PL2020140




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020140
Sequoia - Public infrustructure
Engineering Plan Review
Engineering Plan Review
Approved
05/08/2020
ORCHARD PARK DEVELOPMENT LLC
Locations
Contacts
ORCHARD PARK DEVELOPMENT LLC, Address:8 SW AA HWY  
ORCHARD PARK DEVELOPMENT LLC, Address:8 SW AA HWY  
RENAISSANCE INFRASTRUCTURE CONSULTING, Address:5015 NW CANAL ST SUITE 100, Phone:(816) 800-0950  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 12/16/2020 12/15/2020
Gene Williams, P.E.
Engineering Review No Comments 12/07/2020 12/07/2020
Gene Williams, P.E.
Engineering Review No Comments 10/08/2020 10/08/2020
Gene Williams, P.E.
Traffic Review No Comments 10/08/2020 10/01/2020
Michael Park
Engineering Review Corrections 09/29/2020 09/29/2020
Gene Williams, P.E.
Corrective Action Required
09/29/2020

Please label the existing sanitary manhole with the City manhole number 30-051.
Corrective Action Required
09/29/2020

Please gray out the existing sanitary sewer line north of the existing manhole described above (i.e., to make it appear as an existing feature).
Corrective Action Required
09/29/2020

Please show the flowline "out" on the existing manhole described above. It is impossible to determine if the drop across the manhole is at least 0.5 feet.
Corrective Action Required
09/29/2020

The sanitary sewer is shown with absolute minimum slope. It is recommended that the slope be increased slightly to account for tolerance during construction. The City shall not accept any construction of the sanitary sewer less than 0.60% slope.
Corrective Action Required
09/29/2020

Please label the utility easement on the easement document exhibit as "existing U/E". After this change has been made, please execute and record the document, and provide the City with a document number for verification on the Jackson County website, or provide a recorded copy of the easement. Final approval of these plans is contingenet upon the execution and recording of this document.
Corrective Action Required
09/29/2020

Service lines for the sanitary sewer are shown without a direct path to the sanitary sewer line. The Design and Construction Manual requires that all private sanitary sewer laterals be installed with the shortest route possible. Please be aware that the City no longer requires the wye to be placed outside the paved area. It appears this older requirement was trying to be met, hence the bends in the private sanitary sewer laterals.
Corrective Action Required
09/29/2020

Please show the limits of backfill to be performed where fill is being placed in relation to the water line. The City now requires all plans to include the limits of backfill and sufficient notes to be shown on the profile view of the water line, to ensure that the contractor knows that backfill will be provided to a plane that is 18 inches to the proposed grade of the water line, compacted according to City standards, and then the backfill will be trenched and the water line installed.
Traffic Review No Comments 09/29/2020 09/16/2020
Michael Park
Traffic Review No Comments 06/26/2020 06/29/2020
Michael Park
Engineering Review Corrections 06/26/2020 06/26/2020
Gene Williams, P.E.
Corrective Action Required
06/26/2020

Easement language and exhibits appear acceptable. Please execute and record, and provide the City with verification that the documents have been recorded. This will be required prior to approval of the plans.
Corrective Action Required
06/26/2020

The exact location of sanitary sewer wyes and laterals must be shown on the public infrastructure plans. Although shown on the Final Development Plan, as-built Record Drawings will not be submitted for this, but rather, for the public infrastructure improvements. This is the reason they need to be shown on the public infrastructure plans.
Corrective Action Required
06/26/2020

The locations of the sanitary sewer wyes and laterals may be shown on the plan view, or a table or both.
Engineering Review Corrections 05/22/2020 05/22/2020
Gene Williams, P.E.
Corrective Action Required
05/22/2020

Sanitary sewer should be placed down the middle of the street, rather than the side of the street. This is a recent change to our procedure, and should make the installation of other utilities easier. This will require the revision of the Final Development Plan showing individual wye connections.
Corrective Action Required
05/22/2020

Curb ramp design slopes are incorrect. The City of Lee's Summit uses a more stringent set of design criteria, including a maximum 1.5% design cross slope, and a maximum running slope of 7.5%. Please revise.
Corrective Action Required
05/22/2020

Please show the hydraulic grade line in the profile view for the public storm line. For this particular street, please be aware that the 10 year event must be contained at or below the crown of the pipe.
Corrective Action Required
05/22/2020

A gate valve is required near the cut in tee for the water line.
Corrective Action Required
05/22/2020

Off site sanitary sewer easements are required prior to approval of the plans.
Corrective Action Required
05/22/2020

Why is the landscape plan shown within the public infrastructure plans? Also, there are trees shown directly on top of the water line. A minimum of five (5) feet distance is required between the outside of the water line, and the outside of the mature tree trunk. There are numerous instances where this rule is violated.
Traffic Review Corrections 05/22/2020 05/21/2020
Michael Park
Corrective Action Required
05/19/2020

The NO PARKING signs should be revised to R8-3 (symbolic; no text). The location of proposed NO PARKING signs must be dimensioned on the plans. The proposed NO PARKING signs on the north side of the cul-de-sac should be removed as on the south side of the street will be No Parking; except where typical conditions exist where parking is prohibited that are not signed (e.g adjacent to FH, Mailbox, Driveway, etc.).
Corrective Action Required
05/19/2020

Add street name signs above the stop sign. Orchard Circle is different than Orchard Street. The name Orchard Circle may need to be revised to Orchard Court since this is a cul-de-sac street and not a circle.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
05/08/2020 18-0251 Street & Storm Plans Signed
05/22/2020 Letter DE-Comment Letter (Engineering Plans)
06/12/2020 Plans 18-0251 EETEMP01 2020-06-12
06/12/2020 Plans 18-0251 EESSWR01 2020-06-12
06/12/2020 Letter 18-0251 Public Improvement Comment Response
06/12/2020 Plans 18-0251 Street & Storm Plans 2020-06-11 Signed
06/12/2020 Plans 18-0251 Permanent Sanitary LLC 2020-06-12
06/26/2020 Letter DE-Comment Letter (Engineering Plans)
09/15/2020 Permanent Sanitary Easement LLC
09/15/2020 18-0251 Public Infrastructure Comment Response
09/15/2020 18-0251 Street & Storm Plans Signed
09/15/2020 18-0251 Sequoia EOPC Signed
09/29/2020 Letter DE-Comment Letter (Engineering Plans)
10/01/2020 18-0251 Public Infrastructure Comment Response
10/01/2020 18-0251 Public Plan Revisions (dated 2020-09-15)
10/01/2020 18-0251 Permanent Sanitary LLC
10/01/2020 Plans 18-0251 Street & Storm Plans
10/08/2020 STICKY NOTE FOR APPROVAL
10/09/2020 Engineers Estimate 18-0251 Sequoia EOPC Signed
11/04/2020 Approved Plans Sequoia Residential Street, Storm, Sanitary and Water Approved 11.4.20
11/04/2020 Letter DE-Engineering Plans Approval Letter
12/03/2020 Letter 18-0251 Sequoia Residential Revisions
12/03/2020 Plans 18-0251 CDWTCC01-Waterline Plan & Profile
12/07/2020 Email STICKY NOTE REVISION APPROVAL
12/07/2020 Plans 18-0251 Sequoia Residential Revisions
12/07/2020 Plans 18-0251 Street & Storm Plans 2020-12-07
12/08/2020 Approved Plans Sequoia Revised Street, Storm, Sanitary and Water Plans Approved 12.8.20
12/14/2020 Email Email Approval Revisions
12/14/2020 Plans 18-0251 Sanitary Sheets
12/15/2020 Approved Plans Sequoia Residential Revised Sanitary Approved 12.15.20
02/14/2023 Plans GRADING - G1
02/14/2023 Plans 500 NE OLIVE ST GRADING SUBMITTAL
02/24/2023 Email EMAIL REJECTION WRONG PLANFEB2023
03/14/2024 Activity Document FeeWorksheet Public
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home