Permit Application Status

PRCOM20211560


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20211560
Building Permit - Commercial
Certificate of Occupancy
TOWNSEND SUMMIT LLC
NEW TENANT FINISH
TENANT FINISH FOR PET STORE
04/05/2021
05/07/2021
10/31/2021
11/15/2021
Locations
Contacts
KC ROOFING AND RENOVATION SOLUTIONS LLC, Address:3209 SW 11TH ST CIR, Phone:(816) 988-6003  
HEART OF AMERICA SERVICE CO LLC, Address:8347 MONTICELLO RD, Phone:(913) 441-2772  
ACE ELECTRICAL CONTRACTORS, Address:1353 NE BRANDYWINE RD, Phone:(816) 875-4761  
IPLUMBKC LLC, Address:34108 E TRUMAN RD, Phone:(833) 758-6252  
R. GARY GLUECK ARCHITECTURE, Address:3797 LOOP RD, Phone:(252) 459-5900  
Chris Keck - KC Roofing, Phone:(816) 668-0201  
TOWNSEND SUMMIT LLC, Address:230 SCHILLNG CIR STE 120  
ACE ELECTRICAL CONTRACTORS, Address:1353 NE BRANDYWINE RD, Phone:(816) 875-4761  
CAMM CONSTRUCTION INC, Address:4006 E 137TH TERR, Phone:(816) 607-3602  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 10/19/2021 10/19/2021
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
10/19/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Sprinkler Plan Review Released for Construction 06/03/2021 06/03/2021
Michael Weissenbach
Building Plan Review Approved 05/11/2021 05/05/2021
Joe Frogge
IBC 502.1 - Address Identification
Resolved
05/04/2021

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: This space has been assigned the address of 464 NW Chipman Rd. Please inform your client and update your records.
IBC 1606.2 Design dead load - structural
Resolved
05/05/2021

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional load or provide design to accommodate new weight from rooftop equipment. 4/29/21 - not addressed 5/4/21 - Design criteria (weights) provided. We need verification from architect or structural engineer that the roof can handle new load. Drawings provided are from original design but don't tell us the maximum loading.
Gen - Design professional seals
Resolved
05/04/2021

Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects – Board Rules, Division 2030 – Chapter 3, 20 CSR 2030-3.060 Licensees Seal Documents must bear design professionals original seal with signature and date. (relevant portion paraphrased – reference original document for additional information) Action required: All drawings are to bear dated seal and signature from architect/engineer of record including MEP sheets. 4/29/21 - MEP still not sealed/signed.
IMC 801.2 Combustion air required
Resolved
05/04/2021

2018 IMC 801.2 General. Every fuel-burning appliance shall discharge the products of combustion to a vent, factory-built chimney or masonry chimney, except for appliances vented in accordance with Section 804. The chimney or vent shall be designed for the type of appliance being ventilated. (see code for exception) Action required: Provide complete design for water heater combustion and ventilation air. 4/29/21 - Vent shown but nothing found on combustion air. Heater is in a confined location so ambient area is not sufficient.
IPC 604.9 Water hammer
Resolved
05/04/2021

**This comment added after initial review to address new information that is now on the drawings** 2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Provide compliant water hammer arrestors as air chambers are not allowed.
Zoning Review Approved 04/15/2021 05/05/2021
Joe Frogge
Fire Plan Review Approved with Conditions 05/11/2021 05/05/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
05/04/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Address numbers required
Corrective Action Required
05/04/2021

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Address all exterior doors.
Construction documents - Fire protection systems
Corrective Action Required
05/04/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
05/04/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
05/04/2021

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide 2 2A10BC Fire Extinguishers.
Licensed Contractors Approved 05/11/2021 05/04/2021
Joe Frogge
Fire Plan Review Approved with Conditions 05/06/2021 04/29/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
04/29/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Address numbers required
Corrective Action Required
04/29/2021

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Address all exterior doors.
Construction documents - Fire protection systems
Corrective Action Required
04/29/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
04/29/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
04/29/2021

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide 2 2A10BC Fire Extinguishers.
Misc
Resolved
04/29/2021

(Action Required) Provide an additional exit sign leading into the hallway towards the exterior exit.
Building Plan Review Rejected 05/06/2021 04/29/2021
Joe Frogge
ICC A117.1 604.5.1 Fixed side wall grab bars
Resolved
04/29/2021

ICC A117.1 604.5.1 Fixed side wall grab bars. Fixed side-wall grab bars shall include a horizontal bar complying with Section 604.5.1.1 and a vertical grab bar complying with Section 604.5.12. The vertical grab bar at water closets primarily for children’s use shall comply with Section 609.4.2. ICC A117.1 604.5.1.1 Horizontal grab bar. A horizontal grab bar 42 inches minimum in length shall be located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. ICC A117.1 604.5.1.2 Vertical grab bar. A vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located 39 inches minimum and 41 inches maximum above the floor, and with the center line of the bar located 39 inches minimum and 41 inches maximum from the rear wall. Action required: Modify detail 8/4-2 to comply. Vertical grab bar too far from rear wall and horizontal bar is too short.
IBC 502.1 - Address Identification
Corrective Action Required
04/29/2021

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: This space has been assigned the address of 464 NW Chipman Rd. Please inform your client and update your records.
IBC 1606.2 Design dead load - structural
Corrective Action Required
04/29/2021

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional load or provide design to accommodate new weight from rooftop equipment. 4/29/21 - not addressed
IMC 606.2.1 Duct detector
Resolved
04/29/2021

2018 IMC 606.2.1 Return air systems. Smoke detectors shall be installed in return air systems with a design capacity greater than 2,000 cfm, in the return air duct or plenum upstream of any filters, exhaust air connections, outdoor air connections, or decontamination equipment and appliances. Exception: Smoke detectors are not required in the return air system where all portions of the building served by the air distribution system are protected by area smoke detectors connected to a fire alarm system in accordance with the International Fire Code. The area smoke detection system shall comply with Section 606.4. Action required: Duct mounted smoke detectors belong in return, not supply. Re: HVAC General Notes, sheet M-2.
Gen - Design professional seals
Corrective Action Required
04/29/2021

Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects – Board Rules, Division 2030 – Chapter 3, 20 CSR 2030-3.060 Licensees Seal Documents must bear design professionals original seal with signature and date. (relevant portion paraphrased – reference original document for additional information) Action required: All drawings are to bear dated seal and signature from architect/engineer of record including MEP sheets. 4/29/21 - MEP still not sealed/signed.
IPC 606.2 Location of shutoff valves
Resolved
04/29/2021

2018 IPC 606.2 Location of shutoff valves. Shutoff valves shall be installed in the following locations: 1. On the fixture supply to each plumbing fixture other than bathtubs and showers in one- and two-family residential occupancies, and other than in individual sleeping units that are provided with unit shutoff valves in hotels, motels, boarding houses and similar occupancies. 2. On the water supply pipe to each sillcock. 3. On the water supply pipe to each appliance or mechanical equipment. Action required: Comment for informational purposes. Provide shutoff valves at required locations. To be verified at inspection.
IMC 801.2 Combustion air required
Corrective Action Required
04/29/2021

2018 IMC 801.2 General. Every fuel-burning appliance shall discharge the products of combustion to a vent, factory-built chimney or masonry chimney, except for appliances vented in accordance with Section 804. The chimney or vent shall be designed for the type of appliance being ventilated. (see code for exception) Action required: Provide complete design for water heater combustion and ventilation air. 4/29/21 - Vent shown but nothing found on combustion air. Heater is in a confined location so ambient area is not sufficient.
Misc
Resolved
04/29/2021

Inadequate information to complete review. Action required: Provide pipe material schedule.
IPC 604.9 Water hammer
Corrective Action Required
04/29/2021

**This comment added after initial review to address new information that is now on the drawings** 2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Provide compliant water hammer arrestors as air chambers are not allowed.
Licensed Contractors Approved 04/29/2021 04/29/2021
Joe Frogge
Licensed Contractors Approved 04/15/2021 04/14/2021
Joe Frogge
LC - MEP Subs
Resolved
04/14/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (Plumb KC not licensed in Lee's Summit)
Building Plan Review Rejected 04/15/2021 04/08/2021
Joe Frogge
ICC A117.1 604.5.1 Fixed side wall grab bars
Corrective Action Required
04/08/2021

ICC A117.1 604.5.1 Fixed side wall grab bars. Fixed side-wall grab bars shall include a horizontal bar complying with Section 604.5.1.1 and a vertical grab bar complying with Section 604.5.12. The vertical grab bar at water closets primarily for children’s use shall comply with Section 609.4.2. ICC A117.1 604.5.1.1 Horizontal grab bar. A horizontal grab bar 42 inches minimum in length shall be located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. ICC A117.1 604.5.1.2 Vertical grab bar. A vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located 39 inches minimum and 41 inches maximum above the floor, and with the center line of the bar located 39 inches minimum and 41 inches maximum from the rear wall. Action required: Modify detail 8/4-2 to comply. Vertical grab bar too far from rear wall and horizontal bar is too short.
IBC 502.1 - Address Identification
Corrective Action Required
04/08/2021

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: Suite designation for this address not yet assigned. Provide plan, or similar, showing entire building wing and relationship of this suite to the adjacent suites.
IBC 1606.2 Design dead load - structural
Corrective Action Required
04/08/2021

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional load or provide design to accommodate new weight from rooftop equipment.
IMC 606.2.1 Duct detector
Corrective Action Required
04/08/2021

2018 IMC 606.2.1 Return air systems. Smoke detectors shall be installed in return air systems with a design capacity greater than 2,000 cfm, in the return air duct or plenum upstream of any filters, exhaust air connections, outdoor air connections, or decontamination equipment and appliances. Exception: Smoke detectors are not required in the return air system where all portions of the building served by the air distribution system are protected by area smoke detectors connected to a fire alarm system in accordance with the International Fire Code. The area smoke detection system shall comply with Section 606.4. Action required: Duct mounted smoke detectors belong in return, not supply. Re: HVAC General Notes, sheet M-2.
Gen - Design professional seals
Corrective Action Required
04/08/2021

Missouri Board for Architects, Professional Engineers, Professional Land Surveyors and Professional Landscape Architects – Board Rules, Division 2030 – Chapter 3, 20 CSR 2030-3.060 Licensees Seal Documents must bear design professionals original seal with signature and date. (relevant portion paraphrased – reference original document for additional information) Action required: All drawings are to bear dated seal and signature from architect/engineer of record including MEP sheets.
IMC 601.5 Return air openings
Resolved
04/26/2021

2018 IMC 601.5 Return air openings. Return air openings for heating, ventilation and air-conditioning systems shall comply with all of the following: 1. Openings shall not be located less than 10 feet measured in any direction from an open combustion chamber or draft hood of another appliance located in the same room or space. 2. Return air shall not be taken from a hazardous or insanitary location or a refrigeration room as defined in this code. 3. The amount of return air taken from any room or space shall be not greater than the flow rate of supply air delivered to such room or space. 4. Return and transfer openings shall be sized in accordance with the appliance or equipment manufacturer’s installation instructions, ACCA Manual D or the design of the registered design professional. 5. Return air taken from one dwelling unit shall not be discharged into another dwelling unit. 6. Taking return air from a crawl space shall not be accomplished through a direct connection to the return side of a forced air furnace. Transfer openings in the crawl space enclosure shall not be prohibited. 7. Return air shall not be taken from a closet, bathroom, toilet room, kitchen, garage, boiler room, furnace room or unconditioned attic. 8. Return air shall not be taken from indoor swimming pool enclosures and associated deck areas. (see code for exceptions to item #8) Action required: Provide path for return air to reach RTU #1. 4/26/21 - per convo with ME
IPC 606.2 Location of shutoff valves
Corrective Action Required
04/08/2021

2018 IPC 606.2 Location of shutoff valves. Shutoff valves shall be installed in the following locations: 1. On the fixture supply to each plumbing fixture other than bathtubs and showers in one- and two-family residential occupancies, and other than in individual sleeping units that are provided with unit shutoff valves in hotels, motels, boarding houses and similar occupancies. 2. On the water supply pipe to each sillcock. 3. On the water supply pipe to each appliance or mechanical equipment. Action required: Comment for informational purposes. Provide shutoff valves at required locations. To be verified at inspection.
IMC 801.2 Combustion air required
Corrective Action Required
04/08/2021

2018 IMC 801.2 General. Every fuel-burning appliance shall discharge the products of combustion to a vent, factory-built chimney or masonry chimney, except for appliances vented in accordance with Section 804. The chimney or vent shall be designed for the type of appliance being ventilated. (see code for exception) Action required: Provide complete design for water heater combustion and ventilation air.
Misc
Corrective Action Required
04/08/2021

Inadequate information to complete review. Action required: Provide pipe material schedule.
Fire Plan Review Approved with Conditions 04/15/2021 04/05/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
04/05/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Address numbers required
Corrective Action Required
04/05/2021

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection) Address all exterior doors.
Construction documents - Fire protection systems
Corrective Action Required
04/05/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
04/05/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
04/05/2021

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide 2 2A10BC Fire Extinguishers.
Misc
Corrective Action Required
04/05/2021

(Action Required) Provide an additional exit sign leading into the hallway towards the exterior exit.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Tenent Finish $1,879.63 $1,879.63 Paid 05/07/2021
8331507-Sewer Connection Fee $360.00 $360.00 Paid 05/07/2021
Commercial Excise Tax Fee $6,037.50 $6,037.50 Paid 05/07/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Electrical Inspection - Commercial Partial 5/25/2021 5/25/2021 05/25/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/25/2021
UNDERSLAB CONDUIT AT SALES COUNTER
Underslab Plumbing Inspection - Commercial Partial 5/25/2021 5/25/2021 05/25/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/25/2021
UNDERSLAB PLUMBING RESTROOMS, WATER COOLER,MOP SINK, DOG WASH STATION, WASHING MACHINE, BOWL WASH STATION
In-wall Inspection Failed 6/17/2021 6/17/2021 at 8:20 AM 06/17/2021
Misc
Corrective Action Required
06/17/2021
NO PLANS ON SITE ( ONLY ELECTRICAL NOT CITY STAMPED )
In-wall Inspection Passed 6/21/2021 6/21/2021 06/21/2021
Electrical Service Inspection Passed 8/11/2021 8/11/2021 08/11/2021
Gas Piping Inspection - Commercial Passed 10/7/2021 10/07/2021
Gas Service Inspection - Commercial Passed 10/7/2021 10/07/2021
Above Ceiling Inspection Failed 10/13/2021 10/13/2021 10/13/2021
Miscellaneous Correction
Corrective Action Required
10/13/2021
VENT BATH EXHAUST TO DAYLIGHT OPEN J BOXES ABOVE WASHING MACHINE AND STORAGE ROOM LAUNDRY
Above Ceiling Inspection Passed 10/14/2021 10/14/2021 10/14/2021
Miscellaneous Correction
Resolved
10/14/2021
In-wall Inspection Failed 10/20/2021 10/20/2021 10/20/2021
Misc
Corrective Action Required
10/20/2021
- PROVIDE BONDING SCREWS & PIGTAILS IN METAL BOXES AT ADOPTION KENNELS - - METAL STUD FRAMING APPROVED OK TO COVER -
In-wall Inspection Passed 10/21/2021 10/21/2021 10/21/2021
Misc
Resolved
10/21/2021
- METAL STUD FRAMING APPROVED OK TO COVER -
Alarm Test Passed 11/8/2021 11/08/2021
Underslab Plumbing Inspection - Commercial Passed 11/10/2021 11/10/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/25/2021
UNDERSLAB PLUMBING RESTROOMS, WATER COOLER,MOP SINK, DOG WASH STATION, WASHING MACHINE, BOWL WASH STATION
Underslab Electrical Inspection - Commercial Passed 11/10/2021 11/10/2021
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/25/2021
UNDERSLAB CONDUIT AT SALES COUNTER
Occupancy Inspection - Codes Commercial Failed 11/10/2021 11/10/2021 11/10/2021
Miscellaneous Correction
Corrective Action Required
11/10/2021
PROVIDE EXPANSION TANK WATER HEATER PROVIDE GFCI PROTECTION RECEPTACLES AT SINK NEXT TO DRYER PROVIDE CHROME COVER PLATES @ CLEANOUT IN RESTROOMS : OK TO STOCK & TRAIN :
Occupancy Inspection - Fire Passed 11/10/2021 11/10/2021 11/10/2021
Occupancy Inspection - Codes Commercial Full C of O 11/15/2021 11/15/2021 11/15/2021
Miscellaneous Correction
Resolved
11/15/2021
PROVIDE EXPANSION TANK WATER HEATER PROVIDE GFCI PROTECTION RECEPTACLES AT SINK NEXT TO DRYER PROVIDE CHROME COVER PLATES @ CLEANOUT IN RESTROOMS : OK TO STOCK & TRAIN :
Documents & Images
Date Uploaded File Type Document Name
04/05/2021 Application Form Tara Roth LLC_Lee's Summit Permit Application
04/05/2021 Application Form Tara Roth LLC_City of Lee's Summit Tax Appliaction
04/05/2021 Plans LEES SUMMIT COMPLETE DRAWINGS 1-12-2021
04/05/2021 Letter License Tax Bill
04/05/2021 Letter Fire Building Plan Review
04/08/2021 Letter DS P/R Corrections Document
04/29/2021 Plans PETLAND LEES SUMMIT MPE REVISED
04/29/2021 Letter Petland Lee's Summit MO Comment Letter
04/29/2021 Letter PETLAND LEES SUMMIT MPE LETTER
04/29/2021 Drawing Summit Orchards site plan
04/29/2021 Plans Revision on Lee's Summit 4-28-2021
04/29/2021 Plans PETLAND LEES SUMMIT MPE REVISED
04/29/2021 Letter Fire Building Plan Review
04/30/2021 Petland_Revision on Lee's Summit 4-28-2021 C-1
04/30/2021 Petland_Comment Revision Summary 4-28-2021
04/30/2021 Summit Orchards site plan
04/30/2021 Comment Revision Summary 4-28-2021
04/30/2021 PETLAND LEES SUMMIT MPE LETTER
05/04/2021 Letter DS P/R Corrections Document
05/04/2021 Letter LEES SUMMIT Comment letter 5-4-2021
05/04/2021 Plans LEE'S SUMMIT FINAL SET 5-4-2021
05/04/2021 Engineer Report/Study LEES SUMMIT Rooftop weights and building structure 5-4-2021
05/04/2021 Plans LEE'S SUMMIT FINAL MEP SET 5-4-2021
05/04/2021 Letter LEES SUMMIT MEP Comment letter 5-4-2021
05/05/2021 Letter Fire Building Plan Review
05/05/2021 Email Petland - PRCOM20211560
05/05/2021 Engineer Report/Study SLAGG1909-L050521CK5
05/05/2021 Approved Plans approved plans
05/07/2021 Receipt Receipt for transaction:2021-002659
05/07/2021 Letter DS Building Permit - old
05/17/2021 Email project title change
05/17/2021 Letter DS Building Permit
05/25/2021 Letter INSPECTION SUMMARY
05/25/2021 Letter INSPECTION SUMMARY
06/03/2021 Letter Fire (Sprinkler) Plan Review
06/17/2021 Letter INSPECTION SUMMARY
06/21/2021 Letter INSPECTION SUMMARY
07/12/2021 Email KC Roofing & Reno no longer GC
07/19/2021 Letter DS Building Permit
08/11/2021 Letter INSPECTION SUMMARY
08/24/2021 Approved Plans approved - LEE'S SUMMIT FINAL 8-23-2021-A-6
10/07/2021 Letter INSPECTION SUMMARY
10/07/2021 Letter INSPECTION SUMMARY
10/13/2021 Letter INSPECTION SUMMARY
10/14/2021 Letter INSPECTION SUMMARY
10/19/2021 Petland LSMO - Cover-FA-COVER
10/19/2021 Petland LSMO - Fire Alarm-FA-101
10/19/2021 Letter Fire (Alarm) Plan Review Notice
10/20/2021 Letter INSPECTION SUMMARY
10/21/2021 Letter INSPECTION SUMMARY
11/10/2021 Letter INSPECTION SUMMARY
11/10/2021 Letter INSPECTION SUMMARY
11/10/2021 Letter INSPECTION SUMMARY
11/10/2021 Letter Fire Loss Reduction Form
11/15/2021 Letter Codes Final Certificate of Occupancy
11/15/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home