Property Review

Parcel Number: 344569


Property Details
344569
Active
JACKSON
Legal
A1
Addresses
Street # Pre-Direction Street Name Direction Unit # Status
200 ORCHARD CT NW Active
204 ORCHARD CT NW Active
206 ORCHARD CT NW Active
210 ORCHARD CT NW Active
212 ORCHARD CT NW Active
216 ORCHARD CT NW Active
218 ORCHARD CT NW Active
222 ORCHARD CT NW Active
224 ORCHARD CT NW Active
228 ORCHARD CT NW Active
230 ORCHARD CT NW Active
235 ORCHARD CT NW Active
237 ORCHARD CT NW Active
241 ORCHARD CT NW Active
243 ORCHARD CT NW Active

Permit Applications
Permit # Type Work Class Status Date Issued
PRRES20254089 Building Permit - Residential NEW DUPLEX Issued 10/13/2025
:

: NEW DUPLEX. SLAB. COVERED PATIO.
PRRES20254088 Building Permit - Residential NEW DUPLEX Issued 10/13/2025
:

: NEW DUPLEX - ON SLAB - COVERED PATIO
PRRES20254087 Building Permit - Residential NEW DUPLEX Issued 10/13/2025
:

: NEW DUPLEX. SLAB. COVERED PATIO.
PRRES20253897 Building Permit - Residential NEW DUPLEX Issued 09/17/2025
:

: NEW DUPLEX - FINISHED AND UNFINISHED BASEMENT - COVERED PATIO
PRRES20253896 Building Permit - Residential NEW DUPLEX Issued 09/18/2025
:

: NEW DUPLEX. FINISHED AND UNFINISHED BASEMENT. COVERED PATIO.
PRRES20253883 Building Permit - Residential NEW DUPLEX Approved
:

: NEW DUPLEX. FINISHED AND UNFINISHED BASEMENT. COVERED PATIO.
PRPWRW20251855 Public Works Right of Way Permit PW ROW Water Expired 05/07/2025
:

: Hydrant Replacement
PRPWRW20251451 Public Works Right of Way Permit PW ROW Cable or Fiber Closed 04/11/2025
:

: Relocation of conduit along Olive St to avoid new storm sewer improvements, with one new crossing that will require extra depth. Vaults will need to be adjusted along this project corridor to match the final grade. Coordinate those adjustments with the city’s contractor. There are also poles that will be replaced, Google Fiber will need to transfer to those poles once placed. There is one location where Google FIber will need to adjust vaults and conduit, the vaults at the corner of Main and Orchard will need to be shifted with the conduit adjusted to the new vault locations. The conduit extending south from that intersection will need to be lowered in place, due to the fiber hierarchy. This lowering in place needs to be coordinated with the city’s contractor to ensure the extract location, depth, and restoration is covered sufficiently.
PRRES20240396 Building Permit - Residential NEW DUPLEX Voided
:

: NEW DUPLEX.
PRRES20236698 Building Permit - Residential NEW DUPLEX Voided
:

: Two New Duplexes totaling 5,993 sf each.
PRPWTC20230835 PW Temporary Traffic Control Permit Temporary Traffic Control Closed 02/28/2023
:

: soil borings For Olive and Orchard CIP
PRSUBD20203605 Public Infrastructure DEVELOPMENT COMPLETE Final Acceptance 11/04/2020
:

: Full infrustructure for the development
PR20192318 Voided
:

:
PRLD20192197 Land Disturbance Permit LAND DISTURBANCE Closed 10/14/2019
:

: BURTON TOWNHOMES - LAND DISTURBANCE
Planning Applications
Permit # Type Status Date Closed
PL2025189 Minor Plat Approved 11/10/2025
: Sequoia Residential Lots 7-10 and Tract A1

: A Replat of Sequoia Residential
PL2025188 Minor Plat Approved 11/10/2025
: Sequoia Residential Lots 1-6 and Tract A

: A Replat of Sequoia Residential
PL2025083 Pre-Application Complete 04/25/2025
: Sequoia Residential Lots

: Discussion regarding previously approved duplexes to possible single-family ranch-style homes. Applicant Billy Spellerberg. Fact finding call - no prelim documents. Re: approved PDP PL2019412, approved FDP PL2020137 and recorded plat PL2020138 located in CV documents.
PL2020140 Engineering Plan Review Approved 12/14/2020
: Sequoia - Public infrustructure

:
PL2020138 Final Plat Recorded 01/23/2024
: Sequoia FP

: Attached townhome development
PL2020137 Residential Final Development Plan Approved 06/19/2020
: Sequoia - FDP

: Townhome development
PL2019412 Residential Preliminary Development Plan Expired 05/06/2020
: SEQUOIA

:
PL2019020 Residential Rezoning with Preliminary Development Plan Withdrawn 11/20/2019
: Sequoia (Burton Townhomes)

: Rezoning from RP-2 to RP-3







Effective July 1, 2025, a Parks Impact Fee on new development went into effect. The fee, $250.00 per bedroom with a cap of four bedrooms per living unit on residential projects and a $0.20 pre gross square foot area on non-residential projects will be required prior to issuance of the building permit. If you request additional information or have any questions about this fee or development-related fees, please contact your Project Manager.