Permit Application Status

PRCOM20224906


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20224906
Building Permit - Commercial
Withdrawn
MARION RIDGE SAFETY STORAGE LLC
NEW COMMERCIAL
SPEC WAREHOUSE SUITES FOR SMALL CONTRACTOR TENANTS Applicant withdrew the application as the lot is being sold to a different user. Mike Weisenborn 02/21/2024 3:44 PM
10/03/2022
03/06/2023
06/26/2023
02/21/2024
Locations
Contacts
MARION RIDGE SAFETY STORAGE LLC, Address:1120 NW EAGLE RIDGE BLVD  
WARD DEVELOPMENT & INVESTMENT, Address:1101 C NW PAMELA BLVD, Phone:(816) 918-6416  
MIDWEST ARCHITECTS, Address:1120 NW EAGLE RIDGE BLVD, Phone:(816) 229-8115  
F & G MECHANICAL SERVICES INC, Address:17219 BEL RAY PLACE, Phone:(816) 322-0810  
A & A ELECTRICAL INC, Address:705 SQUIRE CT, Phone:(816) 847-1902  
R2 PLUMBING LLC, Address:1705 A SE COUNTY RD AA, Phone:(816) 215-8098  
ALPHA-OMEGA GEOTECH, Address:1701 STATE AVE, Phone:(913) 371-0000  
CHRIS ARRINGTON, Address:CHRISA@STUCKERCONSTRUCTION.NET, Phone:(816) 912-6219  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 06/29/2023 06/27/2023
Joe Frogge
Zoning Review Approved 06/29/2023 06/22/2023
Shannon McGuire
Engineering Review Approved 06/29/2023 06/22/2023
Sue Pyles, P.E.
Building Plan Review Approved 01/25/2023 02/14/2023
Joe Frogge
Final Development Plan
Resolved
01/26/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 12/28/22 - acknowledged in letter
IBC 1704.2 Special Inspections
Resolved
02/14/2023

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 12/28/22 - acknowledged in letter
IMC 306.5 Equipment on roofs
Resolved
01/19/2023

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide permanent means of roof access. 12/28/22 - Permanent access required. Per IMC Commentary - "If the climbing height exceeds 16 feet, then a permanent means of access, ..... shall be provided."
Special Inspections Review Approved 02/14/2023
Joe Frogge
Final Development Plan Review Approved 02/03/2023 01/26/2023
Mike Weisenborn
I 470 Business and Technology Center - Lot 7
Fire Plan Review Approved 01/25/2023 01/23/2023
Ben Hicks
Licensed Contractors Approved 01/25/2023 01/19/2023
Joe Frogge
Building Plan Review Rejected 12/30/2022 12/28/2022
Joe Frogge
Final Development Plan
Corrective Action Required
12/21/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 12/28/22 - acknowledged in letter
IBC 1704.2 Special Inspections
Corrective Action Required
12/21/2022

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 12/28/22 - acknowledged in letter
Planning - Screening of rooftop equipment
Resolved
12/28/2022

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (parts of parapet are shorter than typical condensing unit)
IBC 1004.1 Design occupant load
Resolved
12/28/2022

2018 IBC 1004.1 Design occupant load. In determining means of egress requirements, the number of occupants for whom means of egress facilities shall be provided shall be determined in accordance with this section. Action required: Either use 1:500 occupant load calculations per schedule or note in code analysis that increase is being used per 1004.5.1.
Code analysis required
Resolved
12/28/2022

Discrepancies found comparing site work to building plans. Coordinate/clarify the following: - 4" sanitary at building exit vs. 6" sanitary to main. - Code analysis shows no fire suppression system but site and building plans show suppression.
IPC 403.1 Minimum number of fixtures
Resolved
12/28/2022

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink at each suite.
IMC 306.5 Equipment on roofs
Corrective Action Required
12/21/2022

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide permanent means of roof access. 12/28/22 - Permanent access required. Per IMC Commentary - "If the climbing height exceeds 16 feet, then a permanent means of access, ..... shall be provided."
Licensed Contractors Approved 12/30/2022 12/28/2022
Joe Frogge
LC - MEP Subs
Resolved
12/28/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (R2 Plumbing not currently licensed)
Fire Plan Review Approved 12/30/2022 12/22/2022
Ben Hicks
Construction documents for fire alarm systems
Resolved
12/22/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Submit shop plans to Lee's Summit Fire for review
Construction documents - Fire protection systems
Resolved
12/22/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Submit shop plans to Lee's Summit Fire Department
Installation acceptance testing
Resolved
12/22/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Action Required: Call 816-969-1300 to schedule system testing
Misc
Resolved
12/22/2022

Action Required: Define if alarm/sprinkler systems will be placed per plans.
Fire Plan Review Rejected 11/17/2022 11/15/2022
Ben Hicks
Construction documents for fire alarm systems
Corrective Action Required
11/15/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Submit shop plans to Lee's Summit Fire for review
Construction documents - Fire protection systems
Corrective Action Required
11/15/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Submit shop plans to Lee's Summit Fire Department
Installation acceptance testing
Corrective Action Required
11/15/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Action Required: Call 816-969-1300 to schedule system testing
Misc
Corrective Action Required
11/15/2022

Action Required: Define if alarm/sprinkler systems will be placed per plans.
Building Plan Review Rejected 11/17/2022 11/11/2022
Joe Frogge
Final Development Plan
Corrective Action Required
11/11/2022

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
IBC 1704.2 Special Inspections
Corrective Action Required
11/11/2022

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Planning - Screening of rooftop equipment
Corrective Action Required
11/11/2022

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (parts of parapet are shorter than typical condensing unit)
IBC 1004.1 Design occupant load
Corrective Action Required
11/11/2022

2018 IBC 1004.1 Design occupant load. In determining means of egress requirements, the number of occupants for whom means of egress facilities shall be provided shall be determined in accordance with this section. Action required: Either use 1:500 occupant load calculations per schedule or note in code analysis that increase is being used per 1004.5.1.
Code analysis required
Corrective Action Required
11/11/2022

Discrepancies found comparing site work to building plans. Coordinate/clarify the following: - 4" sanitary at building exit vs. 6" sanitary to main. - Code analysis shows no fire suppression system but site and building plans show suppression.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
11/14/2022

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink at each suite.
IMC 306.5 Equipment on roofs
Corrective Action Required
11/14/2022

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Provide permanent means of roof access.
Licensed Contractors Rejected 11/17/2022 11/11/2022
Joe Frogge
LC - MEP Subs
Corrective Action Required
11/11/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (R2 Plumbing not currently licensed)
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Commercial $3,460.00 $3,460.00 Paid 03/06/2023
Industrial/Warehouse Excise Tax Fee $2,486.00 $2,486.00 Paid 12/02/2022
Water Meter Fee $1,210.90 $1,210.90 Paid 03/06/2023
Sanitary Sewer Development Fee $2,309.00 $2,309.00 Paid 03/06/2023
Water Tap Fee $12,430.00 $12,430.00 Paid 03/06/2023
Storm Sewer Inspection Fee $1,160.85 $1,160.85 Paid 03/06/2023
Water Insp Fee $59.85 $59.85 Paid 03/06/2023
Sanitary Sewer Insp Fees $57.60 $57.60 Paid 03/06/2023
Paved Surface Inspection Fee $4,916.25 $4,916.25 Paid 03/06/2023
Site Grading Fee $255.00 $255.00 Paid 03/06/2023
Right of Way Permit Fee $85.00 $85.00 Paid 03/06/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Failed 3/9/2023 3/9/2023 03/09/2023
Miscellaneous Correction
Corrective Action Required
03/09/2023
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back.
Erosion Control Inspection Partial 03/21/2023
Miscellaneous Correction
Corrective Action Required
03/09/2023
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back. 3-21-23 DP. Erosion control on the west side of the property is good, the south side is still down.
Site Visit Partial 3/23/2023 3/23/2023 03/23/2023
Misc
Informational
03/23/2023
3-23-23 DP. No work for development
Site Visit Partial 03/31/2023
Misc
Informational
03/23/2023
3-23-23 DP. No work for development 3-31-23 DP. No work for development
Sidewalk Inspection Partial 4/10/2023 04/10/2023
ESC - (Vegetation/Ground Cover) Partial 05/19/2023
Misc
Informational
05/19/2023
5-19-23 NS. ESC is currently in good working order.
Erosion Control Inspection Partial 5/22/2023 05/22/2023
Miscellaneous Correction
Corrective Action Required
03/21/2023
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back. 3-21-23 DP. Erosion control on the west side of the property is good, the south side is still down. 5-22-23 NS Erosion control appears to be good.
Erosion Control Inspection Partial 6/1/2023 06/01/2023
Miscellaneous Correction
Corrective Action Required
05/22/2023
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back. 3-21-23 DP. Erosion control on the west side of the property is good, the south side is still down. 5-22-23 NS Erosion control appears to be good. 6-1-23 NS No erosion control issues
Sidewalk Inspection Partial 6/2/2023 6/8/2023 06/08/2023
Misc
Informational
06/08/2023
6-8-23 NS Site visited work has not started yet.
Erosion Control Inspection Partial 6/9/2023 06/09/2023
Miscellaneous Correction
Corrective Action Required
06/01/2023
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back. 3-21-23 DP. Erosion control on the west side of the property is good, the south side is still down. 5-22-23 NS Erosion control appears to be good. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues
Erosion Control Inspection Partial 6/12/2023 06/12/2023
Miscellaneous Correction
Corrective Action Required
06/09/2023
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back. 3-21-23 DP. Erosion control on the west side of the property is good, the south side is still down. 5-22-23 NS Erosion control appears to be good. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues
Erosion Control Inspection Partial 7/17/2023 07/17/2023
Miscellaneous Correction
Corrective Action Required
06/12/2023
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back. 3-21-23 DP. Erosion control on the west side of the property is good, the south side is still down. 5-22-23 NS Erosion control appears to be good. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues
Erosion Control Inspection Partial 7/24/2023 07/25/2023
Miscellaneous Correction
Corrective Action Required
07/17/2023
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back. 3-21-23 DP. Erosion control on the west side of the property is good, the south side is still down. 5-22-23 NS Erosion control appears to be good. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues
Erosion Control Inspection Partial 7/31/2023 07/31/2023
Miscellaneous Correction
Corrective Action Required
07/25/2023
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back. 3-21-23 DP. Erosion control on the west side of the property is good, the south side is still down. 5-22-23 NS Erosion control appears to be good. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues
Erosion Control Inspection Partial 9/1/2023 09/01/2023
Miscellaneous Correction
Corrective Action Required
07/31/2023
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back. 3-21-23 DP. Erosion control on the west side of the property is good, the south side is still down. 5-22-23 NS Erosion control appears to be good. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues
Water Service Inspection Partial 12/4/2023 12/04/2023
Miscellaneous Correction
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work has not started.
Pavement-Proof Roll Partial 12/4/2023 12/04/2023
Miscellaneous Correction
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work has not started.
Pavement-Surface Partial 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work has not started.
Grading/Excavation/Fill Inspection Partial 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work has not started.
Install Street and Stop Signs Partial 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work has not started.
Pavement-Aggregate Base Partial 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work has not started.
Pavement-Curb Construction Partial 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work has not started.
Pavement-Stabilized Subgrade Partial 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work has not started.
Storm Sewer Construction Inspection Partial 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work has not started.
Sewer Service Inspection Partial 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work has not started.
Water Service Inspection Partial 12/4/2023 12/04/2023
Misc
Informational
12/04/2023
12-4-23 NS Site Visited and it appears work has not started.
Site Visit Partial 12/4/2023 12/04/2023
Misc
Informational
03/31/2023
3-23-23 DP. No work for development 3-31-23 DP. No work for development 12-4-23 NS Site Visited and it appears work has not started.
ESC - (Vegetation/Ground Cover) Partial 12/4/2023 12/04/2023
Misc
Informational
05/19/2023
5-19-23 NS. ESC is currently in good working order. 12-4-23 NS Site Visited and esc is in good working order
Erosion Control Inspection Partial 12/4/2023 12/04/2023
Miscellaneous Correction
Corrective Action Required
09/01/2023
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back. 3-21-23 DP. Erosion control on the west side of the property is good, the south side is still down. 5-22-23 NS Erosion control appears to be good. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 12/18/2023 12/18/2023
Miscellaneous Correction
Corrective Action Required
12/04/2023
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back. 3-21-23 DP. Erosion control on the west side of the property is good, the south side is still down. 5-22-23 NS Erosion control appears to be good. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no erosion control issues 12-18-23 NS Site Visited and no erosion control issues
Site Visit Partial 12/18/2023 12/18/2023
Misc
Informational
12/04/2023
3-23-23 DP. No work for development 3-31-23 DP. No work for development 12-4-23 NS Site Visited and it appears work has not started. 12-18-23 NS Site Visited and no work has started
Erosion Control Inspection Partial 12/20/2023 12/20/2023
Miscellaneous Correction
Corrective Action Required
12/18/2023
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back. 3-21-23 DP. Erosion control on the west side of the property is good, the south side is still down. 5-22-23 NS Erosion control appears to be good. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no erosion control issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 12/22/2023 12/22/2023
Miscellaneous Correction
Corrective Action Required
12/20/2023
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back. 3-21-23 DP. Erosion control on the west side of the property is good, the south side is still down. 5-22-23 NS Erosion control appears to be good. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no erosion control issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 12/28/2023 12/28/2023
Miscellaneous Correction
Corrective Action Required
12/22/2023
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back. 3-21-23 DP. Erosion control on the west side of the property is good, the south side is still down. 5-22-23 NS Erosion control appears to be good. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no erosion control issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 1/2/2024 01/02/2024
Miscellaneous Correction
Corrective Action Required
12/28/2023
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back. 3-21-23 DP. Erosion control on the west side of the property is good, the south side is still down. 5-22-23 NS Erosion control appears to be good. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no erosion control issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-2-24 NS Site Visited and no erosion control issues
Erosion Control Inspection Partial 1/23/2024 01/23/2024
Miscellaneous Correction
Corrective Action Required
01/02/2024
3-9-23 DP. I went by this job site today, about 80% of the Erosion control is down. Silt fence will need to be reinstalled first thing when starting back. 3-21-23 DP. Erosion control on the west side of the property is good, the south side is still down. 5-22-23 NS Erosion control appears to be good. 6-1-23 NS No erosion control issues 6-9-23 NS No erosion control issues 6-12-23 NS No erosion control issues 7-17-23 NS Site visited and no erosion control issues 7-25-23 NS Site visited and no erosion control issues 7-31-23 NS Site visited and no erosion control issues 9-1-23 NS Site visited and no erosion control issues 12-4-23 NS Site Visited and no erosion control issues 12-18-23 NS Site Visited and no erosion control issues 12-20-23 NS Site Visited and no erosion control issues 12-22-23 NS Site Visited and no erosion control issues 12-28-23 NS Site Visited and no erosion control issues 1-2-24 NS Site Visited and no erosion control issues 1-23-24 NS Site Visited and no erosion control issues
Site Visit Partial 1/23/2024 01/23/2024
Misc
Informational
12/18/2023
3-23-23 DP. No work for development 3-31-23 DP. No work for development 12-4-23 NS Site Visited and it appears work has not started. 12-18-23 NS Site Visited and no work has started 1-23-24 NS Site visited, no activity due to weather
Documents & Images
Date Uploaded File Type Document Name
10/04/2022 Letter Project Submission Success_br_Project Name_ WARD -000750149-22
11/01/2022 Application Form APPLICATION
11/10/2022 Letter License Tax Bill
11/15/2022 Letter Fire Building Plan Review
11/15/2022 Letter DS P/R Corrections Document
12/02/2022 Receipt Receipt for transaction: 2022-009249
12/21/2022 Plans 2201 22_12_21 I-470 Business and Technology Center Lot 7 Complete Permit Set with 22_11_17 Revisions
12/21/2022 Letter Plan Review Response Letter 22_11_17
12/22/2022 Letter Fire Building Plan Review
12/28/2022 Letter DS P/R Corrections Document
01/18/2023 Letter Plan Review Response Letter to Planning 23_01_11
01/18/2023 Letter Plan Review Response Letter to Building 23_01_18
01/23/2023 Letter Fire Building Plan Review
01/24/2023 Approved Plans approved plans
01/26/2023 Approved Plans APPROVED 2701 NE McBaine Dr FDP
02/07/2023 3rd Party Permit/Approval 7460 Clearance letter_571031263
02/14/2023 Engineer Report/Study PRCOM 20224906 LAKEWOOD LOT 7 NEW COMMERCIAL BUILDING ENGAGEMENT LETTER
02/17/2023 Plans 2201 23_02_17 I-470 B and T Center Lot 7 Electrical Changes
02/17/2023 Approved Plans approved - 2201 23_02_17 I-470 B and T Center Lot 7 Electrical Changes
03/06/2023 Receipt Receipt for transaction: 2023-001238
03/06/2023 Letter DS Building Permit
03/09/2023 Letter INSPECTION SUMMARY
03/16/2023 Plans steel building
03/16/2023 Approved Plans approved - steel building
03/21/2023 Letter INSPECTION SUMMARY
03/23/2023 Letter INSPECTION SUMMARY
03/29/2023 Plans PEMB 27967 REV1 SEALED PERMIT_001
03/29/2023 Plans S Sheets after PEMB Review
03/31/2023 Letter INSPECTION SUMMARY
04/03/2023 Plans Structural Design Revisions Narrative
05/22/2023 Letter INSPECTION SUMMARY
06/08/2023 Letter Fire Building Plan Review
06/08/2023 Letter Fire Building Plan Review
06/08/2023 Letter Fire Building Plan Review
06/08/2023 Letter Fire Building Plan Review
06/08/2023 Letter Fire Building Plan Review
06/08/2023 Letter Fire Building Plan Review
06/08/2023 Letter Fire Building Plan Review
06/08/2023 Letter INSPECTION SUMMARY
06/08/2023 Letter Fire Building Plan Review
06/08/2023 Letter Fire Building Plan Review
06/08/2023 Letter Fire Building Plan Review
06/08/2023 Letter Fire Building Plan Review
06/08/2023 Letter Fire Building Plan Review
06/08/2023 Letter Fire Building Plan Review
06/09/2023 Letter INSPECTION SUMMARY
06/12/2023 Letter INSPECTION SUMMARY
06/22/2023 Letter Owner Revision Narrative Letter 23_06_22
06/27/2023 Approved Plans approved - 23_06_22 I-470 Business and Technology Center Lot 7 Owner Revisions 6 Full Site & Building Set
06/28/2023 Approved Plans APPROVED FDP REVISED 6.22.2023
07/25/2023 Letter INSPECTION SUMMARY
12/07/2023 Letter Owner Revision Narrative Letter 23_12_07
12/07/2023 Drawing E301_E302_REV7
12/07/2023 Approved Plans approved electrical revisions
01/23/2024 Letter INSPECTION SUMMARY
01/23/2024 Letter INSPECTION SUMMARY
01/23/2024 Letter INSPECTION SUMMARY
01/23/2024 Letter INSPECTION SUMMARY
01/23/2024 Letter INSPECTION SUMMARY
01/23/2024 Letter INSPECTION SUMMARY
01/23/2024 Letter INSPECTION SUMMARY
01/23/2024 Letter INSPECTION SUMMARY
01/23/2024 Letter INSPECTION SUMMARY
01/23/2024 Letter INSPECTION SUMMARY
01/23/2024 Letter INSPECTION SUMMARY
01/23/2024 Letter INSPECTION SUMMARY
01/23/2024 Letter INSPECTION SUMMARY
01/23/2024 Letter INSPECTION SUMMARY
02/21/2024 Email Projec Cancelation Email
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home