Permit Application Status

PRCOM20214277


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20214277
Building Permit - Commercial
Certificate of Occupancy
CITY OF LEES SUMMIT
NEW TENANT FINISH
TENANT FINISH FOR JUICE BAR
08/16/2021
10/25/2021
02/16/2022
01/24/2022
Locations
Contacts
AB Bradley Construction Co., Inc., Address:8337 Monticello Rd, Phone:(913) 221-2390  
allen@abbradleyconstruction.com, Address:allen@abbradleyconstruction.com  
LANCASTER BROTHERS HEATING/COOLING, Address:PO BOX 1202, Phone:(913) 851-3399  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
MAYES PLUMBING INC, Address:501 S MCCLEARY RD STE A, Phone:(816) 792-5400  
Kinetic Design Inc., Address:20381 Lake Forest Dr, Suite B16, Phone:(951) 710-6334  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 12/17/2021 12/17/2021
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
12/17/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Sprinkler Plan Review Released for Construction 12/10/2021 12/10/2021
Michael Weissenbach
Licensed Contractors Approved 10/05/2021 10/18/2021
Joe Frogge
LC - MEP Subs
Resolved
10/18/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/4/21 - acknowledged in letter
Building Plan Review Approved with Conditions 10/05/2021 10/04/2021
Joe Frogge
Health Dept Inspection
Corrective Action Required
09/28/2021

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 10/4/21 - acknowledged in letter
Suite address
Resolved
10/04/2021

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Comment is for informational purposes. This correct address for this tenant is 940 NW Pryor Rd, Unit:G. Please update your records.
ICC A117.1 604.5.1 Fixed side wall grab bars
Resolved
10/04/2021

ICC A117.1 604.5.1 Fixed side wall grab bars. Fixed side-wall grab bars shall include a horizontal bar complying with Section 604.5.1.1 and a vertical grab bar complying with Section 604.5.12. The vertical grab bar at water closets primarily for children’s use shall comply with Section 609.4.2. ICC A117.1 604.5.1.1 Horizontal grab bar. A horizontal grab bar 42 inches minimum in length shall be located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. ICC A117.1 604.5.1.2 Vertical grab bar. A vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located 39 inches minimum and 41 inches maximum above the floor, and with the center line of the bar located 39 inches minimum and 41 inches maximum from the rear wall. Action required: Provide side wall grab bar at toilet. Ref. Details 5/G005 & 2/A401.
IMC 606.2.1 Duct detector
Resolved
10/04/2021

2018 IMC 606.2.1 Return air systems. Smoke detectors shall be installed in return air systems with a design capacity greater than 2,000 cfm, in the return air duct or plenum upstream of any filters, exhaust air connections, outdoor air connections, or decontamination equipment and appliances. Exception: Smoke detectors are not required in the return air system where all portions of the building served by the air distribution system are protected by area smoke detectors connected to a fire alarm system in accordance with the International Fire Code. The area smoke detection system shall comply with Section 606.4. Action required: Provide return air duct mounted smoke detector. (max. capacity per manufacture is 2235 CFM)
IBC 1606.2 Design dead load - structural
Resolved
10/04/2021

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing ceiling structure will support weight of new ceiling mounted hvac equipment. 10/4/21 - per architect, equipment was installed under landlord permit
Fire Plan Review Approved with Conditions 10/05/2021 09/28/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
09/28/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
09/28/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net Note: Walk-in cooler will need to be sprinkled.
Installation acceptance testing
Corrective Action Required
09/28/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Health Department Review Approved 09/13/2021
Joe Frogge
Building Plan Review Rejected 08/26/2021 08/20/2021
Joe Frogge
Health Dept Review
Resolved
09/13/2021

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
08/20/2021

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Suite address
Corrective Action Required
08/20/2021

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Comment is for informational purposes. This correct address for this tenant is 940 NW Pryor Rd, Unit:G. Please update your records.
ICC A117.1 604.5.1 Fixed side wall grab bars
Corrective Action Required
08/20/2021

ICC A117.1 604.5.1 Fixed side wall grab bars. Fixed side-wall grab bars shall include a horizontal bar complying with Section 604.5.1.1 and a vertical grab bar complying with Section 604.5.12. The vertical grab bar at water closets primarily for children’s use shall comply with Section 609.4.2. ICC A117.1 604.5.1.1 Horizontal grab bar. A horizontal grab bar 42 inches minimum in length shall be located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. ICC A117.1 604.5.1.2 Vertical grab bar. A vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located 39 inches minimum and 41 inches maximum above the floor, and with the center line of the bar located 39 inches minimum and 41 inches maximum from the rear wall. Action required: Provide side wall grab bar at toilet. Ref. Details 5/G005 & 2/A401.
IMC 606.2.1 Duct detector
Corrective Action Required
08/20/2021

2018 IMC 606.2.1 Return air systems. Smoke detectors shall be installed in return air systems with a design capacity greater than 2,000 cfm, in the return air duct or plenum upstream of any filters, exhaust air connections, outdoor air connections, or decontamination equipment and appliances. Exception: Smoke detectors are not required in the return air system where all portions of the building served by the air distribution system are protected by area smoke detectors connected to a fire alarm system in accordance with the International Fire Code. The area smoke detection system shall comply with Section 606.4. Action required: Provide return air duct mounted smoke detector. (max. capacity per manufacture is 2235 CFM)
IBC 1606.2 Design dead load - structural
Corrective Action Required
08/20/2021

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing ceiling structure will support weight of new ceiling mounted hvac equipment.
Licensed Contractors Rejected 08/26/2021 08/20/2021
Joe Frogge
LC - MEP Subs
Corrective Action Required
08/20/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 08/26/2021 08/17/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
08/17/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Informational Purposes) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
08/17/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Informational Purposes) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net Note: Walk-in cooler will need to be sprinkled.
Installation acceptance testing
Corrective Action Required
08/17/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $180.00 $180.00 Paid 10/21/2021
7232302-Commercial License Tax Fee $9,142.50 $9,142.50 Paid 01/19/2022
9110078-Valuation Fee for New Tenent Finish $580.00 $580.00 Paid 10/21/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Failed 11/17/2021 11/17/2021 11/17/2021
Miscellaneous Correction
Corrective Action Required
11/17/2021
PRESSURE STEADY ON DWV NO ELECTRICAL STARTED PROVIDE MIDPOINT STRAP VERTICAL DWV 2" & SMALLER FIRE CAULK DWV FLOOR PENETRATIONS
In-wall Inspection Passed 12/14/2021 12/14/2021 12/14/2021
Misc
Resolved
12/14/2021
PRESSURE STEADY ON DWV
Above Ceiling Inspection Partial 12/14/2021 12/14/2021 12/14/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/14/2021
- HARD LIDS FRONT OF STORE OK TO COVER -
Above Ceiling Inspection Passed 1/5/2022 01/05/2022
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
12/14/2021
- HARD LIDS FRONT OF STORE OK TO COVER - - REAR OF STORE OK TO DROP CEILING TILE -
Alarm Test Passed 1/19/2022 01/19/2022
Occupancy Inspection - Codes Commercial Failed 1/21/2022 1/21/2022 01/21/2022
Miscellaneous Correction
Corrective Action Required
01/21/2022
PROVIDE HEALTH DEPT INSPECTION REPORT
Occupancy Inspection - Fire Passed 1/21/2022 1/21/2022 01/21/2022
Occupancy Inspection - Codes Commercial Full C of O 1/24/2022 01/24/2022
Miscellaneous Correction
Resolved
01/24/2022
Documents & Images
Date Uploaded File Type Document Name
08/16/2021 Application Form Permit Application
08/16/2021 Application Form Excise tax form
08/16/2021 Plans _Mech Nekter Lees Summit MO 07-30-21 Client Review Set
08/16/2021 Plans _Arch Nekter Lees Summit MO 07-30-21 Client Review Set
08/16/2021 Plans _Plumb Nekter Lees Summit MO 07-30-21 Client Review Set
08/16/2021 Plans _Elec Nekter Lees Summit MO 07-30-21 Client Review Set
08/17/2021 Email RE_ lt question - juice bar - PRCOM20214277
08/17/2021 Letter License Tax Bill
08/17/2021 Letter Fire Building Plan Review
08/20/2021 Letter DS P/R Corrections Document
09/13/2021 Email New Food Establishment Plan Review - Approved FTG_0001307
09/27/2021 Letter Nekter Lees Summit PCC 1 Response Letter
09/27/2021 Plans _Mech Nekter Lees Summit MO_09-22-21 City Submittal Set
09/27/2021 Plans _Arch Nekter Lees Summit MO_09-22-21 City Submittal Set
09/27/2021 Plans _Elec Nekter Lees Summit MO 09-22-21 City Submittal Set
09/27/2021 Plans _Plumb Nekter Lees Summit MO_09-22-21 City Submittal Set
09/28/2021 Letter Fire Building Plan Review
10/04/2021 Approved Plans approved - arch
10/04/2021 Approved Plans approved - mech
10/04/2021 Approved Plans approved - plumb
10/04/2021 Approved Plans approved - elec
10/21/2021 Receipt Receipt for transaction:2021-008141
10/25/2021 Letter DS Building Permit
11/17/2021 Letter INSPECTION SUMMARY
12/10/2021 15789 Nekter FP PE Stamp
12/10/2021 Letter Fire (Sprinkler) Plan Review
12/14/2021 Letter INSPECTION SUMMARY
12/14/2021 Letter INSPECTION SUMMARY
12/17/2021 Nektar Juice Bar Calcs PE Stamp
12/17/2021 Nektar Juice Bar FA 12 9 21 PE Stamp
12/17/2021 Letter Fire (Alarm) Plan Review Notice
01/05/2022 Letter INSPECTION SUMMARY
01/19/2022 Receipt Receipt for transaction:2022-000326
01/21/2022 Letter INSPECTION SUMMARY
01/24/2022 Letter Codes Final Certificate of Occupancy
01/24/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home