Planning Application Status

PL2022430




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2022430
Commerce Bank Remote ATM
Commercial Final Development Plan
Commercial Final Development Plan
Approved
12/12/2022
Locations
Contacts
Scott Ready, Phone: 8169691225  
Jeff Brocco , Address:Farnsworth Group, Phone:(314) 962-7900  
Russell Dickerson, Address:Commerce Bank, Phone:(816) 760-8371  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 05/02/2023 05/02/2023
Sue Pyles, P.E.
Miscellaneous Correction
Resolved
05/03/2023

Please submit an Engineer's Estimate of Probable Construction Costs.
DE Contact Field Eng. Inspector
Corrective Action Required
04/26/2023

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
04/26/2023

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee of $2,028.00 (which is based on 3% of the total infrastructure cost) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit.
Engineering Review Approved with Conditions 03/01/2023 03/02/2023
Sue Pyles, P.E.
Miscellaneous Correction
Corrective Action Required
03/02/2023

Please submit an Engineer's Estimate of Probable Construction Costs.
DE Contact Field Eng. Inspector
Corrective Action Required
03/02/2023

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
03/02/2023

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $xxx.xx
Planning Review No Comments 03/01/2023 03/02/2023
Hector Soto Jr.
Building Codes Review Approved with Conditions 03/01/2023 02/22/2023
Scott Ready
Miscellaneous Correction
Corrective Action Required
02/22/2023

This site has been assigned the address of 160 NW Oldham Pkwy. Please update your records and inform your client.
Traffic Review No Comments 03/01/2023 02/22/2023
Scott Ready
Fire Review No Comments 03/01/2023 02/22/2023
Scott Ready
Engineering Review Corrections 02/09/2023 02/09/2023
Sue Pyles, P.E.
Corrective Action Required
02/09/2023

Please submit an Engineer's Estimate of Probable Construction Costs.
Corrective Action Required
02/09/2023

Show location of all oil/gas wells, or indicate none are present, and cite the source.
Corrective Action Required
02/09/2023

Show and label the location and limits of the one percent annual chance flood, as set forth on the current FEMA maps, with reference to the panel number and effective date. Elevations shall be provided if shown on the FEMA map.
Corrective Action Required
02/09/2023

Please add a note stating: “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200.”
Corrective Action Required
02/09/2023

The City requires the use of CG-1 curb and gutter. Pllease include the City's standard detail.
Planning Review Corrections 02/09/2023 02/09/2023
Hector Soto Jr.
Corrective Action Required
02/09/2023

APPLICATION. - Provide a copy of the application form signed by the property owner and applicant. - Provide a completed and signed copy of the Ownership Affidavit acknowledging and granting permission for submittal of the subject application.
Corrective Action Required
02/09/2023

PHOTOMETRIC PLAN/LIGHTING. - Provide a photometric plan that complies with the required light levels cited from UDO Section 6.230 that is included on Sheet C1.1. Regarding the lighting requirements, see UDO Section 8.280.D for the specific foot-candle requirements. - In accordance with UDO Section 8.280.B, canopy light fixtures shall be recessed so that the lens cover is flush with the bottom surface of the canopy. Lights shall not be mounted on the top or sides of the canopy.
Corrective Action Required
02/09/2023

PARKING LOT DESIGN AND CIRCULATION. - The travel aisle adjacent to the proposed ATM is shown on Sheet C1.1 as measuring 22' from the face of curb on the ATM side of the aisle to an unidentified line on the other side of the aisle to the northwest. Is this unidentified line the back of curb, face of curb or does it represent the edge of pavement where it meets the curb and gutter? To meet minimum requirements for two-way traffic, the adjacent drive aisle must have 20' of pavement width (to the exclusion of curb and gutter). If a minimum of 20' of actual pavement width is maintained, the aisle can remain a two-way drive. If the minimum 20' of actual pavement width cannot be maintained, then the aisle must be a one-way aisle that will then trigger the installation of appropriate signage and pavement markings directing counter-clockwise circulation through this parking area. - The minimum ATM service drive width shall be 10' (to the exclusion of curb and gutter), meaning 14' from back-of-curb to back-of-curb.
Corrective Action Required
02/09/2023

PARKING SPACE COUNT. - General Note #21 on Sheet C1.0 states that no parking spaces will be lost due to the ATM construction. However, it appears that two spaces will be lost. Delete the note. - List the number of existing parking spaces for this parking area and the number of proposed parking spaces for this parking area.
Corrective Action Required
02/09/2023

PAVEMENT DETAIL. The asphalt pavement detail provided on Sheet C2.0 does not meet the City's minimum design standard. Refer to Table 8-5 under UDO Section 8.260 for minimum pavement design.
Corrective Action Required
02/09/2023

SIGNAGE. A separate sign permit application is required for the ATM signage. For your information over-canopy signage is limited to 6 sq. ft. Signage shown on the elevations appear to be twice the allowed sign area.
Building Codes Review Approved with Conditions 02/09/2023 02/08/2023
Joe Frogge
Miscellaneous Correction
Corrective Action Required
02/08/2023

This site has been assigned the address of 160 NW Oldham Pkwy. Please update your records and inform your client.
Traffic Review No Comments 02/09/2023 02/08/2023
Brad Cooley, P.E., RSPI
Fire Review No Comments 02/09/2023 02/07/2023
Jim Eden
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $725.00 $725.00 Paid 02/22/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
01/26/2023 Application Form Final Development Plan Application
01/26/2023 Plans COMMERCE BANK LEES SUMMIT FDP SET 1-25-23
02/09/2023 Letter Applicant Letter - FDP (DFDP)
02/22/2023 Receipt Receipt for transaction:2023-001014
02/22/2023 Plans LEES SUMMIT CIVIL CDS with 2 way aisle-C1_0 OVERALL SITE PLAN
02/22/2023 Plans LEES SUMMIT CIVIL CDS with 2 way aisle-C1_1 DETAIL SITE PLAN
02/22/2023 Plans LEES SUMMIT CIVIL CDS with 2 way aisle-C2_0 SITE DETAILS
02/22/2023 Plans proto 11 x 17 17-6 x 4-6 island with new canopy rev per dustin with new elec pedestal A-0 COVER S
02/22/2023 Plans proto 11 x 17 17-6 x 4-6 island with new canopy rev per dustin with new elec pedestal A-1 ATM PLA
02/22/2023 Plans proto 11 x 17 17-6 x 4-6 island with new canopy rev per dustin with new elec pedestal A-2 ATM DET
02/22/2023 Plans proto 11 x 17 17-6 x 4-6 island with new canopy rev per dustin with new elec pedestal A-3 ATM DET
02/22/2023 Plans proto 11 x 17 17-6 x 4-6 island with new canopy rev per dustin with new elec pedestal A-4 CANOPY
02/22/2023 Plans proto 11 x 17 17-6 x 4-6 island with new canopy rev per dustin with new elec pedestal E-1 ATM ELE
02/22/2023 Plans proto 11 x 17 17-6 x 4-6 island with new canopy rev per dustin with new elec pedestal E-2 ELEC DE
02/22/2023 Photograph proto 11 x 17 17-6 x 4-6 island with new canopy rev per dustin with new elec pedestal E-3 MILL BA
02/22/2023 Plans proto 11 x 17 17-6 x 4-6 island with new canopy rev per dustin with new elec pedestal S-0 GENERAL
02/22/2023 Plans proto 11 x 17 17-6 x 4-6 island with new canopy rev per dustin with new elec pedestal S-1 FOUNDAT
02/22/2023 Plans proto 11 x 17 17-6 x 4-6 island with new canopy rev per dustin with new elec pedestal S-2 STRUCT
02/22/2023 Plans proto 11 x 17 17-6 x 4-6 island with new canopy rev per dustin with new elec pedestal special bol
02/22/2023 Photograph proto 11 x 17 17-6 x 4-6 island with new canopy rev per dustin with new elec pedestal VOID S-3 ST
02/22/2023 Letter Applicant Letter - FDP (DFDP)0
02/22/2023 Letter DS P_R Corrections Document
02/22/2023 Plans 29095C0417G
02/22/2023 Application Form signed forms
02/22/2023 Plans LEES SUMMIT ATM PLANS 2-22-23
03/02/2023 Letter Applicant Letter - FDP (DFDP)
04/26/2023 Engineers Estimate Sign Designs Proposal - COMMERCE LEES SUMMIT ATM
04/26/2023 Engineers Estimate Zernco Proposal - Commerce Lee Summit
04/26/2023 Approved Plans Approved FDP 042623_LEES SUMMIT ATM PLANS 2-22-24
05/03/2023 Activity Document Fees PL2022430 Commerce Bank Remote ATM FDP
05/03/2023 Letter Applicant Letter - FDP (DFDP)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home