Permit Application Status

PRCOM20222561


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20222561
Building Permit - Commercial
Certificate of Occupancy
DEER BROOK BGOG LLC
ALTERATION COMMERCIAL
Facade of Deer Brook Plaza upgrade and provide new tenant spaces for about 3100 SF. FACADE REMODEL AND WHITE BOXES FOR FUTURE TENANTS - INCLUDES CIRCUIT TO MONUMENT SIGN
06/09/2022
08/26/2022
12/19/2022
02/07/2024
Locations
Contacts
DEER BROOK BGOG LLC, Address:199 S HIGH ST STE 100  
ICON ARCHITECTURE, Address:506 GRAND BLVD, Phone:(816) 221-0250  
CAMM CONSTRUCTION INC, Address:PO BOX 1417, Phone:(816) 607-3602  
DMC SERVICE INC, Address:PO BOX 158, Phone:(913) 481-0505  
KASA ELECTRIC LLC, Address:1206 NW VALLEY RIDGE DR, Phone:(816) 228-4886  
ACCURATE MECHANICAL LLC, Address:205 E 13TH AVE, Phone:(816) 471-2272  
russ@cammconstructioninc.com, Address:russ@cammconstructioninc.com, Phone:(816) 804-0990  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 10/24/2022 10/24/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
10/24/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Plans received 10/24/2022.
Installation acceptance testing
Corrective Action Required
10/24/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule alarm testing.
Sprinkler Plan Review Released for Construction 09/21/2022
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
09/21/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Plans received September 20, 2022.
Installation acceptance testing
Corrective Action Required
09/21/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule a hydrostatic test. A visual inspection will be completed at the occupancy inspection.
Licensed Contractors Approved 07/13/2022 08/24/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
07/06/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 7/7/22 - acknowledged in letter
LC - MEP Subs
Corrective Action Required
07/06/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 7/7/22 - acknowledged in letter
Fire Plan Review Approved with Conditions 07/13/2022 07/13/2022
Jim Eden
Miscellaneous Correction
Corrective Action Required
07/06/2022

3311.2 Maintenance. Required means of egress and required accessible means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress and accessible means of egress systems and facilities. SECTION 3312 Action required- Maintain egress from the tenant spaces during remodel.
Miscellaneous Correction
Corrective Action Required
07/06/2022

Provide or maintain existing exit lighting in the renovated spaces. Verified at inspection.
Misc
Corrective Action Required
07/06/2022

503.3 Marking. Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Action required- The front and rear fire lanes to both buildings shall be posted. .
Construction documents for fire alarm systems
Corrective Action Required
07/06/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide system modification shop drawings for review and appproval.
Construction documents - Fire protection systems
Corrective Action Required
07/06/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide system modification shop drawings for review and appproval.
Address numbers required
Corrective Action Required
07/06/2022

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required- The address shall be posted on the front and each rear door of the spaces. Verified at inspection.
Portable fire extinguishers - general
Corrective Action Required
07/06/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required- Provide a minimum of one 2A:10B:C fire extinguisher in each of the spaces at a comspicuous location in a normal pathway. Verified at
Emergency power for illumination
Corrective Action Required
07/06/2022

2018 IFC 1008.3.1 & 3.2 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises' electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or mor means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. Action required- Provide emergency lighting in the renovated space, including emergency egress lighting.
Building Plan Review Approved with Conditions 07/13/2022 07/07/2022
Joe Frogge
Misc
Corrective Action Required
07/06/2022

This review includes both the north and south buildings. Action required: Comment is for informational purposes.
IBC 502.1 - Address Identification
Corrective Action Required
07/06/2022

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: Comments for informational purposes. - These buildings have multiple suite addresses but will be permitting using their base addresses which are 1121 & 1151 NE Rice Rd. Update your records. - Suite designated as C is actually 1159 NE Rice Rd - Suite designated as Suite D can be either 1157 or 1159 NE Rice Rd. depending on location of main entry. 7/7/22 - acknowledged in letter
IBC 602.1 Type of Construction - general
Resolved
07/07/2022

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Modify Code Information to show correct building types. Both are 5B.
IBC 2902.3.1 Access - access to public toilet
Corrective Action Required
07/06/2022

2018 IBC 2902.3.1 Access. The route to the public toilet facilities required by Section 2902.3 shall not pass through kitchens, storage rooms or closets. Access to the required facilities shall be from within the building or from the exterior of the building. All routes shall comply with the accessibility requirements of this code. The public shall have access to the required toilet facilities at all times that the building is occupied. Action required: Comment is for informational purposes. Restrooms at rear of white boxes may need to be relocated, or new ones built, at future tenant finishes. 7/7/22 - acknowledged in letter
IBC 1008.3 Emergency power for illumination - at exit discharge
Resolved
07/07/2022

2018 IBC 1008.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency lighting at exterior side of exits.
IBC 1606.2 Design dead load - structural
Resolved
07/07/2022

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional loads imposed by ceiling hung and roof mounted equipment.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Resolved
07/07/2022

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle(s) within 25' of new roof mounted condensing units or provide verification of existing.
IBC 1209.2 Finish materials
Resolved
07/07/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish materials at toilets and mop sinks. If paint is used it must be epoxy based.
Fire Plan Review Rejected 06/21/2022 06/22/2022
Jim Eden
Miscellaneous Correction
Corrective Action Required
06/22/2022

3311.2 Maintenance. Required means of egress and required accessible means of egress shall be maintained during construction and demolition, remodeling or alterations and additions to any building. Exception: Approved temporary means of egress and accessible means of egress systems and facilities. SECTION 3312 Action required- Maintain egress from the tenant spaces during remodel.
Miscellaneous Correction
Resolved
07/13/2022

Provide or maintain existing exit lighting in the renovated spaces. Verified at inspection.
Misc
Resolved
07/13/2022

503.3 Marking. Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Action required- The front and rear fire lanes to both buildings shall be posted. .
Construction documents for fire alarm systems
Corrective Action Required
06/22/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide system modification shop drawings for review and appproval.
Construction documents - Fire protection systems
Corrective Action Required
06/22/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide system modification shop drawings for review and appproval.
Address numbers required
Resolved
07/13/2022

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required- The address shall be posted on the front and each rear door of the spaces. Verified at inspection.
Portable fire extinguishers - general
Resolved
07/13/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required- Provide a minimum of one 2A:10B:C fire extinguisher in each of the spaces at a comspicuous location in a normal pathway. Verified at
Emergency power for illumination
Resolved
07/13/2022

2018 IFC 1008.3.1 & 3.2 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises' electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or mor means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. Action required- Provide emergency lighting in the renovated space, including emergency egress lighting.
Building Plan Review Rejected 06/21/2022 06/20/2022
Joe Frogge
Misc
Corrective Action Required
06/20/2022

This review includes both the north and south buildings. Action required: Comment is for informational purposes.
IBC 502.1 - Address Identification
Corrective Action Required
06/20/2022

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: Comments for informational purposes. - These buildings have multiple suite addresses but will be permitting using their base addresses which are 1121 & 1151 NE Rice Rd. Update your records. - Suite designated as C is actually 1159 NE Rice Rd - Suite designated as Suite D can be either 1157 or 1159 NE Rice Rd. depending on location of main entry.
IBC 602.1 Type of Construction - general
Corrective Action Required
06/20/2022

2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. Action required: Modify Code Information to show correct building types. Both are 5B.
IBC 2902.3.1 Access - access to public toilet
Corrective Action Required
06/20/2022

2018 IBC 2902.3.1 Access. The route to the public toilet facilities required by Section 2902.3 shall not pass through kitchens, storage rooms or closets. Access to the required facilities shall be from within the building or from the exterior of the building. All routes shall comply with the accessibility requirements of this code. The public shall have access to the required toilet facilities at all times that the building is occupied. Action required: Comment is for informational purposes. Restrooms at rear of white boxes may need to be relocated, or new ones built, at future tenant finishes.
IBC 1008.3 Emergency power for illumination - at exit discharge
Corrective Action Required
06/20/2022

2018 IBC 1008.3 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises’ electrical supply. 1008.3.1 General. In the event of power supply failure in rooms and spaces that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Aisles. 2. Corridors. 3. Exit access stairways and ramps. 1008.3.2 Buildings. In the event of power supply failure in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps. 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. 1008.3.3 Rooms and Spaces. In the event of power supply failure an emergency electrical system shall automatically illuminate all of the following areas: 1. Electrical equipment rooms. 2. Fire command centers. 3. Fire pump rooms. 4. Generator rooms. 5. Public restrooms with an area greater than 300 square feet. Action required: Provide emergency lighting at exterior side of exits.
IBC 1606.2 Design dead load - structural
Corrective Action Required
06/20/2022

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional loads imposed by ceiling hung and roof mounted equipment.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
06/20/2022

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle(s) within 25' of new roof mounted condensing units or provide verification of existing.
IBC 1209.2 Finish materials
Corrective Action Required
06/20/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish materials at toilets and mop sinks. If paint is used it must be epoxy based.
Licensed Contractors Rejected 06/21/2022 06/20/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
06/20/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
06/20/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $3,000.00 $3,000.00 Paid 08/24/2022
8331507-Sewer Connection Fee $120.00 $120.00 Paid 08/24/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 9/26/2022 9/26/2022 09/26/2022
In-wall Inspection Failed 10/14/2022 10/14/2022 10/14/2022
Misc
Corrective Action Required
10/14/2022
Inspection of demising wall between 1159 and 1157 and restroom in 1159: -Protect DVW at bottom track with BOCA plates -Install backings for grab bars and fixture
In-wall Inspection Passed 10/19/2022 10/19/2022 10/19/2022
Misc
Resolved
10/19/2022
Inspection of demising wall between 1159 and 1157 and restroom in 1159-Ok
Above Ceiling Inspection Partial 12/30/2022 12/30/2022 12/30/2022
Misc
Corrective Action Required
12/30/2022
-Complete restroom exhaust -Provide engineer detail for support of the mechanical units **Ok to drop ceiling tiles
Electrical Service Inspection Passed 2/13/2023 2/13/2023 02/13/2023
Above Ceiling Inspection Passed 03/06/2023
Misc
Resolved
03/06/2023
-Complete restroom exhaust **Ok to drop ceiling tiles
Miscellaneous Inspection Failed 3/6/2023 3/6/2023 03/06/2023
Misc
Corrective Action Required
03/06/2023
**Fire department approval required -Secure downspouts to wall -Complete exterior wall finish -Secure CU raceway within 12” of disconnects -Provide addresses at front and back doors -Provide fire extinguishers per plan -Replace a non-working EM light at front exit (1159) -Point rear exit discharge light down (1155) -Provide access to electrical service grounding connections inside restroom wall
Occupancy Inspection - Fire Passed 3/13/2023 3/9/2023 03/09/2023
Alarm Test Passed 03/09/2023
Miscellaneous Inspection Passed 3/9/2023 03/09/2023
Misc
Resolved
03/09/2023
-Secure downspouts to wall -Complete exterior wall finish -Secure CU raceway within 12” of disconnects
Occupancy Inspection - Codes Commercial Failed 3/13/2023 3/9/2023 03/09/2023
Misc
Corrective Action Required
03/09/2023
-Planning approval required -Secure downspouts to wall -Complete exterior wall finish **WHITE BOXES COMPLETED AND READY FOR TENANT
Occupancy Inspection - Planning Temporary C of O 3/13/2023 3/13/2023 03/13/2023
Misc
Corrective Action Required
03/13/2023
Complete exterior painting on front facade around all the columns.
Misc
Corrective Action Required
03/13/2023
Complete painting around the replaced walls pack light fixtures on the rear facade.
Occupancy Inspection - Codes Commercial Full C of O 02/07/2024
Misc
Resolved
02/07/2024
-Planning approval required -Secure downspouts to wall -Complete exterior wall finish **WHITE BOXES COMPLETED AND READY FOR TENANT
Documents & Images
Date Uploaded File Type Document Name
06/09/2022 Application Form Commercial Permit Application Signed Deer Brook Plaza
06/10/2022 Plans 2021 Deer Brook Plaza - PERMIT SET 061022
06/20/2022 Email email from Planner - re: no FDP
06/22/2022 Letter DS P/R Corrections Document
07/06/2022 Plans 20220706 Deer Brook Plaza REV1 Permit Set
07/06/2022 Engineer Report/Study DeerBrookPlzAHUSupportCalcs
07/06/2022 Letter Deer Brook Plaza Response Letter 06222022
07/14/2022 Approved Plans approved - 20220706 Deer Brook Plaza REV1 Permit Set
07/21/2022 Letter Final Plan Review Conditions
07/21/2022 Letter Fire Building Plan Review
08/24/2022 Receipt Receipt for transaction:2022-006975
08/26/2022 Letter DS Building Permit
09/21/2022 Deerbrook FS rev 2 stpd
09/21/2022 Letter Fire (Sprinkler) Plan Review
09/26/2022 Letter INSPECTION SUMMARY
10/13/2022 Letter 2218000_REVISION #2 - Light Fixtures Rev 10-13-22
10/13/2022 Drawing 06-2218000_E1_10
10/13/2022 Drawing 06-2218000_E1_11
10/13/2022 Drawing 06-2218000_E3_12
10/14/2022 Letter Fire (Sprinkler) Plan Review
10/14/2022 Letter Fire (Sprinkler) Plan Review
10/14/2022 Letter Fire (Sprinkler) Plan Review
10/14/2022 Letter DS Building Permit
10/14/2022 Letter INSPECTION SUMMARY
10/18/2022 Approved Plans approved - 06-2218000_E1_10
10/19/2022 Letter INSPECTION SUMMARY
10/24/2022 Letter Fire (Alarm) Plan Review Notice
12/30/2022 Letter Final Plan Review Conditions
12/30/2022 Letter Fire (Sprinkler) Plan Review
12/30/2022 Letter INSPECTION SUMMARY
01/20/2023 Drawing 2218000_REVISION #3 - ASI No_ 1 ELECTRICAL REVISION 1-16-23
01/24/2023 Approved Plans approved E3.11
02/13/2023 Letter INSPECTION SUMMARY
03/06/2023 Letter INSPECTION SUMMARY
03/06/2023 Letter INSPECTION SUMMARY
03/09/2023 Letter INSPECTION SUMMARY
03/09/2023 Letter INSPECTION SUMMARY
03/13/2023 Letter INSPECTION SUMMARY
02/07/2024 Letter Field Certificate of Occupancy
02/07/2024 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home