Inspection |
Outcome |
Requested |
Scheduled |
Date Inspected |
Underground Electrical Inspection - Commercial
|
Partial
|
2/14/2017
|
2/14/2017
|
02/14/2017
|
|
Misc
|
Underground Electrical Inspection - Commercial
|
Partial
|
3/16/2017
|
3/16/2017
|
03/16/2017
|
|
Misc
|
|
Misc
|
Footing Inspection - Commercial
|
Partial
|
3/17/2017 (11:00)
|
3/17/2017
|
03/17/2017
|
|
Misc
|
Concrete Walls and Columns Inspection
|
Partial
|
3/23/2017 (8:00)
|
3/23/2017
|
03/23/2017
|
|
Misc
|
Footing Inspection - Commercial
|
Partial
|
4/24/2017 (2:00)
|
4/24/2017
|
04/24/2017
|
|
Misc
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Partial
|
|
4/27/2017
|
04/27/2017
|
|
Misc
|
Underslab Plumbing Inspection - Commercial
|
Passed
|
5/2/2017
|
5/2/2017
|
05/02/2017
|
Foundation Inspection - Commercial
|
Partial
|
|
5/5/2017
|
05/05/2017
|
|
Misc
|
Underground Electrical Inspection - Commercial
|
Partial
|
5/18/2017
|
5/18/2017
|
05/18/2017
|
|
Misc
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Partial
|
|
5/22/2017
|
05/22/2017
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
|
5/25/2017
|
05/25/2017
|
|
Misc
|
Electrical Service Inspection
|
Partial
|
|
6/9/2017
|
06/09/2017
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Failed
|
5/25/2017
|
6/15/2017
|
06/15/2017
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Partial
|
|
6/16/2017
|
06/16/2017
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
6/16/2017
|
6/21/2017
|
06/21/2017
|
|
Misc
|
Concrete Walls and Columns Inspection
|
Passed
|
|
3/23/2017
|
06/27/2017
|
|
Misc
|
Footing Inspection - Commercial
|
Passed
|
|
4/24/2017
|
06/27/2017
|
|
Misc
|
Foundation Inspection - Commercial
|
Passed
|
|
5/5/2017
|
06/27/2017
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
6/29/2017
|
6/30/2017
|
06/30/2017
|
|
Misc
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Not Ready
|
7/3/2017
|
7/3/2017
|
07/03/2017
|
|
Misc
|
|
Misc
|
|
Misc
Corrective Action Required
|
Rated Assembly Inspection
|
Partial
|
7/5/2017
|
7/5/2017
|
07/05/2017
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
7/14/2017
|
7/14/2017
|
07/14/2017
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
7/19/2017
|
7/19/2017
|
07/19/2017
|
|
Misc
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Failed
|
7/31/2017
|
7/31/2017
|
07/31/2017
|
|
Misc
|
|
Misc
|
|
Misc
Corrective Action Required
|
Rough Framing Inspection - Commercial
|
Partial
|
8/3/2017
|
8/3/2017
|
08/03/2017
|
|
Misc
|
|
Misc
|
|
Misc
Corrective Action Required
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Failed
|
8/10/2017
|
8/10/2017
|
08/10/2017
|
|
Misc
|
|
Misc
|
|
Misc
Corrective Action Required
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Failed
|
8/11/2017
|
8/11/2017
|
08/11/2017
|
|
Misc
|
|
Misc
|
|
Misc
Corrective Action Required
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Not Ready
|
|
8/21/2017 at 2:45 PM
|
08/21/2017
|
|
Misc
|
|
Misc
|
|
Misc
Corrective Action Required
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Partial
|
8/22/2017
|
8/22/2017 at 2:10 PM
|
08/22/2017
|
|
Misc
|
|
Misc
|
|
Misc
Corrective Action Required
|
|
Misc
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Partial
|
8/25/2017
|
8/25/2017 at 1:10 PM
|
08/25/2017
|
|
Misc
|
|
Misc
Corrective Action Required
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Failed
|
8/28/2017
|
8/28/2017 at 1:10 PM
|
08/28/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Partial
|
8/29/2017
|
8/29/2017 at 1:10 PM
|
08/29/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
All Rough Inspection - Commercial
|
Partial
|
|
9/6/2017 at 1:45 PM
|
09/06/2017
|
|
Misc
|
All Rough Inspection - Commercial
|
Partial
|
9/7/2017
|
9/7/2017 at 9:10 AM
|
09/07/2017
|
|
Misc
|
Sprinkler - Hydrostatic Test
|
Passed
|
|
9/7/2017
|
09/07/2017
|
All Rough Inspection - Commercial
|
Partial
|
9/8/2017
|
9/8/2017 at 3:20 PM
|
09/08/2017
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
9/11/2017
|
9/11/2017 at 2:35 PM
|
09/11/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Partial
|
|
9/11/2017 at 3:10 PM
|
09/11/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
9/12/2017
|
9/12/2017 at 9:30 AM
|
09/12/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
9/13/2017
|
9/13/2017 at 8:35 AM
|
09/13/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
All Rough Inspection - Commercial
|
Partial
|
9/14/2017
|
9/14/2017 at 2:05 PM
|
09/14/2017
|
|
Misc
|
|
Misc
|
All Rough Inspection - Commercial
|
Partial
|
9/18/2017
|
9/18/2017 at 10:25 AM
|
09/18/2017
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
9/18/2017
|
9/18/2017 at 10:45 AM
|
09/18/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
9/19/2017
|
9/19/2017 at 2:35 PM
|
09/19/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
All Rough Inspection - Commercial
|
Partial
|
9/19/2017
|
9/19/2017 at 3:10 PM
|
09/19/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
All Rough Inspection - Commercial
|
Failed
|
9/20/2017
|
9/20/2017 at 4:35 PM
|
09/20/2017
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
|
9/20/2017 at 4:40 PM
|
09/20/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
All Rough Inspection - Commercial
|
Partial
|
9/22/2017
|
9/22/2017 at 10:25 AM
|
09/22/2017
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
9/22/2017
|
9/22/2017 at 11:05 AM
|
09/22/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
All Rough Inspection - Commercial
|
Partial
|
|
9/22/2017 at 12:45 PM
|
09/22/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
9/25/2017
|
9/25/2017 at 2:15 PM
|
09/25/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
All Rough Inspection - Commercial
|
Partial
|
9/26/2017
|
9/26/2017 at 2:55 PM
|
09/26/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
9/27/2017
|
9/27/2017 at 10:30 AM
|
09/27/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
All Rough Inspection - Commercial
|
Partial
|
9/27/2017
|
9/27/2017 at 11:00 AM
|
09/27/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
Corrective Action Required
|
All Rough Inspection - Commercial
|
Partial
|
9/28/2017
|
9/28/2017 at 11:30 AM
|
09/28/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
9/28/2017
|
9/28/2017 at 12:15 PM
|
09/28/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
All Rough Inspection - Commercial
|
Partial
|
9/29/2017
|
9/29/2017 at 8:30 AM
|
09/29/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
9/29/2017
|
9/29/2017 at 9:00 AM
|
09/29/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
All Rough Inspection - Commercial
|
Partial
|
10/2/2017
|
10/2/2017 at 1:00 PM
|
10/02/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
10/3/2017
|
10/3/2017 at 10:00 AM
|
10/03/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
10/4/2017
|
10/4/2017 at 11:30 AM
|
10/04/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
10/5/2017
|
10/5/2017 at 2:00 PM
|
10/05/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
10/5/2017
|
10/6/2017 at 1:00 PM
|
10/06/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Partial
|
10/9/2017
|
10/9/2017 at 2:25 PM
|
10/09/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
|
Rated Assembly Inspection
|
Partial
|
10/11/2017
|
10/11/2017 at 2:40 PM
|
10/11/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
10/12/2017
|
10/12/2017 at 2:15 PM
|
10/12/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
10/13/2017
|
10/13/2017 at 11:55 AM
|
10/13/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
All Rough Inspection - Commercial
|
Partial
|
10/13/2017
|
10/13/2017 at 12:10 PM
|
10/13/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Partial
|
|
10/13/2017 at 12:50 PM
|
10/13/2017
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
10/17/2017
|
10/17/2017 at 1:05 PM
|
10/17/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Partial
|
10/19/2017
|
10/19/2017 at 10:40 AM
|
10/19/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
Electrical Service Inspection
|
Passed
|
11/10/2017
|
11/10/2017 at 2:05 PM
|
11/10/2017
|
All Rough Inspection - Commercial
|
Partial
|
|
11/10/2017 at 2:25 PM
|
11/10/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
Concrete Walls and Columns Inspection
|
Passed
|
|
12/13/2017 at 4:00 PM
|
12/13/2017
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
Concrete Walls and Columns Inspection
|
Passed
|
|
12/13/2017 at 4:00 PM
|
12/13/2017
|
Miscellaneous Inspection
|
Partial
|
|
1/30/2018 at 3:40 PM
|
01/30/2018
|
Miscellaneous Inspection
|
Partial
|
|
1/31/2018 at 10:10 AM
|
01/31/2018
|
Miscellaneous Inspection
|
Partial
|
|
1/31/2018 at 3:30 PM
|
01/31/2018
|
Miscellaneous Inspection
|
Partial
|
|
2/1/2018 at 10:50 AM
|
02/01/2018
|
Miscellaneous Inspection
|
Partial
|
|
2/1/2018 at 2:00 PM
|
02/01/2018
|
Miscellaneous Inspection
|
Partial
|
|
2/2/2018 at 1:45 PM
|
02/02/2018
|
Miscellaneous Inspection
|
Partial
|
|
2/5/2018 at 2:05 PM
|
02/05/2018
|
Miscellaneous Inspection
|
Partial
|
|
2/6/2018 at 7:15 AM
|
02/06/2018
|
Miscellaneous Inspection
|
Partial
|
|
2/6/2018 at 9:25 AM
|
02/06/2018
|
Miscellaneous Inspection
|
Partial
|
|
2/6/2018 at 2:00 PM
|
02/06/2018
|
Miscellaneous Inspection
|
Partial
|
|
2/7/2018 at 3:50 PM
|
02/07/2018
|
Miscellaneous Inspection
|
Partial
|
|
2/8/2018 at 2:00 PM
|
02/08/2018
|
Miscellaneous Inspection
|
Partial
|
|
2/8/2018 at 4:05 PM
|
02/08/2018
|
Alarm Test
|
Passed
|
|
2/9/2018
|
02/09/2018
|
Sprinkler - Flow Test
|
Passed
|
|
2/9/2018
|
02/09/2018
|
All Rough Inspection - Commercial
|
Passed
|
|
11/10/2017
|
02/12/2018
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
Rated Assembly Inspection
|
Passed
|
|
10/19/2017
|
02/12/2018
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
|
Misc
|
Rough Framing Inspection - Commercial
|
Passed
|
|
10/13/2017
|
02/12/2018
|
|
Misc
|
Underground Electrical Inspection - Commercial
|
Passed
|
|
5/18/2017
|
02/12/2018
|
|
Misc
|
|
Misc
|
Miscellaneous Inspection
|
Passed
|
|
2/12/2018 at 7:10 AM
|
02/12/2018
|
Occupancy Inspection - Codes Commercial
|
Temporary C of O
|
2/12/2018
|
2/12/2018 at 1:15 PM
|
02/12/2018
|
Occupancy Inspection - Planning
|
Temporary C of O
|
|
2/12/2018
|
02/12/2018
|
|
|
Occupancy Inspection - Fire
|
Passed
|
|
2/12/2018
|
02/12/2018
|
Occupancy Inspection - Water Utilities
|
Passed
|
|
2/12/2018
|
04/02/2018
|
Occupancy Inspection - Planning
|
Passed
|
|
4/3/2018
|
04/03/2018
|
Occupancy Inspection - Codes Commercial
|
Full C of O
|
|
4/4/2018 at 2:55 PM
|
04/04/2018
|
|
Misc
|
Investigation Inspection
|
Complete
|
|
4/5/2018
|
04/04/2018
|