today
Site Visit Partial 5/8/2023 5/8/2023 05/08/2023
Misc
Corrective Action Required
05/05/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today
Site Visit Partial 5/12/2023 5/12/2023 05/12/2023
Misc
Corrective Action Required
05/08/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today
Site Visit Partial 5/19/2023 5/19/2023 05/19/2023
Misc
Corrective Action Required
05/12/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today
Site Visit Partial 5/23/2023 5/23/2023 05/23/2023
Misc
Corrective Action Required
05/19/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today
Site Visit Partial 5/30/2023 5/30/2023 05/30/2023
Misc
Corrective Action Required
05/23/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site
Erosion Control Inspection Partial 5/31/2023 5/31/2023 05/31/2023
Misc
Informational
05/31/2023
5-31-23 PS Install erosion control on project prior to construction
Site Visit Partial 6/7/2023 6/7/2023 06/07/2023
Misc
Corrective Action Required
05/30/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23b PS No work on site. Contractor has not been on site for extended period of time.
Site Visit Partial 6/14/2023 6/14/2023 06/14/2023
Misc
Corrective Action Required
06/07/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23b PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings
Site Visit Partial 6/15/2023 6/15/2023 06/15/2023
Misc
Corrective Action Required
06/14/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23b PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing
Site Visit Partial 6/19/2023 6/19/2023 06/19/2023
Misc
Corrective Action Required
06/15/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23b PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing.
Site Visit Partial 6/20/2023 6/20/2023 06/20/2023
Misc
Corrective Action Required
06/19/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23b PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings
Grading/Excavation/Fill Inspection Partial 6/21/2023 6/21/2023 06/21/2023
Misc
Informational
06/21/2023
6-21-23 PS Crew on site excavating for building footing and pad
Footing Inspection - Commercial Failed 6/21/2023 (9:30) 6/21/2023 06/21/2023
Misc
Corrective Action Required
06/21/2023
Exterior footing only: -Remove all loose dirt -Provide min 3” rebar clearance from soil -Provide bottom rebars at PVC sewer stub out at north side of building -Complete pilaster reinforcement Interior footing not done yet
Footing Inspection - Commercial Failed 6/22/2023 (8:00) 6/22/2023 06/22/2023
Misc
Corrective Action Required
06/21/2023
Exterior footing only: -Remove all loose dirt -Provide min 3” rebar clearance from soil -Provide bottom rebars at PVC sewer stub out at north side of building -Complete pilaster reinforcement -Have approved plans on site -Provide UFER grounding conductor -Remove all water from bottom of footing Interior footing not done yet
Grading/Excavation/Fill Inspection Partial 6/22/2023 6/22/2023 06/22/2023
Misc
Informational
06/21/2023
6-21-23 PS Crew on site excavating for building footing and pad 6-22-23 PS Crew on site excavating and site grading for building pad
Footing Inspection - Commercial Partial 6/23/2023 (8:00) 6/23/2023 06/23/2023
Misc
Corrective Action Required
06/23/2023
Exterior footing only-OK to pour Interior footing not done yet
Grading/Excavation/Fill Inspection Partial 6/23/2023 6/23/2023 06/23/2023
Misc
Informational
06/22/2023
6-21-23 PS Crew on site excavating for building footing and pad 6-22-23 PS Crew on site excavating and site grading for building pad 6-23-23 PS Contractor performing site work for building pad
Grading/Excavation/Fill Inspection Partial 6/26/2023 6/26/2023 06/26/2023
Misc
Informational
06/23/2023
6-21-23 PS Crew on site excavating for building footing and pad 6-22-23 PS Crew on site excavating and site grading for building pad 6-23-23 PS Contractor performing site work for building pad 6-26-23 PS Contractor grading for building pad
Site Visit Partial 6/28/2023 6/28/2023 06/28/2023
Misc
Corrective Action Required
06/20/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23b PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing
Sanitary Sewer Construction Inspection Passed 6/29/2023 6/29/2023 06/29/2023
Misc
Informational
06/29/2023
6/29/23 PS - Inspected interior sanitary connection to existing stub from prior building and cleanout on north side of building. Existing stub and cleanout to be reused per plans.
Underslab Plumbing Inspection - Commercial Passed 6/30/2023 6/30/2023 06/30/2023
Site Visit Partial 6/30/2023 6/30/2023 06/30/2023
Misc
Corrective Action Required
06/28/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week.
Site Visit Partial 7/3/2023 7/3/2023 07/03/2023
Misc
Corrective Action Required
06/30/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today
Site Visit Partial 7/6/2023 7/6/2023 07/06/2023
Misc
Corrective Action Required
07/03/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today
Site Visit Partial 7/10/2023 7/10/2023 07/10/2023
Misc
Corrective Action Required
07/06/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical
Underslab Electrical Inspection - Commercial Passed 7/11/2023 7/11/2023 07/11/2023
Site Visit Partial 7/11/2023 7/11/2023 07/11/2023
Misc
Corrective Action Required
07/10/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site
Site Visit Partial 7/12/2023 7/12/2023 07/12/2023
Misc
Corrective Action Required
07/11/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab
Site Visit Partial 7/14/2023 7/14/2023 07/14/2023
Misc
Corrective Action Required
07/12/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site
Site Visit Partial 7/17/2023 7/17/2023 07/17/2023
Misc
Corrective Action Required
07/14/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today
Erosion Control Inspection Partial 7/18/2023 7/18/2023 07/18/2023
Misc
Informational
05/31/2023
Site Visit Partial 7/20/2023 7/20/2023 07/20/2023
Misc
Corrective Action Required
07/17/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site
Site Visit Partial 7/21/2023 7/21/2023 07/21/2023
Misc
Corrective Action Required
07/20/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab
Erosion Control Inspection Partial 7/25/2023 7/25/2023 07/25/2023
Misc
Informational
07/18/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site
Site Visit Partial 7/27/2023 7/27/2023 07/27/2023
Misc
Corrective Action Required
07/21/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel
Site Visit Partial 7/28/2023 7/28/2023 07/28/2023
Misc
Corrective Action Required
07/27/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site
Site Visit Partial 8/1/2023 8/1/2023 08/01/2023
Misc
Corrective Action Required
07/28/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel
Site Visit Partial 8/2/2023 8/2/2023 08/02/2023
Misc
Corrective Action Required
08/01/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel
Erosion Control Inspection Partial 8/3/2023 8/3/2023 08/03/2023
Misc
Informational
07/25/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site
Site Visit Partial 8/4/2023 8/4/2023 08/04/2023
Misc
Corrective Action Required
08/02/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel
Site Visit Partial 8/7/2023 8/7/2023 08/07/2023
Misc
Corrective Action Required
08/04/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel
Site Visit Partial 8/9/2023 8/9/2023 08/09/2023
Misc
Corrective Action Required
08/07/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site
Erosion Control Inspection Partial 8/9/2023 8/9/2023 08/09/2023
Misc
Informational
08/03/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection
Site Visit Partial 8/10/2023 8/10/2023 08/10/2023
Misc
Corrective Action Required
08/09/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel
Site Visit Partial 8/11/2023 8/11/2023 08/11/2023
Misc
Corrective Action Required
08/10/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel
Erosion Control Inspection Partial 8/14/2023 8/14/2023 08/14/2023
Misc
Informational
08/09/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection
Site Visit Partial 8/14/2023 8/14/2023 08/14/2023
Misc
Corrective Action Required
08/11/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel
Site Visit Partial 8/15/2023 8/15/2023 08/15/2023
Misc
Corrective Action Required
08/14/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel
Site Visit Partial 8/16/2023 8/16/2023 08/16/2023
Misc
Corrective Action Required
08/15/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel
Site Visit Partial 8/18/2023 8/18/2023 08/18/2023
Misc
Corrective Action Required
08/16/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site
Site Visit Partial 8/21/2023 8/21/2023 08/21/2023
Misc
Corrective Action Required
08/18/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel
Erosion Control Inspection Partial 8/21/2023 8/21/2023 08/21/2023
Misc
Informational
08/14/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection
Site Visit Partial 8/22/2023 8/22/2023 08/22/2023
Misc
Corrective Action Required
08/21/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel
Site Visit Partial 8/24/2023 8/24/2023 08/24/2023
Misc
Corrective Action Required
08/22/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel
Site Visit Partial 8/25/2023 8/25/2023 08/25/2023
Misc
Corrective Action Required
08/24/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel
Site Visit Partial 8/28/2023 8/28/2023 08/28/2023
Misc
Corrective Action Required
08/25/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel
Site Visit Partial 8/30/2023 8/30/2023 08/30/2023
Misc
Corrective Action Required
08/28/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel
Site Visit Partial 8/31/2023 8/31/2023 08/31/2023
Misc
Corrective Action Required
08/30/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel
Site Visit Partial 9/6/2023 9/6/2023 09/06/2023
Misc
Corrective Action Required
08/31/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel
Erosion Control Inspection Partial 9/6/2023 9/6/2023 09/06/2023
Misc
Informational
08/21/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection
Site Visit Partial 9/8/2023 9/8/2023 09/08/2023
Misc
Corrective Action Required
09/06/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel
Site Visit Partial 9/11/2023 9/11/2023 09/11/2023
Misc
Corrective Action Required
09/08/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel
Erosion Control Inspection Partial 9/11/2023 9/11/2023 09/11/2023
Misc
Informational
09/06/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection
Site Visit Partial 9/13/2023 9/13/2023 09/13/2023
Misc
Corrective Action Required
09/11/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel
Site Visit Partial 9/14/2023 9/14/2023 09/14/2023
Misc
Corrective Action Required
09/13/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel
In-wall Inspection Failed 9/14/2023 9/14/2023 09/14/2023
Misc
Corrective Action Required
09/14/2023
9/14/23 -Not ready for in wall inspection at this time. Ok to install exterior sheathing.
Site Visit Partial 9/15/2023 9/15/2023 09/15/2023
Misc
Corrective Action Required
09/14/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel 9-15-23 PS Crew working on building steel
Site Visit Partial 9/20/2023 9/20/2023 09/20/2023
Misc
Corrective Action Required
09/15/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel 9-15-23 PS Crew working on building steel 9-20-23 PS Crew working on building steel
Erosion Control Inspection Partial 9/20/2023 9/20/2023 09/20/2023
Misc
Informational
09/11/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection
Erosion Control Inspection Partial 9/25/2023 9/25/2023 09/25/2023
Misc
Informational
09/20/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection 9-25-23 PS Erosion control acceptable at time of inspection
Site Visit Partial 9/26/2023 9/26/2023 09/26/2023
Misc
Corrective Action Required
09/20/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel 9-15-23 PS Crew working on building steel 9-20-23 PS Crew working on building steel 9-26-23 PS Contractor working on building construction
Rated Assembly Inspection Partial 9/26/2023 9/26/2023 09/26/2023
Misc
Informational
09/26/2023
Exterior sheathing screw pattern approved
Site Visit Partial 9/29/2023 9/29/2023 09/29/2023
Misc
Corrective Action Required
09/26/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel 9-15-23 PS Crew working on building steel 9-20-23 PS Crew working on building steel 9-26-23 PS Contractor working on building construction 9-29-23 PS Contractor working on building construction
Site Visit Partial 10/2/2023 10/2/2023 10/02/2023
Misc
Corrective Action Required
09/29/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel 9-15-23 PS Crew working on building steel 9-20-23 PS Crew working on building steel 9-26-23 PS Contractor working on building construction 9-29-23 PS Contractor working on building construction 10-2-23 PS No work for development today
Site Visit Partial 10/5/2023 10/5/2023 10/05/2023
Misc
Corrective Action Required
10/02/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel 9-15-23 PS Crew working on building steel 9-20-23 PS Crew working on building steel 9-26-23 PS Contractor working on building construction 9-29-23 PS Contractor working on building construction 10-2-23 PS No work for development today 10-5-23 PS No work for development
Erosion Control Inspection Partial 10/11/2023 10/11/2023 10/11/2023
Misc
Informational
09/25/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection 9-25-23 PS Erosion control acceptable at time of inspection 10-11-23 PS Erosion control acceptable at time of inspection
Site Visit Partial 10/12/2023 10/12/2023 10/12/2023
Misc
Corrective Action Required
10/05/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel 9-15-23 PS Crew working on building steel 9-20-23 PS Crew working on building steel 9-26-23 PS Contractor working on building construction 9-29-23 PS Contractor working on building construction 10-2-23 PS No work for development today 10-5-23 PS No work for development 10-12-23 PS No work for development
Site Visit Partial 10/16/2023 10/16/2023 10/16/2023
Misc
Corrective Action Required
10/12/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel 9-15-23 PS Crew working on building steel 9-20-23 PS Crew working on building steel 9-26-23 PS Contractor working on building construction 9-29-23 PS Contractor working on building construction 10-2-23 PS No work for development today 10-5-23 PS No work for development 10-12-23 PS No work for development 10-16-23 PS No work for development
Erosion Control Inspection Partial 10/24/2023 10/24/2023 10/24/2023
Misc
Informational
10/11/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection 9-25-23 PS Erosion control acceptable at time of inspection 10-11-23 PS Erosion control acceptable at time of inspection 10-24-23 PS Erosion control acceptable at time of inspection
Erosion Control Inspection Partial 10/27/2023 10/27/2023 10/27/2023
Misc
Informational
10/24/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection 9-25-23 PS Erosion control acceptable at time of inspection 10-11-23 PS Erosion control acceptable at time of inspection 10-24-23 PS Erosion control acceptable at time of inspection 10-27-23 PS Erosion control acceptable at time of inspection
Erosion Control Inspection Partial 10/30/2023 10/30/2023 10/30/2023
Misc
Informational
10/27/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection 9-25-23 PS Erosion control acceptable at time of inspection 10-11-23 PS Erosion control acceptable at time of inspection 10-24-23 PS Erosion control acceptable at time of inspection 10-27-23 PS Erosion control acceptable at time of inspection 10-30-23 PS Erosion control acceptable at time of inspection
Site Visit Partial 10/31/2023 10/31/2023 10/31/2023
Misc
Corrective Action Required
10/16/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel 9-15-23 PS Crew working on building steel 9-20-23 PS Crew working on building steel 9-26-23 PS Contractor working on building construction 9-29-23 PS Contractor working on building construction 10-2-23 PS No work for development today 10-5-23 PS No work for development 10-12-23 PS No work for development 10-16-23 PS No work for development 10-31-23 PS No work for development today
In-wall Inspection Partial 10/31/2023 10/31/2023 10/31/2023
Misc
Corrective Action Required
09/14/2023
-Protect all pex and dwv within 1.25” to face of framing -Install grommets at pex lines bored through steel framing -Install bonding screw and jumper at metallic box in storage area -Land MC at exterior box near shower *OK TO INSULATE AND 1 SIDE. DO NOT COVER INSPECTION ITEMS
Site Visit Partial 11/2/2023 11/2/2023 11/02/2023
Misc
Corrective Action Required
10/31/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel 9-15-23 PS Crew working on building steel 9-20-23 PS Crew working on building steel 9-26-23 PS Contractor working on building construction 9-29-23 PS Contractor working on building construction 10-2-23 PS No work for development today 10-5-23 PS No work for development 10-12-23 PS No work for development 10-16-23 PS No work for development 10-31-23 PS No work for development today 11-2-23 PS No work for development today
In-wall Inspection Partial 11/3/2023 11/3/2023 11/03/2023
Misc
Corrective Action Required
10/31/2023
-Install bonding screw and jumper at metallic box in storage area *OK TO INSULATE AND 1 SIDE. DO NOT COVER INSPECTION ITEMS
Site Visit Partial 11/6/2023 11/6/2023 11/06/2023
Misc
Corrective Action Required
11/02/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel 9-15-23 PS Crew working on building steel 9-20-23 PS Crew working on building steel 9-26-23 PS Contractor working on building construction 9-29-23 PS Contractor working on building construction 10-2-23 PS No work for development today 10-5-23 PS No work for development 10-12-23 PS No work for development 10-16-23 PS No work for development 10-31-23 PS No work for development today 11-2-23 PS No work for development today 11-6-23 PS No work for development today
Site Visit Partial 11/7/2023 11/7/2023 11/07/2023
Misc
Corrective Action Required
11/06/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel 9-15-23 PS Crew working on building steel 9-20-23 PS Crew working on building steel 9-26-23 PS Contractor working on building construction 9-29-23 PS Contractor working on building construction 10-2-23 PS No work for development today 10-5-23 PS No work for development 10-12-23 PS No work for development 10-16-23 PS No work for development 10-31-23 PS No work for development today 11-2-23 PS No work for development today 11-6-23 PS No work for development today 11-7-23 PS No work for devlopment today
In-wall Inspection Partial 11/10/2023 11/10/2023 11/10/2023
Misc
Corrective Action Required
11/03/2023
-Install bonding screw and jumper at metallic box in storage area * DO NOT COVER INSPECTION ITEMS
In-wall Inspection Passed 11/16/2023
Misc
Resolved
11/16/2023
-Install bonding screw and jumper at metallic box in storage area * DO NOT COVER INSPECTION ITEMS
Gas Service Inspection - Commercial Passed 11/16/2023 11/16/2023 11/16/2023
Erosion Control Inspection Partial 11/21/2023 11/21/2023 11/21/2023
Misc
Informational
10/30/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection 9-25-23 PS Erosion control acceptable at time of inspection 10-11-23 PS Erosion control acceptable at time of inspection 10-24-23 PS Erosion control acceptable at time of inspection 10-27-23 PS Erosion control acceptable at time of inspection 10-30-23 PS Erosion control acceptable at time of inspection 11-21-23 PS Erosion control acceptable at time of inspection
Erosion Control Inspection Partial 12/4/2023 12/4/2023 12/04/2023
Misc
Informational
11/21/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection 9-25-23 PS Erosion control acceptable at time of inspection 10-11-23 PS Erosion control acceptable at time of inspection 10-24-23 PS Erosion control acceptable at time of inspection 10-27-23 PS Erosion control acceptable at time of inspection 10-30-23 PS Erosion control acceptable at time of inspection 11-21-23 PS Erosion control acceptable at time of inspection 12-4-23 PS Erosion control acceptable at time of inspection
Site Visit Partial 12/5/2023 12/5/2023 12/05/2023
Misc
Corrective Action Required
11/07/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel 9-15-23 PS Crew working on building steel 9-20-23 PS Crew working on building steel 9-26-23 PS Contractor working on building construction 9-29-23 PS Contractor working on building construction 10-2-23 PS No work for development today 10-5-23 PS No work for development 10-12-23 PS No work for development 10-16-23 PS No work for development 10-31-23 PS No work for development today 11-2-23 PS No work for development today 11-6-23 PS No work for development today 11-7-23 PS No work for devlopment today 12-5-23 PS No work for development
Water Service Inspection Partial 12/6/2023 12/6/2023 12/06/2023
Misc
Informational
12/06/2023
12-6-23 PS Contractor excavating for connection of new line at building to existing meter
Water Service Inspection Passed 12/7/2023 12/7/2023 12/07/2023
Misc
Informational
12/06/2023
12-6-23 PS Contractor excavating for connection of new line at building to existing meter 12-7-23 PS Contractor connected pex to existing copper tail off meter near building. No additional work performed to existing meter or copper to and from main
Electrical Service Inspection Passed 12/11/2023 12/11/2023 12/11/2023
Erosion Control Inspection Partial 12/18/2023 12/18/2023 12/18/2023
Misc
Informational
12/04/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection 9-25-23 PS Erosion control acceptable at time of inspection 10-11-23 PS Erosion control acceptable at time of inspection 10-24-23 PS Erosion control acceptable at time of inspection 10-27-23 PS Erosion control acceptable at time of inspection 10-30-23 PS Erosion control acceptable at time of inspection 11-21-23 PS Erosion control acceptable at time of inspection 12-4-23 PS Erosion control acceptable at time of inspection 12-18-23 PS Erosion control acceptable at time of inspection
Site Visit Partial 12/21/2023 12/21/2023 12/21/2023
Misc
Corrective Action Required
12/05/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel 9-15-23 PS Crew working on building steel 9-20-23 PS Crew working on building steel 9-26-23 PS Contractor working on building construction 9-29-23 PS Contractor working on building construction 10-2-23 PS No work for development today 10-5-23 PS No work for development 10-12-23 PS No work for development 10-16-23 PS No work for development 10-31-23 PS No work for development today 11-2-23 PS No work for development today 11-6-23 PS No work for development today 11-7-23 PS No work for development today 12-5-23 PS No work for development 12-21-23 PS No work for development today
Footing Inspection - Commercial Passed 12/27/2023
Misc
Resolved
12/27/2023
Exterior footing only-OK to pour Interior footing not done yet
Rated Assembly Inspection Passed 12/27/2023
Misc
Resolved
12/27/2023
Exterior sheathing screw pattern approved
Above Ceiling Inspection Passed 12/27/2023 12/27/2023 12/27/2023
Occupancy Inspection - Engineering Temporary C of O 12/29/2023 12/29/2023 12/28/2023
Misc
Informational
12/28/2023
12-28-23 RH. Temporary Occupancy Approved Punchlist: 1) Site Cleanup 2) Vegetation
Occupancy Inspection - Planning Failed 12/29/2023 12/29/2023 12/28/2023
Corrective Action Required
12/28/2023
EIFS accent bands still need to be installed on the exteior of the building. Wall materials are missing on the rear of the building.
Corrective Action Required
12/28/2023
Sidewalk along Oldham must be installed or payment in lieu of must be made prior to issuing a TCO or CO.
Occupancy Inspection - Codes Commercial Failed 12/29/2023 12/29/2023 12/29/2023
Misc
Corrective Action Required
12/29/2023
-Approval required from departments: Fire, Planning, Field Engineer, Water -Provide Special Inspection approval per IBC 1705 -Provide address -Provide asphalt level within 1/4” of accessible route landing at front as called on plan -Complete installing signage -Provide signage for restrooms -Locate bathroom mirror down so that the bottom edge of mirror to be within 40” of floor -Handrail shall comply with requirements of IBC 1014. Provide handrails on both sides of stair. Handrails shall extend beyond top and bottom stair risers and return to wall or guard/floor per IBC 1014.6 -Stair shall comply with requirements of IBC 1011. Maximum stair riser height difference shall not exceeed 3/8”. Maximum riser shall be no more than 7”. Tread depth shall be min 11” -Provide support for PVC at maximum 4 ft intervals -Provide shutoff device at auxiliary drain pan under furnace -Bond copper water lines to one of the grounding electrodes (bond to building steel) -Seal penetration of exterior wall at CU units -Provide storm drainage system away from building -Complete electrical service to building **OK TO STOCK AND TRAIN. DO NOT OCCUPY UNTIL APPROVED.
Erosion Control Inspection Partial 1/2/2024 1/2/2024 01/02/2024
Misc
Informational
12/18/2023
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection 9-25-23 PS Erosion control acceptable at time of inspection 10-11-23 PS Erosion control acceptable at time of inspection 10-24-23 PS Erosion control acceptable at time of inspection 10-27-23 PS Erosion control acceptable at time of inspection 10-30-23 PS Erosion control acceptable at time of inspection 11-21-23 PS Erosion control acceptable at time of inspection 12-4-23 PS Erosion control acceptable at time of inspection 12-18-23 PS Erosion control acceptable at time of inspection 1-2-24 PS Erosion control acceptable at time of inspection
Site Visit Partial 1/11/2024 1/11/2024 01/11/2024
Misc
Corrective Action Required
12/21/2023
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel 9-15-23 PS Crew working on building steel 9-20-23 PS Crew working on building steel 9-26-23 PS Contractor working on building construction 9-29-23 PS Contractor working on building construction 10-2-23 PS No work for development today 10-5-23 PS No work for development 10-12-23 PS No work for development 10-16-23 PS No work for development 10-31-23 PS No work for development today 11-2-23 PS No work for development today 11-6-23 PS No work for development today 11-7-23 PS No work for development today 12-5-23 PS No work for development 12-21-23 PS No work for development today 12-27-23 Dustin A, no work for us today 12-28-23 Dustin A, No Activity for our dept . 1-11-24 PS No activity for development
Erosion Control Inspection Partial 1/17/2024 1/17/2024 01/17/2024
Misc
Informational
01/02/2024
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection 9-25-23 PS Erosion control acceptable at time of inspection 10-11-23 PS Erosion control acceptable at time of inspection 10-24-23 PS Erosion control acceptable at time of inspection 10-27-23 PS Erosion control acceptable at time of inspection 10-30-23 PS Erosion control acceptable at time of inspection 11-21-23 PS Erosion control acceptable at time of inspection 12-4-23 PS Erosion control acceptable at time of inspection 12-18-23 PS Erosion control acceptable at time of inspection 1-2-24 PS Erosion control acceptable at time of inspection 1-17-24 PS Erosion control acceptable at time of inspection
Erosion Control Inspection Partial 1/24/2024 1/24/2024 01/24/2024
Misc
Informational
01/17/2024
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection 9-25-23 PS Erosion control acceptable at time of inspection 10-11-23 PS Erosion control acceptable at time of inspection 10-24-23 PS Erosion control acceptable at time of inspection 10-27-23 PS Erosion control acceptable at time of inspection 10-30-23 PS Erosion control acceptable at time of inspection 11-21-23 PS Erosion control acceptable at time of inspection 12-4-23 PS Erosion control acceptable at time of inspection 12-18-23 PS Erosion control acceptable at time of inspection 1-2-24 PS Erosion control acceptable at time of inspection 1-17-24 PS Erosion control acceptable at time of inspection 1-24-24 PS Erosion control acceptable at time of inspection
Erosion Control Inspection Partial 2/2/2024 2/2/2024 02/02/2024
Misc
Informational
01/24/2024
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection 9-25-23 PS Erosion control acceptable at time of inspection 10-11-23 PS Erosion control acceptable at time of inspection 10-24-23 PS Erosion control acceptable at time of inspection 10-27-23 PS Erosion control acceptable at time of inspection 10-30-23 PS Erosion control acceptable at time of inspection 11-21-23 PS Erosion control acceptable at time of inspection 12-4-23 PS Erosion control acceptable at time of inspection 12-18-23 PS Erosion control acceptable at time of inspection 1-2-24 PS Erosion control acceptable at time of inspection 1-17-24 PS Erosion control acceptable at time of inspection 1-24-24 PS Erosion control acceptable at time of inspection 2-2-24 PS Erosion control acceptable at time of inspection
Occupancy Inspection - Engineering Temporary C of O 2/12/2024 2/12/2024 02/12/2024
Misc
Informational
12/28/2023
2-12-24 PS Temporary Occupancy Approved Vegetation required, 70% min growth required. Seed and straw mats placed, no vegetation established at inspection
Occupancy Inspection - Codes Commercial Ready for Temp CO 2/12/2024 2/12/2024 02/12/2024
Misc
Corrective Action Required
12/29/2023
-Approval required from departments: Fire, Planning, Field Engineer, -Complete exterior canopy and lighting at entry
Occupancy Inspection - Planning Temporary C of O 2/12/2024 2/12/2024 02/12/2024
Corrective Action Required
02/12/2024
In order to comply with the Unified Development Ordinance, the ground-mounted mechanical equipment (i.e. the condenser unit) at the NE building corner shall be fully screened from view using evergreen landscaping of a height at least as tall as the mechanical equipment at the time of planting.
Occupancy Inspection - Fire Failed 2/12/2024 2/12/2024 02/13/2024
Occupancy Inspection - Fire Failed 02/13/2024
Grading/Excavation/Fill Inspection Passed 2/20/2024 2/20/2024 02/20/2024
Misc
Informational
06/26/2023
6-21-23 PS Crew on site excavating for building footing and pad 6-22-23 PS Crew on site excavating and site grading for building pad 6-23-23 PS Contractor performing site work for building pad 6-26-23 PS Contractor grading for building pad
Occupancy Inspection - Water Utilities Passed 2/12/2024 2/12/2024 03/12/2024
Erosion Control Inspection Partial 3/14/2024 3/14/2024 03/14/2024
Misc
Informational
02/02/2024
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection 9-25-23 PS Erosion control acceptable at time of inspection 10-11-23 PS Erosion control acceptable at time of inspection 10-24-23 PS Erosion control acceptable at time of inspection 10-27-23 PS Erosion control acceptable at time of inspection 10-30-23 PS Erosion control acceptable at time of inspection 11-21-23 PS Erosion control acceptable at time of inspection 12-4-23 PS Erosion control acceptable at time of inspection 12-18-23 PS Erosion control acceptable at time of inspection 1-2-24 PS Erosion control acceptable at time of inspection 1-17-24 PS Erosion control acceptable at time of inspection 1-24-24 PS Erosion control acceptable at time of inspection 2-2-24 PS Erosion control acceptable at time of inspection 3-14-24 PS Erosion control acceptable at time of inspection
Occupancy Inspection - Codes Commercial Ready for Temp CO 3/15/2024 03/15/2024
Misc
Corrective Action Required
02/12/2024
-Approval required from departments: Fire, Planning, Field Engineer, -Complete exterior canopy and lighting at entry
Erosion Control Inspection Partial 3/26/2024 3/26/2024 03/26/2024
Misc
Informational
03/14/2024
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection 9-25-23 PS Erosion control acceptable at time of inspection 10-11-23 PS Erosion control acceptable at time of inspection 10-24-23 PS Erosion control acceptable at time of inspection 10-27-23 PS Erosion control acceptable at time of inspection 10-30-23 PS Erosion control acceptable at time of inspection 11-21-23 PS Erosion control acceptable at time of inspection 12-4-23 PS Erosion control acceptable at time of inspection 12-18-23 PS Erosion control acceptable at time of inspection 1-2-24 PS Erosion control acceptable at time of inspection 1-17-24 PS Erosion control acceptable at time of inspection 1-24-24 PS Erosion control acceptable at time of inspection 2-2-24 PS Erosion control acceptable at time of inspection 3-14-24 PS Erosion control acceptable at time of inspection
Erosion Control Inspection Partial 3/28/2024 3/28/2024 03/28/2024
Misc
Informational
03/26/2024
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection 9-25-23 PS Erosion control acceptable at time of inspection 10-11-23 PS Erosion control acceptable at time of inspection 10-24-23 PS Erosion control acceptable at time of inspection 10-27-23 PS Erosion control acceptable at time of inspection 10-30-23 PS Erosion control acceptable at time of inspection 11-21-23 PS Erosion control acceptable at time of inspection 12-4-23 PS Erosion control acceptable at time of inspection 12-18-23 PS Erosion control acceptable at time of inspection 1-2-24 PS Erosion control acceptable at time of inspection 1-17-24 PS Erosion control acceptable at time of inspection 1-24-24 PS Erosion control acceptable at time of inspection 2-2-24 PS Erosion control acceptable at time of inspection 3-14-24 PS Erosion control acceptable at time of inspection
Occupancy Inspection - Planning Passed 4/9/2024 4/9/2024 04/05/2024
Site Visit Complete 4/9/2024 4/9/2024 04/09/2024
Misc
Corrective Action Required
01/11/2024
3-15-23 PS Made site visit, equipment mobilized on site but contractor not present. Asphalt from existing parking lot has been removed for where building pad will be. 3-16-23 PS No work on site today 3-17-23 PS No work for development 3-20-23 PS No work on site. Contractor has worked on removing remainder of asphalt where building pad will be. 3-21-23 PS No work for development today 3-24-23 PS No work for development today 3-30-23 PS No work for development today 4-3-23 PS No work for development 4-11-23 PS No work on site 4-12-23 PS Contractor mobilizing additional equipment on site to begin construction 4-14-23 PS Contractor on site with equipment/materials to begin excavating for building footing 4-17-23 PS Contractor on site beginning site work for building footing 4-18-23 PS Contractor continues site work for building footing 4-19-23 PS Contractor continues site work for building footing 4-20-23 PS No work on site for development today 4-21-23 PS No work on site for development today 4-24-23 PS No work on site for development today 4-25-23 PS No work for development today 4-26-23 PS No work for development today 4-27-23 PS No work on site for development today 5-1-23 PS No work on site today 5-2-23 PS No work on site today 5-3-23 PS No work on site today 5-8-23 PS No work on site today 5-12-23 PS No work on site today 5-19-23 PS No work on site today 5-30-23 PS No work on site 6-7-23 PS No work on site. Contractor has not been on site for extended period of time. 6-14-23 PS Crew is on site with equipment excavating for building footings 6-15-23 PS Crew excavating for building footing 6-19-23 PS Crews removing spoils piles from site from building pad excavation. Also continuing to excavate for building footing. 6-20-23 PS Crews continuing to excavate for building footings 6-28-23 PS Contractor loading equipment and completing building footing 6-30-23 PS Trades working on underslab plumbing, no inspections for development today. Plumbing contractor expects to complete domestic water service next week. 7-3-23 PS No work on site for development today 7-6-23 PS No work on site for development today 7-10-23 PS Crew on site working on bulding underslab electrical 7-11-23 PS No work on site 7-10-23 PS Contractor pouring building underslab 7-14-23 PS No work on site 7-17-23 PS Crew pouring building slab today 7-20-23 PS No work on site 7-21-23 PS Concrete crew on site for building underslab 7-27-23 PS Crews working on building steel 7-28-23 PS No activity on site 8-1-23 PS Crew working on building steel 8-2-23 PS Crew working on building steel 8-4-23 PS Crew working on building steel 8-7-23 PS Crew working on building steel 8-9-23 PS No activity on site 8-10-23 PS Crew working on building steel 8-11-23 PS Crew working on buidling steel 8-14-23 PS Crew working on building steel 8-15-23 PS Crew working on building steel 8-16-23 PS Crew working on building steel 8-17-23 PS No activity on site 8-21-23 PS Crew working on building steel 8-22-23 PS Crew working on building steel 8-24-23 PS Crew working on building steel 8-25-23 PS Crew working on building steel 8-28-23 PS Crew working on building steel 8-30-23 PS Crew working on building steel 8-31-23 PS Crew working on building steel 9-6-23 PS Crew working on building steel 9-8-23 PS Crew working on building steel 9-11-23 PS Crew working on building steel 9-13-23 PS Crew working on building steel 9-14-23 PS Crew working on building steel 9-15-23 PS Crew working on building steel 9-20-23 PS Crew working on building steel 9-26-23 PS Contractor working on building construction 9-29-23 PS Contractor working on building construction 10-2-23 PS No work for development today 10-5-23 PS No work for development 10-12-23 PS No work for development 10-16-23 PS No work for development 10-31-23 PS No work for development today 11-2-23 PS No work for development today 11-6-23 PS No work for development today 11-7-23 PS No work for development today 12-5-23 PS No work for development 12-21-23 PS No work for development today 12-27-23 Dustin A, no work for us today 12-28-23 Dustin A, No Activity for our dept . 1-11-24 PS No activity for development
ESC - (Vegetation/Ground Cover) Passed 4/9/2024 4/9/2024 04/09/2024
Erosion Control Inspection Passed 4/9/2024 4/9/2024 04/09/2024
Misc
Informational
03/28/2024
7-25-23 PS Erosion control acceptable at inspection, silt contained to site 8-9-23 PS Erosion control acceptable at time of inspection 8-14-23 PS Erosion control acceptable at time of inspection 8-21-23 PS Erosion control acceptable at time of inspection 9-6-23 PS Erosion control acceptable at time of inspection 9-11-23 PS Erosion control acceptable at time of inspection 9-20-23 PS Erosion control acceptable at time of inspection 9-25-23 PS Erosion control acceptable at time of inspection 10-11-23 PS Erosion control acceptable at time of inspection 10-24-23 PS Erosion control acceptable at time of inspection 10-27-23 PS Erosion control acceptable at time of inspection 10-30-23 PS Erosion control acceptable at time of inspection 11-21-23 PS Erosion control acceptable at time of inspection 12-4-23 PS Erosion control acceptable at time of inspection 12-18-23 PS Erosion control acceptable at time of inspection 1-2-24 PS Erosion control acceptable at time of inspection 1-17-24 PS Erosion control acceptable at time of inspection 1-24-24 PS Erosion control acceptable at time of inspection 2-2-24 PS Erosion control acceptable at time of inspection 3-14-24 PS Erosion control acceptable at time of inspection
Occupancy Inspection - Engineering Passed 4/9/2024 04/09/2024
Misc
Resolved
04/09/2024
2-12-24 PS Temporary Occupancy Approved Vegetation required, 70% min growth required. Seed and straw mats placed, no vegetation established at inspection
Occupancy Inspection - Fire Passed 4/9/2024 04/09/2024
Occupancy Inspection - Codes Commercial Full C of O 4/9/2024 4/9/2024 04/09/2024
Misc
Resolved
04/09/2024
-Approval required from departments: Fire, Planning, Field Engineer, -Complete exterior canopy and lighting at entry
Documents & Images
Date Uploaded File Type Document Name
11/09/2022 Application Form Signed-Building Permit Application
11/09/2022 Plans Building Permit Drawings - Water Hole Rebuild_11-07-2022
11/15/2022 Letter old - License Tax Bill
11/28/2022 Letter DS P/R Corrections Document
12/21/2022 Plans Building Permit Drawings - Water Hole Rebuild - Rev 1_12-02-2022
12/21/2022 Letter Review Comment Responses - Water Hole Building Permit
12/21/2022 Letter LC License Certificate - Mr_ Breeze
12/21/2022 Letter HazMat Inventory Statement - Water Hole Rebuild
12/21/2022 Letter Hazardous material storage letter
01/03/2023 Letter Fire Building Plan Review
01/04/2023 Receipt Receipt for transaction:2023-000042
01/04/2023 Letter DS Building Permit
01/05/2023 Letter License Tax Bill
01/10/2023 Approved Plans FDP Approval_121422_Water Hole Rebuild - FDP Arch & Eng Drawings_Rev 1_12-02-2022
03/15/2023 Letter INSPECTION SUMMARY
03/16/2023 Letter INSPECTION SUMMARY
03/16/2023 Letter Signed Permit
03/17/2023 Letter INSPECTION SUMMARY
03/20/2023 Letter INSPECTION SUMMARY
03/21/2023 Letter INSPECTION SUMMARY
03/22/2023 Letter INSPECTION SUMMARY
03/23/2023 Letter INSPECTION SUMMARY
03/24/2023 Plans Water Hole - Rev 2 Dwgs
03/24/2023 Letter TWH - ASI 1 - Narrative
03/24/2023 Letter INSPECTION SUMMARY
03/30/2023 Letter INSPECTION SUMMARY
03/31/2023 Letter INSPECTION SUMMARY
04/03/2023 Letter INSPECTION SUMMARY
04/11/2023 Letter INSPECTION SUMMARY
04/11/2023 Plans Water Hole Rebuild_Complete Dwg Set thru Rev 2
04/12/2023 Approved Plans approved - Water Hole Rebuild_Complete Dwg Set thru Rev 2
04/12/2023 Letter INSPECTION SUMMARY
04/14/2023 Letter INSPECTION SUMMARY
04/17/2023 Letter INSPECTION SUMMARY
04/18/2023 Letter INSPECTION SUMMARY
04/19/2023 Letter INSPECTION SUMMARY
04/20/2023 Letter INSPECTION SUMMARY
04/21/2023 Letter INSPECTION SUMMARY
04/24/2023 Letter INSPECTION SUMMARY
04/25/2023 Letter INSPECTION SUMMARY
04/26/2023 Letter INSPECTION SUMMARY
04/28/2023 Letter INSPECTION SUMMARY
05/01/2023 Letter INSPECTION SUMMARY
05/02/2023 Letter INSPECTION SUMMARY
05/03/2023 Letter INSPECTION SUMMARY
05/05/2023 Letter INSPECTION SUMMARY
05/08/2023 Letter INSPECTION SUMMARY
05/12/2023 Letter INSPECTION SUMMARY
05/19/2023 Letter INSPECTION SUMMARY
05/23/2023 Letter INSPECTION SUMMARY
05/30/2023 Letter INSPECTION SUMMARY
05/31/2023 Letter INSPECTION SUMMARY
06/07/2023 Letter INSPECTION SUMMARY
06/14/2023 Letter INSPECTION SUMMARY
06/15/2023 Letter INSPECTION SUMMARY
06/19/2023 Letter INSPECTION SUMMARY
06/20/2023 Letter INSPECTION SUMMARY
06/21/2023 Letter INSPECTION SUMMARY
06/21/2023 Letter INSPECTION SUMMARY
06/21/2023 Letter Fire Building Plan Review
06/21/2023 Letter Fire Building Plan Review
06/21/2023 Letter Fire Building Plan Review
06/21/2023 Letter Fire Building Plan Review
06/22/2023 Letter INSPECTION SUMMARY
06/23/2023 Letter INSPECTION SUMMARY
06/23/2023 Letter INSPECTION SUMMARY
06/23/2023 Letter INSPECTION SUMMARY
06/26/2023 Letter INSPECTION SUMMARY
06/28/2023 Letter INSPECTION SUMMARY
06/29/2023 Letter INSPECTION SUMMARY
06/30/2023 Letter INSPECTION SUMMARY
06/30/2023 Letter INSPECTION SUMMARY
07/03/2023 Letter INSPECTION SUMMARY
07/06/2023 Letter INSPECTION SUMMARY
07/10/2023 Letter INSPECTION SUMMARY
07/11/2023 Letter INSPECTION SUMMARY
07/11/2023 Letter INSPECTION SUMMARY
07/12/2023 Letter INSPECTION SUMMARY
07/14/2023 Letter INSPECTION SUMMARY
07/17/2023 Letter INSPECTION SUMMARY
07/18/2023 Letter INSPECTION SUMMARY
07/20/2023 Letter INSPECTION SUMMARY
07/21/2023 Letter INSPECTION SUMMARY
07/25/2023 Letter INSPECTION SUMMARY
07/27/2023 Letter INSPECTION SUMMARY
07/28/2023 Letter INSPECTION SUMMARY
08/01/2023 Letter INSPECTION SUMMARY
08/02/2023 Letter INSPECTION SUMMARY
08/03/2023 Letter INSPECTION SUMMARY
08/04/2023 Letter INSPECTION SUMMARY
08/07/2023 Letter INSPECTION SUMMARY
08/09/2023 Letter INSPECTION SUMMARY
08/09/2023 Letter INSPECTION SUMMARY
08/10/2023 Letter INSPECTION SUMMARY
08/11/2023 Letter INSPECTION SUMMARY
08/14/2023 Letter INSPECTION SUMMARY
08/14/2023 Letter INSPECTION SUMMARY
08/15/2023 Letter INSPECTION SUMMARY
08/16/2023 Letter INSPECTION SUMMARY
08/18/2023 Letter INSPECTION SUMMARY
08/21/2023 Letter INSPECTION SUMMARY
08/21/2023 Letter INSPECTION SUMMARY
08/22/2023 Letter INSPECTION SUMMARY
08/24/2023 Letter INSPECTION SUMMARY
08/25/2023 Letter INSPECTION SUMMARY
08/28/2023 Letter INSPECTION SUMMARY
08/30/2023 Letter INSPECTION SUMMARY
08/31/2023 Letter INSPECTION SUMMARY
09/06/2023 Letter INSPECTION SUMMARY
09/06/2023 Letter INSPECTION SUMMARY
09/08/2023 Letter INSPECTION SUMMARY
09/11/2023 Letter INSPECTION SUMMARY
09/11/2023 Letter INSPECTION SUMMARY
09/13/2023 Letter INSPECTION SUMMARY
09/14/2023 Letter INSPECTION SUMMARY
09/14/2023 Letter INSPECTION SUMMARY
09/15/2023 Letter INSPECTION SUMMARY
09/20/2023 Letter INSPECTION SUMMARY
09/20/2023 Letter INSPECTION SUMMARY
09/25/2023 Letter INSPECTION SUMMARY
09/26/2023 Letter INSPECTION SUMMARY
09/26/2023 Letter INSPECTION SUMMARY
09/29/2023 Letter INSPECTION SUMMARY
10/02/2023 Letter INSPECTION SUMMARY
10/05/2023 Letter INSPECTION SUMMARY
10/11/2023 Letter INSPECTION SUMMARY
10/12/2023 Letter INSPECTION SUMMARY
10/16/2023 Letter INSPECTION SUMMARY
10/24/2023 Letter INSPECTION SUMMARY
10/27/2023 Letter INSPECTION SUMMARY
10/30/2023 Letter INSPECTION SUMMARY
10/31/2023 Letter INSPECTION SUMMARY
10/31/2023 Letter INSPECTION SUMMARY
11/02/2023 Letter INSPECTION SUMMARY
11/03/2023 Letter INSPECTION SUMMARY
11/06/2023 Letter INSPECTION SUMMARY
11/07/2023 Letter INSPECTION SUMMARY
11/10/2023 Letter INSPECTION SUMMARY
11/16/2023 Letter INSPECTION SUMMARY
11/16/2023 Letter INSPECTION SUMMARY
11/21/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/05/2023 Letter INSPECTION SUMMARY
12/06/2023 Letter INSPECTION SUMMARY
12/07/2023 Letter INSPECTION SUMMARY
12/11/2023 Letter INSPECTION SUMMARY
12/18/2023 Letter INSPECTION SUMMARY
12/21/2023 Letter INSPECTION SUMMARY
12/27/2023 Letter INSPECTION SUMMARY
12/27/2023 Letter INSPECTION SUMMARY
12/27/2023 Letter INSPECTION SUMMARY
12/28/2023 Letter INSPECTION SUMMARY
12/29/2023 Letter INSPECTION SUMMARY
12/29/2023 Letter INSPECTION SUMMARY
12/29/2023 Letter Fire Building Plan Review
12/29/2023 Letter Fire Building Plan Review
12/28/2023 Letter INSPECTION SUMMARY
01/02/2024 Letter INSPECTION SUMMARY
01/11/2024 Letter INSPECTION SUMMARY
01/17/2024 Letter INSPECTION SUMMARY
01/10/2024 Letter The Watering Hole - backflow inspection
01/24/2024 Letter INSPECTION SUMMARY
02/02/2024 Letter INSPECTION SUMMARY
02/12/2024 Letter INSPECTION SUMMARY
02/12/2024 Letter Fire Building Plan Review
02/14/2024 Certificate/License Codes Temporary Certificate of Occupancy
02/14/2024 Receipt Receipt for transaction:2024-000860
02/20/2024 Letter INSPECTION SUMMARY
03/14/2024 Letter INSPECTION SUMMARY
03/15/2024 Letter TCOExtension Request - Sands Construction Replavement of Waterhole Building
03/18/2024 Certificate/License Codes Temporary Certificate of Occupancy
03/18/2024 Receipt Receipt for transaction:2024-001681
03/26/2024 Letter INSPECTION SUMMARY
03/28/2024 Letter INSPECTION SUMMARY
04/05/2024 Letter INSPECTION SUMMARY
04/09/2024 Letter INSPECTION SUMMARY
04/09/2024 Letter INSPECTION SUMMARY
04/09/2024 Letter INSPECTION SUMMARY
04/09/2024 Letter INSPECTION SUMMARY
04/09/2024 Letter Codes Final Certificate of Occupancy
04/09/2024 Letter Field Certificate of Occupancy
04/09/2024 Letter INSPECTION SUMMARY
04/09/2024 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home